Compliance Just Got Easier: Stay ahead of regulatory changes with instant notifications on updates that matter.

FREE TRIAL UPGRADE!
Thank you for investing in EnvironmentalHazmatHuman ResourcesHuman Resources, Hazmat & Environmental related content. Click 'UPGRADE' to continue.
CANCEL
YOU'RE ALL SET!
Enjoy your limited-time access to the Compliance Network!
A confirmation welcome email has been sent to your email address from ComplianceNetwork@t.jjkellercompliancenetwork.com. Please check your spam/junk folder if you can't find it in your inbox.
YOU'RE ALL SET!
Thank you for your interest in EnvironmentalHazmatHuman ResourcesHuman Resources, Hazmat & Environmental related content.
WHOOPS!
You've reached your limit of free access, if you'd like more info, please contact us at 800-327-6868.
You'll also get exclusive access to:
Already have an account? .

OSHA just released the pre-publication version of its COVID-19 Vaccination and Testing Emergency Temporary Standard (ETS). The final rule takes effect upon publication in the Federal Register on November 5; however, covered employers must comply with:

  • Most provisions by 30 days after publication; and
  • Testing requirement by 60 days after publication.

Scope and applicability

The scope of the standard includes general industry, maritime, construction, and agriculture. Covered entities include all private employers with 100 or more employees firm- or corporate-wide.

In state-plan states, state- and local-government employers, as well as private employers, with 100 or more employees will be covered by state-plan-state rules, which must be promulgated within 30 days of the federal ETS. Note that the federal ETS preempts all state and local requirements that ban or limit the authority of employers to require vaccination, testing, or face covering.

Exemptions

Workplaces not covered by the ETS include:

  • Workplaces covered under the Safer Federal Workforce Task Force COVID-19 Workplace Safety: Guidance for Federal Contractors and subcontractors;
  • Settings where any employee provides healthcare services or healthcare support services when subject to the requirements of the Healthcare ETS (29 CFR 1910.502);
  • Workplaces of employers who have fewer than 100 employees in total firm- or company-wide; and
  • Public employers in states without state plans.

If an employer is covered by the ETS, it does not apply to:

  • Employees who do not report to a workplace where other individuals are present;
  • Employees while working from home; or
  • Employees who work exclusively outdoors.

Summary of requirements

Federal OSHA’s latest final rule will require covered employers to develop, implement, and enforce a policy requiring:

  • COVID-19 vaccination, or
  • Employees to choose to either be vaccinated or undergo regular COVID-19 testing and wear a face covering at work.

Other required elements of the rule include:

  • Determination of employee vaccination status;
  • Employer support for employee vaccination;
  • Testing of employees not fully vaccinated;
  • Employee notification of positive test and removal;
  • Face coverings of employees not fully vaccinated;
  • Providing information to employees;
  • Reporting COVID-19 fatalities/hospitalizations; and
  • Making records available.

More information

OSHA offers more information and guidance including a copy of the rule, several fact sheets, FAQs, sample policy templates, and links to materials incorporated by reference.

News update 1: On November 5, the final rule appeared in the Federal Register. Most provisions of the rule have a compliance date of December 6, and the testing requirement has a compliance date of January 4.

News update 2: On November 6, the Fifth Circuit Court of Appeals issued a temporary stay on the final rule for LA, MS, and TX. The rule is stayed for these three states pending further action by the court. The court asked the government and the petitioners to file motions on November 8 and 9, respectively.

News update 3: On November 7, Texas sent the Fifth Circuit Court of Appeals a motion to stay the ETS, and argues that the ETS exceeds the scope of OSHA’s statutory authority and violates foundational administrative law principles. On November 8, the Fifth Circuit asked the government to respond by November 10 to the Texas motion and Texas to reply by November 11.

News update 4: On November 8, attorneys for OSHA filed an opposition to the emergency stay motion with the Fifth Circuit. The attorneys argue the petitioners’ requests for relief are premature, the petitioners are unlikely to succeed on the merits, and the petitioners have not shown any employer injury outweighs the injuries to government and the public interest.

