FREE TRIAL UPGRADE!
Thank you for investing in EnvironmentalHazmatHuman ResourcesHuman Resources, Hazmat & Environmental related content. Click 'UPGRADE' to continue.
CANCEL
YOU'RE ALL SET!
Enjoy your limited-time access to the Compliance Network!
A confirmation welcome email has been sent to your email address from ComplianceNetwork@t.jjkellercompliancenetwork.com. Please check your spam/junk folder if you can't find it in your inbox.
YOU'RE ALL SET!
Thank you for your interest in EnvironmentalHazmatHuman ResourcesHuman Resources, Hazmat & Environmental related content.
WHOOPS!
You've reached your limit of free access, if you'd like more info, please contact us at 800-327-6868.
You'll also get exclusive access to:
Already have an account? .

EPA Final Rule: National Emission Standards for Hazardous Air Pollutants: Ethylene Production, Miscellaneous Organic Chemical Manufacturing, Organic Liquids Distribution (Non-Gasoline), and Petroleum Refineries Reconsideration

2024-04-04T05:00:00Z

On July 6, 2020, the U.S. Environmental Protection Agency (EPA or the Agency) finalized the residual risk and technology review (RTR) conducted for the Ethylene Production source category, which is part of the Generic Maximum Achievable Control Technology Standards National Emission Standards for Hazardous Air Pollutants (NESHAP); on July 7, 2020, the EPA finalized the RTR conducted for the Organic Liquids Distribution (Non-Gasoline) NESHAP; and on August 12, 2020, the EPA finalized the RTR conducted for the Miscellaneous Organic Chemical Manufacturing NESHAP. Amendments to the Petroleum Refinery Sector NESHAP were most recently finalized on February 4, 2020. Subsequently, the EPA received and granted various petitions for reconsideration on these NESHAP for, among other things, the provisions related to the work practice standards for pressure relief devices (PRDs), emergency flaring, and degassing of floating roof storage vessels. This action finalizes proposed amendments to remove the force majeure exemption for PRDs and emergency flaring, incorporate clarifications for the degassing requirements for floating roof storage vessels, and address other corrections and clarifications.

DATES: This final action is effective on April 4, 2024, published in the Federal Register April 4, 2024, page 23840.

View final rule.

§63.641 Definitions.
Definition of “Flare”RevisedView text
§63.643 Miscellaneous process vent provisions.
(c)(1)-(2)RevisedView text
§63.648 Equipment leak standards.
(j)(3)(iv), (j)(3)(v)(B) and (C), (j)(6) introductory text, and (j)(6)(ii)RevisedView text
§63.655 Reporting and recordkeeping requirements.
(g)RevisedView text
(i)(9)-(12)RevisedView text
§63.670 Requirements for flare control devices.
(b), (d) introductory text, (e), (l)(5) introductory text, (o)(4)(iv), (o)(6), (o)(7)(ii) through (o)(7)(v)RevisedView text
(d)(3)AddedView text
§63.671 Requirements for flare monitoring systems.
(e) introductory textRevisedView text
(e)(4), (f)AddedView text
Appendix to Subpart CC of Part 63—Tables
Table 13RevisedView text
§63.1100 Applicability.
(b), (g)(7)(iii)RevisedView text
§63.1102 Compliance schedule.
(c)(11), (d)(2)(ii), (e)(2)(iii)RevisedView text
§63.1103 Source category-specific applicability, definitions, and requirements.
(e)RevisedView text
§63.1107 Equipment leaks.
(h)(3)(iv), (h)(3)(v)(B) and (C), (h)(6) introductory text, and (h)(6)(ii)RevisedView text
§63.1109 Recordkeeping requirements.
(f)(2), (3), and (5), and (i)(2)RevisedView text
§63.1110 Reporting requirements.
(a)(10), (e)(4)(iii), (e)(4)(iv)(A) and (B), (e)(5)(iii), and (e)(8)(iii)RevisedView text
§63.2346 What emission limitations, operating limits, and work practice standards must I meet?
(a)(6) introductory text, (e)RevisedView text
(a)(6)(iv)AddedView text
§63.2378 How do I demonstrate continuous compliance with the emission limitations, operating limits, and work practice standards?
(e)RevisedView text
§63.2382 What notifications must I submit and when and what information should be submitted?
(d)RevisedView text
§63.2386 What reports must I submit and when and what information is to be submitted in each?
(f), (g), and (h)RevisedView text
(i)-(j)RemovedView text
§63.2406 What definitions apply to this subpart?
Definition of ”Force majeure event”RemovedView text
Table 12 to Subpart EEEE of Part 63—Applicability of General Provisions to Subpart EEEE
“63.9(k)”AddedView text
”63.7(a)(4)”“63.9(k)”RevisedView text
§63.2450 What are my general requirements for complying with this subpart?
(e)(1), (e)(5)(iv), (e)(5)(viii)(B), (e)(6)(i), (e)(7) introductory text, (v)(1)(i), (v)(1)(ii), and (v)(2)RevisedView text
§63.2460 What requirements must I meet for batch process vents?
(c)(9) introductory textView text
§63.2470 What requirements must I meet for storage tanks?
(f)RevisedView text
§63.2480 What requirements must I meet for equipment leaks?
(a), (e)(2)(ii), (e)(2)(iii), (e)(3)(iv), (e)(3)(v)(B), (e)(3)(v)(C), (e)(6)(ii), (f)(18)(iii), (f)(18)(vi), (f)(18)(x), and (f)(18)(xiii)RevisedView text
§63.2490 What requirements must I meet for heat exchange systems?
(a), (d) introductory text, and (d)(4)(iii) introductory text;RevisedView text
(e)AddedView text
§63.2492 How do I determine whether my process vent, storage tank, or equipment is in ethylene oxide service?
(b)RevisedView text
§63.2493 What requirements must I meet for process vents, storage tanks, or equipment that are in ethylene oxide service?
(a)(2)(vi) introductory text, (a)(2)(vi)(C), (a)(2)(viii), (b)(2), (b)(4) introductory text, (b)(4)(iv), (b)(6), (d)(1)(iii), (d)(2)(iii), (d)(3), (d)(4)(v), and (e) introductory textRevisedView text
§63.2515 What notifications must I submit and when?
(d)RevisedView text
§63.2520 What reports must I submit and when?
(d) introductory text, (e) introductory text, (e)(2), (e)(14)(iii), (e)(16), (f) and (g)RevisedView text
(d)(6)AddedView text
(h)-(i)RemovedView text
§63.2525 What records must I keep?
(o), (p)(2), (p)(3), (p)(5), (q)(2), (r)(1), (r)(4)(iv) introductory text, (r)(4)(iv)(B) and (r)(4)(iv)(C)RevisedView text
(r)(4)(iv)(D)AddedView text
§63.2550 What definitions apply to this subpart?
“In ethylene oxide service’”RevisedView text
Table 10 to Subpart FFFF of Part 63—Work Practice Standards for Heat Exchange Systems
Entire tableRevisedView text
Table 12 to Subpart FFFF of Part 63—Applicability of General Provisions to Subpart FFFF
Entry ”63.9(k)”RevisedView text

Previous Text

§63.641 Definitions.

* * * *

Flare means a combustion device lacking an enclosed combustion chamber that uses an uncontrolled volume of ambient air to burn gases. For the purposes of this rule, the definition of flare includes, but is not necessarily limited to, air-assisted flares, steam-assisted flares and non-assisted flares.

§63.643 Miscellaneous process vent provisions.

* * * *

(c)(1) Prior to venting to the atmosphere, process liquids are removed from the equipment as much as practical and the equipment is depressured to a control device meeting requirements in paragraphs (a)(1) or (2) of this section, a fuel gas system, or back to the process until one of the following conditions, as applicable, is met.

(i) The vapor in the equipment served by the maintenance vent has a lower explosive limit (LEL) of less than 10 percent.

(ii) If there is no ability to measure the LEL of the vapor in the equipment based on the design of the equipment, the pressure in the equipment served by the maintenance vent is reduced to 5 pounds per square inch gauge (psig) or less. Upon opening the maintenance vent, active purging of the equipment cannot be used until the LEL of the vapors in the maintenance vent (or inside the equipment if the maintenance is a hatch or similar type of opening) is less than 10 percent.

(iii) The equipment served by the maintenance vent contains less than 72 pounds of total volatile organic compounds (VOC).

(iv) If the maintenance vent is associated with equipment containing pyrophoric catalyst (e.g., hydrotreaters and hydrocrackers) and a pure hydrogen supply is not available at the equipment at the time of the startup, shutdown, maintenance, or inspection activity, the LEL of the vapor in the equipment must be less than 20 percent, except for one event per year not to exceed 35 percent.

(v) If, after applying best practices to isolate and purge equipment served by a maintenance vent, none of the applicable criterion in paragraphs (c)(1)(i) through (iv) of this section can be met prior to installing or removing a blind flange or similar equipment blind, the pressure in the equipment served by the maintenance vent is reduced to 2 psig or less. Active purging of the equipment may be used provided the equipment pressure at the location where purge gas is introduced remains at 2 psig or less.

(c)(2) Except for maintenance vents complying with the alternative in paragraph (c)(1)(iii) of this section, the owner or operator must determine the LEL or, if applicable, equipment pressure using process instrumentation or portable measurement devices and follow procedures for calibration and maintenance according to manufacturer's specifications.

§63.648 Equipment leak standards.

* * * *

(j)(3)(iv) The owner or operator shall determine the total number of release events occurred during the calendar year for each affected pressure relief device separately. The owner or operator shall also determine the total number of release events for each pressure relief device for which the root cause analysis concluded that the root cause was a force majeure event, as defined in this subpart.

* * * *

(j)(3)(v)(B) A second release event not including force majeure events from a single pressure relief device in a 3 calendar year period for the same root cause for the same equipment.

(j)(3)(v)(C) A third release event not including force majeure events from a single pressure relief device in a 3 calendar year period for any reason.

* * * *

(j)(6) Root cause analysis and corrective action analysis. A root cause analysis and corrective action analysis must be completed as soon as possible, but no later than 45 days after a release event. Special circumstances affecting the number of root cause analyses and/or corrective action analyses are provided in paragraphs (j)(6)(i) through (iv) of this section.

* * * *

(j)(6)(ii) You may conduct a single root cause analysis and corrective action analysis for a single emergency event that causes two or more pressure relief devices to release, regardless of the equipment served, if the root cause is reasonably expected to be a force majeure event, as defined in this subpart.

§63.655 Reporting and recordkeeping requirements.

* * * *

(g) The owner or operator of a source subject to this subpart shall submit Periodic Reports no later than 60 days after the end of each 6-month period when any of the information specified in paragraphs (g)(1) through (7) of this section or paragraphs (g)(9) through (14) of this section is collected. The first 6-month period shall begin on the date the Notification of Compliance Status report is required to be submitted. A Periodic Report is not required if none of the events identified in paragraphs (g)(1) through (7) of this section or paragraphs (g)(9) through (14) of this section occurred during the 6-month period unless emissions averaging is utilized. Quarterly reports must be submitted for emission points included in emission averages, as provided in paragraph (g)(8) of this section. An owner or operator may submit reports required by other regulations in place of or as part of the Periodic Report required by this paragraph (g) if the reports contain the information required by paragraphs (g)(1) through (14) of this section.

(1) For storage vessels, Periodic Reports shall include the information specified for Periodic Reports in paragraphs (g)(2) through (5) of this section. Information related to gaskets, slotted membranes, and sleeve seals is not required for storage vessels that are part of an existing source complying with §63.646.

(2) Internal floating roofs.(i) An owner or operator who elects to comply with §63.646 by using a fixed roof and an internal floating roof or by using an external floating roof converted to an internal floating roof shall submit the results of each inspection conducted in accordance with §63.120(a) of subpart G in which a failure is detected in the control equipment.

(A) For vessels for which annual inspections are required under §63.120(a)(2)(i) or (a)(3)(ii) of subpart G, the specifications and requirements listed in paragraphs (g)(2)(i)(A)(1) through (3) of this section apply.

(1) A failure is defined as any time in which the internal floating roof is not resting on the surface of the liquid inside the storage vessel and is not resting on the leg supports; or there is liquid on the floating roof; or the seal is detached from the internal floating roof; or there are holes, tears, or other openings in the seal or seal fabric; or there are visible gaps between the seal and the wall of the storage vessel.

(2) Except as provided in paragraph (g)(2)(i)(A)(3) of this section, each Periodic Report shall include the date of the inspection, identification of each storage vessel in which a failure was detected, and a description of the failure. The Periodic Report shall also describe the nature of and date the repair was made or the date the storage vessel was emptied.

(3) If an extension is utilized in accordance with §63.120(a)(4) of subpart G, the owner or operator shall, in the next Periodic Report, identify the vessel; include the documentation specified in §63.120(a)(4) of subpart G; and describe the date the storage vessel was emptied and the nature of and date the repair was made.

(B) For vessels for which inspections are required under §63.120(a)(2)(ii), (a)(3)(i), or (a)(3)(iii) of subpart G (i.e., internal inspections), the specifications and requirements listed in paragraphs (g)(2)(i)(B)(1) and (2) of this section apply.

(1) A failure is defined as any time in which the internal floating roof has defects; or the primary seal has holes, tears, or other openings in the seal or the seal fabric; or the secondary seal (if one has been installed) has holes, tears, or other openings in the seal or the seal fabric; or, for a storage vessel that is part of a new source, the gaskets no longer close off the liquid surface from the atmosphere; or, for a storage vessel that is part of a new source, the slotted membrane has more than a 10 percent open area.

(2) Each Periodic Report shall include the date of the inspection, identification of each storage vessel in which a failure was detected, and a description of the failure. The Periodic Report shall also describe the nature of and date the repair was made.

(ii) An owner or operator who elects to comply with §63.660 by using a fixed roof and an internal floating roof shall submit the results of each inspection conducted in accordance with §63.1063(c)(1), (d)(1), and (d)(2) of subpart WW in which a failure is detected in the control equipment. For vessels for which inspections are required under §63.1063(c) and (d), the specifications and requirements listed in paragraphs (g)(2)(ii)(A) through (C) of this section apply.

(A) A failure is defined in §63.1063(d)(1) of subpart WW.

(B) Each Periodic Report shall include a copy of the inspection record required by §63.1065(b) of subpart WW when a failure occurs.

(C) An owner or operator who elects to use an extension in accordance with §63.1063(e)(2) of subpart WW shall, in the next Periodic Report, submit the documentation required by §63.1063(e)(2).

(3) External floating roofs.(i) An owner or operator who elects to comply with §63.646 by using an external floating roof shall meet the periodic reporting requirements specified in paragraphs (g)(3)(i)(A) through (C) of this section.

(A) The owner or operator shall submit, as part of the Periodic Report, documentation of the results of each seal gap measurement made in accordance with §63.120(b) of subpart G in which the seal and seal gap requirements of §63.120(b)(3), (4), (5), or (6) of subpart G are not met. This documentation shall include the information specified in paragraphs (g)(3)(i)(A)(1) through (4) of this section.

(1) The date of the seal gap measurement.

(2) The raw data obtained in the seal gap measurement and the calculations described in §63.120(b)(3) and (4) of subpart G.

(3) A description of any seal condition specified in §63.120(b)(5) or (6) of subpart G that is not met.

(4) A description of the nature of and date the repair was made, or the date the storage vessel was emptied.

(B) If an extension is utilized in accordance with §63.120(b)(7)(ii) or (b)(8) of subpart G, the owner or operator shall, in the next Periodic Report, identify the vessel; include the documentation specified in §63.120(b)(7)(ii) or (b)(8) of subpart G, as applicable; and describe the date the vessel was emptied and the nature of and date the repair was made.

(C) The owner or operator shall submit, as part of the Periodic Report, documentation of any failures that are identified during visual inspections required by §63.120(b)(10) of subpart G. This documentation shall meet the specifications and requirements in paragraphs (g)(3)(i)(C)(1) and (2) of this section.

(1) A failure is defined as any time in which the external floating roof has defects; or the primary seal has holes or other openings in the seal or the seal fabric; or the secondary seal has holes, tears, or other openings in the seal or the seal fabric; or, for a storage vessel that is part of a new source, the gaskets no longer close off the liquid surface from the atmosphere; or, for a storage vessel that is part of a new source, the slotted membrane has more than 10 percent open area.

(2) Each Periodic Report shall include the date of the inspection, identification of each storage vessel in which a failure was detected, and a description of the failure. The Periodic Report shall also describe the nature of and date the repair was made.

(ii) An owner or operator who elects to comply with §63.660 by using an external floating roof shall meet the periodic reporting requirements specified in paragraphs (g)(3)(ii)(A) and (B) of this section.

(A) For vessels for which inspections are required under §63.1063(c)(2), (d)(1), and (d)(3) of subpart WW, the owner or operator shall submit, as part of the Periodic Report, a copy of the inspection record required by §63.1065(b) of subpart WW when a failure occurs. A failure is defined in §63.1063(d)(1).

(B) An owner or operator who elects to use an extension in accordance with §63.1063(e)(2) or (c)(2)(iv)(B) of subpart WW shall, in the next Periodic Report, submit the documentation required by those paragraphs.

(4) [Reserved]

(5) An owner or operator who elects to comply with §63.646 or §63.660 by installing a closed vent system and control device shall submit, as part of the next Periodic Report, the information specified in paragraphs (g)(5)(i) through (v) of this section, as applicable.

(i) The Periodic Report shall include the information specified in paragraphs (g)(5)(i)(A) and (B) of this section for those planned routine maintenance operations that would require the control device not to meet the requirements of either §63.119(e)(1) or (2) of subpart G, §63.985(a) and (b) of subpart SS or §63.670, as applicable.

(A) A description of the planned routine maintenance that is anticipated to be performed for the control device during the next 6 months. This description shall include the type of maintenance necessary, planned frequency of maintenance, and lengths of maintenance periods.

(B) A description of the planned routine maintenance that was performed for the control device during the previous 6 months. This description shall include the type of maintenance performed and the total number of hours during those 6 months that the control device did not meet the requirements of either §63.119(e)(1) or (2) of subpart G, §63.985(a) and (b) of subpart SS or §63.670, as applicable, due to planned routine maintenance.

(ii) If a control device other than a flare is used, the Periodic Report shall describe each occurrence when the monitored parameters were outside of the parameter ranges documented in the Notification of Compliance Status report. The description shall include: Identification of the control device for which the measured parameters were outside of the established ranges, and causes for the measured parameters to be outside of the established ranges.

(iii) If a flare is used prior to January 30, 2019 and prior to electing to comply with the requirements in §63.670, the Periodic Report shall describe each occurrence when the flare does not meet the general control device requirements specified in §63.11(b) of subpart A and shall include: Identification of the flare that does not meet the general requirements specified in §63.11(b) of subpart A, and reasons the flare did not meet the general requirements specified in §63.11(b) of subpart A.

(iv) If a flare is used on or after the date for which compliance with the requirements in §63.670 is elected, which can be no later than January 30, 2019, the Periodic Report shall include the items specified in paragraph (g)(11) of this section.

(v) An owner or operator who elects to comply with §63.660 by installing an alternate control device as described in §63.1064 of subpart WW shall submit, as part of the next Periodic Report, a written application as described in §63.1066(b)(3) of subpart WW.

(6) For miscellaneous process vents for which continuous parameter monitors are required by this subpart, periods of excess emissions shall be identified in the Periodic Reports and shall be used to determine compliance with the emission standards.

(i) Period of excess emission means any of the following conditions:

(A) An operating day when the daily average value of a monitored parameter, except presence of a flare pilot flame, is outside the range specified in the Notification of Compliance Status report. Monitoring data recorded during periods of monitoring system breakdown, repairs, calibration checks and zero (low-level) and high-level adjustments shall not be used in computing daily average values of monitored parameters.

(B) An operating day when all pilot flames of a flare are absent.

(C) An operating day when monitoring data required to be recorded in paragraphs (i)(3) (i) and (ii) of this section are available for less than 75 percent of the operating hours.

(D) For data compression systems under paragraph (h)(5)(iii) of this section, an operating day when the monitor operated for less than 75 percent of the operating hours or a day when less than 18 monitoring values were recorded.

(ii) For miscellaneous process vents, excess emissions shall be reported for the operating parameters specified in table 10 of this subpart unless other site-specific parameter(s) have been approved by the operating permit authority.

(iii) For periods in closed vent systems when a Group 1 miscellaneous process vent stream was detected in the bypass line or diverted from the control device and either directly to the atmosphere or to a control device that does not comply with the requirements in §63.643(a), report the date, time, duration, estimate of the volume of gas, the concentration of organic HAP in the gas and the resulting mass emissions of organic HAP that bypassed the control device. For periods when the flow indicator is not operating, report the date, time, and duration.

(7) If a performance test for determination of compliance for a new emission point subject to this subpart or for an emission point that has changed from Group 2 to Group 1 is conducted during the period covered by a Periodic Report, the results of the performance test shall be included in the Periodic Report.

(i) Results of the performance test shall include the identification of the source tested, the date of the test, the percentage of emissions reduction or outlet pollutant concentration reduction (whichever is needed to determine compliance) for each run and for the average of all runs, and the values of the monitored operating parameters.

(ii) The complete test report shall be maintained onsite.

(8) The owner or operator of a source shall submit quarterly reports for all emission points included in an emissions average.

(i) The quarterly reports shall be submitted no later than 60 calendar days after the end of each quarter. The first report shall be submitted with the Notification of Compliance Status report no later than 150 days after the compliance date specified in §63.640.

(ii) The quarterly reports shall include:

(A) The information specified in this paragraph and in paragraphs (g)(2) through (g)(7) of this section for all storage vessels and miscellaneous process vents included in an emissions average;

(B) The information required to be reported by §63.428 (h)(1), (h)(2), and (h)(3) for each gasoline loading rack included in an emissions average, unless this information has already been submitted in a separate report;

(C) The information required to be reported by §63.567(e)(4) and (j)(3) of subpart Y for each marine tank vessel loading operation included in an emissions average, unless the information has already been submitted in a separate report;

(D) Any information pertaining to each wastewater stream included in an emissions average that the source is required to report under the Implementation Plan for the source;

(E) The credits and debits calculated each month during the quarter;

(F) A demonstration that debits calculated for the quarter are not more than 1.30 times the credits calculated for the quarter, as required under §§63.652(e)(4);

(G) The values of any inputs to the credit and debit equations in §63.652 (g) and (h) that change from month to month during the quarter or that have changed since the previous quarter; and

(H) Any other information the source is required to report under the Implementation Plan for the source.

(iii) Every fourth quarterly report shall include the following:

(A) A demonstration that annual credits are greater than or equal to annual debits as required by §63.652(e)(3); and

(B) A certification of compliance with all the emissions averaging provisions in §63.652 of this subpart.

(9) For heat exchange systems, Periodic Reports must include the following information:

(i) The number of heat exchange systems at the plant site subject to the monitoring requirements in §63.654.

(ii) The number of heat exchange systems at the plant site found to be leaking.

(iii) For each monitoring location where the total strippable hydrocarbon concentration was determined to be equal to or greater than the applicable leak definitions specified in §63.654(c)(6), identification of the monitoring location (e.g., unique monitoring location or heat exchange system ID number), the measured total strippable hydrocarbon concentration, the date the leak was first identified, and, if applicable, the date the source of the leak was identified;

(iv) For leaks that were repaired during the reporting period (including delayed repairs), identification of the monitoring location associated with the repaired leak, the total strippable hydrocarbon concentration measured during re-monitoring to verify repair, and the re-monitoring date (i.e., the effective date of repair); and

(v) For each delayed repair, identification of the monitoring location associated with the leak for which repair is delayed, the date when the delay of repair began, the date the repair is expected to be completed (if the leak is not repaired during the reporting period), the total strippable hydrocarbon concentration and date of each monitoring event conducted on the delayed repair during the reporting period, and an estimate of the potential strippable hydrocarbon emissions over the reporting period associated with the delayed repair.

(10) For pressure relief devices subject to the requirements §63.648(j), Periodic Reports must include the information specified in paragraphs (g)(10)(i) through (iv) of this section.

(i) For pressure relief devices in organic HAP gas or vapor service, pursuant to §63.648(j)(1), report any instrument reading of 500 ppm or greater.

(ii) For pressure relief devices in organic HAP gas or vapor service subject to §63.648(j)(2), report confirmation that any monitoring required to be done during the reporting period to show compliance was conducted.

(iii) For pilot-operated pressure relief devices in organic HAP service, report each pressure release to the atmosphere through the pilot vent that equals or exceeds 72 pounds of VOC per day, including duration of the pressure release through the pilot vent and estimate of the mass quantity of each organic HAP released.

(iv) For pressure relief devices in organic HAP service subject to §63.648(j)(3), report each pressure release to the atmosphere, including duration of the pressure release and estimate of the mass quantity of each organic HAP released, and the results of any root cause analysis and corrective action analysis completed during the reporting period, including the corrective actions implemented during the reporting period and, if applicable, the implementation schedule for planned corrective actions to be implemented subsequent to the reporting period.

(11) For flares subject to §63.670, Periodic Reports must include the information specified in paragraphs (g)(11)(i) through (iv) of this section.

(i) Records as specified in paragraph (i)(9)(i) of this section for each 15-minute block during which there was at least one minute when regulated material is routed to a flare and no pilot flame is present.

(ii) Visible emission records as specified in paragraph (i)(9)(ii)(C) of this section for each period of 2 consecutive hours during which visible emissions exceeded a total of 5 minutes.

(iii) The 15-minute block periods for which the applicable operating limits specified in §63.670(d) through (f) are not met. Indicate the date and time for the period, the net heating value operating parameter(s) determined following the methods in §63.670(k) through (n) as applicable.

(iv) For flaring events meeting the criteria in §63.670(o)(3):

(A) The start and stop time and date of the flaring event.

(B) The length of time for which emissions were visible from the flare during the event.

(C) The periods of time that the flare tip velocity exceeds the maximum flare tip velocity determined using the methods in §63.670(d)(2) and the maximum 15-minute block average flare tip velocity recorded during the event.

(D) Results of the root cause and corrective actions analysis completed during the reporting period, including the corrective actions implemented during the reporting period and, if applicable, the implementation schedule for planned corrective actions to be implemented subsequent to the reporting period.

(12) For delayed coking units, the Periodic Report must include the information specified in paragraphs (g)(12)(i) through (iv) of this section.

(i) For existing source delayed coking units, any 60-cycle average exceeding the applicable limit in §63.657(a)(1).

(ii) For new source delayed coking units, any direct venting event exceeding the applicable limit in §63.657(a)(2).

(iii) The total number of double quenching events performed during the reporting period.

(iv) For each double quenching draining event when the drain water temperature exceeded 210°F, report the drum, date, time, the coke drum vessel pressure or temperature, as applicable, when pre-vent draining was initiated, and the maximum drain water temperature during the pre-vent draining period.

(13) For maintenance vents subject to the requirements in §63.643(c), Periodic Reports must include the information specified in paragraphs (g)(13)(i) through (iv) of this section for any release exceeding the applicable limits in §63.643(c)(1). For the purposes of this reporting requirement, owners or operators complying with §63.643(c)(1)(iv) must report each venting event for which the lower explosive limit is 20 percent or greater; owners or operators complying with §63.643(c)(1)(v) must report each venting event conducted under those provisions and include an explanation for each event as to why utilization of this alternative was required.

(i) Identification of the maintenance vent and the equipment served by the maintenance vent.

(ii) The date and time the maintenance vent was opened to the atmosphere.

(iii) The lower explosive limit, vessel pressure, or mass of VOC in the equipment, as applicable, at the start of atmospheric venting. If the 5 psig vessel pressure option in §63.643(c)(1)(ii) was used and active purging was initiated while the lower explosive limit was 10 percent or greater, also include the lower explosive limit of the vapors at the time active purging was initiated.

(iv) An estimate of the mass of organic HAP released during the entire atmospheric venting event.

(14) Any changes in the information provided in a previous Notification of Compliance Status report.

* * * *

(i)(9) For each flare subject to §63.670, each owner or operator shall keep the records specified in paragraphs (i)(9)(i) through (xii) of this section up-to-date and readily accessible, as applicable.

(i) Retain records of the output of the monitoring device used to detect the presence of a pilot flame as required in §63.670(b) for a minimum of 2 years. Retain records of each 15-minute block during which there was at least one minute that no pilot flame is present when regulated material is routed to a flare for a minimum of 5 years.

(ii) Retain records of daily visible emissions observations or video surveillance images required in §63.670(h) as specified in the paragraphs (i)(9)(ii)(A) through (C), as applicable, for a minimum of 3 years.

(A) If visible emissions observations are performed using Method 22 at 40 CFR part 60, appendix A-7, the record must identify whether the visible emissions observation was performed, the results of each observation, total duration of observed visible emissions, and whether it was a 5-minute or 2-hour observation. If the owner or operator performs visible emissions observations more than one time during a day, the record must also identify the date and time of day each visible emissions observation was performed.

(B) If video surveillance camera is used, the record must include all video surveillance images recorded, with time and date stamps.

(C) For each 2 hour period for which visible emissions are observed for more than 5 minutes in 2 consecutive hours, the record must include the date and time of the 2 hour period and an estimate of the cumulative number of minutes in the 2 hour period for which emissions were visible.

(iii) The 15-minute block average cumulative flows for flare vent gas and, if applicable, total steam, perimeter assist air, and premix assist air specified to be monitored under §63.670(i), along with the date and time interval for the 15-minute block. If multiple monitoring locations are used to determine cumulative vent gas flow, total steam, perimeter assist air, and premix assist air, retain records of the 15-minute block average flows for each monitoring location for a minimum of 2 years, and retain the 15-minute block average cumulative flows that are used in subsequent calculations for a minimum of 5 years. If pressure and temperature monitoring is used, retain records of the 15-minute block average temperature, pressure and molecular weight of the flare vent gas or assist gas stream for each measurement location used to determine the 15-minute block average cumulative flows for a minimum of 2 years, and retain the 15-minute block average cumulative flows that are used in subsequent calculations for a minimum of 5 years.

(iv) The flare vent gas compositions specified to be monitored under §63.670(j). Retain records of individual component concentrations from each compositional analyses for a minimum of 2 years. If NHVvg analyzer is used, retain records of the 15-minute block average values for a minimum of 5 years.

(v) Each 15-minute block average operating parameter calculated following the methods specified in §63.670(k) through (n), as applicable.

(vi) [Reserved]

(vii) All periods during which operating values are outside of the applicable operating limits specified in §63.670(d) through (f) when regulated material is being routed to the flare.

(viii) All periods during which the owner or operator does not perform flare monitoring according to the procedures in §63.670(g) through (j).

(ix) Records of periods when there is flow of vent gas to the flare, but when there is no flow of regulated material to the flare, including the start and stop time and dates of periods of no regulated material flow.

(x) Records when the flow of vent gas exceeds the smokeless capacity of the flare, including start and stop time and dates of the flaring event.

(xi) Records of the root cause analysis and corrective action analysis conducted as required in §63.670(o)(3), including an identification of the affected facility, the date and duration of the event, a statement noting whether the event resulted from the same root cause(s) identified in a previous analysis and either a description of the recommended corrective action(s) or an explanation of why corrective action is not necessary under §63.670(o)(5)(i).

(xii) For any corrective action analysis for which implementation of corrective actions are required in §63.670(o)(5), a description of the corrective action(s) completed within the first 45 days following the discharge and, for action(s) not already completed, a schedule for implementation, including proposed commencement and completion dates.

(10) [Reserved]

(11) For each pressure relief device subject to the pressure release management work practice standards in §63.648(j)(3), the owner or operator shall keep the records specified in paragraphs (i)(11)(i) through (iii) of this section. For each pilot-operated pressure relief device subject to the requirements at §63.648(j)(3), the owner or operator shall keep the records specified in paragraph (i)(11)(iv) of this section.

(i) Records of the prevention measures implemented as required in §63.648(j)(3)(ii), if applicable.

(ii) Records of the number of releases during each calendar year and the number of those releases for which the root cause was determined to be a force majeure event. Keep these records for the current calendar year and the past five calendar years.

