Be Part of the Ultimate Safety & Compliance Community
Trending news, knowledge-building content, and more – all personalized to you!
§257.52 Applicability of other regulations.
§257.60 Placement above the uppermost aquifer.
§257.70 Design criteria for new CCR landfills and any lateral expansion of a CCR landfill.
§257.71 Liner design criteria for existing CCR surface impoundments.
§257.73 Structural integrity criteria for existing CCR surface impoundments.
§257.81 Run-on and run-off controls for CCR landfills.
§257.82 Hydrologic and hydraulic capacity requirements for CCR surface impoundments.
§257.83 Inspection requirements for CCR surface impoundments.
§257.84 Inspection requirements for CCR landfills.
§257.91 Groundwater monitoring systems.
§257.92 [Reserved]
§257.93 Groundwater sampling and analysis requirements.
§257.94 Detection monitoring program.
§257.95 Assessment monitoring program.
§257.96 Assessment of corrective measures.
§257.98 Implementation of the corrective action program.
§257.100 Inactive CCR surface impoundments.
§257.101 Closure or retrofit of CCR units.
§257.102 Criteria for conducting the closure or retrofit of CCR units.
§257.103 Alternative closure requirements.
§257.104 Post-closure care requirements.
§257.105 Recordkeeping requirements.
§257.106 Notification requirements.
§257.107 Publicly accessible internet site requirements.
[80 FR 21468, April 17, 2015]