News update 5: On November 9, the petitioners filed a motion to stay enforcement pending review with the Fifth Circuit. The petitioners argue that the ETS exceeds OSHA’s statutory authority because it attempts to protect employees from employees, does not relate to the workplace, mandates a vaccine, and does not address a toxic or physically harmful substance or agent.

News update 6: On November 10, the Texas Trucking Association and others sent the Fifth Circuit a petition for review of the ETS and a motion to stay the ETS pending review. The group argues that without a stay, businesses face immediate irreparable harm, including unrecoverable compliance costs, lost profits, lost sales to competitors (with less than 100 employees), etc. Also, on November 10, attorneys for OSHA filed a supplemental opposition to the emergency stay motion with the Fifth Circuit. The attorneys argued that OSHA had authority to adopt the ETS and that the agency reasonably concluded that the standard is necessary to address a grave danger.

News update 7: On November 11, Texas filed its reply with the Fifth Circuit in support of a stay, arguing again that the ETS exceeds the scope of OSHA’s statutory authority and violates foundational administrative law principles. Also, on November 11, other documents were filed with the Fifth Circuit, including one from the American Medical Association in opposition to motions to stay the ETS.

News update 8: On November 12, the Fifth Circuit issued a 22-page opinion in Case No. 21-60845 that concludes: “The petitioners’ motion for a stay pending review is GRANTED. Enforcement of the Occupational Safety and Health Administration’s “COVID-19 Vaccination and Testing; Emergency Temporary Standard” remains STAYED pending adequate judicial review of the petitioners’ underlying motions for a permanent injunction. In addition, IT IS FURTHER ORDERED that OSHA take no steps to implement or enforce the Mandate until further court order.” Subsequently, federal OSHA said, “While OSHA remains confident in its authority to protect workers in emergencies, OSHA has suspended activities related to the implementation and enforcement of the ETS pending future developments in the litigation.”

News update 9: On November 16, attorneys for OSHA notified the United States Judicial Panel on Multidistrict Litigation that there were 34 petitions for review of the ETS in the D.C., First, Second, Third, Fourth, Fifth, Sixth, Seventh, Eighth, Ninth, Tenth, and Eleventh Circuit Courts of Appeals. The OSHA attorneys requested the Panel to consolidate the petitions. In response, on November 16 the Panel randomly selected the United States Court of Appeals for the Sixth Circuit Court in which to consolidate the petitions for review. That means the case against the OSHA ETS will be heard by the Sixth Circuit.

News update 10: The Sixth Circuit schedule indicates the court is collecting motions/responses through December 10.

News update 11: On November 29 OSHA attorneys filed a motion opposing petitions for the Sixth Circuit to hear the case with the 16-member court. The agency prefers a three-judge panel.

News update 12: On December 3 OSHA issued an extension of the ETS comment period until January 19.

News update 13: Please refer to the OSHA ETS goes to appeals court article for more updates.

Specialized Industries

Go beyond the regulations! Visit the Institute for in-depth guidance on a wide range of compliance subjects in safety and health, transportation, environment, and human resources.

J. J. Keller® COMPLIANCE NETWORK is a premier online safety and compliance community, offering members exclusive access to timely regulatory content in workplace safety (OSHA), transportation (DOT), environment (EPA), and human resources (DOL).

Interact With Our Compliance Experts

Puzzled by a regulatory question or issue? Let our renowned experts provide the answers and get your business on track to full compliance!

Upcoming Events

Reference the Compliance Network Safety Calendar to keep track of upcoming safety and compliance events. Browse by industry or search by keyword to see relevant dates and observances, including national safety months, compliance deadlines, and more.

SAFETY & COMPLIANCE NEWS

Keep up with the latest regulatory developments from OSHA, DOT, EPA, DOL, and more.

REGSENSE® REGULATORY REFERENCE

Explore a comprehensive database of word-for-word regulations on a wide range of compliance topics, with simplified explanations and best practices advice from our experts.