(iii) For each release to the atmosphere, the owner or operator shall keep the records specified in paragraphs (i)(11)(iii)(A) through (D) of this section.

(A) The start and end time and date of each pressure release to the atmosphere.

(B) Records of any data, assumptions, and calculations used to estimate of the mass quantity of each organic HAP released during the event.

(C) Records of the root cause analysis and corrective action analysis conducted as required in §63.648(j)(3)(iii), including an identification of the affected facility, the date and duration of the event, a statement noting whether the event resulted from the same root cause(s) identified in a previous analysis and either a description of the recommended corrective action(s) or an explanation of why corrective action is not necessary under §63.648(j)(7)(i).

(D) For any corrective action analysis for which implementation of corrective actions are required in §63.648(j)(7), a description of the corrective action(s) completed within the first 45 days following the discharge and, for action(s) not already completed, a schedule for implementation, including proposed commencement and completion dates.

(iv) For pilot-operated pressure relief devices, general or release-specific records for estimating the quantity of VOC released from the pilot vent during a release event, and records of calculations used to determine the quantity of specific HAP released for any event or series of events in which 72 or more pounds of VOC are released in a day.

(12) For each maintenance vent opening subject to the requirements in §63.643(c), the owner or operator shall keep the applicable records specified in paragraphs (i)(12)(i) through (vi) of this section.

(i) The owner or operator shall maintain standard site procedures used to deinventory equipment for safety purposes (e.g., hot work or vessel entry procedures) to document the procedures used to meet the requirements in §63.643(c). The current copy of the procedures shall be retained and available on-site at all times. Previous versions of the standard site procedures, is applicable, shall be retained for five years.

(ii) If complying with the requirements of §63.643(c)(1)(i) and the lower explosive limit at the time of the vessel opening exceeds 10 percent, identification of the maintenance vent, the process units or equipment associated with the maintenance vent, the date of maintenance vent opening, and the lower explosive limit at the time of the vessel opening.

(iii) If complying with the requirements of §63.643(c)(1)(ii) and either the vessel pressure at the time of the vessel opening exceeds 5 psig or the lower explosive limit at the time of the active purging was initiated exceeds 10 percent, identification of the maintenance vent, the process units or equipment associated with the maintenance vent, the date of maintenance vent opening, the pressure of the vessel or equipment at the time of discharge to the atmosphere and, if applicable, the lower explosive limit of the vapors in the equipment when active purging was initiated.

(iv) If complying with the requirements of §63.643(c)(1)(iii), records used to estimate the total quantity of VOC in the equipment and the type and size limits of equipment that contain less than 72 pounds of VOC at the time of maintenance vent opening. For each maintenance vent opening for which the deinventory procedures specified in paragraph (i)(12)(i) of this section are not followed or for which the equipment opened exceeds the type and size limits established in the records specified in this paragraph, identification of the maintenance vent, the process units or equipment associated with the maintenance vent, the date of maintenance vent opening, and records used to estimate the total quantity of VOC in the equipment at the time the maintenance vent was opened to the atmosphere.

(v) If complying with the requirements of §63.643(c)(1)(iv), identification of the maintenance vent, the process units or equipment associated with the maintenance vent, records documenting the lack of a pure hydrogen supply, the date of maintenance vent opening, and the lower explosive limit of the vapors in the equipment at the time of discharge to the atmosphere for each applicable maintenance vent opening.

(vi) If complying with the requirements of §63.643(c)(1)(v), identification of the maintenance vent, the process units or equipment associated with the maintenance vent, records documenting actions taken to comply with other applicable alternatives and why utilization of this alternative was required, the date of maintenance vent opening, the equipment pressure and lower explosive limit of the vapors in the equipment at the time of discharge, an indication of whether active purging was performed and the pressure of the equipment during the installation or removal of the blind if active purging was used, the duration the maintenance vent was open during the blind installation or removal process, and records used to estimate the total quantity of VOC in the equipment at the time the maintenance vent was opened to the atmosphere for each applicable maintenance vent opening.

§63.670 Requirements for flare control devices.

* * * *

(b) Pilot flame presence. The owner or operator shall operate each flare with a pilot flame present at all times when regulated material is routed to the flare. Each 15-minute block during which there is at least one minute where no pilot flame is present when regulated material is routed to the flare is a deviation of the standard. Deviations in different 15-minute blocks from the same event are considered separate deviations. The owner or operator shall monitor for the presence of a pilot flame as specified in paragraph (g) of this section.

* * * *

(d) Flare tip velocity. For each flare, the owner or operator shall comply with either paragraph (d)(1) or (2) of this section, provided the appropriate monitoring systems are in-place, whenever regulated material is routed to the flare for at least 15-minutes and the flare vent gas flow rate is less than the smokeless design capacity of the flare.

* * * *

(e) Combustion zone operating limits. For each flare, the owner or operator shall operate the flare to maintain the net heating value of flare combustion zone gas (NHVcz) at or above 270 British thermal units per standard cubic feet (Btu/scf) determined on a 15-minute block period basis when regulated material is routed to the flare for at least 15-minutes. The owner or operator shall monitor and calculate NHVcz as specified in paragraph (m) of this section.

* * * *

(5) When a continuous monitoring system is used as provided in paragraph (j)(1) or (3) of this section and, if applicable, paragraph (j)(4) of this section, the owner or operator may elect to determine the 15-minute block average NHVvg using either the calculation methods in paragraph (l)(5)(i) of this section or the calculation methods in paragraph (l)(5)(ii) of this section. The owner or operator may choose to comply using the calculation methods in paragraph (l)(5)(i) of this section for some flares at the petroleum refinery and comply using the calculation methods (l)(5)(ii) of this section for other flares. However, for each flare, the owner or operator must elect one calculation method that will apply at all times, and use that method for all continuously monitored flare vent streams associated with that flare. If the owner or operator intends to change the calculation method that applies to a flare, the owner or operator must notify the Administrator 30 days in advance of such a change.

(i) Feed-forward calculation method. When calculating NHVvg for a specific 15-minute block:

(A) Use the results from the first sample collected during an event, (for periodic flare vent gas flow events) for the first 15-minute block associated with that event.

(B) If the results from the first sample collected during an event (for periodic flare vent gas flow events) are not available until after the second 15-minute block starts, use the results from the first sample collected during an event for the second 15-minute block associated with that event.

(C) For all other cases, use the results that are available from the most recent sample prior to the 15-minute block period for that 15-minute block period for all flare vent gas steams. For the purpose of this requirement, use the time that the results become available rather than the time the sample was collected. For example, if a sample is collected at 12:25 a.m. and the analysis is completed at 12:38 a.m., the results are available at 12:38 a.m. and these results would be used to determine compliance during the 15-minute block period from 12:45 a.m. to 1:00 a.m.

(ii) Direct calculation method. When calculating NHVvg for a specific 15-minute block:

(A) If the results from the first sample collected during an event (for periodic flare vent gas flow events) are not available until after the second 15-minute block starts, use the results from the first sample collected during an event for the first 15-minute block associated with that event.

(B) For all other cases, use the arithmetic average of all NHVvg measurement data results that become available during a 15-minute block to calculate the 15-minute block average for that period. For the purpose of this requirement, use the time that the results become available rather than the time the sample was collected. For example, if a sample is collected at 12:25 a.m. and the analysis is completed at 12:38 a.m., the results are available at 12:38 a.m. and these results would be used to determine compliance during the 15-minute block period from 12:30 a.m. to 12:45 a.m.

* * * *

(o)(4)(iv) You may conduct a single root cause analysis and corrective action analysis for a single event that causes two or more flares to have a flow event meeting the criteria in paragraph (o)(3)(i) or (ii) of this section, regardless of the configuration of the flares, if the root cause is reasonably expected to be a force majeure event, as defined in this subpart.

* * * *

(o)(6) The owner or operator shall determine the total number of events for which a root cause and corrective action analyses was required during the calendar year for each affected flare separately for events meeting the criteria in paragraph (o)(3)(i) of this section and those meeting the criteria in paragraph (o)(3)(ii) of this section. For the purpose of this requirement, a single root cause analysis conducted for an event that met both of the criteria in paragraphs (o)(3)(i) and (ii) of this section would be counted as an event under each of the separate criteria counts for that flare. Additionally, if a single root cause analysis was conducted for an event that caused multiple flares to meet the criteria in paragraph (o)(3)(i) or (ii) of this section, that event would count as an event for each of the flares for each criteria in paragraph (o)(3) of this section that was met during that event. The owner or operator shall also determine the total number of events for which a root cause and correct action analyses was required and the analyses concluded that the root cause was a force majeure event, as defined in this subpart.

* * * *

(o)(7)(ii) Two visible emissions exceedance events meeting the criteria in paragraph (o)(3)(i) of this section that were not caused by a force majeure event from a single flare in a 3 calendar year period for the same root cause for the same equipment.

(iii) Two flare tip velocity exceedance events meeting the criteria in paragraph (o)(3)(ii) of this section that were not caused by a force majeure event from a single flare in a 3 calendar year period for the same root cause for the same equipment.

(iv) Three visible emissions exceedance events meeting the criteria in paragraph (o)(3)(i) of this section that were not caused by a force majeure event from a single flare in a 3 calendar year period for any reason.

(v) Three flare tip velocity exceedance events meeting the criteria in paragraph (o)(3)(ii) of this section that were not caused by a force majeure event from a single flare in a 3 calendar year period for any reason.

§63.671 Requirements for flare monitoring systems.

* * * *

(e) Additional requirements for gas chromatographs. For monitors used to determine compositional analysis for net heating value per §63.670(j)(1), the gas chromatograph must also meet the requirements of paragraphs (e)(1) through (3) of this section.

Appendix to Subpart CC of Part 63—Tables

* * * *

Table 13 - Calibration and Quality Control Requirements for CPMS
ParameterMinimum accuracy requirementsCalibration requirements
Temperature±1 percent over the normal range of temperature measured, expressed in degrees Celsius (C), or 2.8 degrees C, whichever is greaterConduct calibration checks at least annually; conduct calibration checks following any period of more than 24 hours throughout which the temperature exceeded the manufacturer's specified maximum rated temperature or install a new temperature sensor.
At least quarterly, inspect all components for integrity and all electrical connections for continuity, oxidation, and galvanic corrosion, unless the CPMS has a redundant temperature sensor.
Record the results of each calibration check and inspection.
Locate the temperature sensor in a position that provides a representative temperature; shield the temperature sensor system from electromagnetic interference and chemical contaminants.
Flow Rate for All Flows Other Than Flare Vent Gas±5 percent over the normal range of flow measured or 1.9 liters per minute (0.5 gallons per minute), whichever is greater, for liquid flowConduct a flow sensor calibration check at least biennially (every two years); conduct a calibration check following any period of more than 24 hours throughout which the flow rate exceeded the manufacturer's specified maximum rated flow rate or install a new flow sensor.
±5 percent over the normal range of flow measured or 280 liters per minute (10 cubic feet per minute), whichever is greater, for gas flowAt least quarterly, inspect all components for leakage, unless the CPMS has a redundant flow sensor.
±5 percent over the normal range measured for mass flowRecord the results of each calibration check and inspection.
Locate the flow sensor(s) and other necessary equipment (such as straightening vanes) in a position that provides representative flow; reduce swirling flow or abnormal velocity distributions due to upstream and downstream disturbances.
Flare Vent Gas Flow Rate±20 percent of flow rate at velocities ranging from 0.03 to 0.3 meters per second (0.1 to 1 feet per second)
±5 percent of flow rate at velocities greater than 0.3 meters per second (1 feet per second)
Conduct a flow sensor calibration check at least biennially (every two years); conduct a calibration check following any period of more than 24 hours throughout which the flow rate exceeded the manufacturer's specified maximum rated flow rate or install a new flow sensor.
At least quarterly, inspect all components for leakage, unless the CPMS has a redundant flow sensor.
Record the results of each calibration check and inspection.
Locate the flow sensor(s) and other necessary equipment (such as straightening vanes) in a position that provides representative flow; reduce swirling flow or abnormal velocity distributions due to upstream and downstream disturbances.
Pressure±5 percent over the normal operating range or 0.12 kilopascals (0.5 inches of water column), whichever is greaterReview pressure sensor readings at least once a week for straightline (unchanging) pressure and perform corrective action to ensure proper pressure sensor operation if blockage is indicated.
Using an instrument recommended by the sensor's manufacturer, check gauge calibration and transducer calibration annually; conduct calibration checks following any period of more than 24 hours throughout which the pressure exceeded the manufacturer's specified maximum rated pressure or install a new pressure sensor.
At least quarterly, inspect all components for integrity, all electrical connections for continuity, and all mechanical connections for leakage, unless the CPMS has a redundant pressure sensor.
Record the results of each calibration check and inspection.
Locate the pressure sensor(s) in a position that provides a representative measurement of the pressure and minimizes or eliminates pulsating pressure, vibration, and internal and external corrosion.
Net Heating Value by Calorimeter±2 percent of spanSpecify calibration requirements in your site specific CPMS monitoring plan. Calibration requirements should follow manufacturer's recommendations at a minimum.
Temperature control (heated and/or cooled as necessary) the sampling system to ensure proper year-round operation.
Where feasible, select a sampling location at least two equivalent diameters downstream from and 0.5 equivalent diameters upstream from the nearest disturbance. Select the sampling location at least two equivalent duct diameters from the nearest control device, point of pollutant generation, air in-leakages, or other point at which a change in the pollutant concentration or emission rate occurs.
Net Heating Value by Gas ChromatographAs specified in Performance Specification 9 of 40 CFR part 60, appendix BFollow the procedure in Performance Specification 9 of 40 CFR part 60,appendix B, except that a single daily mid-level calibration check can be used (rather than triplicate analysis), the multi-point calibration can be conducted quarterly (rather than monthly), and the sampling line temperature must be maintained at a minimum temperature of 60°C (rather than 120°C).
Hydrogen analyzer±2 percent over the concentration measured or 0.1 volume percent, whichever is greaterSpecify calibration requirements in your site specific CPMS monitoring plan. Calibration requirements should follow manufacturer's recommendations at a minimum.
Where feasible, select the sampling location at least two equivalent duct diameters from the nearest control device, point of pollutant generation, air in-leakages, or other point at which a change in the pollutant concentration occurs.

§63.1100 Applicability.

* * * *

(b) Subpart A requirements. The following provisions of subpart A of this part (General Provisions), §§63.1 through 63.5, and §§63.12 through 63.15, apply to owners or operators of affected sources subject to this subpart. For sources that reclassify from major source to area source status, the applicable provisions of §63.9(j) and (k) apply. Beginning no later than the compliance dates specified in §63.1102(c), for ethylene production affected sources, §§63.7(a)(4), (c), (e)(4), and (g)(2) and 63.10(b)(2)(vi) also apply.

* * * *

(iii) Beginning no later than the compliance dates specified in §63.1102(c), flares subject to the requirements in 40 CFR part 63, subpart CC and used as a control device for an emission point subject to the requirements in Table 7 to §63.1103(e) are only required to comply with the flare requirements in 40 CFR part 63, subpart CC. This paragraph does not apply to multi-point pressure assisted flares.

§63.1102 Compliance schedule.

* * * *

(c)(11) The requirements in §63.1108(a)(4)(i), (b)(1)(ii), (b)(2), and (b)(4)(ii)(B).

* * * *

(d)(2)(ii) The compliance requirements specified in §63.1108(a)(4)(i), (b)(1)(ii), (b)(2), and (b)(4)(ii)(B).

* * * *

(e)(2)(iii) The compliance requirements specified in §63.1108(a)(4)(i), (b)(1)(ii), (b)(2), and (b)(4)(ii)(B).

§63.1103 Source category-specific applicability, definitions, and requirements.

* * * *

(e) Ethylene production applicability, definitions, and requirements- (1) Applicability- (i) Affected source. For the ethylene production (as defined in paragraph (e)(2) of this section) source category, the affected source comprises all emission points listed in paragraphs (e)(1)(i)(A) through (G) of this section that are associated with an ethylene production unit that is located at a major source, as defined in section 112(a) of the Act.

(A) All storage vessels (as defined in §63.1101) that store liquids containing organic HAP.

(B) All ethylene process vents (as defined in paragraph (e)(2) of this section) from continuous unit operations.

(C) All transfer racks (as defined in paragraph (e)(2) of this section) that load HAP-containing material.

(D) Equipment (as defined in §63.1101) that contains or contacts organic HAP.

(E) All waste streams (as defined in paragraph (e)(2) of this section) associated with an ethylene production unit.

(F) All heat exchange systems (as defined in §63.1082(b)) associated with an ethylene production unit.

(G) All ethylene cracking furnaces and associated decoking operations.

(ii) Exceptions. The emission points listed in paragraphs (e)(1)(ii) (A) through (L) of this section are in the ethylene production source category but are not subject to the requirements of paragraph (e)(3) of this section.

(A) Equipment that is located within an ethylene production unit that is subject to this subpart but does not contain organic HAP.

(B) Stormwater from segregated sewers.

(C) Water from fire-fighting and deluge systems in segregated sewers.

(D) Spills.

(E) Water from safety showers.

(F) Water from testing of fire-fighting and deluge systems.

(G) Vessels storing organic liquids that contain organic HAP as impurities.

(H) Transfer racks, loading arms, or loading hoses that only transfer liquids containing organic HAP as impurities.

(I) Transfer racks, loading arms, or loading hoses that vapor balance during all transfer operations.

(J) Air emissions from all ethylene cracking furnaces.

(K) Pressure vessels designed to operate in excess of 204.9 kilopascals and without emissions to the atmosphere.

(L) Vessels permanently attached to motor vehicles such as trucks, railcars, barges, or ships.

(iii) Exclusions. The provisions of this subpart do not apply to process units and emission points subject to subparts F, G, H, I and CC of this part.

(iv) Compliance schedule. The compliance schedule for the ethylene production source category is specified in §63.1102.

(2) Definitions. Ethylene process vent means a gas stream with a flow rate greater than 0.005 standard cubic meters per minute containing greater than 20 parts per million by volume HAP that is continuously discharged during operation of an ethylene production unit, as defined in this section. Ethylene process vents are gas streams that are discharged to the atmosphere (or the point of entry into a control device, if any) either directly or after passing through one or more recovery devices. Ethylene process vents do not include relief valve discharges; gaseous streams routed to a fuel gas system; leaks from equipment regulated under this subpart; episodic or nonroutine releases such as those associated with startup, shutdown, and malfunction; and in situ sampling systems (online analyzers).

Decoking operation means the coke combustion activity that occurs inside the radiant tube(s) in the ethylene cracking furnace firebox. Coke combustion activities during decoking can also occur in other downstream equipment such as the process gas outlet piping and transfer line exchangers or quench points.

Ethylene process vent means a gas stream with a flow rate greater than 0.005 standard cubic meters per minute containing greater than 20 parts per million by volume HAP that is continuously discharged during operation of an ethylene production unit. On and after July 6, 2023, ethylene process vent means a gas stream with a flow rate greater than 0.005 standard cubic meters per minute containing greater than 20 parts per million by volume HAP that is continuously or periodically discharged during operation of an ethylene production unit. Ethylene process vents are gas streams that are discharged to the atmosphere (or the point of entry into a control device, if any) either directly or after passing through one or more recovery devices. Ethylene process vents do not include:

(A) Pressure relief device discharges;

(B) Gaseous streams routed to a fuel gas system, including any flares using fuel gas, of which less than 50 percent of the fuel gas is derived from an ethylene production unit;

(C) Gaseous streams routed to a fuel gas system whereby any flares using fuel gas, of which 50 percent or more of the fuel gas is derived from an ethylene production unit, comply with §63.1103(e)(4) beginning no later than the compliance dates specified in §63.1102(c);

(D) Leaks from equipment regulated under this subpart;

(E) Episodic or nonroutine releases such as those associated with startup, shutdown, and malfunction until July 6, 2023;

(F) In situ sampling systems (online analyzers) until July 6, 2023; and

(G) Coke combustion emissions from decoking operations beginning no later than the compliance dates specified in §63.1102(c).

Ethylene production or production unit means a chemical manufacturing process unit in which ethylene and/or propylene are produced by separation from petroleum refining process streams or by subjecting hydrocarbons to high temperatures in the presence of steam. The ethylene production unit includes the separation of ethylene and/or propylene from associated streams such as a C4 product, pyrolysis gasoline, and pyrolysis fuel oil. Ethylene production does not include the manufacture of SOCMI chemicals such as the production of butadiene from the C4 stream and aromatics from pyrolysis gasoline.

Force majeure event means a release of HAP, either directly to the atmosphere from a pressure relief device or discharged via a flare, that is demonstrated to the satisfaction of the Administrator to result from an event beyond the owner or operator's control, such as natural disasters; acts of war or terrorism; loss of a utility external to the ethylene production unit (e.g., external power curtailment), excluding power curtailment due to an interruptible service agreement; and fire or explosion originating at a near or adjoining facility outside of the ethylene production unit that impacts the ethylene production unit's ability to operate.Force majeure event means a release of HAP, either directly to the atmosphere from a pressure relief device or discharged via a flare, that is demonstrated to the satisfaction of the Administrator to result from an event beyond the owner or operator's control, such as natural disasters; acts of war or terrorism; loss of a utility external to the ethylene production unit (e.g., external power curtailment), excluding power curtailment due to an interruptible service agreement; and fire or explosion originating at a near or adjoining facility outside of the ethylene production unit that impacts the ethylene production unit's ability to operate.

Heat exchange system means any cooling tower system or once-through cooling water system (e.g., river or pond water). A heat exchange system can include an entire recirculating or once-through cooling system.

Organic HAP means the compounds listed in Table 1 to subpart XX of this part.

Pressure-assisted multi-point flare means a flare system consisting of multiple flare burners in staged arrays whereby the vent stream pressure is used to promote mixing and smokeless operation at the flare burner tips. Pressure-assisted multi-point flares are designed for smokeless operation at velocities up to Mach = 1 conditions (i.e., sonic conditions), can be elevated or at ground level, and typically use cross-lighting for flame propagation to combust any flare vent gases sent to a particular stage of flare burners.

Pressure relief device means a valve, rupture disk, or similar device used only to release an unplanned, nonroutine discharge of gas from process equipment in order to avoid safety hazards or equipment damage. A pressure relief device discharge can result from an operator error, a malfunction such as a power failure or equipment failure, or other unexpected cause. Such devices include conventional, spring-actuated relief valves, balanced bellows relief valves, pilot-operated relief valves, rupture disks, and breaking, buckling, or shearing pin devices. Devices that are actuated either by a pressure of less than or equal to 2.5 pounds per square inch gauge or by a vacuum are not pressure relief devices.

Periodically dischargedmeans gas stream discharges that are intermittent for which the total organic HAP concentration is greater than 20 parts per million by volume and total volatile organic compound emissions are 50 pounds per day or more. These intermittent discharges are associated with routine operations, maintenance activities, startups, shutdowns, malfunctions, or process upsets and do not include pressure relief device discharges or discharges classified as maintenance vents.

Radiant tube(s) means any portion of the tube coil assembly located within the ethylene cracking furnace firebox whereby a thermal cracking reaction of hydrocarbons (in the presence of steam) occurs. Hydrocarbons and steam pass through the radiant tube(s) of the ethylene cracking furnace during normal operation and coke is removed from the inside of the radiant tube(s) during decoking operation.

Relief valvemeans a type of pressure relief device that is designed to re-close after the pressure relief.

Transfer rack means the collection of loading arms and loading hoses at a single loading rack that is used to fill tank trucks and/or railcars with organic HAP. Transfer rack includes the associated pumps, meters, shutoff valves, relief valves, and other piping and valves. Transfer rack does not include racks, arms, or hoses that contain organic HAP only as impurities; or racks, arms, or hoses that vapor balance during all loading operations.

Waste means any material resulting from industrial, commercial, mining, or agricultural operations, or from community activities, that is discarded or is being accumulated, stored, or physically, chemically, thermally, or biologically treated prior to being discarded, recycled, or discharged.

Waste stream means the waste generated by a particular process unit, product tank, or waste management unit. The characteristics of the waste stream (e.g., flow rate, HAP concentration, water content) are determined at the point of waste generation. Examples of a waste stream include process wastewater, product tank drawdown, sludge and slop oil removed from waste management units, and landfill leachate.

(3) Requirements. The owner or operator must control organic HAP emissions from each affected source emission point by meeting the applicable requirements specified in Table 7 to this section. An owner or operator must perform the applicability assessment procedures and methods for process vents specified in §63.1104, except for paragraphs (d), (g), (h) through (j), (l)(1), and (n). An owner or operator must perform the applicability assessment procedures and methods for equipment leaks specified in §63.1107. General compliance, recordkeeping, and reporting requirements are specified in §§63.1108 through 63.1112. Before July 6, 2023, minimization of emissions from startup, shutdown, and malfunctions must be addressed in the startup, shutdown, and malfunction plan required by §63.1111; the plan must also establish reporting and recordkeeping of such events. A startup, shutdown, and malfunction plan is not required on and after July 6, 2023 and the requirements specified in §63.1111 no longer apply; however, for historical compliance purposes, a copy of the plan must be retained and available on-site for five years after July 6, 2023. Except as specified in paragraph (e)(4)(i) of this section, procedures for approval of alternate means of emission limitations are specified in §63.1113.

(4) Flares. Beginning no later than the compliance dates specified in §63.1102(c), if a steam-assisted, air-assisted, non-assisted, or pressure-assisted multi-point flare is used as a control device for an emission point subject to the requirements in Table 7 to this section, then the owner or operator must meet the applicable requirements for flares as specified in §§63.670 and 63.671 of subpart CC, including the provisions in Tables 12 and 13 to subpart CC of this part, except as specified in paragraphs (e)(4)(i) through (xiv) of this section. This requirement also applies to any flare using fuel gas from a fuel gas system, of which 50 percent or more of the fuel gas is derived from an ethylene production unit, being used to control an emission point subject to the requirements in Table 7 of this section. For purposes of compliance with this paragraph, the following terms are defined in §63.641 of subpart CC: Assist air, assist steam, center steam, combustion zone, combustion zone gas, flare, flare purge gas, flare supplemental gas, flare sweep gas, flare vent gas, lower steam, net heating value, perimeter assist air, pilot gas, premix assist air, total steam, and upper steam.

(i) The owner or operator may elect to comply with the alternative means of emissions limitation requirements specified in of §63.670(r) of subpart CC in lieu of the requirements in §63.670(d) through (f) of subpart CC, as applicable. However, instead of complying with §63.670(r)(3) of subpart CC, the owner or operator must submit the alternative means of emissions limitation request following the requirements in §63.1113.

(ii) Instead of complying with §63.670(o)(2)(i) of subpart CC, the owner or operator must develop and implement the flare management plan no later than the compliance dates specified in §63.1102(c).

(iii) Instead of complying with §63.670(o)(2)(iii) of subpart CC, if required to develop a flare management plan and submit it to the Administrator, then the owner or operator must also submit all versions of the plan in portable document format (PDF) to the EPA via the Compliance and Emissions Data Reporting Interface (CEDRI), which can be accessed through the EPA's Central Data Exchange (CDX) (https://cdx.epa.gov/). If you claim some of the information in your flare management plan is confidential business information (CBI), submit a version with the CBI omitted via CEDRI. A complete plan, including information claimed to be CBI and clearly marked as CBI, must be mailed to the following address: U.S. Environmental Protection Agency, Office of Air Quality Planning and Standards, Sector Policies and Programs Division, U.S. EPA Mailroom (E143-01), Attention: Ethylene Production Sector Lead, 109 T.W. Alexander Drive, Research Triangle Park, NC 27711.

(iv) Section 63.670(o)(3)(ii) of subpart CC and all references to §63.670(o)(3)(ii) of subpart CC do not apply. Instead, the owner or operator must comply with the maximum flare tip velocity operating limit at all times.

(v) Substitute “ethylene production unit” for each occurrence of “petroleum refinery.”

(vi) Each occurrence of “refinery” does not apply.

(vii) Except as specified in paragraph (e)(4)(vii)(G) of this section, if a pressure-assisted multi-point flare is used as a control device for an emission point subject to the requirements in Table 7 to this section, then the owner or operator must comply with the requirements specified in paragraphs (e)(4)(vii)(A) through (F) of this section.

(A) The owner or operator is not required to comply with the flare tip velocity requirements in §63.670(d) and (k) of subpart CC;

(B) The owner or operator must substitute “800” for each occurrence of “270” in §63.670(e) of subpart CC;

(C) The owner or operator must determine the 15-minute block average NHVvg using only the direct calculation method specified in §63.670(l)(5)(ii) of subpart CC;

(D) Instead of complying with §63.670(b) and (g) of subpart CC, if a pressure-assisted multi-point flare uses cross-lighting on a stage of burners rather than having an individual pilot flame on each burner, the owner or operator must operate each stage of the pressure-assisted multi-point flare with a flame present at all times when regulated material is routed to that stage of burners. Each stage of burners that cross-lights in the pressure-assisted multi-point flare must have at least two pilots with at least one continuously lit and capable of igniting all regulated material that is routed to that stage of burners. Each 15-minute block during which there is at least one minute where no pilot flame is present on a stage of burners when regulated material is routed to that stage is a deviation of the standard. Deviations in different 15-minute blocks from the same event are considered separate deviations. The pilot flame(s) on each stage of burners that use cross-lighting must be continuously monitored by a thermocouple or any other equivalent device used to detect the presence of a flame;

(E) Unless the owner or operator of a pressure-assisted multi-point flare chooses to conduct a cross-light performance demonstration as specified in this paragraph, the owner or operator must ensure that if a stage of burners on the flare uses cross-lighting, that the distance between any two burners in series on that stage is no more than 6 feet when measured from the center of one burner to the next burner. A distance greater than 6 feet between any two burners in series may be used provided the owner or operator conducts a performance demonstration that confirms the pressure-assisted multi-point flare will cross-light a minimum of three burners and the spacing between the burners and location of the pilot flame must be representative of the projected installation. The compliance demonstration must be approved by the permitting authority and a copy of this approval must be maintained onsite. The compliance demonstration report must include: A protocol describing the test methodology used, associated test method QA/QC parameters, the waste gas composition and NHVcz of the gas tested, the velocity of the waste gas tested, the pressure-assisted multi-point flare burner tip pressure, the time, length, and duration of the test, records of whether a successful cross-light was observed over all of the burners and the length of time it took for the burners to cross-light, records of maintaining a stable flame after a successful cross-light and the duration for which this was observed, records of any smoking events during the cross-light, waste gas temperature, meteorological conditions (e.g., ambient temperature, barometric pressure, wind speed and direction, and relative humidity), and whether there were any observed flare flameouts; and

(F) The owner or operator of a pressure-assisted multi-point flare must install and operate pressure monitor(s) on the main flare header, as well as a valve position indicator monitoring system for each staging valve to ensure that the flare operates within the proper range of conditions as specified by the manufacturer. The pressure monitor must meet the requirements in Table 13 to subpart CC of this part.

(G) If a pressure-assisted multi-point flare is operating under the requirements of an approved alternative means of emission limitations, the owner or operator shall either continue to comply with the terms of the alternative means of emission limitations or comply with the provisions in paragraphs (e)(4)(vii)(A) through (F) of this section.

(viii) If an owner or operator chooses to determine compositional analysis for net heating value with a continuous process mass spectrometer, the owner or operator must comply with the requirements specified in paragraphs (e)(4)(viii)(A) through (G) of this section.

(A) The owner or operator must meet the requirements in §63.671(e)(2). The owner or operator may augment the minimum list of calibration gas components found in §63.671(e)(2) with compounds found during a pre-survey or known to be in the gas through process knowledge.

(B) Calibration gas cylinders must be certified to an accuracy of 2 percent and traceable to National Institute of Standards and Technology (NIST) standards.

(C) For unknown gas components that have similar analytical mass fragments to calibration compounds, the owner or operator may report the unknowns as an increase in the overlapped calibration gas compound. For unknown compounds that produce mass fragments that do not overlap calibration compounds, the owner or operator may use the response factor for the nearest molecular weight hydrocarbon in the calibration mix to quantify the unknown component's NHVvg.