THE J. J. KELLER INSTITUTE

The Institute is your destination for in-depth content on 120+ compliance subjects. Discover articles, videos, and interactive exercises that will strengthen your understanding of regulatory concepts relevant to your business.

ADD HAZMAT, ENVIRONMENTAL, & HR RESOURCES

Unlock exclusive content offering expert insights into hazmat, environmental, and human resources compliance with a COMPLIANCE NETWORK EDGE membership.

DIRECT ACCESS TO COMPLIANCE EXPERTS

Struggling with a compliance challenge? Get the solution from our in-house team of experts! You can submit a question to our experts by email, set up a phone or video call, or request a detailed research report.

EVENTS

Register to attend live online events hosted by our experts. These webcasts and virtual conferences feature engaging discussions on important compliance topics in a casual, knowledge-sharing environment.

Most Recent Highlights In Environmental

2026-06-25T05:00:00Z

Hazardous waste episodic events: What to do when a bad month happens

Every generator has that month. A tank clean-out gets scheduled; a forklift punctures a tote, and suddenly you've generated way more hazardous waste than you normally would. If you're a Very Small Quantity Generator (VSQG) or Small Quantity Generator (SQG), that one bad month could technically bump you into Large Quantity Generator (LQG) status, potentially subjecting the facility to LQG requirements such as contingency planning, personnel training, and biennial reporting.

The good news is that EPA built in an escape hatch. The 2016 Generator Improvements Rule added 40 CFR Part 262, Subpart L (the "episodic event" provision), which lets you keep your normal generator category for that month, if you follow the rules in 40 CFR 262.232 exactly.

Scenario 1: The planned tank clean-out

Picture a metal finishing shop that's normally an SQG, generating about 400 kg/month of spent plating solution. They finally get around to cleaning out an old process tank that's been sitting idle for three years. That clean-out produces about 1,800 kg of sludge in one shot and enough to push them into LQG numbers for the month.

Since this is something the facility planned and scheduled for, it's a planned episodic event. Here's what the employer would need to do:

  • Notify EPA (or the delegated state agency) at least 30 calendar days before the clean-out starts, using EPA Form 8700-12. Include the start/end dates, why the event is happening, estimated waste types and quantities, and a 24-hour emergency contact.
  • Double-check the facility's EPA ID number to make sure it is current.
  • Stage the waste properly with compliant containers or tanks and labeled with the episodic event start date.
  • Get it manifested and shipped off-site within 60 calendar days of the start date.
  • Hang onto every record including the notification, manifests for 3 years after the event ends.

Scenario 2: The unplanned spill

Next, picture a packaging plant. They are a VSQG generating around 80 kg/month. They have a forklift punch a hole in a 275-gallon tote of listed solvent and by the time cleanup is done, they're looking at about 900 kg of contaminated absorbent and solvent residue. Nobody planned this. It's not part of normal operations. That makes it an unplanned episodic event. Here is what they should do:

  • They have 72 hours to notify EPA or the state by phone, email, or fax. There will be no time to fill out paperwork first.
  • Follow that up by submitting EPA Form 8700-12 after the fact, documenting what happened since you couldn't give advance notice.
  • Keep the spill cleanup waste separate from your routine waste streams and label it with the episodic start date.
  • The same 60-day shipping window and 3-year recordkeeping requirement apply here too.

The things you can't skip

Whether the event is planned or unplanned, there are a handful of conditions that apply across the board and missing any one of them could cost you the episodic event relief entirely.

  • One event per year, period. Both VSQGs and SQGs get exactly one episodic event a year unless they petition the Regional Administrator under 40 CFR 262.233 for a second. That second one must be the opposite type, so if your first was planned, the next must be unplanned.
  • The clock doesn't wait. Exactly 30 days out for planned and 72 hours for unplanned are required. Miss either window or you lose the relief entirely, meaning full LQG status kicks in for that period.
  • The 60-day shipping clock starts on day one of the event, not when you send the notification, so make sure to track it immediately.
  • Manifest the waste properly. Episodic waste can ship under the standard Subpart B manifest rules, even in the same load as your regular waste.
  • Write everything down. Three years of solid records such as dates, causes of event, quantities, and where it went is what separates a clean inspection from an enforcement headache.

Keys to remember: The episodic event provision rewards generators who plan, classify the event correctly, notify on time, ship within 60 days, and document everything for three years.

2026-06-25T05:00:00Z

Hazardous waste episodic events: What to do when a bad month happens

Every generator has that month. A tank clean-out gets scheduled; a forklift punctures a tote, and suddenly you've generated way more hazardous waste than you normally would. If you're a Very Small Quantity Generator (VSQG) or Small Quantity Generator (SQG), that one bad month could technically bump you into Large Quantity Generator (LQG) status, potentially subjecting the facility to LQG requirements such as contingency planning, personnel training, and biennial reporting.

The good news is that EPA built in an escape hatch. The 2016 Generator Improvements Rule added 40 CFR Part 262, Subpart L (the "episodic event" provision), which lets you keep your normal generator category for that month, if you follow the rules in 40 CFR 262.232 exactly.

Scenario 1: The planned tank clean-out

Picture a metal finishing shop that's normally an SQG, generating about 400 kg/month of spent plating solution. They finally get around to cleaning out an old process tank that's been sitting idle for three years. That clean-out produces about 1,800 kg of sludge in one shot and enough to push them into LQG numbers for the month.

Since this is something the facility planned and scheduled for, it's a planned episodic event. Here's what the employer would need to do:

  • Notify EPA (or the delegated state agency) at least 30 calendar days before the clean-out starts, using EPA Form 8700-12. Include the start/end dates, why the event is happening, estimated waste types and quantities, and a 24-hour emergency contact.
  • Double-check the facility's EPA ID number to make sure it is current.
  • Stage the waste properly with compliant containers or tanks and labeled with the episodic event start date.
  • Get it manifested and shipped off-site within 60 calendar days of the start date.
  • Hang onto every record including the notification, manifests for 3 years after the event ends.

Scenario 2: The unplanned spill

Next, picture a packaging plant. They are a VSQG generating around 80 kg/month. They have a forklift punch a hole in a 275-gallon tote of listed solvent and by the time cleanup is done, they're looking at about 900 kg of contaminated absorbent and solvent residue. Nobody planned this. It's not part of normal operations. That makes it an unplanned episodic event. Here is what they should do:

  • They have 72 hours to notify EPA or the state by phone, email, or fax. There will be no time to fill out paperwork first.
  • Follow that up by submitting EPA Form 8700-12 after the fact, documenting what happened since you couldn't give advance notice.
  • Keep the spill cleanup waste separate from your routine waste streams and label it with the episodic start date.
  • The same 60-day shipping window and 3-year recordkeeping requirement apply here too.

The things you can't skip

Whether the event is planned or unplanned, there are a handful of conditions that apply across the board and missing any one of them could cost you the episodic event relief entirely.

  • One event per year, period. Both VSQGs and SQGs get exactly one episodic event a year unless they petition the Regional Administrator under 40 CFR 262.233 for a second. That second one must be the opposite type, so if your first was planned, the next must be unplanned.
  • The clock doesn't wait. Exactly 30 days out for planned and 72 hours for unplanned are required. Miss either window or you lose the relief entirely, meaning full LQG status kicks in for that period.
  • The 60-day shipping clock starts on day one of the event, not when you send the notification, so make sure to track it immediately.
  • Manifest the waste properly. Episodic waste can ship under the standard Subpart B manifest rules, even in the same load as your regular waste.
  • Write everything down. Three years of solid records such as dates, causes of event, quantities, and where it went is what separates a clean inspection from an enforcement headache.

Keys to remember: The episodic event provision rewards generators who plan, classify the event correctly, notify on time, ship within 60 days, and document everything for three years.