(D) The owner or operator may use the response factor for n-pentane to quantify any unknown components detected with a higher molecular weight than n-pentane.

(E) The owner or operator must perform an initial calibration to identify mass fragment overlap and response factors for the target compounds.

(F) The owner or operator must meet applicable requirements in Performance Specification 9 of 40 CFR part 60, appendix B, for continuous monitoring system acceptance including, but not limited to, performing an initial multi-point calibration check at three concentrations following the procedure in Section 10.1 and performing the periodic calibration requirements listed for gas chromatographs in Table 13 to subpart CC of this part, for the process mass spectrometer. The owner or operator may use the alternative sampling line temperature allowed under Net Heating Value by Gas Chromatograph in Table 13 to subpart CC of this part.

(G) The average instrument calibration error (CE) for each calibration compound at any calibration concentration must not differ by more than 10 percent from the certified cylinder gas value. The CE for each component in the calibration blend must be calculated using the following equation:



Where:

Cm = Average instrument response (ppm)

Ca = Certified cylinder gas value (ppm)

(ix) An owner or operator using a gas chromatograph or mass spectrometer for compositional analysis for net heating value may choose to use the CE of NHVmeasured versus the cylinder tag value NHV as the measure of agreement for daily calibration and quarterly audits in lieu of determining the compound-specific CE. The CE for NHV at any calibration level must not differ by more than 10 percent from the certified cylinder gas value. The CE for must be calculated using the following equation:



Where:

NHVmeasured = Average instrument response (Btu/scf)

NHVa = Certified cylinder gas value (Btu/scf)

(x) Instead of complying with §63.670(p) of subpart CC, the owner or operator must keep the flare monitoring records specified in §63.1109(e).

(xi) Instead of complying with §63.670(q) of subpart CC, the owner or operator must comply with the reporting requirements specified in §63.1110(d) and (e)(4).

(xii) When determining compliance with the pilot flame requirements specified in §63.670(b) and (g), substitute “pilot flame or flare flame” for each occurrence of “pilot flame.”

(xiii) When determining compliance with the flare tip velocity and combustion zone operating limits specified in §63.670(d) and (e), the requirement effectively applies starting with the 15-minute block that includes a full 15 minutes of the flaring event. The owner or operator is required to demonstrate compliance with the velocity and NHVcz requirements starting with the block that contains the fifteenth minute of a flaring event. The owner or operator is not required to demonstrate compliance for the previous 15-minute block in which the event started and contained only a fraction of flow.

(xiv) In lieu of meeting the requirements in §§63.670 and 63.671 of subpart CC, an owner or operator may submit a request to the Administrator for approval of an alternative test method in accordance with §63.7(f). The alternative test method must be able to demonstrate on an ongoing basis at least once every 15-minutes that the flare meets 96.5% combustion efficiency and provide a description of the alternative recordkeeping and reporting that would be associated with the alternative test method. The alternative test method request may also include a request to use the alternative test method in lieu of the pilot or flare flame monitoring requirements of 63.670(g).

(5) Maintenance vents. Unless an extension is requested in accordance with the provisions in §63.6(i) of subpart A, beginning no later than the compliance dates specified in §63.1102(c), an owner or operator may designate an ethylene process vent as a maintenance vent if the vent is only used as a result of startup, shutdown, maintenance, or inspection of equipment where equipment is emptied, depressurized, degassed, or placed into service. The owner or operator must comply with the applicable requirements in paragraphs (e)(5)(i) through (iii) of this section for each maintenance vent.

(i) Prior to venting to the atmosphere, remove process liquids from the equipment as much as practical and depressurize the equipment to either: A flare meeting the requirements specified in paragraph (e)(4) of this section, or a non-flare control device meeting the requirements specified in §63.982(c)(2) of subpart SS, until one of the following conditions, as applicable, is met.

(A) The vapor in the equipment served by the maintenance vent has a lower explosive limit (LEL) of less than 10 percent.

(B) If there is no ability to measure the LEL of the vapor in the equipment based on the design of the equipment, the pressure in the equipment served by the maintenance vent is reduced to 5 pounds per square inch gauge (psig) or less. Upon opening the maintenance vent, active purging of the equipment cannot be used until the LEL of the vapors in the maintenance vent (or inside the equipment if the maintenance is a hatch or similar type of opening) is less than 10 percent.

(C) The equipment served by the maintenance vent contains less than 50 pounds of total volatile organic compounds (VOC).

(D) If, after applying best practices to isolate and purge equipment served by a maintenance vent, none of the applicable criterion in paragraphs (e)(5)(i)(A) through (C) of this section can be met prior to installing or removing a blind flange or similar equipment blind, then the pressure in the equipment served by the maintenance vent must be reduced to 2 psig or less before installing or removing the equipment blind. During installation or removal of the equipment blind, active purging of the equipment may be used provided the equipment pressure at the location where purge gas is introduced remains at 2 psig or less.

(ii) Except for maintenance vents complying with the alternative in paragraph (e)(5)(i)(C) of this section, the owner or operator must determine the LEL or, if applicable, equipment pressure using process instrumentation or portable measurement devices and follow procedures for calibration and maintenance according to manufacturer's specifications.

(iii) For maintenance vents complying with the alternative in paragraph (e)(5)(i)(C) of this section, the owner or operator must determine mass of VOC in the equipment served by the maintenance vent based on the equipment size and contents after considering any contents drained or purged from the equipment. Equipment size may be determined from equipment design specifications. Equipment contents may be determined using process knowledge.

(6) Bypass lines. Beginning on the compliance dates specified in §63.1102(c), the use of a bypass line at any time on a closed vent system to divert emissions subject to the requirements in Table 7 to §63.1103(e) to the atmosphere or to a control device not meeting the requirements specified in Table 7 of this subpart is an emissions standards violation. If the owner or operator is subject to the bypass monitoring requirements of §63.983(a)(3) of subpart SS, then the owner or operator must continue to comply with the requirements in §63.983(a)(3) of subpart SS and the recordkeeping and reporting requirements in §§63.998(d)(1)(ii) and 63.999(c)(2) of subpart SS, in addition to paragraph (e)(9) of this section, the recordkeeping requirements specified in §63.1109(g), and the reporting requirements specified in §63.1110(e)(6). For purposes of compliance with this paragraph, the phrase “Except for equipment needed for safety purposes such as pressure relief devices, low leg drains, high point bleeds, analyzer vents, and open-ended valves or lines” in §63.983(a)(3) does not apply; instead, the exemptions specified in paragraph (e)(6)(i) and (ii) of this section apply.

(i) Except for pressure relief devices subject to 40 CFR 63.1107(h)(4), equipment such as low leg drains and equipment subject to the requirements specified in paragraph (f) of Table 7 to §63.1103(e) are not subject to this paragraph (e)(6) of this section.

(ii) Open-ended valves or lines that use a cap, blind flange, plug, or second valve and follow the requirements specified in §60.482-6(a)(2), (b), and (c) or follow requirements codified in another regulation that are the same as §60.482-6(a)(2), (b), and (c) are not subject to this paragraph (e)(6) of this section.

(7) Decoking operation standards for ethylene cracking furnaces. Beginning no later than the compliance dates specified in §63.1102(c), the owner or operator must comply with paragraph (e)(7)(i) of this section and also use at least two of the control measures specified in paragraphs (e)(7)(ii) through (v) of this section to minimize coke combustion emissions from the decoking of the radiant tube(s) in each ethylene cracking furnace.

(i) During normal operations, conduct daily inspections of the firebox burners and repair all burners that are impinging on the radiant tube(s) as soon as practical, but not later than 1 calendar day after the flame impingement is found. The owner or operator may delay burner repair beyond 1 calendar day using the procedures specified in paragraphs (e)(7)(i)(A) and (B) of this section provided the repair cannot be completed during normal operations, the burner cannot be shutdown without significantly impacting the furnace heat distribution and firing rate, and action is taken to reduce flame impingement as much as possible during continued operation. An inspection may include, but is not limited to: visual inspection of the radiant tube(s) for localized bright spots (this may be confirmed with a temperature gun), use of luminescent powders injected into the burner to illuminate the flame pattern, or identifying continued localized coke build-up that causes short runtimes between decoking cycles. A repair may include, but is not limited to: Taking the burner out of service, replacing the burner, adjusting the alignment of the burner, adjusting burner configuration, making burner air corrections, repairing a malfunction of the fuel liquid removal equipment, or adding insulation around the radiant tube(s).

(A) If a shutdown for repair would cause greater emissions than the potential emissions from delaying repair, repair must be completed following the next planned decoking operation (and before returning the ethylene cracking furnace back to normal operations) or during the next ethylene cracking furnace complete shutdown (when the ethylene cracking furnace firebox is taken completely off-line), whichever is earlier.

(B) If a shutdown for repair would cause lower emissions than the potential emissions from delaying repair, then shutdown of the ethylene cracking furnace must immediately commence and the repair must be completed before returning the ethylene cracking furnace back to normal operations.

(ii) During decoking operations, beginning before the expected end of the air-in decoke time, continuously monitor (or use a gas detection tube or equivalent sample technique every three hours to monitor) the CO2 concentration in the combined decoke effluent downstream of the last component being decoked for an indication that the coke combustion in the ethylene cracking furnace radiant tube(s) is complete. The owner or operator must immediately initiate procedures to stop the coke combustion once the CO2 concentration at the outlet consistently reaches a level that indicates combustion of coke is complete and site decoke completion assurance procedures have been concluded.

(iii) During decoking operations, continuously monitor the temperature at the radiant tube(s) outlet when air is being introduced to ensure the coke combustion occurring inside the radiant tube(s) is not so aggressive (i.e., too hot) that it damages either the radiant tube(s) or ethylene cracking furnace isolation valve(s). The owner or operator must immediately initiate procedures to reduce the temperature at the radiant tube(s) outlet once the temperature reaches a level that indicates combustion of coke inside the radiant tube(s) is too aggressive.

(iv) After decoking, but before returning the ethylene cracking furnace back to normal operations, verify that decoke air is no longer being added.

(v) After decoking, but before returning the ethylene cracking furnace back to normal operations and/or during normal operations, inject materials into the steam or feed to reduce coke formation inside the radiant tube(s) during normal operation.

(8) Ethylene cracking furnace isolation valve inspections. Beginning no later than the compliance dates specified in §63.1102(c), the owner or operator must conduct ethylene cracking furnace isolation valve inspections as specified in paragraphs (e)(8)(i) and (ii) of this section.

(i) Prior to decoking operation, inspect the applicable ethylene cracking furnace isolation valve(s) to confirm that the radiant tube(s) being decoked is completely isolated from the ethylene production process so that no emissions generated from decoking operations are sent to the ethylene production process. If poor isolation is identified, then the owner or operator must rectify the isolation issue prior to continuing decoking operations to prevent leaks into the ethylene production process.

(ii) Prior to returning the ethylene cracking furnace to normal operations after a decoking operation, inspect the applicable ethylene cracking furnace isolation valve(s) to confirm that the radiant tube(s) that was decoked is completely isolated from the decoking pot or furnace firebox such that no emissions are sent from the radiant tube(s) to the decoking pot or furnace firebox once the ethylene cracking furnace returns to normal operation. If poor isolation is identified, then the owner or operator must rectify the isolation issue prior to continuing normal operations to prevent product from escaping to the atmosphere through the decoking pot or furnace firebox.

(9) Startup, shutdown, and malfunction referenced provisions. Beginning no later than the compliance dates specified in §63.1102(c), the referenced provisions specified in paragraphs (e)(9)(i) through (xx) of this section do not apply when demonstrating compliance with paragraph (e)(3) of this section.

(i) The second sentence of §63.181(d)(5)(i) of subpart H.

(ii) The second sentence of §63.983(a)(5) of subpart SS.

(iii) The phrase “except during periods of start-up, shutdown and malfunction as specified in the referencing subpart” in §63.984(a) of subpart SS.

(iv) The phrase “except during periods of start-up, shutdown and malfunction as specified in the referencing subpart” in §63.985(a) of subpart SS.

(v) The phrase “other than start-ups, shutdowns, or malfunctions” in §63.994(c)(1)(ii)(D) of subpart SS.

(vi) Section 63.996(c)(2)(ii) of subpart SS.

(vii) The last sentence of §63.997(e)(1)(i) of subpart SS.

(viii) Section 63.998(b)(2)(iii) of subpart SS.

(ix) The phrase “other than periods of startups, shutdowns, and malfunctions” from §63.998(b)(5)(i)(A) of subpart SS.

(x) The phrase “other than a start-up, shutdown, or malfunction” from §63.998(b)(5)(i)(B)(3) of subpart SS.

(xi) The phrase “other than periods of startups, shutdowns, and malfunctions” from §63.998(b)(5)(i)(C) of subpart SS.

(xii) The phrase “other than a start-up, shutdown, or malfunction” from §63.998(b)(5)(ii)(C) of subpart SS.

(xiii) The phrase “except as provided in paragraphs (b)(6)(i)(A) and (B) of this section” from §63.998(b)(6)(i) of subpart SS.

(xiv) The second sentence of §63.998(b)(6)(ii) of subpart SS.

(xv) Section 63.998(c)(1)(ii)(D) through (G) of subpart SS.

(xvi) Section 63.998(d)(3) of subpart SS.

(xvii) The phrase “may be included as part of the startup, shutdown, and malfunction plan, as required by the referencing subpart for the source, or” from §63.1024(f)(4)(i) of subpart UU.

(xviii) The phrase “(except periods of startup, shutdown, or malfunction)” from §63.1026(e)(1)(ii)(A) of subpart UU.

(xix) The phrase “(except periods of startup, shutdown, or malfunction)” from §63.1028(e)(1)(i)(A) of subpart UU.

(xx) The phrase “(except periods of startup, shutdown, or malfunction)” from §63.1031(b)(1) of subpart UU.

(10) Storage vessel degassing. Beginning no later than the compliance dates specified in §63.1102(c), for each storage vessel subject to paragraph (b) or (c) of Table 7 to §63.1103(e), the owner or operator must comply with paragraphs (e)(10)(i) through (iii) of this section during storage vessel shutdown operations (i.e., emptying and degassing of a storage vessel) until the vapor space concentration in the storage vessel is less than 10 percent of the LEL. The owner or operator must determine the LEL using process instrumentation or portable measurement devices and follow procedures for calibration and maintenance according to manufacturer's specifications.

(i) Remove liquids from the storage vessel as much as practicable;

(ii) Comply with one of the following:

(A) Reduce emissions of total organic HAP by 98 weight-percent by venting emissions through a closed vent system to a flare and meet the requirements of §63.983 and paragraphs (e)(4) and (9) of this section.

(B) Reduce emissions of total organic HAP by 98 weight-percent by venting emissions through a closed vent system to any combination of non-flare control devices and meet the requirements specified in §63.982(c)(1) and paragraph (e)(9) of this section.

(C) Reduce emissions of total organic HAP by 98 weight-percent by routing emissions to a fuel gas system or process and meet the requirements specified in §63.982(d) and paragraph (e)(9) of this section.

(iii) Maintain records necessary to demonstrate compliance with the requirements in §63.1108(a)(4)(ii) including, if appropriate, records of existing standard site procedures used to empty and degas (deinventory) equipment for safety purposes.

Table 7 to §63.1103(e)—What Are My Requirements If I Own or Operate an Ethylene Production Existing or New Affected Source?
If you own or operate . . .And if . . .Then you must . . .
(a) A storage vessel (as defined in §63.1101) that stores liquid containing organic HAP(1) The maximum true vapor pressure of total organic HAP is ≥3.4 kilopascals but <76.6 kilopascals; and the capacity of the vessel is ≥4 cubic meters but <95 cubic meters(i) Fill the vessel through a submerged pipe; or (ii) Comply with the requirements for storage vessels with capacities ≥95 cubic meters.
(b) A storage vessel (as defined in §63.1101) that stores liquid containing organic HAP(1) The maximum true vapor pressure of total organic HAP is ≥3.4 kilopascals but <76.6 kilopascals; and the capacity of the vessel is ≥95 cubic meters(i) Except as specified in paragraph (b)(1)(iii) of this table, comply with the requirements of subpart WW of this part; or (ii) Except as specified in paragraph (b)(1)(iii) of this table, reduce emissions of total organic HAP by 98 weight-percent by venting emissions through a closed vent system to any combination of control devices and meet the requirements of §63.982(a)(1). (iii) Beginning no later than the compliance dates specified in §63.1102(c), comply with paragraph (b)(1)(iii)(A), (B), (C), or (D) of this table, and (e)(10) of this section. (A) Comply with the requirements of subpart WW of this part; or (B) Reduce emissions of total organic HAP by 98 weight-percent by venting emissions through a closed vent system to a flare and meet the requirements of §63.983 and paragraphs (e)(4) and (9) of this section; or (C) Reduce emissions of total organic HAP by 98 weight-percent by venting emissions through a closed vent system to any combination of non-flare control devices and meet the requirements specified in §63.982(c)(1) and (e)(9) of this section; or (D) Reduce emissions of total organic HAP by 98 weight-percent by routing emissions to a fuel gas system(a) or process and meet the requirements specified in §63.982(d) and (e)(9) of this section.
(c) A storage vessel (as defined in §63.1101) that stores liquid containing organic HAP(1) The maximum true vapor pressure of total organic HAP is ≥76.6 kilopascals(i) Except as specified in paragraph (c)(1)(ii) of this table, reduce emissions of total organic HAP by 98 weight-percent by venting emissions through a closed vent system to any combination of control devices and meet the requirements of §63.982(a)(1). (ii) Beginning no later than the compliance dates specified in §63.1102(c), comply with paragraph (c)(1)(ii)(A), (B), or (C) of this table, and (e)(10) of this section. (A) Reduce emissions of total organic HAP by 98 weight-percent by venting emissions through a closed vent system to a flare and meet the requirements of §63.983 and paragraphs (e)(4) and (9) of this section; or (B) Reduce emissions of total organic HAP by 98 weight-percent by venting emissions through a closed vent system to any combination of non-flare control devices and meet the requirements specified in §63.982(c)(1) and (e)(9) of this section; or (C) Reduce emissions of total organic HAP by 98 weight-percent by routing emissions to a fuel gas system(a) or process and meet the requirements specified in §63.982(d) and (e)(9) of this section.
(d) An ethylene process vent (as defined in paragraph (e)(2) of this section)(1) The process vent is at an existing source and the vent stream has a flow rate ≥0.011 scmm and a total organic HAP concentration ≥50 parts per million by volume on a dry basis; or the process vent is at a new source and the vent stream has a flow rate ≥0.008 scmm and a total organic HAP concentration ≥30 parts per million by volume on a dry basis(i) Except as specified in paragraph (d)(1)(ii) of this table, reduce emissions of organic HAP by 98 weight-percent; or reduce organic HAP or TOC to a concentration of 20 parts per million by volume on a dry basis corrected to 3% oxygen; whichever is less stringent, by venting emissions through a closed vent system to any combination of control devices and meet the requirements specified in §63.982(b) and (c)(2). (ii) Beginning no later than the compliance dates specified in §63.1102(c), comply with the maintenance vent requirements specified in paragraph (e)(5) of this section and either paragraph (d)(1)(ii)(A) or (B) of this table. (A) Reduce emissions of organic HAP by 98 weight-percent; or reduce organic HAP or TOC to a concentration of 20 parts per million by volume on a dry basis corrected to 3-percent oxygen; whichever is less stringent, by venting emissions through a closed vent system to a flare and meet the requirements of §63.983 and paragraphs (e)(4) and (9) of this section; or (B) Reduce emissions of organic HAP by 98 weight-percent; or reduce organic HAP or TOC to a concentration of 20 parts per million by volume on a dry basis corrected to 3-percent oxygen; whichever is less stringent, by venting emissions through a closed vent system to any combination of non-flare control devices and meet the requirements specified in §63.982(c)(2) and (e)(9) of this section.
(e) A transfer rack (as defined in paragraph (e)(2) of this section)(1) Materials loaded have a true vapor pressure of total organic HAP ≥3.4 kilopascals and ≥76 cubic meters per day (averaged over any consecutive 30-day period) of HAP-containing material is loaded(i) Reduce emissions of organic HAP by 98 weight-percent; or reduce organic HAP or TOC to a concentration of 20 parts per million by volume on a dry basis corrected to 3-percent oxygen; whichever is less stringent, by venting emissions through a closed vent system to any combination of control devices as specified in §63.1105 and meet the requirements specified in paragraph (e)(9) of this section.; or
(ii) Install process piping designed to collect the HAP-containing vapors displaced from tank trucks or railcars during loading and to route it to a process, a fuel gas system, or a vapor balance system, as specified in §63.1105 and meet the requirements specified in paragraph (e)(9) of this section.(a)
(f) Equipment (as defined in §63.1101) that contains or contacts organic HAP(1) The equipment contains or contacts ≥5 weight-percent organic HAP; and the equipment is not in vacuum service(i) Except as specified in paragraph (f)(1)(ii) of this table, comply with the requirements of subpart UU of this part. (ii) Beginning no later than the compliance dates specified in §63.1102(c), comply with the requirements of paragraph (e)(9) of this section and subpart UU of this part, except instead of complying with the pressure relief device requirements of §63.1030 of subpart UU, meet the requirements of §63.1107(h), and in lieu of the flare requirement of §63.1034(b)(2)(iii), comply with the requirements specified in paragraph (e)(4) of this section.(a)
(g) Processes that generate waste (as defined in paragraph (e)(2) of this section(1) The waste stream contains any of the following HAP: Benzene, cumene, ethyl benzene, hexane, naphthalene, styrene, toluene, o-xylene, m-xylene, p-xylene, or 1,3-butadieneComply with the waste requirements of subpart XX of this part. For ethylene production unit waste stream requirements, terms have the meanings specified in subpart XX.
(h) A heat exchange system (as defined in §63.1082(b)) Comply with the heat exchange system requirements of subpart XX of this part.
(i) A closed vent system that contains one or more bypass lines(1) The bypass line could divert a vent stream directly to the atmosphere or to a control device not meeting the requirements in this tableBeginning no later than the compliance dates specified in §63.1102(c), comply with the requirements specified in paragraphs (e)(6) and (9) of this section.
(j) A decoking operation associated with an ethylene cracking furnaceBeginning no later than the compliance dates specified in §63.1102(c), comply with the requirements specified in paragraphs (e)(7) and (8) of this section.
(a) Beginning no later than the compliance dates specified in §63.1102(c), any flare using fuel gas from a fuel gas system, of which 50 percent or more of the fuel gas is derived from an ethylene production unit as determined on an annual average basis, must be in compliance with paragraph (e)(4) of this section.

§63.1107 Equipment leaks.

* * * *

(h)(3)(iv) The owner or operator must determine the total number of release events that occurred during the calendar year for each affected pressure relief device separately. The owner or operator must also determine the total number of release events for each pressure relief device for which the root cause analysis concluded that the root cause was a force majeure event, as defined in §63.1103(e)(2).

(h)(3)(v)(B) A second release event not including force majeure events from a single pressure relief device in a 3-calendar year period for the same root cause for the same equipment.

* * * *

(h)(6) Root cause analysis and corrective action analysis. A root cause analysis and corrective action analysis must be completed as soon as possible, but no later than 45 days after a release event. Special circumstances affecting the number of root cause analyses and/or corrective action analyses are provided in paragraphs (h)(6)(i) through (iv) of this section.

* * * *

(h)(6)(ii) Prior to June 3, 2024, you may conduct a single root cause analysis and corrective action analysis for a single emergency event that causes two or more pressure relief devices to release, regardless of the equipment served, if the root cause is reasonably expected to be a force majeure event, as defined in §63.1103(e)(2).

§63.1109 Recordkeeping requirements.

* * * *

(2) If complying with the requirements of §63.1103(e)(5)(i)(A) and the LEL at the time of the vessel opening exceeds 10 percent, records that identify the maintenance vent, the process units or equipment associated with the maintenance vent, the date of maintenance vent opening, and the LEL at the time of the vessel opening.

(3) If complying with the requirements of §63.1103(e)(5)(i)(B) and either the vessel pressure at the time of the vessel opening exceeds 5 psig or the LEL at the time of the active purging was initiated exceeds 10 percent, records that identify the maintenance vent, the process units or equipment associated with the maintenance vent, the date of maintenance vent opening, the pressure of the vessel or equipment at the time of discharge to the atmosphere and, if applicable, the LEL of the vapors in the equipment when active purging was initiated.

* * * *

(5) If complying with the requirements of §63.1103(e)(5)(i)(D), identification of the maintenance vent, the process units or equipment associated with the maintenance vent, records documenting actions taken to comply with other applicable alternatives and why utilization of this alternative was required, the date of maintenance vent opening, the equipment pressure and LEL of the vapors in the equipment at the time of discharge, an indication of whether active purging was performed and the pressure of the equipment during the installation or removal of the blind if active purging was used, the duration the maintenance vent was open during the blind installation or removal process, and records used to estimate the total quantity of VOC in the equipment at the time the maintenance vent was opened to the atmosphere for each applicable maintenance vent opening.

* * * *

(i)(2) Records of the number of releases during each calendar year and the number of those releases for which the root cause was determined to be a force majeure event. Keep these records for the current calendar year and the past five calendar years.

§63.1110 Reporting requirements.

* * * *

(a)(10) Beginning no later than the compliance dates specified in §63.1102(c), within 60 days after the date of completing each performance test required by this subpart, the owner or operator must submit the results of the performance test following the procedures specified in paragraphs (a)(10)(i)(A) through (C) of this section.

(i) Beginning no later than the compliance dates specified in §63.1102(c) for ethylene production affected sources, specified in §63.1102(d) for cyanide chemicals manufacturing affected sources, and specified in §63.1102(e) for carbon black production affected sources, within 60 days after the date of completing each performance test required by this subpart or applicability assessment required by §63.1103(f)(3)(iv), the owner or operator must submit the results of the performance test or applicability assessment following the procedures specified in paragraphs (a)(10)(i)(A) through (C) of this section.

(A) Data collected using test methods supported by the EPA's Electronic Reporting Tool (ERT) as listed on the EPA's ERT website (https://www.epa.gov/electronic-reporting-air-emissions/electronic-reporting-tool-ert) at the time of the test. Submit the results of the performance test or applicability assessment to the EPA via CEDRI, which can be accessed through the EPA's CDX ( https://cdx.epa.gov/ ). The data must be submitted in a file format generated through the use of the EPA's ERT. Alternatively, you may submit an electronic file consistent with the extensible markup language (XML) schema listed on the EPA's ERT website.

(B) Data collected using test methods that are not supported by the EPA's ERT as listed on the EPA's ERT website at the time of the test. The results of the performance test or applicability assessment must be included as an attachment in the ERT or an alternate electronic file consistent with the XML schema listed on the EPA's ERT website. Submit the ERT generated package or alternative file to the EPA via CEDRI.

(C) CBI. Do not use CEDRI to submit information you claim as CBI. Anything submitted to CEDRI cannot later be claimed CBI. Although we do not expect persons to assert a claim of CBI, if an owner or operator wishes to assert a CBI claim for some of the information submitted under paragraph (a)(10)(i)(A) or (B) of this section, then the owner or operator must submit a complete file, including information claimed to be CBI, to the EPA. The file must be generated through the use of the EPA's ERT or an alternate electronic file consistent with the XML schema listed on the EPA's ERT website. Submit the file on a compact disc, flash drive, or other commonly used electronic storage medium and clearly mark the medium as CBI. Mail the electronic medium to U.S. EPA/OAQPS/CORE CBI Office, Attention: Group Leader, Measurement Policy Group, MD C404-02, 4930 Old Page Rd., Durham, NC 27703. The same file with the CBI omitted must be submitted to the EPA via EPA's CDX as described in paragraphs (a)(10)(i)(A) and (B) of this section. All CBI claims must be asserted at the time of submission. Furthermore, under CAA section 114(c), emissions data is not entitled to confidential treatment, and the EPA is required to make emissions data available to the public. Thus, emissions data will not be protected as CBI and will be made publicly available.

(ii) Beginning no later than the compliance dates specified in §63.1102(c) through (e), the owner or operator must submit all subsequent Notification of Compliance Status reports required under paragraph (a)(4) of this section in PDF format to the EPA via CEDRI, which can be accessed through EPA's CDX ( https://cdx.epa.gov/ ). All subsequent Periodic Reports required under paragraph (a)(5) of this section must be submitted to the EPA via CEDRI using the appropriate electronic report template on the CEDRI website ( https://www.epa.gov/electronic-reporting-air-emissions/compliance-and-emissions-data-reporting-interface-cedri ) for this subpart beginning no later than the compliance dates specified in §63.1102(c) through (e) or once the report template has been available on the CEDRI website for 1 year, whichever date is later. The date report templates become available will be listed on the CEDRI website. The report must be submitted by the deadline specified in this subpart, regardless of the method in which the report is submitted. Although we do not expect persons to assert a claim of CBI, if you wish to assert a CBI claim, then submit a complete report, including information claimed to be CBI, to the EPA. Periodic Reports must be generated using the appropriate template on the CEDRI website. Submit the file on a compact disc, flash drive, or other commonly used electronic storage medium and clearly mark the medium as CBI. Mail the electronic medium to U.S. EPA/OAQPS/CORE CBI Office, MD C404-02, 4930 Old Page Road, Durham NC 27703 to the attention of the applicable person specified in paragraphs (A) through (C) of this section. The same file with the CBI omitted must be submitted to the EPA via the EPA's CDX as described earlier in this paragraph. All CBI claims must be asserted at the time of submission. Furthermore, under CAA section 114(c), emissions data is not entitled to confidential treatment, and the EPA is required to make emissions data available to the public. Thus, emissions data will not be protected as CBI and will be made publicly available.

(A) Ethylene Production Sector Lead

(B) Cyanide Chemicals Manufacturing Sector Lead

(C) Carbon Black Production Sector Lead

(iii) If you are required to electronically submit a report through CEDRI in the EPA's CDX, you may assert a claim of EPA system outage for failure to timely comply with the reporting requirement. To assert a claim of EPA system outage, the owner or operator must meet the requirements outlined in paragraphs (a)(10)(iii)(A) through (G) of this section.

(A) The owner or operator must have been or will be precluded from accessing CEDRI and submitting a required report within the time prescribed due to an outage of either the EPA's CEDRI or CDX systems.

(B) The outage must have occurred within the period of time beginning five business days prior to the date that the submission is due.

(C) The outage may be planned or unplanned.

(D) The owner or operator must submit notification to the Administrator in writing as soon as possible following the date you first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.

(E) The owner or operator must provide to the Administrator a written description identifying:

(1) The date(s) and time(s) when CDX or CEDRI was accessed and the system was unavailable;

(2) A rationale for attributing the delay in reporting beyond the regulatory deadline to EPA system outage;

(3) Measures taken or to be taken to minimize the delay in reporting; and

(4) The date by which you propose to report, or if you have already met the reporting requirement at the time of the notification, the date you reported.

(F) The decision to accept the claim of EPA system outage and allow an extension to the reporting deadline is solely within the discretion of the Administrator.

(G) In any circumstance, the report must be submitted electronically as soon as possible after the outage is resolved.

(iv) If you are required to electronically submit a report through CEDRI in the EPA's CDX, you may assert a claim of force majeure for failure to timely comply with the reporting requirement. To assert a claim of force majeure, the owner or operator must meet the requirements outlined in paragraphs (a)(10)(iv)(A) through (E) of this section.

(A) You may submit a claim if a force majeure event is about to occur, occurs, or has occurred or there are lingering effects from such an event within the period of time beginning five business days prior to the date the submission is due. For the purposes of this paragraph, a force majeure event is defined as an event that will be or has been caused by circumstances beyond the control of the affected facility, its contractors, or any entity controlled by the affected facility that prevents you from complying with the requirement to submit a report electronically within the time period prescribed. Examples of such events are acts of nature (e.g., hurricanes, earthquakes, or floods), acts of war or terrorism, or equipment failure or safety hazard beyond the control of the affected facility (e.g., large scale power outage).

(B) The owner or operator must submit notification to the Administrator in writing as soon as possible following the date you first knew, or through due diligence should have known, that the event may cause or has caused a delay in reporting.

(C) The owner or operator must provide to the Administrator:

(1) A written description of the force majeure event;

(2) A rationale for attributing the delay in reporting beyond the regulatory deadline to the force majeure event;

(3) Measures taken or to be taken to minimize the delay in reporting; and

(4) The date by which you propose to report, or if you have already met the reporting requirement at the time of the notification, the date you reported.

(D) The decision to accept the claim of force majeure and allow an extension to the reporting deadline is solely within the discretion of the Administrator.

(E) In any circumstance, the reporting must occur as soon as possible after the force majeure event occurs.

* * * *

(e)(4)(iii) The periods specified in §63.1109(e)(7). Indicate the date and start time for the period, and the net heating value operating parameter(s) determined following the methods in §63.670(k) through (n) of subpart CC as applicable.

* * * *

(e)(4)(iv)(A) The start and stop time and date of the flaring event.

(B) The length of time that emissions were visible from the flare during the event.

* * * *

(e)(5)(iii) The LEL, vessel pressure, or mass of VOC in the equipment, as applicable, at the start of atmospheric venting. If the 5 psig vessel pressure option in §63.1103(e)(5)(i)(B) was used and active purging was initiated while the LEL was 10 percent or greater, also include the LEL of the vapors at the time active purging was initiated.

* * * *

(e)(8)(iii) For pressure relief devices in organic HAP service subject to §63.1107(h)(3), report each pressure release to the atmosphere, including duration of the pressure release and estimate of the mass quantity of each organic HAP released; the results of any root cause analysis and corrective action analysis completed during the reporting period, including the corrective actions implemented during the reporting period; and, if applicable, the implementation schedule for planned corrective actions to be implemented subsequent to the reporting period.

* * *

§63.2346 What emission limitations, operating limits, and work practice standards must I meet?

* * * *

(a)(6) Beginning no later than the compliance dates specified in §63.2342(e), tank emissions during storage tank shutdown operations (i.e., emptying and degassing of a storage tank) for each storage tank at an affected source storing organic liquids that meets the tank capacity and liquid vapor pressure criteria for control in items 3 through 6 of Table 2 to this subpart, or items 1 through 3 of Table 2b to this subpart, you must comply with paragraphs (a)(6)(i) through (iii) of this section during tank emptying and degassing until the vapor space concentration in the tank is less than 10 percent of the lower explosive limit (LEL). The owner or operator must determine the LEL using process instrumentation or portable measurement devices and follow procedures for calibration and maintenance according to manufacturer's specifications.

* * * *

(e) Operating limits. For each high throughput transfer rack, you must meet each operating limit in Table 3 to this subpart for each control device used to comply with the provisions of this subpart whenever emissions from the loading of organic liquids are routed to the control device. Except as specified in paragraph (k) of this section, for each storage tank and low throughput transfer rack, you must comply with paragraph (l) of this section and the requirements for monitored parameters as specified in subpart SS of this part, for storage vessels and, during the loading of organic liquids, for low throughput transfer racks, respectively. Alternatively, you may comply with the operating limits in Table 3 to this subpart.

§63.2378 How do I demonstrate continuous compliance with the emission limitations, operating limits, and work practice standards?

* * * *

(e) Beginning no later than the compliance dates specified in §63.2342(e), paragraphs (b) through (d) of this section no longer apply. Instead, you must be in compliance with each emission limitation, operating limit, and work practice standard specified in paragraph (a) of this section at all times, except during periods of nonoperation of the affected source (or specific portion thereof) resulting in cessation of the emissions to which this subpart applies and must comply with the requirements specified in paragraphs (e)(1) through (5) of this section, as applicable. Equipment subject to the work practice standards for equipment leak components in Table 4 to this subpart, item 4 are not subject to this paragraph (e).

(1) Except as specified in paragraphs (e)(3) through (5) of this section, the use of a bypass line at any time on a closed vent system to divert a vent stream to the atmosphere or to a control device not meeting the requirements specified in paragraph (a) of this section is an emissions standards deviation.

(2) If you are subject to the bypass monitoring requirements of §63.983(a)(3), then you must continue to comply with the requirements in §63.983(a)(3) and the recordkeeping and reporting requirements in §§63.998(d)(1)(ii) and 63.999(c)(2), in addition to §63.2346(l), the recordkeeping requirements specified in §63.2390(g), and the reporting requirements specified in §63.2386(c)(12).

(3) Periods of planned routine maintenance of a control device used to control storage tank breathing loss emissions, during which the control device does not meet the emission limits in Table 2 or 2b to this subpart, must not exceed 240 hours per year. The level of material in the storage vessel shall not be increased during periods that the closed-vent system or control device is bypassed to perform routine maintenance.

(4) If you elect to route emissions from storage tanks to a fuel gas system or to a process, as allowed by §63.982(d), to comply with the emission limits in Table 2 or 2b to this subpart, the total aggregate amount of time during which the breathing loss emissions bypass the fuel gas system or process during the calendar year without being routed to a control device, for all reasons (except product changeovers of flexible operation units and periods when a storage tank has been emptied and degassed), must not exceed 240 hours. The level of material in the storage vessel shall not be increased during periods that the fuel gas system or process is bypassed to perform routine maintenance.

§63.2382 What notifications must I submit and when and what information should be submitted?

* * * *

(d)(3) Submitting Notification of Compliance Status. Beginning no later than the compliance dates specified in §63.2342(e), you must submit all subsequent Notification of Compliance Status reports to the EPA via CEDRI, which can be accessed through EPA's Central Data Exchange (CDX) (https://cdx.epa.gov/). If you claim some of the information required to be submitted via CEDRI is confidential business information (CBI), then submit a complete report, including information claimed to be CBI, to the EPA. Submit the file on a compact disc, flash drive, or other commonly used electronic storage medium and clearly mark the medium as CBI. Mail the electronic medium to U.S. Environmental Protection Agency, Office of Air Quality Planning and Standards, Sector Policies and Programs Division, U.S. EPA Mailroom (C404-02), Attention: Organic Liquids Distribution Sector Lead, 4930 Old Page Rd., Durham, NC 27703. The same file with the CBI omitted must be submitted to the EPA via EPA's CDX as described earlier in this paragraph. You may assert a claim of EPA system outage or force majeure for failure to timely comply with this reporting requirem

§63.2386 What reports must I submit and when and what information is to be submitted in each?

* * * *

(f) Beginning no later than the compliance dates specified in §63.2342(e), you must submit all Compliance reports to the EPA via CEDRI, which can be accessed through EPA's CDX (https://cdx.epa.gov/). You must use the appropriate electronic report template on the CEDRI website (https://www.epa.gov/electronic-reporting-air-emissions/compliance-and-emissions-data-reporting-interface-cedri) for this subpart. The date report templates become available will be listed on the CEDRI website. Unless the Administrator or delegated state agency or other authority has approved a different schedule for submission of reports under §§63.9(i) and 63.10(a), the report must be submitted by the deadline specified in this subpart, regardless of the method in which the report is submitted. If you claim some of the information required to be submitted via CEDRI is CBI, submit a complete report, including information claimed to be CBI, to the EPA. The report must be generated using the appropriate form on the CEDRI website or an alternate electronic file consistent with the extensible markup language (XML) schema listed on the CEDRI website. Submit the file on a compact disc, flash drive, or other commonly used electronic storage medium and clearly mark the medium as CBI. Mail the electronic medium to U.S. Environmental Protection Agency, Office of Air Quality Planning and Standards, Sector Policies and Programs Division, U.S. EPA Mailroom (C404-02), Attention: Organic Liquids Distribution Sector Lead, 4930 Old Page Rd., Durham, NC 27703. The same file with the CBI omitted must be submitted to the EPA via EPA's CDX as described earlier in this paragraph. You may assert a claim of EPA system outage or force majeure for failure to timely comply with this reporting requirement provided you meet the requirements outlined in paragraph (i) or (j) of this section, as applicable.

(g) Beginning no later than the compliance dates specified in §63.2342(e), you must start submitting performance test reports in accordance with this paragraph. Unless otherwise specified in this subpart, within 60 days after the date of completing each performance test required by this subpart, you must submit the results of the performance test following the procedures specified in paragraphs (g)(1) through (3) of this section.

(1) Data collected using test methods supported by the EPA's Electronic Reporting Tool (ERT) as listed on the EPA's ERT website (https://www.epa.gov/electronic-reporting-air-emissions/electronic-reporting-tool-ert) at the time of the test. Submit the results of the performance test to the EPA via CEDRI, which can be accessed through the EPA's CDX (https://cdx.epa.gov/). The data must be submitted in a file format generated through the use of the EPA's ERT. Alternatively, you may submit an electronic file consistent with the XML schema listed on the EPA's ERT website.

(2) Data collected using test methods that are not supported by the EPA's ERT as listed on the EPA's ERT website at the time of the test. The results of the performance test must be included as an attachment in the ERT or an alternate electronic file consistent with the XML schema listed on the EPA's ERT website. Submit the ERT generated package or alternative file to the EPA via CEDRI.

(3) CBI. If you claim some of the information submitted under paragraph (g)(1) or (2) of this section is CBI, then you must submit a complete file, including information claimed to be CBI, to the EPA. The file must be generated through the use of the EPA's ERT or an alternate electronic file consistent with the XML schema listed on the EPA's ERT website. Submit the file on a compact disc, flash drive, or other commonly used electronic storage medium and clearly mark the medium as CBI. Mail the electronic medium to U.S. EPA/OAQPS/CORE CBI Office, Attention: Group Leader, Measurement Policy Group, MD C404-02, 4930 Old Page Rd., Durham, NC 27703. The same file with the CBI omitted must be submitted to the EPA via EPA's CDX as described in paragraphs (g)(1) and (2) of this section.

(h) Beginning no later than the compliance dates specified in §63.2342(e), you must start submitting performance evaluation reports in accordance with this paragraph. Unless otherwise specified in this subpart, within 60 days after the date of completing each CEMS performance evaluation (as defined in §63.2) , you must submit the results of the performance evaluation following the procedures specified in paragraphs (h)(1) through (3) of this section.

(1) Performance evaluations of CEMS measuring relative accuracy test audit (RATA) pollutants that are supported by the EPA's ERT as listed on the EPA's ERT website at the time of the evaluation. Submit the results of the performance evaluation to the EPA via CEDRI, which can be accessed through the EPA's CDX. The data must be submitted in a file format generated through the use of the EPA's ERT. Alternatively, you may submit an electronic file consistent with the XML schema listed on the EPA's ERT website.

(2) Performance evaluations of CEMS measuring RATA pollutants that are not supported by the EPA's ERT as listed on the EPA's ERT website at the time of the evaluation. The results of the performance evaluation must be included as an attachment in the ERT or an alternate electronic file consistent with the XML schema listed on the EPA's ERT website. Submit the ERT generated package or alternative file to the EPA via CEDRI.

(3) CBI. If you claim some of the information submitted under paragraph (h)(1) or (2) of this section is CBI, then you must submit a complete file, including information claimed to be CBI, to the EPA. The file must be generated through the use of the EPA's ERT or an alternate electronic file consistent with the XML schema listed on the EPA's ERT website. Submit the file on a compact disc, flash drive, or other commonly used electronic storage medium and clearly mark the medium as CBI. Mail the electronic medium to U.S. EPA/OAQPS/CORE CBI Office, Attention: Group Leader, Measurement Policy Group, MD C404-02, 4930 Old Page Rd., Durham, NC 27703. The same file with the CBI omitted must be submitted to the EPA via the EPA's CDX as described in paragraphs (h)(1) and (2) of this section.

Table 12 to Subpart EEEE of Part 63—Applicability of General Provisions to Subpart EEEE

* * * *

§63.9(k) Electronic reporting proceduresProcedure to report electronically for notification in §63.9(j)Yes, only as specified in §63.9(j).

§63.2450 What are my general requirements for complying with this subpart?

* * * *

(e)(1) Except when complying with §63.2485, if you reduce organic HAP emissions by venting emissions through a closed-vent system to any combination of control devices (except a flare) or recovery devices, you must meet the requirements of paragraph (e)(4) of this section, and the requirements of §63.982(c) and the requirements referenced therein.

* * * *

(e)(5)(iv) Instead of complying with paragraph (o)(2)(iii) of §63.670 of subpart CC, if required to develop a flare management plan and submit it to the Administrator, then you must also submit all versions of the plan in portable document format (PDF) to the EPA via the Compliance and Emissions Data Reporting Interface (CEDRI), which can be accessed through the EPA's Central Data Exchange (CDX) (https://cdx.epa.gov/). The EPA will make all the information submitted through CEDRI available to the public without further notice to you. Do not use CEDRI to submit information you claim as confidential business information (CBI). Anything submitted using CEDRI cannot later be claimed to be CBI. Although we do not expect persons to assert a claim of CBI, if you wish to assert a CBI claim, submit a version with the CBI omitted via CEDRI. A complete plan, including information claimed to be CBI and clearly marked as CBI, must be mailed to the following address: U.S. Environmental Protection Agency, Office of Air Quality Planning and Standards, Sector Policies and Programs Division, CORE CBI Office, U.S. EPA Mailroom (C404-02), Attention: Miscellaneous Organic Chemical Manufacturing Sector Lead, 4930 Old Page Rd., Durham, NC 27703. All CBI claims must be asserted at the time of submission. Furthermore, under CAA section 114(c) emissions data is not entitled to confidential treatment, and the EPA is required to make emissions data available to the public. Thus, emissions data will not be protected as CBI and will be made publicly available.

* * * *

(e)(5)(viii)(B) You must substitute "800" for each occurrence of "270" in paragraph (e) of §63.670 of subpart CC;

* * * *

(e)(6)(i) If you are subject to the bypass monitoring requirements of §63.148(f) of subpart G, then you must continue to comply with the requirements in §63.148(f) of subpart G and the recordkeeping and reporting requirements in §§63.148(j)(2) and (3) of subpart G, and (h)(3) of subpart G, in addition to the applicable requirements specified in §63.2485(q), the recordkeeping requirements specified in §63.2525(n), and the reporting requirements specified in §63.2520(e)(12).

* * * *

(e)(7) Beginning no later than the compliance dates specified in §63.2445(g), if you reduce organic HAP emissions by venting emissions through a closed-vent system to an adsorber(s) that cannot be regenerated or a regenerative adsorber(s) that is regenerated offsite, then you must comply with paragraphs (e)(4) and (6) of this section and the requirements in §63.983, and you must install a system of two or more adsorber units in series and comply with the requirements specified in paragraphs (e)(7)(i) through (iii) of this section.

* * * *

(v)(1)(i) The vapor in the equipment served by the maintenance vent has a lower explosive limit (LEL) of less than 10 percent and has an outlet concentration less than or equal to 20 ppmv hydrogen halide and halogen HAP.

* * * *

(v)(1)(ii) If there is no ability to measure the LEL of the vapor in the equipment based on the design of the equipment, the pressure in the equipment served by the maintenance vent is reduced to 5 pounds per square inch gauge (psig) or less. Upon opening the maintenance vent, active purging of the equipment cannot be used until the LEL of the vapors in the maintenance vent (or inside the equipment if the maintenance is a hatch or similar type of opening) is less than 10 percent.

* * * *

(v)(2) Except for maintenance vents complying with the alternative in paragraph (v)(1)(iii) of this section, you must determine the LEL or, if applicable, equipment pressure using process instrumentation or portable measurement devices and follow procedures for calibration and maintenance according to manufacturer's specifications.

§63.2460 What requirements must I meet for batch process vents?

* * * *

(c)(9) Requirements for a biofilter. If you use a biofilter to meet either the95-percent reduction requirement or outlet concentration requirement specified in Table 2 to this subpart, you must meet the requirements specified in paragraphs (c)(9)(i) through (vi) of this section.

§63.2470 What requirements must I meet for storage tanks?

* * * *

(f) Storage tank degassing. Beginning no later than the compliance dates specified in §63.2445(g), for each storage tank subject to item 1 of Table 4 to this subpart, you must comply with paragraphs (f)(1) through (3) of this section during storage tank shutdown operations (i.e., emptying and degassing of a storage tank) until the vapor space concentration in the storage tank is less than 10 percent of the LEL. You must determine the LEL using process instrumentation or portable measurement devices and follow procedures for calibration and maintenance according to manufacturer's specifications.

§63.2480 What requirements must I meet for equipment leaks?

(a) You must meet each requirement in Table 6 to this subpart that applies to your equipment leaks, except as specified in paragraphs (b) through (f) of this section. For each light liquid pump, valve, and connector in ethylene oxide service as defined in §63.2550(i), you must also meet the applicable requirements specified in §§63.2492 and 63.2493(d) and (e).

* * * *

(e)(2)(i) If the pressure relief device does not consist of or include a rupture disk, conduct instrument monitoring, as specified in §63.1023(b) of subpart UU, §63.180(c) of subpart H, or §65.104(b) of this chapter, no later than 5 calendar days after the pressure relief device returns to organic HAP gas or vapor service following a pressure release to verify that the pressure relief device is operating with an instrument reading of less than 500 ppm.

* * * *

(e)(2)(iii) If the pressure relief device consists only of a rupture disk, install a replacement disk as soon as practicable after a pressure release, but no later than 5 calendar days after the pressure release. You must not initiate startup of the equipment served by the rupture disk until the rupture disc is replaced. You must conduct instrument monitoring, as specified in §63.1023(b) of subpart UU, §63.180(c) of subpart H, or §65.104(b) of this chapter, no later than 5 calendar days after the pressure relief device returns to organic HAP gas or vapor service following a pressure release to verify that the pressure relief device is operating with an instrument reading of less than 500 ppm.

* * * *

(e)(3)(iv) You must determine the total number of release events that occurred during the calendar year for each affected pressure relief device separately. You must also determine the total number of release events for each pressure relief device for which the root cause analysis concluded that the root cause was a force majeure event, as defined in §63.2550.

* * * *

(e)(3)(5)(B) A second release event not including force majeure events from a single pressure relief device in a 3 calendar year period for the same root cause for the same equipment.

(e)(3)(5)(C) A third release event not including force majeure events from a single pressure relief device in a 3 calendar year period for any reason.

* * * *

(e)(6)(ii) You may conduct a single root cause analysis and corrective action analysis for a single emergency event that causes two or more pressure relief devices to release, regardless of the equipment served, if the root cause is reasonably expected to be a force majeure event, as defined in §63.2550.

* * * *

(f)(18)(iii) In §63.181(b)(2)(i), replace the reference to §63.165(a) with §63.2480(e)(1).

* * * *

(f)(18)(vi) The information required to be reported under §63.182(d)(2)(xiv) is now required to be reported under §63.2520(e)(15)(i) through (iii).

* * * *

(f)(18)(x) The reference to §63.1030(c) in §63.1022(a)(1)(v) no longer applies. Instead comply with the §63.2480(e)(1) and (2).

* * * *

(f)(18)(xiii) The information required to be reported under §63.1039(b)(4) is now required to be reported under §63.2520(e)(15)(i) and (ii).

§63.2490 What requirements must I meet for heat exchange systems?

* * * *

(a) You must comply with each requirement in Table 10 to this subpart that applies to your heat exchange systems, except as specified in paragraphs (b) through (d) of this section.

* * * *

(d) Unless one or more of the conditions specified in §63.104(a)(1), (2), (5), and (6) are met, beginning no later than the compliance dates specified in §63.2445(g), the requirements of §63.104 as specified in Table 10 to this subpart and paragraphs (b) and (c) of this section no longer apply. Instead, you must monitor the cooling water for the presence of total strippable hydrocarbons that indicate a leak according to paragraph (d)(1) of this section, and if you detect a leak, then you must repair it according to paragraphs (d)(2) and (3) of this section, unless repair is delayed according to paragraph (d)(4) of this section. At any time before the compliance dates specified in §63.2445(g), you may choose to comply with the requirements in this paragraph (d) in lieu of the requirements of §63.104 as specified in Table 10 to this subpart and paragraphs (b) and (c) of this section. The requirements in this paragraph (d) do not apply to heat exchange systems that have a maximum cooling water flow rate of 10 gallons per minute or less.

* * * *

(d)(4)(iii) The delay of repair action level is a total strippable hydrocarbon concentration (as methane) in the stripping gas of 62 ppmv or, for heat exchange systems with a recirculation rate of 10,000 gallons per minute or less, the delay of repair action level is a total hydrocarbon mass emissions rate (as methane) or 1.8 kg/hr. The delay of repair action level is assessed as described in paragraph (d)(4)(iii)(A) or (B) of this section, as applicable.

§63.2492 How do I determine whether my process vent, storage tank, or equipment is in ethylene oxide service?

* * * *

(b) For storage tanks, you must measure the concentration of ethylene oxide of the fluid stored in the storage tanks using Method 624.1 of 40 CFR part 136, appendix A, or preparation by Method 5031 and analysis by Method 8260D (both incorporated by reference, see §63.14) in the SW-846 Compendium. In lieu of preparation by SW-846 Method 5031, you may use SW-846 Method 5030B (incorporated by reference, see §63.14), as long as: You do not use a preservative in the collected sample; you store the sample with minimal headspace as cold as possible and at least below 4 degrees C; and you analyze the sample as soon as possible, but in no case longer than 7 days from the time the sample was collected. If you are collecting a sample from a pressure vessel, you must maintain the sample under pressure both during and following sampling.

§63.2493 What requirements must I meet for process vents, storage tanks, or equipment that are in ethylene oxide service?

* * * *

(a)(2)(vi) If you vent emissions through a closed-vent system to a scrubber, then you must establish operating parameter limits by monitoring the operating parameters specified in paragraphs (a)(2)(vi)(A) through (C) of this section during the performance test.

* * * *

(a)(2)(vi)(C) Temperature of the water entering the scrubber column. The temperature may be measured at any point after the heat exchanger and prior to entering the top of the scrubber column. Determine the average inlet water temperature as the average of the test run averages.

* * * *

(a)(2)(viii) If you vent emissions through a closed-vent system to a control device other than a flare, scrubber, or thermal oxidizer, then you must notify the Administrator of the operating parameters that you plan to monitor during the performance test prior to establishing operating parameter limits for the control device.

* * * *

(b)(2) Continuously monitor the ethylene oxide concentration at the exit of the control device using an FTIR CEMS meeting the requirements of Performance Specification 15 of 40 CFR part 60, appendix B, and §63.2450(j). If you use an FTIR CEMS, you do not need to conduct the performance testing required in paragraph (b)(3) of this section or the operating parameter monitoring required in paragraphs (b)(4) through (6) of this section.

* * * *

(b)(4) If you vent emissions through a closed-vent system to a scrubber, then you must comply with §63.2450(e)(4) and (6) and the requirements in §63.983, and you must meet the operating parameter limits specified in paragraphs (b)(4)(i) through (v) of this section.

* * * *

(b)(4)(iv) Maximum temperature of the water entering the scrubber column, equal to the average temperature measured during the most recent performance test. Compliance with the inlet water temperature operating limit must be determined continuously on a 1-hour block basis. Use a temperature sensor with a minimum accuracy of ±1 percent over the normal range of the temperature measured, expressed in degrees Celsius, or 2.8 degrees Celsius, whichever is greater.

* * * *

(b)(6) If you vent emissions through a closed-vent system to a control device other than a flare, scrubber, or thermal oxidizer, then you must comply with §63.2450(e)(4) and (6) and the requirements in §63.983, and you must monitor the operating parameters identified in paragraph (a)(2)(viii) of this section and meet the established operating parameter limits to ensure continuous compliance. The frequency of monitoring and averaging time will be determined based upon the information provided to the Administrator.

* * * *

(d)(1)(iii) When a leak is detected, it must be repaired as soon as practicable, but not later than 15 calendar days after it is detected.

* * * *

(d)(2)(iii) When a leak is detected, it must be repaired as soon as practicable, but not later than 15 calendar days after it is detected.

* * * *

(d)(3) For each light liquid pump or connector in ethylene oxide service that is added to an affected source, and for each light liquid pump or connector in ethylene oxide service that replaces a light liquid pump or connector in ethylene oxide service, you must initially monitor for leaks within 5 days after initial startup of the equipment.

* * * *

(d)(4)(v) Replace all references to §63.2445(g) with §63.2445(h).

* * * *

(e) Non-applicable referenced provisions. The referenced provisions specified in paragraphs (e)(1) through (15) of this section do not apply when demonstrating compliance with this section.

* * * *

§63.2515 What notifications must I submit and when?

* * * *

(d) Supplement to Notification of Compliance Status. You must also submit supplements to the Notification of Compliance Status as specified in §63.2520(d)(3) through (5).

§63.2520 What reports must I submit and when?

* * * *

(d) Notification of compliance status report. You must submit a notification of compliance status report according to the schedule in paragraph (d)(1) of this section, and the notification of compliance status report must contain the information specified in paragraphs (d)(2) through (5) of this section.

* * * *

(e) Compliance report. The compliance report must contain the information specified in paragraphs (e)(1) through (17) of this section. On and after August 12, 2023 or once the reporting template for this subpart has been available on the CEDRI website for 1 year, whichever date is later, you must submit all subsequent reports to the EPA via the CEDRI, which can be accessed through the EPA's CDX (https://cdx.epa.gov/). The EPA will make all the information submitted through CEDRI available to the public without further notice to you. Do not use CEDRI to submit information you claim as CBI. Anything submitted using CEDRI cannot later be claimed to be CBI. You must use the appropriate electronic report template on the CEDRI website (https://www.epa.gov/electronic-reporting-air-emissions/compliance-and-emissions-data-reporting-interface-cedri) for this subpart. The date report templates become available will be listed on the CEDRI website. Unless the Administrator or delegated state agency or other authority has approved a different schedule for submission of reports under §§63.9(i) and 63.10(a) of subpart A, the report must be submitted by the deadline specified in this subpart, regardless of the method in which the report is submitted. Although we do not expect persons to assert a claim of CBI, if you wish to assert a CBI claim, submit a complete report, including information claimed to be CBI, to the EPA. The report must be generated using the appropriate form on the CEDRI website or an alternate electronic file consistent with the extensible markup language (XML) schema listed on the CEDRI website. Submit the file on a compact disc, flash drive, or other commonly used electronic storage medium and clearly mark the medium as CBI. Mail the electronic medium to U.S. Environmental Protection Agency, Office of Air Quality Planning and Standards, Sector Policies and Programs Division, CORE CBI Office, U.S. EPA Mailroom (C404-02), Attention: Miscellaneous Organic Chemical Manufacturing Sector Lead, 4930 Old Page Rd., Durham, NC 27703. The same file with the CBI omitted must be submitted to the EPA via the EPA's CDX as described in this paragraph (e). All CBI claims must be asserted at the time of submission. Furthermore under CAA section 114(c) emissions data is not entitled to confidential treatment, and the EPA is required to make emissions data available to the public. Thus, emissions data will not be protected as CBI and will be made publicly available. You may assert a claim of EPA system outage or force majeure for failure to timely comply with the reporting requirement in this paragraph (e) provided you meet the requirements outlined in paragraph (i) or (j) of this section, as applicable.

* * * *

(e)(2) Statement by a responsible official with that official's name, title, and signature, certifying the accuracy of the content of the report. If your report is submitted via CEDRI, the certifier's electronic signature during the submission process replaces the requirement in this paragrpah (e)(2).

* * * *

(e)(14)(iii) The lower explosive limit in percent, vessel pressure in psig, or mass in pounds of VOC in the equipment, as applicable, at the start of atmospheric venting. If the 5 psig vessel pressure option in §63.2450(v)(1)(ii) was used and active purging was initiated while the lower explosive limit was 10 percent or greater, also include the lower explosive limit of the vapors at the time active purging was initiated.

* * * *

(e)(16) For each heat exchange system subject to §63.2490(d), beginning no later than the compliance dates specified in §63.2445(g), the reporting requirements of §63.104(f)(2) no longer apply; instead, the compliance report must include the information specified in paragraphs (e)(16)(i) through (v) of this section.

(i) The number of heat exchange systems at the plant site subject to the monitoring requirements in §63.2490(d) during the reporting period;

(ii) The number of heat exchange systems subject to the monitoring requirements in §63.2490(d) at the plant site found to be leaking during the reporting period;

(iii) For each monitoring location where the total strippable hydrocarbon concentration or total hydrocarbon mass emissions rate was determined to be equal to or greater than the applicable leak definitions specified in §63.2490(d)(1)(v) during the reporting period, identification of the monitoring location (e.g., unique monitoring location or heat exchange system ID number), the measured total strippable hydrocarbon concentration or total hydrocarbon mass emissions rate, the date the leak was first identified, and, if applicable, the date the source of the leak was identified;

(iv) For leaks that were repaired during the reporting period (including delayed repairs), identification of the monitoring location associated with the repaired leak, the total strippable hydrocarbon concentration or total hydrocarbon mass emissions rate measured during re-monitoring to verify repair, and the re-monitoring date (i.e., the effective date of repair); and

(v) For each delayed repair, identification of the monitoring location associated with the leak for which repair is delayed, the date when the delay of repair began, the date the repair is expected to be completed (if the leak is not repaired during the reporting period), the total strippable hydrocarbon concentration or total hydrocarbon mass emissions rate and date of each monitoring event conducted on the delayed repair during the reporting period, and an estimate in pounds of the potential total hydrocarbon emissions over the reporting period associated with the delayed repair.

* * * *

(f) Performance test reports. Beginning no later than October 13, 2020, you must submit performance test reports in accordance with this paragraph (f). Unless otherwise specified in this subpart, within 60 days after the date of completing each performance test required by this subpart, you must submit the results of the performance test following the procedures specified in paragraphs (f)(1) through (3) of this section.

(1) Data collected using test methods supported by the EPA's Electronic Reporting Tool (ERT) as listed on the EPA's ERT website (https://www.epa.gov/electronic-reporting-air-emissions/electronic-reporting-tool-ert) at the time of the test. Submit the results of the performance test to the EPA via CEDRI, which can be accessed through the EPA's CDX (https://cdx.epa.gov/). The data must be submitted in a file format generated through the use of the EPA's ERT. Alternatively, you may submit an electronic file consistent with the extensible markup language (XML) schema listed on the EPA's ERT website.

(2) Data collected using test methods that are not supported by the EPA's ERT as listed on the EPA's ERT website at the time of the test. The results of the performance test must be included as an attachment in the ERT or an alternate electronic file consistent with the XML schema listed on the EPA's ERT website. Submit the ERT generated package or alternative file to the EPA via CEDRI.

(3) Confidential business information (CBI). The EPA will make all the information submitted through CEDRI available to the public without further notice to you. Do not use CEDRI to submit information you claim as CBI. Anything submitted using CEDRI cannot later be claimed to be CBI. Although we do not expect persons to assert a claim of CBI, if you wish to assert a CBI claim, you must submit a complete file, including information claimed to be CBI, to the EPA. The file must be generated through the use of the EPA's ERT or an alternate electronic file consistent with the XML schema listed on the EPA's ERT website. Submit the file on a compact disc, flash drive, or other commonly used electronic storage medium and clearly mark the medium as CBI. Mail the electronic medium to U.S. Environmental Protection Agency, Office of Air Quality Planning and Standards, Sector Policies and Programs Division, CORE CBI Office, U.S. EPA Mailroom (C404-02), Attention: Group Leader, Measurement Policy Group, 4930 Old Page Rd., Durham, NC 27703. The same file with the CBI omitted must be submitted to the EPA via the EPA's CDX as described in paragraph (f)(1) and (2) of this section. All CBI claims must be asserted at the time of submission. Furthermore, under CAA section 114(c) emissions data is not entitled to confidential treatment, and the EPA is required to make emissions data available to the public. Thus, emissions data will not be protected as CBI and will be made publicly available.