2026-06-24T05:00:00Z

Indiana adds permanent underground carbon dioxide storage rules

Effective date: June 10, 2026

This applies to: Entities that seek to participate in carbon sequestration projects

Description of change: The Natural Resources Commission adopted rules for permanent underground carbon dioxide storage, establishing:

  • The rules for entities seeking to petition the Indiana Department of Natural Resources to issue involuntary integration orders for pore spaces, and
  • The rules for storage operators seeking to apply for certificates of project completion.

These regulations add options for entities; the requirements apply only if the options are utilized.

The rules impact entities seeking to participate in carbon sequestration projects. The regulations also affect pore space owners and surface owners.

2026-06-24T05:00:00Z

Virginia reinstates power plant CO2 budget program

Effective date: April 24, 2026

This applies to: Power plant owners

Description of change: The Virginia Department of Environmental Quality reinstated the Virginia CO2 Budget Trading Program Regulation, which implements the Regional Greenhouse Gas Initiative (RGGI). Participation in the RGGI was stopped in 2023, but the state will resume participation on July 1, 2026, the same date on which the compliance requirements take effect.

The regulation requires fossil fuel-fired units that serve an electricity generator with a capacity of 25 megawatts or more to obtain enough allowances to cover CO2 emissions, which they can purchase in the September and December RGGI auctions.

The department also adopted amendments to the regulations, including establishing a one-time 6-month control period from July 1, 2026, to December 31, 2026.

Related state info: Clean air operating permits state comparison

2026-06-24T05:00:00Z

New Hampshire updates sludge management rules

Effective date: May 15, 2026

This applies to: Owners and operators of drinking water and wastewater treatment plants that generate sludge; land application sites; and facilities that treat, manage, or dispose of sludge

Description of change: The New Hampshire Department of Environmental Services amended sludge management rules. Major changes include:

  • Reinstating 5-year site and facility permit renewals (instead of 10 years),
  • Adding annual reporting requirements for sludge haulers (which already apply to septage haulers), and
  • Requiring all applications to be submitted electronically.

The rule also codifies per- and polyfluoroalkyl substances (PFAS) sampling (implemented in 2019 for the sludge quality certificate program).

See More

Most Recent Highlights In Transportation

2026-06-24T05:00:00Z

New Jersey adopts permanent remediation standards for PFAS

Effective date: June 15, 2026

This applies to: Contaminated sites subject to the remediation regulations for contaminated groundwater, soil, and soil leachate

Description of change: The New Jersey Department of Environmental Protection (NJDEP) formally adopted its interim remediation standards for specific per- and polyfluoroalkyl substances (PFAS), including:

  • Groundwater quality standards for hexafluoropropylene oxide dimer acid and its ammonium salt (GenX chemicals); and
  • Soil and soil leachate remediation standards for:
    • Perfluorononanoic acid (PFNA);
    • Perfluorooctane sulfonate (PFOS);
    • Perfluorooctanoic acid (PFOA);
    • GenX chemicals; and
    • Methanol.

The interim standards have been in place since 2022 and 2023, requiring regulated entities to conduct remediation to ensure these PFAS are cleaned up.

Additionally, the NJDEP amended the technical requirements to mandate analyses of the following chemicals in all media when contaminants are unknown or not well documented at a contaminated site:

  • PFNA,
  • PFOS,
  • PFOA,
  • GenX chemicals, and
  • 2,3,7,8-tetrachlorodibenzo-p-dioxin.
2026-06-24T05:00:00Z

Indiana adds permanent underground carbon dioxide storage rules

Effective date: June 10, 2026

This applies to: Entities that seek to participate in carbon sequestration projects

Description of change: The Natural Resources Commission adopted rules for permanent underground carbon dioxide storage, establishing:

  • The applicability of carbon sequestration projects, and
  • The rules for the Department of Natural Resources issuing involuntary integration orders and certificates of project completion.

The rules impact entities seeking to participate in carbon sequestration projects under IC 14-39. The regulations also affect pore space owners and surface owners.