(g) CEMS relative accuracy test audit (RATA) Performance evaluation reports. Beginning no later than October 13, 2020, you must start submitting CEMS RATA performance evaluation reports in accordance with this paragraph (g). Unless otherwise specified in this subpart, within 60 days after the date of completing each continuous monitoring system performance evaluation (as defined in §63.2), you must submit the results of the performance evaluation following the procedures specified in paragraphs (g)(1) through (3) of this section.

(1) Performance evaluations of CMS measuring RATA pollutants that are supported by the EPA's ERT as listed on the EPA's ERT website at the time of the evaluation. Submit the results of the performance evaluation to the EPA via CEDRI, which can be accessed through the EPA's CDX. The data must be submitted in a file format generated through the use of the EPA's ERT. Alternatively, you may submit an electronic file consistent with the XML schema listed on the EPA's ERT website.

(2) Performance evaluations of CMS measuring RATA pollutants that are not supported by the EPA's ERT as listed on the EPA's ERT website at the time of the evaluation. The results of the performance evaluation must be included as an attachment in the ERT or an alternate electronic file consistent with the XML schema listed on the EPA's ERT website. Submit the ERT generated package or alternative file to the EPA via CEDRI.

(3) Confidential business information (CBI). The EPA will make all the information submitted through CEDRI available to the public without further notice to you. Do not use CEDRI to submit information you claim as CBI. Anything submitted using CEDRI cannot later be claimed to be CBI. Although we do not expect persons to assert a claim of CBI, if you wish to assert a CBI claim, you must submit a complete file, including information claimed to be CBI, to the EPA. The file must be generated through the use of the EPA's ERT or an alternate electronic file consistent with the XML schema listed on the EPA's ERT website. Submit the file on a compact disc, flash drive, or other commonly used electronic storage medium and clearly mark the medium as CBI. Mail the electronic medium to U.S. Environmental Protection Agency, Office of Air Quality Planning and Standards, Sector Policies and Programs Division, CORE CBI Office, U.S. EPA Mailroom (C404-02), Attention: Group Leader, Measurement Policy Group, 4930 Old Page Rd., Durham, NC 27703. The same file with the CBI omitted must be submitted to the EPA via the EPA's CDX as described in paragraphs (g)(1) and (2) of this section. All CBI claims must be asserted at the time of submission. Furthermore, under CAA section 114(c) emissions data is not entitled to confidential treatment, and the EPA is required to make emissions data available to the public. Thus, emissions data will not be protected as CBI and will be made publicly available.

§63.2525 What records must I keep?

* * * *

(o) For each nonregenerative adsorber and regenerative adsorber that is regenerated offsite subject to the requirements in §63.2450(e)(7), you must keep the applicable records specified in paragraphs (o)(1) through (4) of this section.

(1) Outlet HAP or TOC concentration for each adsorber bed measured during each performance test conducted.

(2) Daily outlet HAP or TOC concentration.

(3) Date and time you last replaced the adsorbent.

(4) If you conduct monitoring less frequently than daily as specified in §63.2450(e)(7)(iii)(B), you must record the average life of the bed.

* * * *

(p)(2) If complying with the requirements of §63.2450(v)(1)(i) and the lower explosive limit at the time of the vessel opening exceeds 10 percent, identification of the maintenance vent, the process units or equipment associated with the maintenance vent, the date of maintenance vent opening, and the lower explosive limit at the time of the vessel opening.

(p)(3) If complying with the requirements of §63.2450(v)(1)(ii) and either the vessel pressure at the time of the vessel opening exceeds 5 psig or the lower explosive limit at the time of the active purging was initiated exceeds 10 percent, identification of the maintenance vent, the process units or equipment associated with the maintenance vent, the date of maintenance vent opening, the pressure of the vessel or equipment at the time of discharge to the atmosphere and, if applicable, the lower explosive limit of the vapors in the equipment when active purging was initiated.

* * * *

(p)(5) If complying with the requirements of §63.2450(v)(1)(iv), identification of the maintenance vent, the process units or equipment associated with the maintenance vent, records documenting actions taken to comply with other applicable alternatives and why utilization of this alternative was required, the date of maintenance vent opening, the equipment pressure and lower explosive limit of the vapors in the equipment at the time of discharge, an indication of whether active purging was performed and the pressure of the equipment during the installation or removal of the blind if active purging was used, the duration the maintenance vent was open during the blind installation or removal process, and records used to estimate the total quantity of VOC in the equipment at the time the maintenance vent was opened to the atmosphere for each applicable maintenance vent opening.

* * * *

(q)(2) Records of the number of releases during each calendar year and the number of those releases for which the root cause was determined to be a force majeure event. Keep these records for the current calendar year and the past 5 calendar years.

* * * *

(r)(1) Monitoring data required by §63.2490(d) that indicate a leak, the date the leak was detected, or, if applicable, the basis for determining there is no leak.

* * * *

(r)(4)(iv) An estimate of the potential total hydrocarbon emissions from the leaking heat exchange system or heat exchanger for each required delay of repair monitoring interval following the procedures in paragraphs (r)(4)(iv)(A) through (C) of this section.

* * * *

(r)(4)(iv)(B) For delay of repair monitoring intervals prior to repair of the leak, calculate the potential total hydrocarbon emissions for the leaking heat exchange system or heat exchanger for the monitoring interval by multiplying the mass emissions rate, determined in §63.2490(d)(1)(iii)(B) or paragraph (r)(4)(iv)(A) of this section, by the duration of the delay of repair monitoring interval. The duration of the delay of repair monitoring interval is the time period starting at midnight on the day of the previous monitoring event or at midnight on the day the repair would have had to be completed if the repair had not been delayed, whichever is later, and ending at midnight of the day the of the current monitoring event.

(C) For delay of repair monitoring intervals ending with a repaired leak, calculate the potential total hydrocarbon emissions for the leaking heat exchange system or heat exchanger for the final delay of repair monitoring interval by multiplying the duration of the final delay of repair monitoring interval by the mass emissions rate determined for the last monitoring event prior to the re-monitoring event used to verify the leak was repaired. The duration of the final delay of repair monitoring interval is the time period starting at midnight of the day of the last monitoring event prior to re-monitoring to verify the leak was repaired and ending at the time of the re-monitoring event that verified that the leak was repaired.

§63.2550 What definitions apply to this subpart?

* * * *

In ethylene oxide service means the following:

(1) For equipment leaks, any equipment that contains or contacts a fluid (liquid or gas) that is at least 0.1 percent by weight of ethylene oxide. If information exists that suggests ethylene oxide could be present in equipment, the equipment is considered to be "in ethylene oxide service" unless sampling and analysis is performed as specified in §63.2492 to demonstrate that the equipment does not meet the definition of being "in ethylene oxide service". Examples of information that could suggest ethylene oxide could be present in equipment, include calculations based on safety data sheets, material balances, process stoichiometry, or previous test results provided the results are still relevant to the current operating conditions.

(2) For process vents, each batch and continuous process vent in a process that, when uncontrolled, contains a concentration of greater than or equal to 1 ppmv undiluted ethylene oxide, and when combined, the sum of all these process vents would emit uncontrolled ethylene oxide emissions greater than or equal to 5 lb/yr (2.27 kg/yr). If information exists that suggests ethylene oxide could be present in a batch or continuous process vent, then the batch or continuous process vent is considered to be "in ethylene oxide service" unless an analysis is performed as specified in §63.2492 to demonstrate that the batch or continuous process vent does not meet the definition of being "in ethylene oxide service". Examples of information that could suggest ethylene oxide could be present in a batch or continuous process vent, include calculations based on safety data sheets, material balances, process stoichiometry, or previous test results provided the results are still relevant to the current operating conditions.

(3) For storage tanks, storage tanks of any capacity and vapor pressure storing a liquid that is at least 0.1 percent by weight of ethylene oxide. If knowledge exists that suggests ethylene oxide could be present in a storage tank, then the storage tank is considered to be "in ethylene oxide service" unless sampling and analysis is performed as specified in §63.2492 to demonstrate that the storage tank does not meet the definition of being "in ethylene oxide service". The exemptions for "vessels storing organic liquids that contain HAP only as impurities" and "pressure vessels designed to operate in excess of 204.9 kilopascals and without emissions to the atmosphere" listed in the definition of "storage tank" in this section do not apply for storage tanks that may be in ethylene oxide service. Examples of information that could suggest ethylene oxide could be present in a storage tank, include calculations based on safety data sheets, material balances, process stoichiometry, or previous test results provided the results are still relevant to the current operating conditions.

Table 10 to Subpart FFFF of Part 63—Work Practice Standards for Heat Exchange Systems

Table 10 to Subpart FFFF of Part 63—Work Practice Standards for Heat Exchange Systems
For each . . .You must . . .
Heat exchange system, as defined in §63.101a. Comply with the requirements of §63.104 and the requirements referenced therein, except as specified in §63.2490(b) and (c); or
b. Comply with the requirements in §63.2490(d).

Table 12 to Subpart FFFF of Part 63—Applicability of General Provisions to Subpart FFFF

* * * *

§63.9(k)Electronic reporting proceduresYes, as specified in §63.9(j).

Specialized Industries

Go beyond the regulations! Visit the Institute for in-depth guidance on a wide range of compliance subjects in safety and health, transportation, environment, and human resources.

J. J. Keller® COMPLIANCE NETWORK is a premier online safety and compliance community, offering members exclusive access to timely regulatory content in workplace safety (OSHA), transportation (DOT), environment (EPA), and human resources (DOL).

Interact With Our Compliance Experts

Puzzled by a regulatory question or issue? Let our renowned experts provide the answers and get your business on track to full compliance!

Upcoming Events

Reference the Compliance Network Safety Calendar to keep track of upcoming safety and compliance events. Browse by industry or search by keyword to see relevant dates and observances, including national safety months, compliance deadlines, and more.

SAFETY & COMPLIANCE NEWS

Keep up with the latest regulatory developments from OSHA, DOT, EPA, DOL, and more.

REGSENSE® REGULATORY REFERENCE

Explore a comprehensive database of word-for-word regulations on a wide range of compliance topics, with simplified explanations and best practices advice from our experts.

THE J. J. KELLER INSTITUTE

The Institute is your destination for in-depth content on 120+ compliance subjects. Discover articles, videos, and interactive exercises that will strengthen your understanding of regulatory concepts relevant to your business.

ADD HAZMAT, ENVIRONMENTAL, & HR RESOURCES

Unlock exclusive content offering expert insights into hazmat, environmental, and human resources compliance with a COMPLIANCE NETWORK EDGE membership.

DIRECT ACCESS TO COMPLIANCE EXPERTS

Struggling with a compliance challenge? Get the solution from our in-house team of experts! You can submit a question to our experts by email, set up a phone or video call, or request a detailed research report.

EVENTS

Register to attend live online events hosted by our experts. These webcasts and virtual conferences feature engaging discussions on important compliance topics in a casual, knowledge-sharing environment.

Most Recent Highlights In Environmental

New chemical review: What are the 5 possible results?
2024-12-11T06:00:00Z

New chemical review: What are the 5 possible results?

Before a new chemical substance can enter the marketplace, it first travels through the New Chemicals Review Program. Section 5 of the Toxic Substances Control Act (TSCA) requires the Environmental Protection Agency (EPA) to review new chemicals for any unreasonable risk of injury they may pose to human or environmental health. The agency determines (a) whether the substances can enter the marketplace and (b) if they require restrictions to manage any unreasonable risk.

To manufacture (including import) a chemical for commercial purposes that’s not on the TSCA Chemical Substance Inventory (i.e., a new chemical), you have to submit a premanufacture notice (PMN) to EPA. In December 2024, EPA finalized the new chemicals review rule. It clarifies that when you submit a PMN, you may not manufacture the new chemical substance until the agency issues a safety determination and completes any associated actions (like developing rules to limit its use).

Start the PMN process by conducting your own review! Evaluate and prepare for the possible determinations EPA will make for your new chemical substance.

Safety determinations

Submitting a PMN sparks the beginning of the new chemicals review process. EPA completes the review process by making one of five possible safety determinations for the new chemical.

It’s important to note that three types of determinations fall under the scope of Section 5(e) actions. If EPA makes any determination under Section 5(e), it must issue a Section 5(e) order with requirements that limit or ban the manufacture, processing, distribution in commerce, use, or disposal of the new chemical. Examples include toxicity testing, personal protective equipment for exposed workers, and environmental release restrictions.

Let’s take a look at each one.

Section 5(a)(3)(C): Not likely to present an unreasonable risk

In the most straightforward scenario, EPA can find that the new chemical isn’t likely to pose an unreasonable risk.

In this case, the agency will notify you and publish its findings in the Federal Register. Once you receive the Section 5(a)(3)(C) notice from EPA, you may begin manufacturing the new chemical substance, even if the applicable review period isn’t over.

Section 5(f): Presents an unreasonable risk

The agency may find that a new chemical presents an unreasonable risk of injury.

It will use Section 5(f) to limit or ban the manufacture, processing, distribution in commerce, use, or disposal of the new chemical through either:

  • A proposed rule that takes immediate effect, or
  • An issued order.

Section 5(e): Insufficient information

The agency may determine that it doesn’t have enough information to make a “reasoned evaluation” of the new chemical’s impact on health and the environment.

EPA will issue a Section 5(e) order with restrictions to mitigate or eliminate the unreasonable risk.

Section 5(e): May present an unreasonable risk

If EPA doesn’t have enough information, it can alternatively determine that the new chemical poses an unreasonable risk due to insufficient information.

The agency will issue a Section 5(e) order with restrictions to mitigate or eliminate the unreasonable risk.

Section 5(e): Presents unreasonable risk due to quantity

On the other hand, EPA may determine that the new chemical will be produced in substantial quantities that could (a) be released in large amounts to the environment or (b) result in significant human exposure.

EPA will issue a Section 5(e) order with restrictions to mitigate or eliminate the unreasonable risk.

Regulatory action

In December 2024, EPA finalized changes to the rule for new chemical reviews. It clarifies that the agency must make one of five statutory determinations for each PMN, significant new use notice, and microbial commercial activity notice it receives.

The final rule also:

  • Eliminates full review exemptions for per- and polyfluoroalkyl substances (or PFAS) as well as for persistent, bioaccumulative, and toxic (PBT) chemicals if environmental releases of or potentially unreasonable exposures to PBT chemicals are expected;
  • Clarifies the information required in new chemical notices;
  • Changes EPA’s procedures for reviewing notices with incomplete information or errors;
  • Updates the application form on the EPA Central Data Exchange; and
  • Streamlines the suspension request process for submitters.

Key to remember: EPA reviews each new chemical and makes one of five possible safety determinations that dictate both if and how the substance can enter the marketplace.

Chemical management: Minimizing risks, maximizing compliance
2024-12-10T06:00:00Z

Chemical management: Minimizing risks, maximizing compliance

In 2022, the National Institute for Occupational Safety and Health (NIOSH) reported a staggering 658,000 workers were exposed to harmful chemicals, resulting in 839 fatalities. These statistics highlight the significant health and safety risks that an unexpected exposure to a hazardous chemical, or a substantial threat of a hazardous substance release, can pose to workers, organizations, and communities. A thorough understanding of chemical management regulations is crucial to ensure potential hazardous exposures are minimized.

Hazard communication (HazCom)

OSHA’s HazCom standard (29 CFR 1910.1200) is designed to inform workers about chemical hazards and how to protect themselves.

Key definitions: A "hazardous chemical" is any chemical which is classified as a physical hazard or a health hazard, a simple asphyxiant, combustible dust, or other hazards not that may not be classified but still pose a serious danger.

Indicators: Any workplace where hazardous chemicals are used, stored, or processed needs a hazard communication program. Labels, safety data sheets (SDSs), and employee training are essential components.

Training requirements: Training must cover how to read and understand labels, the purpose and location of SDSs, and specific protective measures when handling hazardous chemicals. Training must be provided upon initial assignment and updated whenever new chemical hazards are introduced.

Hazardous materials (Hazmat)

The DOT’s hazmat regulations (DOT 49 CFR Parts 171-180) include substances that, if transported improperly, can harm people, property, or the environment. By correctly handling and moving these materials, organizations can avoid accidents and safeguard both public health and the environment.

Key definitions: A "hazardous material" is any substance or material capable of posing an unreasonable risk when transported in commerce. This can include flammable, toxic, and reactive substances.

Indicators: Activities involving the loading, unloading, and handling of hazardous materials require adherence to hazmat regulations. This requirement also applies to organizations that make or maintain packaging, or a part of packaging, that's marked or sold as suitable for transporting hazardous materials commercially.

Training requirements: Workers handling hazmat must undergo specific training on material classification, safe handling, emergency response, and transportation. Training must be provided within 90 days of initial assignment and a refresher at least once every three years. Training must also be documented and retained for a minimum of three years.

Hazardous waste (Hazwaste)

The EPA’s hazwaste regulations (40 CFR Parts 260-299) refer to any waste material that could potentially harm the environment or human health if not managed correctly. Additionally, many states have hazardous waste requirements beyond EPA regulations.

Key Definitions: Hazardous waste includes materials classified as toxic, ignitable, corrosive, or reactive, based on specific criteria.

Indicators: Managing hazardous waste follows the material’s entire lifecycle including the generation, transportation, treatment, storage, and disposal, known as "cradle-to-grave." Requirements are based on the quantity of waste generated.

Training requirements: Employees involved in hazardous waste management must receive training on waste handling, storage, labeling, and disposal procedures. Annual training requirements are based on generator quantity status.

Hazardous waste operations and emergency response (HAZWOPER)

OSHA’s HAZWOPER standard (29 CFR 1910.120) protects workers involved in hazardous waste management and emergency response. HAZWOPER covers a wide range of activities, including cleanup operations and responses to hazardous substance releases.

Key definitions: A hazardous substance is any material that can harm health and safety if released into the environment. In the context of HAZWOPER, this includes materials that pose risks in emergencies, such as spills, leaks, or other uncontrolled releases.

Indicators: Workers and organizations tasked with hazardous waste cleanup, spill response, and emergency operations require specialized training, equipment, and procedures.

Training requirements: HAZWOPER training is intensive and includes specific requirements depending on job roles. Training levels include 24-hour, 40-hour, and 8-hour refresher courses for different exposure risks. Employees learn about hazardous substance properties, emergency response procedures, PPE use, and decontamination processes.

Process Safety Management (PSM)

OSHA’s PSM standard (29 CFR 1910.119) aims to prevent accidental chemical releases that could seriously harm employees or the environment by including safety measures, risk assessments, and employee training to ensure safe operations. It is especially important in industries handling highly hazardous chemicals including facilities with high-risk chemical processes.

Key definitions: OSHA defines a "highly hazardous chemical" as any substance that poses a significant risk of causing serious harm to people, property, or the environment due to its toxic, reactive, flammable, or explosive properties.

Indicators: Any workplace handling large volumes of hazardous chemicals or using complex chemical processes including chemicals that are specifically listed by OSHA in appendix A of the standard, are present in quantities above specified thresholds, or exhibit properties that make them likely to cause a major incident.

Training requirements: PSM training covers safe operating procedures, hazard analysis, and incident investigation for employees involved in high-risk processes. Training must be provided at initial assignment and a refresher at least once every three years.

Key to remember: Chemical management is a complex task. Understanding what regulatory requirements apply will ensure compliance as well as minimize the chance for dangerous incidents.

Deadliest chemical disaster still haunts, decades later
2024-12-03T06:00:00Z

Deadliest chemical disaster still haunts, decades later

December 2024 marks the 40th anniversary of one of history’s worst industrial incidents — the release of a deadly gas at a chemical plant in Bhopal, India. This incident, along with another in West Virginia in 1985, spurred U.S. legislative and regulatory action. However, some might say that work is not finished.

Think of the Emergency Planning and Community Right-to-Know Act (EPCRA) of 1986, the EPA Risk Management Program (RMP) standard, and the OSHA Process Safety Management (PSM) standard, for example. You’ll find roots to the Bhopal disaster.

What happened in Bhopal?

It was late on December 2, 1984, at a chemical facility. A faulty valve leaked water into a tank of methyl isocyanate (or MIC). This prompted a violent reaction inside the tank. History tells us that at about 1:00 a.m. on that fateful December 3, the failure of a safety valve triggered a massive release. A dense, lethal cloud of MIC and other chemicals drifted over the city of Bhopal.

By dawn, thousands of residents were dead, along with birds, dogs, cows, and other animals. The injured flocked to hospitals in overwhelming numbers. A lack of information about just what the chemicals were, however, compounded the catastrophe.

India officials reported half a million or more chemical exposures. Estimates vary, but as many as 10,000 people perished in the initial few days. Tens of thousands died prematurely in the decades to follow, according to sources.

What happened in West Virginia?

In August 1985, a chemical release in Institute, West Virginia, showed Americans that a “Bhopal-like” incident could happen here. Aldicarb oxime and other chemicals released from the facility, and over 125 residents landed in the hospital. Again, a lack of available chemical information was noteworthy. Many U.S. citizens began to fear they faced catastrophic risks.

What happened next?

In the wake of the incidents, Congress enacted laws:

Together, they required EPA and OSHA to issue regulations to:

  • Increase community chemical emergency preparedness,
  • Require companies to report worst-case release scenarios,
  • Require companies to develop RMPs and PSM programs to protect communities and workers, respectively.

Congress also established the Chemical Safety and Hazard Investigation Board (CSB) to investigate chemical incidents and recommend measures to prevent them. Despite these actions, the U.S. continues to experience serious chemical incidents. A visit to the CSB or National Response Center (NRC) websites reveals countless incident reports since 1990. A look at the 2024 data finds:

CSB video

Ten years ago, on the 30th anniversary of the Bhopal disaster, CSB posted a six-minute video explaining how the tragedy occurred. The video also examines more recent U.S. incidents. It emphasizes what more could be done to prevent similar incidents.

CSB investigations around the time of the video found deficiencies in design and PSM, similar to those uncovered in Bhopal! CSB Chairperson Rafael Moure-Eraso argued: “Process safety management regulations are in need of reform. There must be more emphasis on preventing the occurrence of major chemical accidents through safer design. Responding to emergencies and punishing people after the fact are not enough.”

Push for regulatory reform

Another headline-making incident in April 2013 involved a massive explosion of ammonium nitrate at a fertilizer storage/distribution facility in West, Texas. It fatally injured 12 volunteer firefighters and two members of the public and caused hundreds of injuries. The incident prompted the Executive Order on Improving Chemical Facility Safety and Security (EO 13650) on August 1, 2013. The order directed the federal government to:

  • Improve operational coordination with state and local partners;
  • Enhance federal agency coordination and information sharing;
  • Modernize policies, regulations, and standards; and
  • Work with stakeholders to identify best practices.

The feds held listening sessions and issued a flurry of fact sheets, alerts, and enforcement policy changes (See here and here.). Note that the RMP regulation at 40 CFR 68 was eventually amended this year on March 11, 2024. The PSM standard remains unchanged, despite a request for information on December 9, 2013. In an about-face, Congress allowed the Chemical Facility Anti-Terrorism Standards program (at 6 CFR 27) to expire on July 28, 2023, but many in Congress and industry would like to see its return.

Key to remember

This month marks the 40th anniversary of the Bhopal chemical disaster. It sparked the U.S. Congress to take steps back then to prevent such a disaster from occurring here. Those actions did not spell the end to all chemical disasters in the U.S. In response, a renewed push for regulatory reforms popped up in the last decade.

5 key release detection requirements for underground storage tanks
2024-11-26T06:00:00Z

5 key release detection requirements for underground storage tanks

Leak detection on an underground tank storing petroleum or other hazardous materials can be the factor that prevents a release from turning into a contamination catastrophe. A leak (or release) detection system alerts tank operators and owners of potential releases, allowing them to respond and limit contamination quickly.

The Environmental Protection Agency (EPA) requires regulated underground storage tanks (USTs) to have release detection systems. Here are five things you should know about complying with UST leak detection requirements.

1. The rules cover the entire UST system.

EPA’s release detection requirements (40 CFR Part 280 Subpart D) apply to USTs and any underground piping connected to the tanks.

Owners and operators must equip each regulated UST and piping with leak detection that:

  • Detects a release from any part of the tank or its piping that routinely contains petroleum or hazardous waste;
  • Meets the manufacturer’s instructions for proper installation and calibration;
  • Follows the operation, maintenance, and testing requirements of the manufacturer’s instructions, a nationally recognized code of practice, or the implementing agency; and
  • Complies with federal performance standards.

2. Tank release detection methods depend on the installation or replacement date.

The UST’s date of installation or replacement determines the release detection methods that owners and operators can use for the tank. There are three categories of release detection methods:

  • Interstitial (e.g., secondary containment with interstitial monitoring),
  • Internal (e.g., automatic tank gauging systems), and
  • External (e.g., groundwater monitoring).

Owners and operators of USTs installed on or before April 11, 2016, choose at least one leak detection method from the range of interstitial, internal, and external options (or another method approved by the implementing agency). However, owners and operators of USTs installed or replaced after April 11, 2016, must use secondary containment with interstitial monitoring.

3. Piping release detection methods depend on two factors.

The release detection methods for piping that UST owners and operators can use are based on (a) the date of installation or replacement and (b) the type of piping.

Pressurized piping installed on or before April 11, 2016, must:

  • Have an automatic line leak detector that shuts off or restricts product flow or triggers an alarm, and
  • Receive annual line testing or monthly monitoring.

Pressurized piping installed or replaced after April 11, 2016, must also have an automatic line leak detector and use secondary containment with interstitial monitoring.

Suction piping installed on or before April 11, 2016, must use monthly monitoring or line testing every three years (unless the piping is exempt from requirements). Suction piping installed or replaced after April 11, 2016, must use secondary containment with interstitial monitoring (unless the piping is exempt from requirements).

4. Secondary containment with interstitial monitoring is the standard.

EPA revised the UST regulations in 2015, requiring all new and replaced tanks and piping to use secondary containment with interstitial monitoring for release detection. For example, say you have a UST installed before April 11, 2016, but you have to replace its piping. You must use secondary containment with interstitial monitoring for the replaced piping.

Secondary containment refers to a physical barrier between the UST and the environment, such as a double-walled tank or internally fitted liner. If the UST leaks, the barrier holds the leak between the tank and the barrier so it can be detected.

The interstitial monitor detects leaks between the tank and the barrier and alerts owners and operators of a potential leak. Monitoring devices range from physical dipsticks to high-tech pressure and liquid-detecting sensors.

5. State requirements may differ.

Many states implement the UST regulatory program. State requirements must be at least equal to EPA’s, and in some cases, they may be more stringent.

Whether you have one UST at a facility or several at facilities across the country, it’s vital to check state requirements to ensure you comply with all applicable standards.

UST release detection systems can help your facility prevent potential leaks from turning into environmental — and compliance — disasters.

Key to remember: EPA requires underground storage tanks to have release detection systems that alert owners and operators quickly to potential leaks.

EPA airs interim Good Neighbor Plan rules for power plants and industrial facilities
2024-11-13T06:00:00Z

EPA airs interim Good Neighbor Plan rules for power plants and industrial facilities

Future emission requirements for certain power plants and other industrial sources across 23 states remain up in the air. The Environmental Protection Agency (EPA) published the Third Final Interim Rule for its Good Neighbor Plan (GNP) in October 2024, officially pausing the federal emissions-control program in all affected states as legal battles continue.

So, the GNP requirements are paused, but what does that mean for the facilities covered by the rule?

What’s the GNP rule? Who does it impact?

The GNP is a federal program for 23 states that requires fossil fuel-fired power plants and other industrial facilities (such as manufacturers and solid waste incinerators) to lower emissions of ozone-forming nitrogen oxides (NOx) that hinder downwind states’ ability to achieve and maintain the 2015 Ozone National Ambient Air Quality Standards (NAAQS).

Interim GNP rules set

EPA issued the First and Second Interim Final Rules in 2023 in response to a judicial order to partially stay the agency’s disapproval of State Implementation Plans (SIPs) for implementing the NAAQS. The rules temporarily stopped enforcement of the GNP in 12 states.

In July 2024, the U.S. Supreme Court issued an order of stay for three other states challenging the GNP rule in a separate case. EPA responded to the Supreme Court with the Third Interim Final Rule. Although the Supreme Court’s order addresses only the states involved in the case, the rule pauses the GNP’s requirements for the emissions sources in all remaining 11 states.

Interim rule requirements

Until the GNP rule is settled, power plants and industrial facilities must meet the less stringent 2008 Ozone NAAQS. Two rules address interstate emissions for this standard:

  • The 2016 Cross-State Air Pollution Rule Update for the 2008 Ozone NAAQS (CSAPR), and
  • The 2021 Revised CSAPR.

Power plants

For the interim, power plants in states with previous interstate air pollution requirements for the 2008 Ozone NAAQS are subject to equivalent requirements established by the CSAPR and Revised CSAPR rules:

  • Power plants covered by the CSAPR’s NOx Ozone Season “Group 2” Trading Program before the GNP remain subject to the state emissions budgets and unit-level allowances set in the CSAPR. These include power plants in Alabama, Arkansas, Mississippi, Missouri, Oklahoma, and Texas. Further, power plants in Wisconsin transfer back to the Group 2 trading program.
  • Power plants covered by the Revised CSAPR’s NOx Ozone Season “Group 3” Trading Program before the GNP transfer back to the Group 2 trading program. However, the emissions budgets and unit-level allowances set in the Revised CSAPR’s Group 3 trading program apply. These affect power plants in Kentucky, Louisiana, and West Virginia.
  • Other power plants covered by the Revised CSAPR’s NOx Ozone Season “Group 3” Trading Program before the GNP transfer to the Group 2 trading program. But, the emissions budgets and unit-level allowances set in the Revised CSAPR’s Group 3 trading program apply.

The interim rules also make allowances interchangeable for power plants in some states for Group 2 trading program compliance, including Illinois, Indiana, Kentucky, Louisiana, Maryland, Michigan, New Jersey, New York, Ohio, Pennsylvania, Virginia, and West Virginia.

Power plants in Alabama, Arkansas, Mississippi, Missouri, Oklahoma, and Texas retain their banked Group 2 allowances. Also, Kentucky, Louisiana, and West Virginia may convert banked 2021–22 Group 3 allowances to Group 2 allowances.

Power plants in Illinois, Indiana, Maryland, Michigan, New Jersey, New York, Ohio, Pennsylvania, Virginia, and Wisconsin may convert their 2021–23 Group 3 allowances to Group 2 allowances. However, EPA will recall the 2024 Group 3 allowances issued before the stay order.

Power plants in Minnesota, Nevada, and Utah weren’t covered by previous ozone NAAQS requirements, so they maintain the status quo. Additionally, California power plants aren’t subject to GNP requirements.

Industrial sources

Most of the GNP’s requirements for industrial facilities don’t begin until the start of the 2026 ozone season (May 1, 2026). EPA won’t enforce the deadlines that occur before then for procedural requirements, such as submitting optional case-by-case emissions limits requests.

What’s the future of the GNP?

For now, the future of the GNP remains unclear due to ongoing litigation. EPA’s administrative stay remains in effect until:

  • The U.S. Supreme Court lifts its stay order,
  • Other courts lift judicial stay orders for SIP disapprovals, and
  • EPA establishes rulemaking aligned with any judicial rulings on the merits of the GNP.

Plus, if a state’s judicial stay order due to SIP disapproval is lifted, the agency won’t remove the stay for the state’s emissions sources until the Supreme Court lifts its stay order.

Key to remember: EPA’s final interim rules establish temporary compliance requirements for power plants and other industrial sources while the Good Neighbor Plan remains paused.

See More

Most Recent Highlights In Transportation

EHS Monthly Round Up - October 2024

EHS Monthly Round Up - October 2024

In this October 2024 roundup video, we'll review the most impactful environmental, health, and safety news.

Hi everyone! Welcome to the monthly news roundup video, where we’ll review the most impactful environmental, health, and safety news. Please view the content links in the transcript for more information about the topics I’ll be covering today. Let’s get started!

A Government Accountability Office report says OSHA can do more to protect warehouse and delivery workers from ergonomic injuries. The report recommends several steps for OSHA to consider, including ensuring compliance officers can easily obtain data on when musculoskeletal disorders occurred.