2026-06-24T05:00:00Z

Nevada adds requirements for hazardous waste recyclers

Effective date: June 8, 2026

This applies to: Hazardous waste recyclers

Description of change: The State Environmental Commission adopted regulations to add requirements for entities that recycle certain hazardous waste, including compliance with:

  • Certain federal requirements;
  • Local zoning requirements, if applicable;
  • Specific reporting and notification requirements; and
  • Other particular regulations of the commission.

The rules also:

  • Exempt owners and operators of certain facilities that recycle certain hazardous materials without storing those materials before they’re recycled from the above requirements, and
  • Add fees for written determinations (required to construct or operate a facility or mobile unit for hazardous waste recycling) and for the facilities that recycle certain hazardous materials without storing those materials before they’re recycled.
2026-06-24T05:00:00Z

Virginia reinstates power plant CO2 budget program

Effective date: April 24, 2026

This applies to: Power plant owners

Description of change: The Virginia Department of Environmental Quality reinstated the Virginia CO2 Budget Trading Program Regulation, which implements the Regional Greenhouse Gas Initiative (RGGI). Participation in the RGGI was stopped in 2023, but the state will resume participation on July 1, 2026, the same date on which the compliance requirements take effect.

The regulation requires fossil fuel-fired units that serve an electricity generator with a capacity of 25 megawatts or more to obtain enough allowances to cover CO2 emissions, which they can purchase in the September and December RGGI auctions.

The department also adopted amendments to the regulations, including establishing a one-time 6-month control period from July 1, 2026, to December 31, 2026.

Related state info: Clean air operating permits state comparison

2026-06-24T05:00:00Z

New Hampshire updates sludge management rules

Effective date: May 15, 2026

This applies to: Owners and operators of drinking water and wastewater treatment plants that generate sludge; land application sites; and facilities that treat, manage, or dispose of sludge

Description of change: The New Hampshire Department of Environmental Services amended sludge management rules. Major changes include:

  • Reinstating 5-year site and facility permit renewals (instead of 10 years),
  • Adding annual reporting requirements for sludge haulers (which already apply to septage haulers), and
  • Requiring all applications to be submitted electronically.

The rule also codifies per- and polyfluoroalkyl substances (PFAS) sampling (implemented in 2019 for the sludge quality certificate program).

See More

Most Recent Highlights In Safety & Health

2026-06-24T05:00:00Z

New Jersey adopts permanent remediation standards for PFAS

Effective date: June 15, 2026

This applies to: Contaminated sites subject to the remediation regulations for contaminated groundwater, soil, and soil leachate

Description of change: The New Jersey Department of Environmental Protection (NJDEP) formally adopted its interim remediation standards for specific per- and polyfluoroalkyl substances (PFAS), including:

  • Groundwater quality standards for hexafluoropropylene oxide dimer acid and its ammonium salt (GenX chemicals); and
  • Soil and soil leachate remediation standards for:
    • Perfluorononanoic acid (PFNA);
    • Perfluorooctane sulfonate (PFOS);
    • Perfluorooctanoic acid (PFOA);
    • GenX chemicals; and
    • Methanol.

The interim standards have been in place since 2022 and 2023, requiring regulated entities to conduct remediation to ensure these PFAS are cleaned up.

Additionally, the NJDEP amended the technical requirements to mandate analyses of the following chemicals in all media when contaminants are unknown or not well documented at a contaminated site:

  • PFNA,
  • PFOS,
  • PFOA,
  • GenX chemicals, and
  • 2,3,7,8-tetrachlorodibenzo-p-dioxin.
2026-06-24T05:00:00Z

Nevada adds requirements for hazardous waste recyclers

Effective date: June 8, 2026

This applies to: Hazardous waste recyclers

Description of change: The State Environmental Commission adopted regulations to add requirements for entities that recycle certain hazardous waste, including compliance with:

  • Certain federal requirements;
  • Local zoning requirements, if applicable;
  • Specific reporting and notification requirements; and
  • Other particular regulations of the commission.