OSHA updated its inspection guidance for animal slaughtering and processing industries. Inspections will focus on several hazards, including sanitation, ergonomics, and machine guarding. Among other changes, compliance officers will conduct inspections during off-shift times and identify workplace activities that impact employees most at risk such as temporary employees.

OSHA urges workers involved in hurricane cleanup and recovery efforts to be mindful of hazards, especially those associated with restoring electricity, removing debris, and trimming trees. Proper training, experience, and familiarity with related equipment helps ensure worker safety.

And finally, turning to environmental news, EPA extended the 2024 Chemical Data Reporting deadline to November 22 due to technical difficulties with its electronic reporting tool. The 2024 report covers activities that occurred between calendar years 2020 and 2023.

Thanks for tuning in to the monthly news roundup. We’ll see you next month!

Expert Insights: End-of-year environmental checklist
2024-11-07T06:00:00Z

Expert Insights: End-of-year environmental checklist

As the year draws to a close, it’s essential for environmental professionals to take proactive steps to ensure a smooth transition into the new year. As an environmental professional working in the industry, I always took this time to address key tasks to avoid last-minute stress and position my organization for a successful environmental compliance year. Here are a few tips and reminders for you to consider.

Verify expiration dates

It’s a good time to verify expiration dates and to ensure all permits and licenses are current and valid. Identify renewal requirements and gather necessary documentation and information for upcoming renewals. Take corrective actions to rectify any violations or deficiencies.

Get ready to report

If Tier II reporting applies to your facility, start gathering information on hazardous chemicals stored or handled on-site. The March 1 deadline will approach quickly, and you’ll want to be prepared.

Assess performance

The end of the year provides an opportunity to review and assess your organization’s environmental performance and identify areas for improvement. Use your experience throughout the year to guide you as you develop corrective action plans. Review and update emergency response plans. Verify that contact information, procedures, and equipment are up to date.

Get organized

File documents and store all environmental records in a systematic and organized manner. Consider scanning important documents to create electronic copies. Establish guidelines for retaining environmental records to comply with legal requirements.

Things can change rapidly during the year, and much-needed tasks can fall by the wayside. By carving out time at the end of the year to complete these tasks, you can set a strong foundation for a successful and compliant new year.

EPA alert clamps down on oil storage tank overfills
2024-10-28T05:00:00Z

EPA alert clamps down on oil storage tank overfills

Are your aboveground storage tanks (ASTs) engineered to avoid overfills during oil transfers? EPA issued a technical alert to highlight the importance of overfill prevention measures. Having these systems is not enough, though. They must be properly designed, operated, maintained, and inspected.

The 13-page alert (EPA 540-S-24-001) aims at owners and operators of “substantial harm oil storage facilities.” These facilities are often covered by 40 CFR 112, including both the oil Spill Prevention, Control, and Countermeasure (SPCC) regulations and oil Facility Response Plan (FRP) regulations.

Implementing overfill prevention is mandated by part 112. That’s because these critical systems alert you to potential container overfills. Overfills are often the cause of oil discharges.

Overfill dangers

Overfills of large ASTs during high-volume oil transfers have led to:

  • Discharges of oil to the land, air, and waterways;
  • Fires and explosions;
  • Injuries; and
  • Damage to nearby tanks, facilities, and communities.

The alert showcases two headline-making incidents to illustrate the danger:

  • October 2009 — A 5-million-gallon AST overflowed during a routine gasoline transfer operation from a marine tanker vessel to an onshore tank farm. The aerosolized gasoline spray created a vapor cloud that ignited. This resulted in a massive explosion. The automated overfill prevention system was not operable. Other factors like open dike drain valves and inadequate nighttime lighting contributed to the extent of the incident.
  • December 2005 — An AST overfilled at an oil storage depot. This created a vapor cloud that ignited. A subsequent explosion caused multiple tank fires and loss of containment. It also damaged 22 ASTs and neighboring properties and injured 43 people. The overfill prevention mechanisms were not operable.

Overfills are preventable

Overfills can happen, but they are preventable! The alert explains that overfill prevention systems commonly used at facilities monitor liquid levels in tanks. These prevention systems include:

  • Audible or visual high-liquid-level alarms,
  • Automatic high-liquid-level pump shutoff devices,
  • Gauges with attendants, and
  • Direct communication procedures during product transfers.

The trouble is, when these systems fail, overfills can still occur. Therefore, it’s critical to take other measures. Adequate system maintenance, inspection, implementation, nighttime security lighting, training, and procedures are examples.

So, oil discharges to the environment and waterways may be prevented and/or minimized with the help of overfill prevention systems. At the same time, however, owners and operators need to implement:

  • Standardized oil handling and transfer procedures,
  • Proper operation and maintenance of dike drainage valves,
  • Routine inspection and testing procedures, and
  • Security lighting that’s maintained.

More information in the alert

EPA’s technical alert addresses adequately designed, implemented, and maintained overfill prevention systems. The alert explores:

  • EPA’s regulations,
  • Historical overfill incidents,
  • Regulatory requirements,
  • Associated standards and practices, and
  • Technical considerations to lower risks.

Thirteen references and their links are included. Two worth noting are:

If you have an SPCC- and/or FRP-regulated facility, EPA urges you to review the alert. You should also consider whether more action is needed to address these requirements at your oil storage facility.

Key to remember

EPA issued a technical alert to highlight the importance of overfill prevention measures. The agency says they must be properly designed, operated, maintained, and inspected.

TSCA Section 4 Test Orders: What are your facility’s options?
2024-10-25T05:00:00Z

TSCA Section 4 Test Orders: What are your facility’s options?

Did you know that the chemicals your facility makes and processes could be subject to additional testing requirements? Through a Section 4 Test Order under the Toxic Substances Control Act (TSCA), the Environmental Protection Agency (EPA) can require manufacturers (including importers) and processors to test and submit information on existing chemicals and mixtures through the agency’s Central Data Exchange (CDX).

For example, EPA issued the fifth TSCA Section 4 Test Order for per- and polyfluoroalkyl substances (PFAS) in October 2024. Five companies must submit information on the PFAS commonly known as 6:2 FTAc (used to manufacture plastics, resins, textiles, apparel, leather, and other chemicals), which the agency found may present an unreasonable risk of injury to human health or the environment.

How will your facility respond if it receives a TSCA Section 4 Test Order? Let’s look at the four response options.

First, submit the identification response

Entities that receive a test order must first submit an identification response within 30 days of the order’s effective date. You can identify as a manufacturer, processor, or both.

If you don’t manufacture or process the chemical or believe EPA mistakenly sent you the order, you may claim that you’re not subject to the order. Provide supporting information with the claim in the identification response.

Next, choose the initial response

Companies subject to the test order then submit an initial response to tell EPA how it will comply. There are four response options:

  • Develop and submit the information,
  • Submit information from an existing study,
  • Apply for an exemption, and
  • Join a consortium.

You can choose a different response for every test required by the order. Let’s zoom in on each option.

Option 1: Develop the information

The most straightforward response is to conduct the test(s) and generate the information. The order contains everything you need to know, including:

  • The tests required,
  • The methodologies and protocols you can use, and
  • The applicable deadlines.

Option 2: Submit existing information

Alternatively, if you believe EPA hasn’t considered relevant information, you can submit an existing study and/or other relevant information. Include a rationale document that explains how the existing information you present fulfills the test order’s requirements and which information it covers (i.e., Does it provide parts of or all the needed information?).

If EPA finds any of the existing data you submit acceptable, the agency will remove the obligations in the test order that the existing information fulfills. However, if the agency determines the existing information isn’t acceptable, you must submit a different response option within 10 days of EPA’s rejection.

Option 3: Request an exemption

EPA grants exemptions to avoid duplicating information. You may be exempt from a test order if:

  • Information on an equivalent chemical was already submitted or is being developed, or
  • Information on an equivalent chemical is being developed for a TSCA Section 4(a) rule, order, or consent agreement.

Include with your exemption application a rationale document that identifies:

  • The chemical substance subject to the order,
  • The testing requirements from which you seek exemption,
  • Which companies submitted or are developing information for an equivalent chemical substance if your exemption request relies on information generated by others,
  • The chemical identity of the equivalent substance,
  • The required equivalence data, and
  • Contact information.

You must also include a sworn statement of financial responsibility to reimburse the entity(ies) that paid the costs to submit the testing information if your exemption is granted.

Option 4: Join a consortium

EPA allows companies subject to the same test order to form a consortium to share the costs of generating the required information (including testing and fees).

To begin, inform EPA individually of the specific chemicals and tests you plan to address through a consortium. The individual designated as the lead in the consortium then submits the initial response on behalf of all entities in the group.

Organizations interested in joining a consortium must contact EPA’s TSCA Hotline by email (tsca-hotline@epa.gov) or phone call ((202) 554-1404).

Test order tips

Consider these helpful tips when choosing how to respond to a TSCA Section 4 Test Order:

  • All communications for test orders occur through EPA’s CDX system, so ensure your company has registered with CDX and assigned the appropriate roles to each user.
  • Keep a record of the automated email from CDX confirming receipt of your initial response.
  • You’ll receive a response from EPA that either:
    • Requests more information to support and/or clarify your response, or
    • Confirms receipt of a well-substantiated response requiring no further action.

Key to remember: EPA’s TSCA Section 4 Test Orders require manufacturers (including importers) and processors to develop information on existing chemicals. Companies subject to the order have four response options.

2021-11-15T06:00:00Z

86 FR 62917 Significant New Use Rules on Certain Chemical Substances (20-10.B)

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Parts 9 and 721

[EPA-HQ-OPPT-2020-0497; FRL-8215-01-OCSPP]

RIN 2070-AB27

Significant New Use Rules on Certain Chemical Substances (20-10.B)

AGENCY: Environmental Protection Agency (EPA).

ACTION: Final rule.

SUMMARY: EPA is issuing significant new use rules (SNURs) under the Toxic Substances Control Act (TSCA) for chemical substances which were the subject of premanufacture notices (PMNs). This action requires persons to notify EPA at least 90 days before commencing manufacture (defined by statute to include import) or processing of any of these chemical substances for an activity that is designated as a significant new use by this rule. This action further requires that persons not commence manufacture or processing for the significant new use until they have submitted a Significant New Use Notice (SNUN), EPA has conducted a review of the notice, made an appropriate determination on the notice, and has taken any risk management actions as are required as a result of that determination.

DATES: This rule is effective on January 14, 2022. For purposes of judicial review, this rule shall be promulgated at 1 p.m. (e.s.t.) on November 29, 2021.

FOR FURTHER INFORMATION CONTACT:

For technical information contact: William Wysong, New Chemicals Division (7405M), Office of Pollution Prevention and Toxics, Environmental Protection Agency, 1200 Pennsylvania Ave. NW, Washington, DC 20460-0001; telephone number: (202) 564-4163; email address: wysong.william@epa.gov.

For general information contact: The TSCA-Hotline, ABVI-Goodwill, 422 South Clinton Ave., Rochester, NY 14620; telephone number: (202) 554-1404; email address: TSCA-Hotline@epa.gov.

SUPPLEMENTARY INFORMATION:

I. General Information

A. Does this action apply to me?

You may be potentially affected by this action if you manufacture, process, or use the chemical substances contained in this rule. The following list of North American Industrial Classification System (NAICS) codes is not intended to be exhaustive, but rather provides a guide to help readers determine whether this document applies to them. Potentially affected entities may include:

  • Manufacturers or processors of one or more subject chemical substances (NAICS codes 325 and 324110), e.g., chemical manufacturing and petroleum refineries.

This action may also affect certain entities through pre-existing import certification and export notification rules under TSCA, which would include the SNUR requirements. Chemical importers are subject to the TSCA section 13 (15 U.S.C. 2612) import provisions. The EPA policy in support of import certification appears at 40 CFR part 707, subpart B. In addition, pursuant to 40 CFR 721.20, any persons who export or intend to export a chemical substance that is the subject of this rule are subject to the export notification provisions of TSCA section 12(b) (15 U.S.C. 2611(b)), and must comply with the export notification requirements in 40 CFR part 707, subpart D.

B. How can I access the docket?

The docket includes information considered by the Agency in developing the proposed and final rules. The docket for this action, identified by docket identification (ID) number EPA-HQ-OPPT-2020-0497, is available at https://www.regulations.gov and at the Office of Pollution Prevention and Toxics Docket (OPPT Docket), Environmental Protection Agency Docket Center (EPA/DC), West William Jefferson Clinton Bldg., Rm. 3334, 1301 Constitution Ave. NW, Washington, DC. The Public Reading Room is open from 8:30 a.m. to 4:30 p.m., Monday through Friday, excluding legal holidays. The telephone number for the Public Reading Room is (202) 566-1744, and the telephone number for the OPPT Docket is (202) 566-0280. Please review the visitor instructions and additional information about the docket available at https://www.epa.gov/dockets.

Due to the public health emergency, the EPA Docket Center (EPA/DC) and Reading Room is closed to visitors with limited exceptions. The staff continues to provide remote customer service via email, phone, and webform. For the latest status information on EPA/DC services and docket access, visit https://www.epa.gov/dockets.

II. Background

A. What action is the Agency taking?

EPA is finalizing SNURs under TSCA section 5(a)(2) for chemical substances which were the subject of PMNs P-18-289, P-18-330, P-18-334, P-18-335, and P-18-337. These SNURs require persons who intend to manufacture or process any of these chemical substances for an activity that is designated as a significant new use to notify EPA at least 90 days before commencing that activity.

Previously, in the Federal Register of October 20, 2020 (85 FR 66506) (FRL-10015-28), EPA proposed SNURs for these chemical substances. More information on the specific chemical substances subject to this final rule can be found in the Federal Register document proposing the SNURs. The docket includes information considered by the Agency in developing the proposed and final rules, including public comments and EPA's responses to the public comments received on the proposed rules, as described in Unit IV.

B. What is the Agency's authority for taking this action?

TSCA section 5(a)(2) (15 U.S.C. 2604(a)(2)) authorizes EPA to determine that a use of a chemical substance is a “significant new use.” EPA must make this determination by rule after considering all relevant factors, including the four TSCA section 5(a)(2) factors listed in Unit III.

C. Do the SNUR general provisions apply?

General provisions for SNURs appear in 40 CFR part 721, subpart A. These provisions describe persons subject to the rule, recordkeeping requirements, exemptions to reporting requirements, and applicability of the rule to uses occurring before the effective date of the rule. Provisions relating to user fees appear at 40 CFR part 700. Pursuant to 40 CFR 721.1(c), persons subject to these SNURs must comply with the same SNUN requirements and EPA regulatory procedures as submitters of PMNs under TSCA section 5(a)(1)(A). In particular, these requirements include the information submission requirements of TSCA sections 5(b) and 5(d)(1), the exemptions authorized by TSCA sections 5(h)(1), 5(h)(2), 5(h)(3), and 5(h)(5) and the regulations at 40 CFR part 720. Once EPA receives a SNUN, EPA must either determine that the significant new use is not likely to present an unreasonable risk of injury or take such regulatory action as is associated with an alternative determination before manufacture or processing for the significant new use can commence. If EPA determines that the significant new use is not likely to present an unreasonable risk, EPA is required under TSCA section 5(g) to make public, and submit for publication in the Federal Register , a statement of EPA's findings.

III. Significant New Use Determination

A. Determination Factors

TSCA section 5(a)(2) states that EPA's determination that a use of a chemical substance is a significant new use must be made after consideration of all relevant factors, including:

  • The projected volume of manufacturing and processing of a chemical substance.
  • The extent to which a use changes the type or form of exposure of human beings or the environment to a chemical substance.
  • The extent to which a use increases the magnitude and duration of exposure of human beings or the environment to a chemical substance.
  • The reasonably anticipated manner and methods of manufacturing, processing, distribution in commerce, and disposal of a chemical substance.

In determining what would constitute a significant new use for the chemical substances that are the subject of these SNURs, EPA considered relevant information about the toxicity of the chemical substances, and potential human exposures and environmental releases that may be associated with the substances, in the context of the four bulleted TSCA section 5(a)(2) factors listed in this unit. During its review of these chemicals, EPA identified certain conditions of use that are not intended by the submitters, but reasonably foreseen to occur. EPA is designating those reasonably foreseen conditions of use as well as certain other circumstances of use as significant new uses.

B. Procedures for Significant New Uses Claimed as Confidential Business Information (CBI)

By this rule, EPA is establishing certain significant new uses which have been claimed as CBI subject to Agency confidentiality regulations at 40 CFR part 2 and 40 CFR part 720, subpart E. Absent a final determination or other disposition of the confidentiality claim under 40 CFR part 2 procedures, EPA is required to keep this information confidential. EPA promulgated a procedure to deal with the situation where a specific significant new use is CBI, at 40 CFR 721.1725(b)(1) and has referenced it to apply to other SNURs.

Under these procedures a manufacturer or processor may request EPA to determine whether a specific use would be a significant new use under the rule. The manufacturer or processor must show that it has a bona fide intent to manufacture or process the chemical substance and must identify the specific use for which it intends to manufacture or process the chemical substance. If EPA concludes that the person has shown a bona fide intent to manufacture or process the chemical substance, EPA will tell the person whether the use identified in the bona fide submission would be a significant new use under the rule. Since most of the chemical identities of the chemical substances subject to these SNURs are also CBI, manufacturers and processors can combine the bona fide submission under the procedure in 40 CFR 721.1725(b)(1) with that under 40 CFR 721.11 into a single step.

If EPA determines that the use identified in the bona fide submission would not be a significant new use, i.e., the use does not meet the criteria specified in the rule for a significant new use, that person can manufacture or process the chemical substance so long as the significant new use trigger is not met. In the case of a production volume trigger, this means that the annual production volume limit is not exceeded by the amount identified in the bona fide submission to EPA. Because of confidentiality concerns, EPA does not typically disclose the actual production volume that constitutes the use trigger. Thus, if the person later intends to exceed that volume, a new bona fide submission would be necessary to determine whether that higher volume would be a significant new use.

IV. Public Comments

EPA received a public comment from one identifying entity on the proposed rule. The Agency's response is described in a separate Response to Public Comments document that is available in the public docket for this rulemaking. In addition, EPA received three anonymous comments. They were either general in nature and did not pertain to the proposed rule or were broadly supportive of the rule and requested no changes to the rule itself; therefore, no response is required. EPA made no changes to the final rule based on these comments.

V. Substances Subject to This Rule

EPA is establishing significant new use and recordkeeping requirements for chemical substances in 40 CFR part 721, subpart E. In Unit IV. of the proposed SNUR, EPA provided the following information for each chemical substance:

  • PMN number.
  • Chemical name (generic name, if the specific name is claimed as CBI).
  • Chemical Abstracts Service (CAS) Registry number (if assigned for non-confidential chemical identities).
  • Basis for the SNUR.
  • Potentially useful information.
  • CFR citation assigned in the regulatory text section of this final rule.

The regulatory text section of these rules specifies the activities designated as significant new uses. Certain new uses, including production volume limits and other uses designated in the rules, may be claimed as CBI.

VI. Rationale and Objectives of the Rule

A. Rationale

During review of the PMNs submitted for the chemical substances that are the subject of these SNURs and as further discussed in Unit IV. of the proposed rule, EPA identified certain other reasonably foreseen conditions of use in addition to those conditions of use intended by the submitter. EPA has determined that the chemical under the intended conditions of use is not likely to present an unreasonable risk. However, EPA has not assessed risks associated with the reasonably foreseen conditions of use. EPA is designating these conditions of use as well as certain other circumstances of use as significant new uses. As a result, those significant new uses cannot occur without going through a separate, subsequent EPA review and determination process associated with a SNUN.

B. Objectives

EPA is issuing these SNURs because the Agency wants:

  • To have an opportunity to review and evaluate data submitted in a SNUN before the notice submitter begins manufacturing or processing a listed chemical substance for the described significant new use.
  • To be obligated to make a determination under TSCA section 5(a)(3) regarding the use described in the SNUN, under the conditions of use. The Agency will either determine under section 5(a)(3)(C) that the significant new use is not likely to present an unreasonable risk, including an unreasonable risk to a potentially exposed or susceptible subpopulation identified as relevant by the Administrator under the conditions of use, or make a determination under TSCA section 5(a)(3)(A) or (B) and take the required regulatory action associated with the determination, before manufacture or processing for the significant new use of the chemical substance can occur.
  • To be able to complete its review and determination on each of the PMN substances, while deferring analysis on the significant new uses proposed in these rules unless and until the Agency receives a SNUN.

Issuance of a SNUR for a chemical substance does not signify that the chemical substance is listed on the TSCA Inventory. Guidance on how to determine if a chemical substance is on the TSCA Inventory is available on the internet at https://www.epa.gov/tsca-inventory.

VII. Applicability of the Rules to Uses Occurring Before the Effective Date of the Final Rule

To establish a significant new use, EPA must determine that the use is not ongoing. The chemical substances subject to this rule were undergoing premanufacture review at the time of signature of the proposed rule and were not on the TSCA inventory. In cases where EPA has not received a notice of commencement (NOC) and the chemical substance has not been added to the TSCA Inventory, no person may commence such activities without first submitting a PMN. Therefore, for the chemical substances subject to these SNURs, EPA concluded at the time of signature of the proposed rule that the designated significant new uses were not ongoing.

EPA designated October 7, 2020 (the date of web posting of the proposed rule) as the cutoff date for determining whether the new use is ongoing. The objective of EPA's approach is to ensure that a person cannot defeat a SNUR by initiating a significant new use before the effective date of the final rule.

Persons who began commercial manufacture or processing of the chemical substances for a significant new use identified on or after that date will have to cease any such activity upon the effective date of the final rule. To resume their activities, these persons would have to first comply with all applicable SNUR notification requirements and EPA would have to take action under TSCA section 5 allowing manufacture or processing to proceed.

VIII. Development and Submission of Information

EPA recognizes that TSCA section 5 does not require development of any particular new information (e.g., generating test data) before submission of a SNUN. There is an exception: If a person is required to submit information for a chemical substance pursuant to a rule, Order or consent agreement under TSCA section 4, then TSCA section 5(b)(1)(A) requires such information to be submitted to EPA at the time of submission of the SNUN.

In the absence of a rule, Order, or consent agreement under TSCA section 4 covering the chemical substance, persons are required only to submit information in their possession or control and to describe any other information known to or reasonably ascertainable by them (see 40 CFR 720.50). However, upon review of PMNs and SNUNs, the Agency has the authority to require appropriate testing. Unit IV. of the proposed rule lists potentially useful information for all SNURs listed here. Descriptions are provided for informational purposes. The potentially useful information identified in Unit IV. of the proposed rule will be useful to EPA's evaluation in the event that someone submits a SNUN for the significant new use. Companies who are considering submitting a SNUN are encouraged, but not required, to develop the information on the substance, which may assist with EPA's analysis of the SNUN.

EPA strongly encourages persons, before performing any testing, to consult with the Agency pertaining to protocol election. Furthermore, pursuant to TSCA section 4(h), which pertains to reduction of testing in vertebrate animals, EPA encourages consultation with the Agency on the use of alternative test methods and strategies (also called New Approach Methodologies, or NAMs), if available, to generate the recommended test data. EPA encourages dialog with Agency representatives to help determine how best the submitter can meet both the data needs and the objective of TSCA section 4(h). For more information on alternative test methods and strategies to reduce vertebrate animal testing, visit https://www.epa.gov/assessing-and-managing-chemicals-under-tsca/alternative-test-methods-and-strategies-reduce.

The potentially useful information described in Unit IV. of the proposed rule may not be the only means of providing information to evaluate the chemical substance associated with the significant new uses. However, submitting a SNUN without any test data may increase the likelihood that EPA will take action under TSCA sections 5(e) or 5(f). EPA recommends that potential SNUN submitters contact EPA early enough so that they will be able to conduct the appropriate tests.

SNUN submitters should be aware that EPA will be better able to evaluate SNUNs which provide detailed information on the following:

  • Human exposure and environmental release that may result from the significant new use of the chemical substances.

IX. SNUN Submissions

According to 40 CFR 721.1(c), persons submitting a SNUN must comply with the same notification requirements and EPA regulatory procedures as persons submitting a PMN, including submission of test data on health and environmental effects as described in 40 CFR 720.50. SNUNs must be submitted on EPA Form No. 7710-25, generated using e-PMN software, and submitted to the Agency in accordance with the procedures set forth in 40 CFR 720.40 and 721.25. E-PMN software is available electronically at https://www.epa.gov/reviewing-new-chemicals-under-toxic-substances-control-act-tsca.

X. Economic Analysis

EPA has evaluated the potential costs of establishing SNUN requirements for potential manufacturers and processors of the chemical substances subject to this rule. EPA's complete economic analysis is available in the docket for this rulemaking.

XI. Statutory and Executive Order Reviews

Additional information about these statutes and executive orders can be found at https://www.epa.gov/laws-regulations-and-executive-orders.

A. Executive Order 12866: Regulatory Planning and Review and Executive Order 13563: Improving Regulations and Regulatory Review

This action establishes SNURs for new chemical substances that were the subject of PMNs. The Office of Management and Budget (OMB) has exempted these types of actions from review under Executive Orders 12866 (58 FR 51735, October 4, 1993) and 13563 (76 FR 3821, January 21, 2011).

B. Paperwork Reduction Act (PRA)

According to PRA, 44 U.S.C. 3501 et seq., an agency may not conduct or sponsor, and a person is not required to respond to a collection of information that requires OMB approval under PRA, unless it has been approved by OMB and displays a currently valid OMB control number. The OMB control numbers for EPA's regulations in title 40 of the CFR, after appearing in the Federal Register, are listed in 40 CFR part 9, and included on the related collection instrument or form, if applicable.

The information collection requirements related to this action have already been approved by OMB pursuant to PRA under OMB control number 2070-0012 (EPA ICR No. 574). This action does not impose any burden requiring additional OMB approval. If an entity were to submit a SNUN to the Agency, the annual burden is estimated to average between 30 and 170 hours per response. This burden estimate includes the time needed to review instructions, search existing data sources, gather and maintain the data needed, and complete, review, and submit the required SNUN.

The listing of the OMB control numbers of the collection instruments and their subsequent codification in the table in 40 CFR 9.1 satisfies the display requirements of the PRA and OMB's implementing regulations at 5 CFR part 1320. Since this ICR was previously subject to public notice and comment prior to OMB approval, and given the technical nature of the table in 40 CFR part 9, EPA finds that further notice and comment to amend it is unnecessary. As a result, EPA finds that there is “good cause” under section 553(b)(3)(B) of the Administrative Procedure Act (5 U.S.C. 553(b)(3)(B)) to amend this table in 40 CFR 9.1 without further notice and comment.

C. Regulatory Flexibility Act (RFA)

Pursuant to RFA section 605(b), 5 U.S.C. 601 et seq., I hereby certify that promulgation of this SNUR would not have a significant adverse economic impact on a substantial number of small entities. The requirement to submit a SNUN applies to any person (including small or large entities) who intends to engage in any activity described in the final rule as a “significant new use.” Because these uses are “new,” based on all information currently available to EPA, it appears that no small or large entities presently engage in such activities. A SNUR requires that any person who intends to engage in such activity in the future must first notify EPA by submitting a SNUN. Although some small entities may decide to pursue a significant new use in the future, EPA cannot presently determine how many, if any, there may be. However, EPA's experience to date is that, in response to the promulgation of SNURs covering over 1,000 chemicals, the Agency receives only a small number of notices per year. For example, the number of SNUNs received was seven in Federal fiscal year (FY) 2013, 13 in FY2014, six in FY2015, 12 in FY2016, 13 in FY2017, and 11 in FY2018. Only a fraction of these were from small businesses. In addition, the Agency currently offers relief to qualifying small businesses by reducing the SNUN submission fee from $16,000 to $2,800. This lower fee reduces the total reporting and recordkeeping of cost of submitting a SNUN to about $10,116 for qualifying small firms. Therefore, the potential economic impacts of complying with this SNUR are not expected to be significant or adversely impact a substantial number of small entities. In a SNUR that published in the Federal Register of June 2, 1997 (62 FR 29684) (FRL-5597-1), the Agency presented its general determination that final SNURs are not expected to have a significant economic impact on a substantial number of small entities, which was provided to the Chief Counsel for Advocacy of the Small Business Administration.

D. Unfunded Mandates Reform Act (UMRA)

Based on EPA's experience with proposing and finalizing SNURs, State, local, and Tribal governments have not been impacted by these rulemakings, and EPA does not have any reasons to believe that any State, local, or Tribal government will be impacted by this action. As such, EPA has determined that this action does not impose any enforceable duty, contain any unfunded mandate, or otherwise have any effect on small governments subject to the requirements of UMRA sections 202, 203, 204, or 205 (2 U.S.C. 1501 et seq. ).

E. Executive Order 13132: Federalism

This action will not have federalism implications because it is not expected to have a substantial direct effect on States, on the relationship between the National Government and the States, or on the distribution of power and responsibilities among the various levels of government, as specified in Executive Order 13132 (64 FR 43255, August 10, 1999).

F. Executive Order 13175: Consultation and Coordination With Indian Tribal Governments

This action will not have Tribal implications because it is not expected to have substantial direct effects on Indian Tribes, significantly or uniquely affect the communities of Indian Tribal governments and does not involve or impose any requirements that affect Indian Tribes. Accordingly, the requirements of Executive Order 13175 (65 FR 67249, November 9, 2000), do not apply to this action.

G. Executive Order 13045: Protection of Children From Environmental Health and Safety Risks

This action is not subject to Executive Order 13045 (62 FR 19885, April 23, 1997), because this is not an economically significant regulatory action as defined by Executive Order 12866, and this action does not address environmental health or safety risks disproportionately affecting children.

H. Executive Order 13211: Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use

This action is not subject to Executive Order 13211 (66 FR 28355, May 22, 2001), because this action is not a significant regulatory action under Executive Order 12866.

I. National Technology Transfer and Advancement Act (NTTAA)

In addition, since this action does not involve any technical standards, NTTAA section 12(d), 15 U.S.C. 272 note, does not apply to this action.

J. Executive Order 12898: Federal Actions To Address Environmental Justice in Minority Populations and Low-Income Populations

This action does not entail special considerations of environmental justice related issues as delineated by Executive Order 12898 (59 FR 7629, February 16, 1994).

K. Congressional Review Act (CRA)

This action is subject to the CRA, 5 U.S.C. 801 et seq., and EPA will submit a rule report containing this rule and other required information to each House of the Congress and to the Comptroller General of the United States. This action is not a “major rule” as defined by 5 U.S.C. 804(2).

List of Subjects

40 CFR Part 9

Environmental protection, Reporting and recordkeeping requirements.

40 CFR Part 721

Environmental protection, Chemicals, Hazardous substances, Reporting and recordkeeping requirements.

Dated: October 26, 2021.

Tala Henry,

Deputy Director, Office of Pollution Prevention and Toxics.

Therefore, for the reasons stated in the preamble, EPA is amending 40 CFR chapter I as follows:

PART 9—OMB APPROVALS UNDER THE PAPERWORK REDUCTION ACT

1. The authority citation for part 9 continues to read as follows:

Authority:

7 U.S.C. 135 et seq., 136-136y; 15 U.S.C. 2001, 2003, 2005, 2006, 2601-2671; 21 U.S.C. 331j, 346a; 31 U.S.C. 9701; 33 U.S.C. 1251 et seq., 1311, 1313d, 1314, 1318, 1321, 1326, 1330, 1342, 1344, 1345 (d) and (e), 1361; E.O. 11735, 38 FR 21243, 3 CFR, 1971-1975 Comp. p. 973; 42 U.S.C. 241, 242b, 243, 246, 300f, 300g, 300g-1, 300g-2, 300g-3, 300g-4, 300g-5, 300g-6, 300j-1, 300j-2, 300j-3, 300j-4, 300j-9, 1857 et seq., 6901-6992k, 7401-7671q, 7542, 9601-9657, 11023, 11048.

2. In §9.1, amend the table by adding entries for §§721.11561 through 721.11565 in numerical order under the undesignated center heading “Significant New Uses of Chemical Substances” to read as follows:

§9.1

OMB approvals under the Paperwork Reduction Act.