The rules also:

  • Exempt owners and operators of certain facilities that recycle certain hazardous materials without storing those materials before they’re recycled from the above requirements, and
  • Add fees for written determinations (required to construct or operate a facility or mobile unit for hazardous waste recycling) and for the facilities that recycle certain hazardous materials without storing those materials before they’re recycled.
2026-06-24T05:00:00Z

Virginia reinstates power plant CO2 budget program

Effective date: April 24, 2026

This applies to: Power plant owners

Description of change: The Virginia Department of Environmental Quality reinstated the Virginia CO2 Budget Trading Program Regulation, which implements the Regional Greenhouse Gas Initiative (RGGI). Participation in the RGGI was stopped in 2023, but the state will resume participation on July 1, 2026, the same date on which the compliance requirements take effect.

The regulation requires fossil fuel-fired units that serve an electricity generator with a capacity of 25 megawatts or more to obtain enough allowances to cover CO2 emissions, which they can purchase in the September and December RGGI auctions.

The department also adopted amendments to the regulations, including establishing a one-time 6-month control period from July 1, 2026, to December 31, 2026.

Related state info: Clean air operating permits state comparison

2026-06-24T05:00:00Z

New Hampshire updates sludge management rules

Effective date: May 15, 2026

This applies to: Owners and operators of drinking water and wastewater treatment plants that generate sludge; land application sites; and facilities that treat, manage, or dispose of sludge

Description of change: The New Hampshire Department of Environmental Services amended sludge management rules. Major changes include:

  • Reinstating 5-year site and facility permit renewals (instead of 10 years),
  • Adding annual reporting requirements for sludge haulers (which already apply to septage haulers), and
  • Requiring all applications to be submitted electronically.

The rule also codifies per- and polyfluoroalkyl substances (PFAS) sampling (implemented in 2019 for the sludge quality certificate program).

2026-06-24T05:00:00Z

New Jersey adopts permanent remediation standards for PFAS

Effective date: June 15, 2026

This applies to: Contaminated sites subject to the remediation regulations for contaminated groundwater, soil, and soil leachate

Description of change: The New Jersey Department of Environmental Protection (NJDEP) formally adopted its interim remediation standards for specific per- and polyfluoroalkyl substances (PFAS), including:

  • Groundwater quality standards for hexafluoropropylene oxide dimer acid and its ammonium salt (GenX chemicals); and
  • Soil and soil leachate remediation standards for:
    • Perfluorononanoic acid (PFNA);
    • Perfluorooctane sulfonate (PFOS);
    • Perfluorooctanoic acid (PFOA);
    • GenX chemicals; and
    • Methanol.

The interim standards have been in place since 2022 and 2023, requiring regulated entities to conduct remediation to ensure these PFAS are cleaned up.

Additionally, the NJDEP amended the technical requirements to mandate analyses of the following chemicals in all media when contaminants are unknown or not well documented at a contaminated site:

  • PFNA,
  • PFOS,
  • PFOA,
  • GenX chemicals, and
  • 2,3,7,8-tetrachlorodibenzo-p-dioxin.
See More

Most Recent Highlights In Human Resources

2026-06-24T05:00:00Z

Nevada adds requirements for hazardous waste recyclers

Effective date: June 8, 2026

This applies to: Hazardous waste recyclers

Description of change: The State Environmental Commission adopted regulations to add requirements for entities that recycle certain hazardous waste, including compliance with:

  • Certain federal requirements;
  • Local zoning requirements, if applicable;
  • Specific reporting and notification requirements; and
  • Other particular regulations of the commission.

The rules also:

  • Exempt owners and operators of certain facilities that recycle certain hazardous materials without storing those materials before they’re recycled from the above requirements, and
  • Add fees for written determinations (required to construct or operate a facility or mobile unit for hazardous waste recycling) and for the facilities that recycle certain hazardous materials without storing those materials before they’re recycled.
2026-06-24T05:00:00Z

Virginia reinstates power plant CO2 budget program

Effective date: April 24, 2026

This applies to: Power plant owners

Description of change: The Virginia Department of Environmental Quality reinstated the Virginia CO2 Budget Trading Program Regulation, which implements the Regional Greenhouse Gas Initiative (RGGI). Participation in the RGGI was stopped in 2023, but the state will resume participation on July 1, 2026, the same date on which the compliance requirements take effect.