* * * * *

40 CFR citationOMB control No.
* * * * *
Significant New Uses of Chemical Substances
* * * * *
721.115612070-0012
721.115622070-0012
721.115632070-0012
721.115642070-0012
721.115652070-0012
* * * * *

* * * * *

PART 721—SIGNIFICANT NEW USES OF CHEMICAL SUBSTANCES

3. The authority citation for part 721 continues to read as follows:

Authority:

15 U.S.C. 2604, 2607, and 2625(c).

4. Add §§721.11561 through 721.11565 to subpart E to read as follows:

Subpart E—Significant New Uses for Specific Chemical Substances

Sec.

* * * * *

§721.11561 2-[2-(methylcarboxymonocyclic)amino)ethoxy]alcohol (generic).

§721.11562 Formaldehyde, polymer with alkyl aryl ketone (generic).

§721.11563 Propanedioic acid, 1,3-dihexyl ester.

§721.11564 Propanedioic acid, 1,3-dicyclohexyl ester.

§721.11565Propanedioic acid, 2,2-bis(hydroxymethyl)-, 1,3-dicyclohexyl ester.

* * * * *

§721.11561 2-[2-(methylcarboxymonocyclic)amino)ethoxy]alcohol (generic).

(a) Chemical substance and significant new uses subject to reporting. (1) The chemical substance identified generically as 2-[2-(methylcarboxymonocyclic)amino)ethoxy]alcohol (generic).(PMN P-18-289) is subject to reporting under this section for the significant new uses described in paragraph (a)(2) of this section.

(2) The significant new uses are:

(i) Industrial, commercial, and consumer activities. Requirements as specified in §721.80(j) and (s). For purposes of §721.80(s), the annual manufacture and importation volume is 80,000 kilograms.

(ii) [Reserved]

(b) Specific requirements. The provisions of subpart A of this part apply to this section except as modified by this paragraph (b).

(1) Recordkeeping. Recordkeeping requirements as specified in §721.125(a) through (c) and (i) are applicable to manufacturers and processors of this substance.

(2) Limitation or revocation of certain notification requirements. The provisions of §721.185 apply to this section.

(3) Determining whether a specific use is subject to this section. The provisions of §721.1725(b)(1) apply to paragraph (a)(2)(i) of this section.

§721.11562 Formaldehyde, polymer with alkyl aryl ketone (generic).

(a) Chemical substance and significant new uses subject to reporting. (1) The chemical substance identified generically as formaldehyde, polymer with alkyl aryl ketone (PMN P-18-330) is subject to reporting under this section for the significant new uses described in paragraph (a)(2) of this section.

(2) The significant new uses are:

(i) Industrial, commercial, and consumer activities. Requirements as specified in §721.80(o).

(ii) Release to water. Requirements as specified in §721.90(a)(4), (b)(4), and (c)(4), where N=770.

(b) Specific requirements. The provisions of subpart A of this part apply to this section except as modified by this paragraph (b).

(1) Recordkeeping. Recordkeeping requirements as specified in §721.125(a) through (c), (i) and (k) are applicable to manufacturers and processors of this substance.

(2) Limitation or revocation of certain notification requirements. The provisions of §721.185 apply to this section.

§721.11563 Propanedioic acid, 1,3-dihexyl ester.

(a) Chemical substance and significant new uses subject to reporting. (1) The chemical substance identified as propanedioic acid, 1,3-dihexyl ester (PMN P-18-334; CAS No. 1431-37-4) is subject to reporting under this section for the significant new uses described in paragraph (a)(2) of this section.

(2) The significant new uses are:

(i) Industrial, commercial, and consumer activities. Requirements as specified in §721.80(g).

(ii) Release to water. Requirements as specified in §721.90(a)(4), (b)(4), and (c)(4), where N=3.

(b) Specific requirements. The provisions of subpart A of this part apply to this section except as modified by this paragraph (b).

(1) Recordkeeping. Recordkeeping requirements as specified in §721.125(a) through (c), (i) and (k) are applicable to manufacturers and processors of this substance.

(2) Limitation or revocation of certain notification requirements. The provisions of §721.185 apply to this section.

§721.11564 Propanedioic acid, 1,3-dicyclohexyl ester.

(a) Chemical substance and significant new uses subject to reporting. (1) The chemical substance identified as propanedioic acid, 1,3-dicyclohexyl ester (PMN P-18-335; CAS No. 1152-57-4) is subject to reporting under this section for the significant new uses described in paragraph (a)(2) of this section.

(2) The significant new uses are:

(i) Industrial, commercial, and consumer activities. Requirements as specified in §721.80(g).

(ii) Release to water. Requirements as specified in §721.90(a)(4), (b)(4), and (c)(4), where N=6.

(b) Specific requirements. The provisions of subpart A of this part apply to this section except as modified by this paragraph (b).

(1) Recordkeeping. Recordkeeping requirements as specified in §721.125(a) through (c), (i) and (k) are applicable to manufacturers and processors of this substance.

(2) Limitation or revocation of certain notification requirements. The provisions of §721.185 apply to this section.

§721.11565Propanedioic acid, 2,2-bis(hydroxymethyl)-, 1,3-dicyclohexyl ester.

(a) Chemical substance and significant new uses subject to reporting. (1) The chemical substance identified as propanedioic acid, 2,2- bis(hydroxymethyl)-, 1,3-dicyclohexyl ester (PMN P-18-337; CAS No. 2222732-46-7) is subject to reporting under this section for the significant new uses described in paragraph (a)(2) of this section.

(2) The significant new uses are:

(i) Release to water. Requirements as specified in §721.90(a)(4), (b)(4), and (c)(4), where N=95.

(ii) [Reserved]

(b) Specific requirements. The provisions of subpart A of this part apply to this section except as modified by this paragraph (b).

(1) Recordkeeping. Recordkeeping requirements as specified in §721.125(a) through (c) and (k) are applicable to manufacturers and processors of this substance.

(2) Limitation or revocation of certain notification requirements. The provisions of §721.185 apply to this section.

[FR Doc. 2021-24789 Filed 11-12-21; 8:45 am]

BILLING CODE 6560-50-P

See More

Most Recent Highlights In Safety & Health

EHS Monthly Round Up - September 2024

EHS Monthly Round Up - September 2024

In this September 2024 video, we'll review the most impactful environmental, health, and safety news.

Hi everyone! Welcome to the monthly news roundup video, where we’ll review the most impactful environmental, health, and safety news. Please view the content links in the transcript for more information about the topics I’ll be covering today. Let’s get started!

OSHA published its proposed heat illness rule on August 30. It applies to both indoor and outdoor work in general industry, construction, agriculture, and maritime. Comments on the proposal will be accepted until December 30. OSHA encourages both employers and workers to submit comments.

Fall protection for construction remained number one on OSHA’s list of Top 10 violations for the 14th year in a row. There was little movement among the other Top 10 entries, with Hazard Communication at number 2 and ladders at number 3.

OSHA may exclude volunteer emergency response organizations from its proposed emergency response rule. During the rule’s public comment period, the agency received numerous comments that raised serious economic feasibility concerns.

During its silica enforcement inspections, OSHA also found violations of the hazard communication, respiratory protection, and noise standards. Over 200 companies were targeted as part of the agency’s respirable crystalline silica emphasis program.

Employers can view workplace injury and illness trends using OSHA’s Severe Injury Report dashboard. This new online tool allows users to search the agency’s severe injury report database. Severe injuries and illnesses are those that result in inpatient hospitalization, amputation, or loss of an eye.

And finally, turning to environmental news, an EPA final rule impacts facilities that reclassify from major to area source status under the National Emission Standards for Hazardous Air Pollutants program. These facilities must continue to meet the major source emission standards for seven hazardous air pollutants.

Thanks for tuning in to the monthly news roundup. We’ll see you next month!

2021-12-27T06:00:00Z

86 FR 73131 Revisions to the Unregulated Contaminant Monitoring Rule (UCMR 5) for Public Water Systems and Announcement of Public Meetings

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 141

[EPA-HQ-OW-2020-0530; FRL-6791-03-OW]

RIN 2040-AF89

Revisions to the Unregulated Contaminant Monitoring Rule (UCMR 5) for Public Water Systems and Announcement of Public Meetings

AGENCY: Environmental Protection Agency (EPA).

ACTION: Final rule and notice of public meetings.

SUMMARY: The U.S. Environmental Protection Agency (EPA) is finalizing a Safe Drinking Water Act (SDWA) rule that requires certain public water systems (PWSs) to collect national occurrence data for 29 per- and polyfluoroalkyl substances (PFAS) and lithium. Subject to the availability of appropriations, EPA will include all systems serving 3,300 or more people and a representative sample of 800 systems serving 25 to 3,299 people. If EPA does not receive the appropriations needed for monitoring all of these systems in a given year, EPA will reduce the number of systems serving 25 to 10,000 people that will be asked to perform monitoring. This final rule is a key action to ensure science-based decision-making and prioritize protection of disadvantaged communities in accordance with EPA's PFAS Strategic Roadmap. EPA is also announcing plans for public webinars to discuss implementation of the fifth Unregulated Contaminant Monitoring Rule (UCMR 5).

DATES: This final rule is effective on January 26, 2022. The incorporation by reference of certain publications listed in this final rule is approved by the Director of the Federal Register as of January 26, 2022.

ADDRESSES: EPA has established a docket for this action under Docket ID No. EPA-HQ-OW-2020-0530. All documents in the docket are listed on the https://www.regulations.gov website. Although listed in the index, some information is not publicly available, e.g., CBI or other information whose disclosure is restricted by statute. Certain other material, such as copyrighted material, is not placed on the internet and will be publicly available only in hard copy form. Publicly available docket materials are available electronically through https://www.regulations.gov.

FOR FURTHER INFORMATION CONTACT: Brenda D. Bowden, Standards and Risk Management Division (SRMD), Office of Ground Water and Drinking Water (OGWDW) (MS 140), Environmental Protection Agency, 26 West Martin Luther King Drive, Cincinnati, Ohio 45268; telephone number: (513) 569-7961; email address: bowden.brenda@epa.gov; or Melissa Simic, SRMD, OGWDW (MS 140), Environmental Protection Agency, 26 West Martin Luther King Drive, Cincinnati, Ohio 45268; telephone number: (513) 569-7864; email address: simic.melissa@epa.gov. For general information, visit the Ground Water and Drinking Water web page at: https://www.epa.gov/ground-water-and-drinking-water.

SUPPLEMENTARY INFORMATION:

Table of Contents

I. Summary Information

A. Purpose of the Regulatory Action

1. What action is EPA taking?

2. Does this action apply to me?

3. What is EPA's authority for taking this action?

4. What is the applicability date?

B. Summary of the Regulatory Action

C. Economic Analysis

1. What is the estimated cost of this action?

2. What are the benefits of this action?

II. Public Participation

A. What meetings have been held in preparation for UCMR 5?

B. How do I participate in the upcoming meetings?

1. Meeting Participation

2. Meeting Materials

III. General Information

A. How are CCL, UCMR, Regulatory Determination process, and NCOD interrelated?

B. What are the Consumer Confidence Reporting and Public Notice Reporting requirements for public water systems that are subject to UCMR?

C. What is the UCMR 5 timeline?

D. What is the role of “States” in UCMR?

E. How did EPA consider Children's Environmental Health?

F. How did EPA address Environmental Justice?

G. How did EPA coordinate with Indian Tribal Governments?

H. How are laboratories approved for UCMR 5 analyses?

1. Request To Participate

2. Registration

3. Application Package

4. EPA's Review of Application Package

5. Proficiency Testing

6. Written EPA Approval

I. What documents are being incorporated by reference?

1. Methods From the U.S. Environmental Protection Agency

2. Alternative Methods From American Public Health Association—Standard Methods (SM)

3. Methods From ASTM International

IV. Description of Final Rule and Summary of Responses to Public Comments

A. What contaminants must be monitored under UCMR 5?

1. This Final Rule

2. Summary of Major Comments and EPA Responses

a. Aggregate PFAS Measure

b. Legionella Pneumophila

c. Haloacetonitriles

d. 1,2,3-Trichloropropane

B. What is the UCMR 5 sampling design?

1. This Final Rule

2. Summary of Major Comments and EPA Responses

C. What is the sampling frequency and timing?

1. This Final Rule

2. Summary of Major Comments and EPA Responses

D. Where are the sampling locations and what is representative monitoring?

1. This Final Rule

2. Summary of Major Comments and EPA Responses

E. How long do laboratories and PWSs have to report data?

1. This Final Rule

2. Summary of Major Comments and EPA Responses

F. What are the reporting requirements for UCMR 5?

1. This Final Rule

2. Summary of Major Comments and EPA Responses

a. Data Elements

b. Reporting State Data

G. What are the UCMR 5 Minimum Reporting Levels (MRLs) and how were they determined?

1. This Final Rule

2. Summary of Major Comments and EPA Responses

H. What are the requirements for laboratory analysis of field reagent blank samples?

1. This Final Rule

2. Summary of Major Comments and EPA Responses

I. How will EPA support risk communication for UCMR 5 results?

V. Statutory and Executive Order Reviews

A. Executive Order 12866: Regulatory Planning and Review and Executive Order 13563: Improving Regulation and Regulatory Review

B. Paperwork Reduction Act (PRA)

C. Regulatory Flexibility Act (RFA)

D. Unfunded Mandates Reform Act (UMRA)

E. Executive Order 13132: Federalism

F. Executive Order 13175: Consultation and Coordination With Indian Tribal Governments

G. Executive Order 13045: Protection of Children From Environmental Health Risks and Safety Risks

H. Executive Order 13211: Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution or Use

I. National Technology Transfer and Advancement Act (NTTAA)

J. Executive Order 12898: Federal Actions To Address Environmental Justice in Minority Populations and Low-Income Populations

K. Congressional Review Act (CRA)

VI. References

Abbreviations and Acronyms

μg/L Microgram per Liter

11Cl-PF3OUdS 11-chloroeicosafluoro-3-oxaundecane-1-sulfonic Acid

4:2 FTS 1H, 1H, 2H, 2H-perfluorohexane Sulfonic Acid

6:2 FTS 1H, 1H, 2H, 2H-perfluorooctane Sulfonic Acid

8:2 FTS 1H, 1H, 2H, 2H-perfluorodecane Sulfonic Acid

9Cl-PF3ONS 9-chlorohexadecafluoro-3-oxanone-1-sulfonic Acid

ADONA 4,8-dioxa-3H-perfluorononanoic Acid

AES Atomic Emission Spectrometry

ASDWA Association of State Drinking Water Administrators

ASTM ASTM International

AWIA America's Water Infrastructure Act of 2018

CASRN Chemical Abstracts Service Registry Number

CBI Confidential Business Information

CCL Contaminant Candidate List

CCR Consumer Confidence Report

CFR Code of Federal Regulations

CRA Congressional Review Act

CWS Community Water System

DBP Disinfection Byproduct

DWSRF Drinking Water State Revolving Fund

EPA United States Environmental Protection Agency

EPTDS Entry Point to the Distribution System

FR Federal Register

FRB Field Reagent Blank

GW Ground Water

GWRMP Ground Water Representative Monitoring Plan

HFPO-DA Hexafluoropropylene Oxide Dimer Acid (GenX)

HRL Health Reference Level

ICP Inductively Coupled Plasma

ICR Information Collection Request

IDC Initial Demonstration of Capability

LCMRL Lowest Concentration Minimum Reporting Level

LC/MS/MS Liquid Chromatography/Tandem Mass Spectrometry

MDBP Microbial and Disinfection Byproduct

MRL Minimum Reporting Level

NAICS North American Industry Classification System

NCOD National Contaminant Occurrence Database

NDAA National Defense Authorization Act for Fiscal Year 2020

NEtFOSAA N-ethyl Perfluorooctanesulfonamidoacetic Acid

NFDHA Nonafluoro‐3,6‐dioxaheptanoic Acid

ng/L Nanogram per Liter

NMeFOSAA N-methyl Perfluorooctanesulfonamidoacetic Acid

NPDWR National Primary Drinking Water Regulation

NTNCWS Non-transient Non-community Water System

NTTAA National Technology Transfer and Advancement Act

NTWC National Tribal Water Council

OGWDW Office of Ground Water and Drinking Water

OMB Office of Management and Budget

PFAS Per- and Polyfluoroalkyl Substances

PFBA Perfluorobutanoic Acid

PFBS Perfluorobutanesulfonic Acid

PFDA Perfluorodecanoic Acid

PFDoA Perfluorododecanoic Acid

PFEESA Perfluoro (2‐ethoxyethane) Sulfonic Acid

PFHpA Perfluoroheptanoic Acid

PFHpS Perfluoroheptanesulfonic Acid

PFHxA Perfluorohexanoic Acid

PFHxS Perfluorohexanesulfonic Acid

PFMBA Perfluoro‐4‐methoxybutanoic Acid

PFMPA Perfluoro‐3‐methoxypropanoic Acid

PFNA Perfluorononanoic Acid

PFOA Perfluorooctanoic Acid

PFOS Perfluorooctanesulfonic Acid

PFPeA Perfluoropentanoic Acid

PFPeS Perfluoropentanesulfonic Acid

PFTA Perfluorotetradecanoic Acid

PFTrDA Perfluorotridecanoic Acid

PFUnA Perfluoroundecanoic Acid

PN Public Notice

PRA Paperwork Reduction Act

PT Proficiency Testing

PWS Public Water System

QC Quality Control

RFA Regulatory Flexibility Act

SBA Small Business Administration

SBREFA Small Business Regulatory Enforcement Fairness Act

SDWA Safe Drinking Water Act

SDWARS Safe Drinking Water Accession and Review System

SDWIS/Fed Safe Drinking Water Information System Federal Reporting Services

SM Standard Methods for the Examination of Water and Wastewater

SOP Standard Operating Procedure

SPE Solid Phase Extraction

SRMD Standards and Risk Management Division

SW Surface Water

SWTR Surface Water Treatment Rule

TNCWS Transient Non-community Water System

TOF Total Organic Fluorine

TOP Total Oxidizable Precursors

UCMR Unregulated Contaminant Monitoring Rule

UMRA Unfunded Mandates Reform Act of 1995

U.S. United States

USEPA United States Environmental Protection Agency

I. Summary Information

A. Purpose of the Regulatory Action

1. What action is EPA taking?

This final rule requires certain public water systems (PWSs), described in section I.A.2 of this preamble, to collect national occurrence data for 29 PFAS and lithium. PFAS and lithium are not currently subject to national primary drinking water regulations, and EPA is requiring collection of data under UCMR 5 to inform EPA regulatory determinations and risk-management decisions. Consistent with EPA's PFAS Strategic Roadmap, UCMR 5 will provide new data critically needed to improve EPA's understanding of the frequency that 29 PFAS (and lithium) are found in the nation's drinking water systems and at what levels. This data will ensure science-based decision-making and help prioritize protection of disadvantaged communities.

2. Does this action apply to me?

This final rule applies to PWSs described in this section. PWSs are systems that provide water for human consumption through pipes, or constructed conveyances, to at least 15 service connections or that regularly serve an average of at least 25 individuals daily at least 60 days out of the year. A community water system (CWS) is a PWS that has at least 15 service connections used by year-round residents or regularly serves at least 25 year-round residents. A non-transient non-community water system (NTNCWS) is a PWS that is not a CWS and that regularly serves at least 25 of the same people over 6 months per year. Under this final rule, all large CWSs and NTNCWSs serving more than 10,000 people are required to monitor. In addition, small CWSs and NTNCWSs serving between 3,300 and 10,000 people are required to monitor (subject to available EPA appropriations and EPA notification of such requirement) as are the PWSs included in a nationally representative sample of CWSs and NTNCWSs serving between 25 and 3,299 people (see “Selection of Nationally Representative Public Water Systems for the Unregulated Contaminant Monitoring Rule: 2021 Update” for a description of the statistical approach for EPA's selection of the nationally representative sample (USEPA, 2021a), available in the UCMR 5 public docket). EPA expects to clarify the monitoring responsibilities for affected small systems by approximately July 1 of each year preceding sample collection, based on the availability of appropriations each year.

As in previous UCMRs, transient non-community water systems (TNCWSs) ( i.e., non-community water systems that do not regularly serve at least 25 of the same people over 6 months per year) are not required to monitor under UCMR 5. EPA leads UCMR 5 monitoring as a direct-implementation program. States, Territories, and Tribes with primary enforcement responsibility (primacy) to administer the regulatory program for PWSs under SDWA (hereinafter collectively referred to in this document as “states”), can participate in the implementation of UCMR 5 through voluntary Partnership Agreements (see discussion of Partnership Agreements in Section III.D of this preamble). Under Partnership Agreements, states can choose to be involved in various aspects of UCMR 5 monitoring for PWSs they oversee; however, the PWS remains responsible for compliance with the final rule. Potentially regulated categories and entities are identified in the following table.

CategoryExamples of potentially regulated entitiesNAICS *
* NAICS = North American Industry Classification System.
State, local, & Tribal governmentsState, local, and Tribal governments that analyze water samples on behalf of PWSs required to conduct such analysis; State, local, and Tribal governments that directly operate CWSs and NTNCWSs required to monitor924110
IndustryPrivate operators of CWSs and NTNCWSs required to monitor221310
MunicipalitiesMunicipal operators of CWSs and NTNCWSs required to monitor924110

This table is not intended to be exhaustive, but rather provides a guide for readers regarding entities likely to be regulated by this action. This table lists the types of entities that EPA is aware could potentially be regulated by this action. Other types of entities not listed in the table could also be regulated. To determine whether your entity is regulated by this action, you should carefully examine the definition of PWS found in Title 40 in the Code of Federal Regulations (CFR) at 40 CFR 141.2 and 141.3, and the applicability criteria found in 40 CFR 141.40(a)(1) and (2). If you have questions regarding the applicability of this action to a particular entity, please consult the contacts listed in the preceding FOR FURTHER INFORMATION CONTACT section of this preamble.

3. What is EPA's authority for taking this action?

As part of EPA's responsibilities under SDWA, the agency implements section 1445(a)(2), Monitoring Program for Unregulated Contaminants. This section, as amended in 1996, requires that once every five years, beginning in August 1999, EPA issue a list of not more than 30 unregulated contaminants to be monitored by PWSs. SDWA requires that EPA enter the monitoring data into the agency's publicly available National Contaminant Occurrence Database (NCOD) at https://www.epa.gov/sdwa/national-contaminant-occurrence-database-ncod.

EPA must vary the frequency and schedule for monitoring based on the number of people served, the source of supply, and the contaminants likely to be found. EPA is using SDWA Section 1445(a)(2) authority as the basis for monitoring the unregulated contaminants under this final rule.

Section 2021 of America's Water Infrastructure Act of 2018 (AWIA) (Pub. L. 115-270) amended SDWA and specifies that, subject to the availability of EPA appropriations for such purpose and sufficient laboratory capacity, EPA's UCMR program must require all PWSs serving between 3,300 and 10,000 people to monitor for the contaminants in a particular UCMR cycle, and ensure that only a nationally representative sample of systems serving between 25 and 3,299 people are required to monitor for those contaminants. EPA has developed this final rule anticipating that necessary appropriations will become available; however, to date, Congress has not appropriated additional funding ( i.e., funding in addition to the $2.0 million that EPA has historically set aside each year from the Drinking Water State Revolving Fund, using SDWA authority, to support UCMR monitoring at small systems) to cover monitoring expenses for all PWSs serving between 3,300 and 10,000 people. Provisions in the final rule enable the agency to adjust the number of these systems that must monitor based upon available appropriations.

AWIA did not amend the original SDWA requirements for large PWSs. Therefore, PWSs serving a population larger than 10,000 people continue to be responsible for participating in UCMR.

Section 7311 of the National Defense Authorization Act for Fiscal Year 2020 (NDAA) (Pub. L. 116-92) amended SDWA and specifies that EPA shall include all PFAS in UCMR 5 for which a drinking water method has been validated by the Administrator and that are not subject to a national primary drinking water regulation.

4. What is the applicability date?

The applicability date represents an internal milestone used by EPA to determine if a PWS is included in the UCMR program and whether it will be treated as small ( i.e., serving 25 to 10,000 people) or large ( i.e., serving more than 10,000 people). It does not represent a date by which respondents need to take any action. The determination of whether a PWS is required to monitor under UCMR 5 is based on the type of system ( e.g., CWS, NTNCWS, etc.) and its retail population served, as indicated by the Safe Drinking Water Information System Federal Reporting Services (SDWIS/Fed) inventory on February 1, 2021. SDWIS/Fed can be accessed at https://www.epa.gov/ground-water-and-drinking-water/safe-drinking-water-information-system-sdwis-federal-reporting. Examining water system type and population served as of February 1, 2021 allowed EPA to develop a draft list of PWSs tentatively subject to UCMR 5 and share that list with the states during 2021 for their review. This advance planning and review then allowed EPA to load state-reviewed PWS information into EPA's reporting system so that those PWSs can be promptly notified upon publication of this final rule. If a PWS receives such notification and believes it has been erroneously included in UCMR 5 based on an incorrect retail population, the system should contact their state authority to verify its population served as of the applicability date. If an error impacting rule applicability is identified, the state or the PWS may contact EPA to address the error. The 5-year UCMR 5 cycle spans January 2022 through December 2026, with preparations in 2022, sample collection between January 1, 2023, and December 31, 2025, and completion of data reporting in 2026. By approximately July 1 of the year prior to each year's sample collection ( i.e., by July 1, 2022 for 2023 sampling; by July 1, 2023 for 2024 sampling; and by July 1, 2024 for 2025 sampling) EPA expects to determine whether it has received necessary appropriations to support its plan to monitor at all systems serving between 3,300 and 10,000 people and at a representative group of 800 smaller systems. As EPA finalizes its small-system plan for each sample collection year, the agency will notify the small PWSs accordingly.

B. Summary of the Regulatory Action

EPA is requiring certain PWSs to collect occurrence data for 29 PFAS and lithium. This document addresses key aspects of UCMR 5, including the following: Analytical methods to measure the contaminants; laboratory approval; monitoring timeframe; sampling locations; data elements ( i.e., information required to be collected along with the occurrence data); data reporting timeframes; monitoring cost; public participation; conforming and editorial changes, such as those necessary to remove requirements solely related to UCMR 4; and EPA responses to public comments on the proposed rule. This document also discusses the implication for UCMR 5 of the AWIA Section 2021(a) requirement that EPA collect monitoring data from all systems serving more than 3,300 people “subject to the availability of appropriations.”

Regardless of whether EPA is able to carry out the small-system monitoring as planned, or instead reduces the scope of that monitoring, the small-system data collection, coupled with data collection from all systems serving more than 10,000 people under this action, will provide scientifically valid data on the national occurrence of 29 PFAS and lithium in drinking water. The UCMR data are the primary source of national occurrence data that EPA uses to inform regulatory and other risk management decisions for drinking water contaminant candidates.

EPA is required under SDWA Section 1445(a)(2)(C)(ii) to pay the “reasonable cost of such testing and laboratory analysis” for all applicable PWSs serving 25 to 10,000 people. Consistent with AWIA, EPA will require monitoring at as many systems serving 3,300 to 10,000 people as appropriations support (see Section IV.B of this preamble for more information on the agency's sampling design).

The agency received several public comments expressing concern that significant laboratory capacity will be needed to support the full scope envisioned for UCMR 5 PFAS monitoring. EPA anticipates that sufficient laboratory capacity will exist to support the expanded UCMR 5 scope. EPA's experience over the first four cycles of UCMR implementation has been that laboratory capacity quickly grows to meet UCMR demand. EPA also notes that the number of laboratories successfully participating in the early stages of the UCMR 5 laboratory approval program is a good indicator that there will be a robust national network of laboratories experienced in PFAS drinking water analysis.

By early 2022, EPA will notify all small CWSs and NTNCWSs serving between 3,300 and 10,000 people of their anticipated requirement to monitor, which EPA expects to confirm and schedule by July 1 preceding each collection year based on the availability of appropriations. The nationally representative sample of smaller PWSs described in Section I.A of this preamble will be similarly notified and advised of their schedules.

This final rule addresses the requirements of the NDAA by including all 29 PFAS that are within the scope of EPA Methods 533 and 537.1. Both of these methods have been validated by EPA for drinking water analysis.

C. Economic Analysis

1. What is the estimated cost of this action?

EPA estimates the total average national cost of this action would be $21 million per year over the 5-year effective period of the final rule (2022-2026) assuming EPA collects information from all systems serving between 3,300 and 10,000 people. All of these costs are associated with paperwork burden under the Paperwork Reduction Act (PRA). EPA discusses the expected costs as well as documents the assumptions and data sources used in the preparation of this estimate in the “Information Collection Request for the Final Unregulated Contaminant Monitoring Rule (UCMR 5)” (USEPA, 2021b). Costs are incurred by large PWSs (for sampling and analysis); small PWSs (for sampling); state regulatory agencies ( i.e., those who volunteer to assist EPA with oversight and implementation support); and EPA (for regulatory support and oversight activities, and analytical and shipping costs for samples from small PWSs). These costs are also summarized in Exhibit 1 of this preamble. EPA's estimates are based on executing the full monitoring plan for small systems ( i.e., including all systems serving 3,300 to 10,000 people and a representative group of 800 smaller systems). As such, those estimates represent an upper bound. If EPA does not receive the necessary appropriations in one or more of the collections years—and thus collects data from fewer small systems—the actual costs would be lower than those estimated here.

EPA received several comments on the cost of monitoring. EPA has accounted for the cost/burden associated with all of the PWS activities as part of the comprehensive cost/burden estimates. In order to provide the most accurate and updated cost estimate, EPA re-examined labor burden estimates for states, EPA, and PWS activities and updated costs of laboratory services for sample analysis, based on consultations with national drinking water laboratories, when developing this final rule.

The costs for a particular UCMR cycle are heavily influenced by the selection of contaminants and associated analytical methods. EPA identified three EPA-developed analytical methods (and, in the case of lithium, multiple optional alternative methods) to analyze samples for UCMR 5 contaminants. EPA's estimate of the UCMR 5 analytical cost is $740 per sample set ( i.e., $740 to analyze a set of samples from one sample point and one sample event for the 30 UCMR 5 contaminants).

Exhibit 1 of this preamble details the EPA-estimated annual average national costs (accounting for labor and non-labor expenses). Laboratory analysis and sample shipping account for approximately 65 percent of the estimated total national cost for the implementation of UCMR 5. EPA estimated laboratory costs based on consultations with multiple commercial drinking water testing laboratories. EPA's cost estimates for the laboratory methods include shipping and analysis.

EPA expects that states will incur modest labor costs associated with voluntary assistance with the implementation of UCMR 5. EPA estimated state costs using the relevant assumptions from the State Resource Model developed by the Association of State Drinking Water Administrators (ASDWA) (ASDWA, 2013) to help states forecast resource needs. Model estimates were adjusted to account for actual levels of state participation under UCMR 4. State assistance with EPA's implementation of UCMR 5 is voluntary; thus, the level of effort is expected to vary among states and will depend on their individual agreements with EPA.

EPA assumes that one-third of the systems will collect samples during each of the three sample-collection years from January 2023 through December 2025.