The regulation requires fossil fuel-fired units that serve an electricity generator with a capacity of 25 megawatts or more to obtain enough allowances to cover CO2 emissions, which they can purchase in the September and December RGGI auctions.

The department also adopted amendments to the regulations, including establishing a one-time 6-month control period from July 1, 2026, to December 31, 2026.

Related state info: Clean air operating permits state comparison

2026-06-24T05:00:00Z

North Carolina approved revisions to wastewater discharge rules

Effective date: May 1, 2026

This applies to: Facilities with domestic wastewater discharges up to 2 million gallons per day

Description of change: The North Carolina Department of Environmental Quality (DEQ) adopted a rule that adds a permitting option to the National Pollutant Discharge Elimination System (NPDES) program for facilities with domestic wastewater discharges of up to 2 million gallons per day.

DEQ removed the ban on new or expanded discharges of oxygen-consuming waste when the 7Q10 and 30Q2 flows are both 0 for these facilities. In other words, it allows systems to discharge domestic wastewater to zero-flow receiving streams, provided the system:

  • Meets qualifying criteria,
  • Complies with specific effluent limits, and
  • Uses low-energy methods before discharging wastewater to the receiving stream.

It’ll likely benefit areas where the cost of piping to a higher-flowing stream farther away is prohibitive.

2026-06-24T05:00:00Z

New Hampshire updates sludge management rules

Effective date: May 15, 2026

This applies to: Owners and operators of drinking water and wastewater treatment plants that generate sludge; land application sites; and facilities that treat, manage, or dispose of sludge

Description of change: The New Hampshire Department of Environmental Services amended sludge management rules. Major changes include:

  • Reinstating 5-year site and facility permit renewals (instead of 10 years),
  • Adding annual reporting requirements for sludge haulers (which already apply to septage haulers), and
  • Requiring all applications to be submitted electronically.

The rule also codifies per- and polyfluoroalkyl substances (PFAS) sampling (implemented in 2019 for the sludge quality certificate program).

2026-06-24T05:00:00Z

New Jersey adopts permanent remediation standards for PFAS

Effective date: June 15, 2026

This applies to: Contaminated sites subject to the remediation regulations for contaminated groundwater, soil, and soil leachate

Description of change: The New Jersey Department of Environmental Protection (NJDEP) formally adopted its interim remediation standards for specific per- and polyfluoroalkyl substances (PFAS), including:

  • Groundwater quality standards for hexafluoropropylene oxide dimer acid and its ammonium salt (GenX chemicals); and
  • Soil and soil leachate remediation standards for:
    • Perfluorononanoic acid (PFNA);
    • Perfluorooctane sulfonate (PFOS);
    • Perfluorooctanoic acid (PFOA);
    • GenX chemicals; and
    • Methanol.

The interim standards have been in place since 2022 and 2023, requiring regulated entities to conduct remediation to ensure these PFAS are cleaned up.

Additionally, the NJDEP amended the technical requirements to mandate analyses of the following chemicals in all media when contaminants are unknown or not well documented at a contaminated site:

  • PFNA,
  • PFOS,
  • PFOA,
  • GenX chemicals, and
  • 2,3,7,8-tetrachlorodibenzo-p-dioxin.
See More
New Network Poll
What's your opinion on using Performance Improvement Plans (PIPs) as an employee performance management tool?

What's your opinion on using Performance Improvement Plans (PIPs) as an employee performance management tool?

No active poll
Please come back soon!
See More
See More
See More
See More
Saved to my EVENT CALENDAR!
View your saved links by clicking the arrow next to your profile picture located in the header. Then, click “My Activity” to view the Event Calendar on your Activity page.