Exhibit 1—Estimated Average Annual Costs of UCMR 5 1
EntityAverage annual cost (million) (2022-2026) 2
1 Based on the scope of small-system monitoring described in AWIA.
2 Totals may not equal the sum of components due to rounding.
3 Labor costs pertain to PWSs, states, and EPA. Costs include activities such as reading the final rule, notifying systems selected to participate, sample collection, data review, reporting, and record keeping.
4 Non-labor costs will be incurred primarily by EPA and by large and very large PWSs. They include the cost of shipping samples to laboratories for testing and the cost of the laboratory analyses.
5 For a typical UCMR program that involves the expanded scope prescribed by AWIA, EPA estimates an average annual cost to the agency of $17M/year (over a 5-year cycle) ($2M/year for the representative sample of 800 PWSs serving between 25 and 3,299 people and $15M/year for all PWSs serving between 3,300 and 10,000 people). The projected cost to EPA for UCMR 5 implementation is lower than for a typical UCMR program because of lower sample analysis expenses. Those lower expenses are a result of analytical method efficiencies ( i.e., being able to monitor for 30 chemicals with only three analytical methods).
Small PWSs (25-10,000), including labor 3 only (non-labor costs 4 paid for by EPA)$0.3
Large PWSs (10,001-100,000), including labor and non-labor costs7.0
Very Large PWSs (100,001 and greater), including labor and non-labor costs2.2
States, including labor costs related to implementation coordination0.8
EPA, including labor for implementation and non-labor for small system testing5 10.5
Average Annual National Total20.8

Additional details regarding EPA's cost assumptions and estimates can be found in the Information Collection Request (ICR) (USEPA, 2021b), ICR Number 2040-0304, which presents estimated cost and labor hours for the 5-year UCMR 5 period of 2022-2026. Copies of the ICR may be obtained from the EPA public docket for this final rule under Docket ID No. EPA-HQ-OW-2020-0530.

2. What are the benefits of this action?

The public benefits from the information about whether or not unregulated contaminants are present in their drinking water. If contaminants are not found, consumer confidence in their drinking water should improve. If contaminants are found, related health effects may be avoided when subsequent actions, such as regulations, are implemented, reducing or eliminating those contaminants.

II. Public Participation

A. What meetings have been held in preparation for UCMR 5?

EPA held three public meetings on UCMR 5 over the period of 2018 through 2021. EPA held a meeting focused on drinking water methods for unregulated contaminants on June 6, 2018, in Cincinnati, Ohio. Representatives from state agencies, laboratories, PWSs, environmental organizations, and drinking water associations joined the meeting via webinar and in person. Meeting topics included an overview of regulatory process elements (including the Contaminant Candidate List (CCL), UCMR, and Regulatory Determination), and drinking water methods under development (see USEPA, 2018 for presentation materials). EPA held a second meeting on July 16, 2019, in Cincinnati, Ohio. Representatives from State agencies, Tribes, laboratories, PWSs, environmental organizations, and drinking water associations participated in the meeting via webinar and in person. Meeting topics included the impacts of AWIA, analytical methods and contaminants being considered by EPA, potential sampling design, and other possible aspects of the UCMR 5 approach (see USEPA, 2019a for meeting materials). EPA held two identical virtual meetings on April 6 and 7, 2021, during the public comment period for the proposed rule (see USEPA, 2021c for presentation materials). Topics included the proposed UCMR 5 monitoring requirements, analyte selection and rationale, analytical methods, the laboratory approval process, and ground water representative monitoring plans (GWRMPs). Representatives of state agencies, laboratories, PWSs, environmental organizations, and drinking water associations participated in the meeting via webinar. In Section II.B of this preamble, the agency is announcing additional meetings to be held in 2022, which will assist with implementation.

B. How do I participate in the upcoming meetings?

EPA will hold multiple virtual meetings during 2022 to discuss UCMR 5 implementation planning, data reporting using Safe Drinking Water Accession and Review System (SDWARS), and best practices for sample collection. Dates and times of the upcoming meetings will be posted on EPA's website at https://www.epa.gov/dwucmr/unregulated-contaminant-monitoring-rule-ucmr-meetings-and-materials. EPA anticipates hosting the meetings focused on implementation planning in spring 2022, and the SDWARS and sample-collection meetings in fall 2022. Stakeholders who have participated in past UCMR meetings and/or those who register to use SDWARS will receive notification of these events. Other interested stakeholders are also welcome to participate.

1. Meeting Participation

Those who wish to participate in the public meetings, via webinar, can find information on how to register at https://www.epa.gov/dwucmr/unregulated-contaminant-monitoring-rule-ucmr-meetings-and-materials. The number of webinar connections available for the meetings are limited and will be available on a first-come, first-served basis. If stakeholder interest results in exceeding the maximum number of available connections for participants in upcoming webinar offerings, EPA may schedule additional webinars, with dates and times posted on EPA's Unregulated Contaminant Monitoring Program Meetings and Materials web page at https://www.epa.gov/dwucmr/unregulated-contaminant-monitoring-rule-ucmr-meetings-and-materials.

2. Meeting Materials

EPA expects to send meeting materials by email to all registered participants prior to the meeting. The materials will be posted on EPA's website at https://www.epa.gov/dwucmr/unregulated-contaminant- monitoring-rule-ucmr-meetings-and-materials for people who do not participate in the webinar.

III. General Information

A. How are CCL, UCMR, Regulatory Determination process, and NCOD interrelated?

Under the 1996 amendments to SDWA, Congress established a multi-step, risk-based approach for determining which contaminants would become subject to drinking water standards. Under the first step, EPA is required to publish a CCL every five years that identifies contaminants that are not subject to any proposed or promulgated drinking water regulations, are known or anticipated to occur in PWSs, and may require future regulation under SDWA. EPA published the draft CCL 5 in the Federal Register on July 19, 2021 (86 FR 37948, July 19, 2021 (USEPA, 2021d)). Under the second step, EPA must require, every five years, monitoring of unregulated contaminants as described in this action. The third step requires EPA to determine, every five years, whether or not to regulate at least five contaminants from the CCL. Under Section 1412(b)(1)(A) of SDWA, EPA regulates a contaminant in drinking water if the Administrator determines that:

(1) The contaminant may have an adverse effect on the health of persons;

(2) The contaminant is known to occur or there is substantial likelihood that the contaminant will occur in PWSs with a frequency and at levels of public health concern; and

(3) In the sole judgment of the Administrator, regulation of such contaminant presents a meaningful opportunity for health risk reduction for persons served by PWSs.

For the contaminants that meet all three criteria, SDWA requires EPA to publish national primary drinking water regulations (NPDWRs). Information on the CCL and the regulatory determination process can be found at: https://www.epa.gov/ccl.

The data collected through the UCMR program are made available to the public through the National Contaminant Occurrence Database (NCOD) for drinking water. EPA developed the NCOD to satisfy requirements in SDWA Section 1445(g), to assemble and maintain a drinking water contaminant occurrence database for both regulated and unregulated contaminants in drinking water systems. NCOD houses data on unregulated contaminant occurrence; data from EPA's “Six-Year Review” of national drinking water regulations; and ambient and/or source water data. Section 1445(g)(3) of SDWA requires that EPA maintain UCMR data in the NCOD and use the data when evaluating the frequency and level of occurrence of contaminants in drinking water at a level of public health concern. UCMR results can be viewed by the public via NCOD ( https://www.epa.gov/sdwa/national-contaminant-occurrence-database-ncod ) or via the UCMR web page at: https://www.epa.gov/dwucmr.

B. What are the Consumer Confidence Reporting and Public Notice Reporting requirements for public water systems that are subject to UCMR?

In addition to reporting UCMR monitoring data to EPA, PWSs are responsible for presenting and addressing UCMR results in their annual Consumer Confidence Reports (CCRs) (40 CFR 141.153) and must address Public Notice (PN) requirements associated with UCMR (40 CFR 141.207). More details about the CCR and PN requirements can be viewed by the public at: https://www.epa.gov/ccr and https://www.epa.gov/dwreginfo/public-notification-rule, respectively.

C. What is the UCMR 5 timeline?

This final rule identifies a UCMR 5 sampling period of 2023 to 2025. Prior to 2023 EPA will coordinate laboratory approval, tentatively select representative small systems (USEPA, 2021a), organize Partnership Agreements, develop State Monitoring Plans (see Section III.D of this preamble), establish monitoring schedules and inventory, and conduct outreach and training. Exhibit 2 of this preamble illustrates the major activities that EPA expects will take place in preparation for and during the implementation of UCMR 5.

BILLING CODE 6560-50-P



BILLING CODE 6560-50-C

D. What is the role of “States” in UCMR?

UCMR is a direct implementation rule ( i.e., EPA has primary responsibility for its implementation) and state participation is voluntary. Under the previous UCMR cycles, specific activities that individual states agreed to carry out or assist with were identified and established exclusively through Partnership Agreements. Through Partnership Agreements, states can help EPA implement UCMR and help ensure that the UCMR data are of the highest quality possible to best support the agency decision making. Under UCMR 5, EPA will continue to use the Partnership Agreement process to determine and document the following: The process for review and revision of the State Monitoring Plans; replacing and updating PWS information, including inventory ( i.e., PWS identification codes (PWSID), facility identification code along with associated facility types and water source type, etc.); review of proposed GWRMPs; notification and instructions for systems; and compliance assistance. EPA recognizes that states often have the best information about their PWSs and encourages them to partner in the UCMR 5 program.

E. How did EPA consider Children's Environmental Health?

By monitoring for unregulated contaminants that may pose health risks via drinking water, UCMR furthers the protection of public health for all citizens, including children. Children consume more water per unit of body weight compared to adults. Moreover, formula-fed infants drink a large amount of water compared to their body weight; thus, children's exposure to contaminants in drinking water may present a disproportionate health risk (USEPA, 2011). The objective of UCMR 5 is to collect nationally representative drinking water occurrence data on unregulated contaminants for future regulatory consideration. Information on the prioritization process, as well as contaminant-specific information ( e.g., source, use, production, release, persistence, mobility, health effects, and occurrence), that EPA used to select the analyte list, is contained in “Information Compendium for Contaminants for the Final Unregulated Contaminant Monitoring Rule (UCMR 5)” (USEPA, 2021e), available in the UCMR 5 public docket.

Since this is a final rule to monitor for contaminants and not to reduce their presence in drinking water to an acceptable level, the rule does not concern environmental health or safety risks presenting a disproportionate risk to children that would be addressed by this action (See Section V.G Executive Order 13045 of this preamble). Therefore, Executive Order 13045 does not apply to UCMR. However, EPA's Policy on Evaluating Health Risks to Children, which ensures that the health of infants and children is explicitly considered in the agency's decision making, is applicable, see: https://www.epa.gov/children/epas-policy-evaluating-risk-children.

EPA considered children's health risks during the development of UCMR 5. This included considering public comments about candidate contaminant priorities. Many commenters supported the agency's inclusion of PFAS and lithium in UCMR 5. Some commenters requested that EPA consider children and infant health risks in its risk communication for UCMR 5.

Using quantitation data from multiple laboratories, EPA establishes statistically-based UCMR reporting levels the agency considers feasible for the national network of approved drinking water laboratories. EPA generally sets the reporting levels as low as is technologically practical for measurement by that national network of laboratories, even if that level is well below concentrations that are currently associated with known or suspected health effects. In doing so, EPA positions itself to better address contaminant risk information in the future, including that associated with unique risks to children.

F. How did EPA address Environmental Justice (EJ)?

EPA has concluded that this action is not subject to Executive Order 12898 because it does not establish an environmental health or safety standard (see Section V.J Executive Order 12898 of this preamble). EPA Administrator Regan issued a directive to all EPA staff to incorporate environmental justice (EJ) into the agency's work, including regulatory activities, such as integrating EJ considerations into the regulatory development processes and considering regulatory options to maximize benefits to communities that “continue to suffer from disproportionately high pollution levels and the resulting adverse health and environmental impacts.” In keeping with this directive, and consistent with AWIA, EPA will, subject to the availability of sufficient appropriations, expand UCMR 5 to include all PWSs serving between 3,300 and 10,000 people as described in Sections I.A.4 and IV.B of this preamble. If there are sufficient appropriations, the expansion in the number of participating PWSs will provide a more comprehensive assessment of contaminant occurrence data from small and rural communities, including disadvantaged communities.

By developing a national characterization of unregulated contaminants that may pose health risks via drinking water from PWSs, UCMR furthers the protection of public health for all citizens. If EPA receives the needed appropriations, the expansion in monitoring scope reflected in UCMR 5 ( i.e., including all PWSs serving 3,300 to 10,000 people) will better support state and regional analyses and determination of potential EJ-related issues that need to be addressed. EPA structured the UCMR 5 rulemaking process to allow for meaningful involvement and transparency. EPA organized public meetings and webinars to share information regarding the development and implementation of UCMR 5; consulted with Tribal governments; and convened a workgroup that included representatives from several states. EPA will support stakeholder interest in UCMR 5 results by making them publicly available, as described in Section III.A of this preamble, and by developing additional risk-communication materials to help individuals and communities understand the significance of contaminant occurrence.

EPA received multiple comments on environmental justice considerations. Commenters expressed support for the continued collection of U.S. Postal Service Zip Codes for each PWS's service area and requested that EPA provide multilingual UCMR materials. EPA will continue to collect Zip Codes for UCMR 5, as collected under UCMR 3 and UCMR 4, to support potential assessments of whether or not certain communities are disproportionately impacted by particular drinking water contaminants. EPA also intends to develop the sampling instructions, fact sheets, and data summaries in both English and Spanish.

G. How did EPA coordinate with Indian Tribal Governments?

EPA has concluded that this action has Tribal implications. However, it will neither impose substantial direct compliance costs on federally recognized Tribal governments, nor preempt Tribal law. (See section V.F Executive Order 13175 of this preamble).

EPA consulted with Tribal officials under the EPA Policy on Consultation and Coordination with Indian Tribes early in the process of developing this action to ensure meaningful and timely input into its development. EPA initiated the Tribal consultation and coordination process before proposing the rule by mailing a “Notification of Consultation and Coordination” letter on June 26, 2019, to the Tribal leadership of the then 573 federally recognized Tribes. The letter invited Tribal leaders and representatives of Tribal governments to participate in an August 6, 2019, UCMR 5 Tribal consultation and coordination informational meeting. Presentation topics included an overview of the UCMR program, potential approaches to monitoring and implementation for UCMR 5, and the UCMR 5 contaminants and analytical methods under consideration. After the presentation, EPA provided an opportunity for input and questions on the action. Eight representatives from five Tribes attended the August meeting. Tribal representatives asked clarifying questions regarding program costs to PWSs and changes in PWS participation per AWIA. EPA addressed the questions during the meeting. Following the meeting, EPA received and addressed one additional clarifying question from a Tribal representative during the Tribal consultation process. No other Tribal representatives submitted written comments during the UCMR 5 consultation comment period that ended September 1, 2019.

Prior to the August 2019 meeting, EPA provided additional opportunities for Tribal officials to provide meaningful and timely input into the development of the proposed rule. On July 10, 2019, EPA participated in a monthly conference call with the National Tribal Water Council (NTWC). EPA shared a brief summary of UCMR statutory requirements with the Council and highlighted the upcoming official Tribal meeting. EPA also invited Tribal leaders and representatives to participate in a public meeting, held on July 16, 2019, to discuss the development of the proposed rule. Representatives from six Tribes participated in the public meeting. Following the publication of the proposal, EPA advised the Indian Health Services of the 60-day public comment period to assist with facilitating additional Tribal comments on the proposed rule. EPA received no public comments from Tribal officials.

A complete summary of the consultation, titled, “Summary of the Tribal Coordination and Consultation Process for the Fifth Unregulated Contaminant Monitoring Rule (UCMR 5) Proposal,” is provided in the UCMR 5 public docket listed in the ADDRESSES section of this preamble.

H. How are laboratories approved for UCMR 5 analyses?

Consistent with prior UCMRs, this action maintains the requirement that PWSs use laboratories approved by EPA to analyze UCMR 5 samples. Interested laboratories are encouraged to apply for EPA approval as early as possible. The UCMR 5 laboratory approval process, which began with the publication of the UCMR 5 proposal, is designed to assess whether laboratories possess the required equipment and can meet laboratory-performance and data-reporting criteria described in this action.

EPA expects demand for laboratory support to increase significantly based on the greater number of PWSs expected to participate in UCMR 5. EPA anticipates that the number of participating small water systems will increase from the typical 800 to approximately 6,000 (see Exhibit 5 in Section IV.B of this preamble). In preparation for this increase, EPA will solicit proposals and award contracts to laboratories to support small system monitoring prior to the end of the proficiency testing (PT) program. As in previous UCMR programs, EPA expects that laboratories awarded contracts by EPA will be required to first be approved to perform all methods. The requirements for the laboratory approval process are described in steps 1 through 6 of the following paragraphs.

EPA will require laboratories seeking approval to: (1) Provide EPA with data documenting an initial demonstration of capability (IDC) as outlined in each method; (2) verify successful performance at or below the minimum reporting levels (MRLs) as specified in this action; (3) provide information about laboratory standard operating procedures (SOPs); and (4) participate in two EPA PT studies for the analytes of interest. Audits of laboratories may be conducted by EPA prior to and/or following approval, and maintaining approval is contingent on timely and accurate reporting. The “UCMR 5 Laboratory Approval Manual” (USEPA, 2021f), available in the UCMR 5 public docket, provides more specific guidance on EPA laboratory approval program and the specific method acceptance criteria. EPA has included sample-collection procedures that are specific to the methods in the “UCMR 5 Laboratory Manual,” and will address these procedures in our outreach to the PWSs that will be collecting samples.

The UCMR 5 laboratory approval program will provide an assessment of the ability of laboratories to perform analyses using the methods listed in 40 CFR 141.40(a)(3), Table 1 of this preamble. Laboratory participation in the program is voluntary. However, as in the previous UCMRs, EPA will require PWSs to exclusively use laboratories that have been approved under the program. EPA will post a list of approved UCMR 5 laboratories to https://www.epa.gov/dwucmr and will bring this to the attention of the PWSs in our outreach.

1. Request To Participate

Laboratories interested in the UCMR 5 laboratory approval program first email EPA at: UCMR_Lab_Approval@epa.gov to request registration materials. EPA began accepting requests beginning with the publication of the proposal in the Federal Register .

2. Registration

Laboratory applicants provide registration information that includes laboratory name, mailing address, shipping address, contact name, phone number, email address, and a list of the UCMR 5 methods for which the laboratory is seeking approval. This registration step provides EPA with the necessary contact information and ensures that each laboratory receives a customized application package.

3. Application Package

Laboratory applicants will complete and return a customized application package that includes the following: IDC data, including precision, accuracy, and results of MRL studies; information regarding analytical equipment and other materials; proof of current drinking water laboratory certification (for select compliance monitoring methods); method-specific SOPs; and example chromatograms for each method under review.

As a condition of receiving and maintaining approval, the laboratory must promptly post UCMR 5 monitoring results and quality control data that meet method criteria (on behalf of its PWS clients) to EPA's UCMR electronic data reporting system, SDWARS.

Based on the January 1, 2023 start for UCMR 5 sample collection, the deadline for a laboratory to submit the necessary registration and application information is August 1, 2022.

4. EPA's Review of Application Package

EPA will review the application packages and, if necessary, request follow-up information. Laboratories that successfully complete the application process become eligible to participate in the UCMR 5 PT program.

5. Proficiency Testing

A PT sample is a synthetic sample containing a concentration of an analyte or mixture of analytes that is known to EPA, but unknown to the laboratory. To be approved, a laboratory must meet specific acceptance criteria for the analysis of a UCMR 5 PT sample(s) for each analyte in each method, for which the laboratory is seeking approval. EPA offered three PT studies between publication of the proposed rule and final rule, and anticipates offering at least two additional studies. Interested laboratories must participate in and report data for at least two PT studies. This allows EPA to collect a robust dataset for PT results, and provides laboratories with extra analytical experience using UCMR 5 methods. Laboratories must pass a PT for every analyte in the method to be approved for that method and may participate in multiple PT studies in order to produce passing results for each analyte. EPA has taken this approach in UCMR 5, recognizing that EPA Method 533 contains 25 analytes. EPA does not expect to conduct additional PT studies after the start of PWS monitoring; however, EPA expects to conduct laboratory audits (remote and/or on-site) throughout the implementation of UCMR 5 on an as needed and/or random basis. Initial laboratory approval is contingent on successful completion of PT studies, which includes properly uploading the PT results to SDWARS. Continued laboratory approval is contingent on successful completion of the audit process and satisfactorily meeting all the other stated conditions.

6. Written EPA Approval

For laboratories that have already successfully completed steps 1 through 5, EPA sent the laboratory a notification letter listing the methods for which approval was “pending” ( i.e., pending promulgation of this final rule). Because no changes have been made to the final rule that impact the laboratory approval program, laboratories that received pending-approval letters will be notified of full approval without further action on their part. Approval actions for additional laboratories that successfully complete steps 1 through 5 will also be documented by EPA in writing.

I. What documents are being incorporated by reference?

The following methods are being incorporated by reference into this section for UCMR 5 monitoring. All method material is available for inspection electronically at https://www.regulations.gov (Docket ID No. EPA-HQ-OW-2020-0530), or from the sources listed for each method. The methods that may be used to support monitoring under this final rule are as follows:

1. Methods From the U.S. Environmental Protection Agency

The following methods are available at EPA's Docket No. EPA-HQ-OW-2020-0530.

(i) EPA Method 200.7 “Determination of Metals and Trace Elements in Water and Wastes by Inductively Coupled Plasma-Atomic Emission Spectrometry,” Revision 4.4, 1994. Available at https://www.epa.gov/esam/method-2007-determination-metals-and-trace-elements-water-and-wastes-inductively-coupled-plasma. This is an EPA method for the analysis of metals and trace elements in water by ICP-AES and may be used to measure lithium during UCMR 5. See also the discussion of non-EPA alternative methods for lithium in this section.

(ii) EPA Method 533 “Determination of Per- and Polyfluoroalkyl Substances in Drinking Water by Isotope Dilution Anion Exchange Solid Phase Extraction and Liquid Chromatography/Tandem Mass Spectrometry,” November 2019, EPA 815-B-19-020. Available at https://www.epa.gov/dwanalyticalmethods/analytical-methods-developed-epa-analysis-unregulated-contaminants. This is an EPA method for the analysis PFAS in drinking water using SPE and LC/MS/MS and is to be used to measure 25 PFAS during UCMR 5 (11Cl-PF3OUdS, 8:2 FTS, 4:2 FTS, 6:2 FTS, ADONA, 9Cl-PF3ONS, HFPO-DA (GenX), NFDHA, PFEESA, PFMPA, PFMBA, PFBS, PFBA, PFDA, PFDoA, PFHpS, PFHpA, PFHxS, PFHxA, PFNA, PFOS, PFOA, PFPeS, PFPeA, and PFUnA).

(iii) EPA Method 537.1 “Determination of Selected Per- and Polyfluorinated Alkyl Substances in Drinking Water by Solid Phase Extraction and Liquid Chromatography/Tandem Mass Spectrometry (LC/MS/MS),” Version 2.0, March 2020, EPA/600/R-20/006. Available at https://www.epa.gov/dwanalyticalmethods/analytical-methods-developed-epa-analysis-unregulated-contaminants. This is an EPA method for the analysis of PFAS in drinking water using SPE and LC/MS/MS and is to be used to measure four PFAS during UCMR 5 (NEtFOSAA, NMeFOSAA, PFTA, and PFTrDA).

2. Alternative Methods From American Public Health Association—Standard Methods (SM)

The following methods are from American Public Health—Standard Methods (SM), 800 I Street NW, Washington, DC 20001-3710.

(i) “Standard Methods for the Examination of Water & Wastewater,” 23rd edition (2017).

(a) SM 3120 B, “Metals by Plasma Emission Spectroscopy (2017): Inductively Coupled Plasma (ICP) Method.” This is a Standard Method for the analysis of metals in water and wastewater by emission spectroscopy using ICP and may be used for the analysis of lithium.

(ii) “Standard Methods Online,” approved 1999. Available for purchase at https://www.standardmethods.org.

(a) SM 3120 B, “Metals by Plasma Emission Spectroscopy: Inductively Coupled Plasma (ICP) Method, Standard Methods Online,” revised December 14, 2020. This is a Standard Method for the analysis of metals in water and wastewater by emission spectroscopy using ICP and may be used for the analysis of lithium.

3. Methods From ASTM International

The following methods are from ASTM International, 100 Barr Harbor Drive, West Conshohocken, PA 19428-2959.

(i) ASTM D1976-20, “Standard Test Method for Elements in Water by Inductively-Coupled Plasma Atomic Emission Spectroscopy,” approved May 1, 2020. Available for purchase at https://www.astm.org/Standards/D1976.htm. This is an ASTM method for the analysis of elements in water by ICP-AES and may be used to measure lithium.

IV. Description of Final Rule and Summary of Responses to Public Comments

EPA published “Revisions to the Unregulated Contaminant Monitoring Rule (UCMR 5) for Public Water Systems and Announcement of Public Meeting;” Proposed Rule, on March 11, 2021 (86 FR 13846, (USEPA, 2021g)). The UCMR 5 proposal identified three EPA analytical methods, and multiple alternative methods, to support water system monitoring for 30 UCMR 5 contaminants (29 PFAS and lithium) and detailed other potential changes relative to UCMR 4. Among the other changes reflected in the UCMR 5 proposal were the following: Requirement for water systems serving 3,300 to 10,000 people to monitor per AWIA requirements “subject to the availability of appropriations”; provisions for sampling frequency, timing, and locations; submission timeframe for GWRMPs; data reporting timeframes; and reporting requirements.

EPA received 75 sets of comments from 72 public commenters, including other federal agencies, state and local governments, utilities and utility stakeholder organizations, laboratories, academia, non-governmental organizations, and other interested stakeholders. After considering the comments, EPA developed the final UCMR 5 as described in Exhibit 3 of this preamble. Except as noted, the UCMR 5 final rule approach is consistent with the proposed rule. A track-changes version of the rule language, comparing UCMR 4 to UCMR 5, (“Revisions to 40 CFR 141.35 and 141.40” (USEPA, 2021h)), is included in the electronic docket listed in the ADDRESSES section of this preamble.

This section summarizes key aspects of this final rule and the associated comments received in response to the proposed rule. EPA has compiled all public comments and EPA's responses in the “Response to Comments on the Fifth Unregulated Contaminant Monitoring Rule (UCMR 5) Proposal,” (USEPA, 2021i), which can be found in the electronic docket listed in the ADDRESSES section of this preamble.

Exhibit 3—Key Elements of Final UCMR 5
NumberTitle
CFR rule sectionDescription of sectionCorresponding preamble section
NumberTitle
40 CFR 141.40(a)(3)Contaminants in UCMR 5Maintains proposed list of 29 PFAS and lithium for monitoringIV.A
40 CFR 141.35(d), 40 CFR 141.40(a)(2)(ii), and 40 CFR 141.40(a)(4)(ii)Scope of UCMR 5 applicabilityRevises the scope of UCMR 5 to reflect that small CWSs and NTNCWSs serving 25 to 10,000 people will monitor (consistent with AWIA), if they are notified by the agencyIV.B
40 CFR 141.40(a)(i)(B)Sampling frequency and timingMaintains proposed sample frequency (four sample events for SW, two sample events for GW)IV.C
40 CFR 141.35(c)(3)Sampling locations and Ground Water Representative Monitoring Plans (GWRMPs)Maintains proposed flexibility for PWSs to submit a GWRMP proposal to EPAIV.D
40 CFR 141.35(c)(6)(ii) and 40 CFR 141.40(a)(5)(vi)Reporting timeframeMaintains proposed timeframe (“within 90 days from the sample collection date”) for laboratories to post and approve analytical results in EPA's electronic data reporting system (for review by the PWS). Maintains proposed timeframe (“30 days from when the laboratory posts the data to EPA's electronic data reporting system”) for PWSs to review, approve, and submit data to the state and EPAIV.E
40 CFR 141.35(e)Reporting requirementsRemoves one proposed data element, maintains 27 proposed data elements, and clarifies the use of state dataIV.F
40 CFR 141.40(a)(3)Minimum reporting levels (MRL)Maintains proposed MRLs for contaminantsIV.G

A. What contaminants must be monitored under UCMR 5?

1. This Final Rule

EPA is maintaining the proposed list of UCMR 5 contaminants and the methods associated with analyzing those contaminants (see Exhibit 4 of this preamble). Further information on the prioritization process, as well as contaminant-specific information ( e.g., source, use, production, release, persistence, mobility, health effects, and occurrence), that EPA used to select the analyte list, is contained in “Information Compendium for Contaminants for the Final Unregulated Contaminant Monitoring Rule (UCMR 5)” (USEPA, 2021e). This Information Compendium can be found in the electronic docket listed in the ADDRESSES section of this preamble.

Exhibit 4—UCMR 5 Analytes
1 EPA Method 533 (Solid phase extraction (SPE) liquid chromatography/tandem mass spectrometry (LC/MS/MS)) (USEPA, 2019b).
2 EPA Method 537.1 Version 2.0 (Solid phase extraction (SPE) liquid chromatography/tandem mass spectrometry (LC/MS/MS)) (USEPA, 2020).
3 EPA Method 200.7 (Inductively coupled plasma-atomic emission spectrometry (ICP-AES)) (USEPA, 1994).
4 Standard Methods (SM) 3120 B (SM, 2017) or SM 3120 B-99 (SM Online, 1999).
5 ASTM International (ASTM) D1976-20 (ASTM, 2020).
Twenty-five Per- and Polyfluoroalkyl Substances (PFAS) using EPA Method 533 (SPE LC/MS/MS):
11-chloroeicosafluoro-3-oxaundecane-1-sulfonic acid (11Cl-PF3OUdS)perfluorodecanoic acid (PFDA).
1H, 1H, 2H, 2H-perfluorodecane sulfonic acid (8:2 FTS)perfluorododecanoic acid (PFDoA).
1H, 1H, 2H, 2H-perfluorohexane sulfonic acid (4:2 FTS)perfluoroheptanesulfonic acid (PFHpS).
1H, 1H, 2H, 2H-perfluorooctane sulfonic acid (6:2 FTS)perfluoroheptanoic acid (PFHpA).
4,8-dioxa-3H-perfluorononanoic acid (ADONA)perfluorohexanesulfonic acid (PFHxS).
9-chlorohexadecafluoro-3-oxanone-1-sulfonic acid (9Cl-PF3ONS)perfluorohexanoic acid (PFHxA).
hexafluoropropylene oxide dimer acid (HFPO-DA) (GenX)perfluorononanoic acid (PFNA).
nonafluoro‐3,6‐dioxaheptanoic acid (NFDHA)perfluorooctanesulfonic acid (PFOS).
perfluoro (2‐ethoxyethane) sulfonic acid (PFEESA)perfluorooctanoic acid (PFOA).
perfluoro‐3‐methoxypropanoic acid (PFMPA)perfluoropentanesulfonic acid (PFPeS).
perfluoro‐4‐methoxybutanoic acid (PFMBA)perfluoropentanoic acid (PFPeA).
perfluorobutanesulfonic acid (PFBS)perfluoroundecanoic acid (PFUnA).
perfluorobutanoic acid (PFBA)
Four Per- and Polyfluoroalkyl Substances (PFAS) using EPA Method 537.1 (SPE LC/MS/MS):
n-ethyl perfluorooctanesulfonamidoacetic acid (NEtFOSAA)perfluorotetradecanoic acid (PFTA).
n-methyl perfluorooctanesulfonamidoacetic acid (NMeFOSAA)perfluorotridecanoic acid (PFTrDA).
One Metal/Pharmaceutical using EPA Method 200.7 (ICP-AES) or alternate SM or ASTM:
lithium

2. Summary of Major Comments and EPA Responses

Those who expressed an opinion about the proposed UCMR 5 analytes were supportive of EPA's inclusion of the 29 PFAS and lithium. Commenters expressed mixed opinions on the consideration of additional contaminants, particularly “aggregate PFAS,” Legionella pneumophilia, haloacetonitriles, and 1,2,3-trichloropropane. The major comments and EPA responses regarding these contaminants are summarized in the discussion that follows.

a. Aggregate PFAS Measure

EPA received multiple comments encouraging the agency to validate and include a total organic fluorine (TOF) and/or total oxidizable precursors (TOP) technique in UCMR 5 as a screening tool to determine “total PFAS.” EPA also received comments expressing concern for the limitations of the analytical methodologies, including a lack of sensitivity and specificity for PFAS using TOF.

EPA has not identified a complete, validated, peer-reviewed aggregate PFAS method with the appropriate specificity and sensitivity to support UCMR 5 monitoring. EPA's Office of Water and Office of Research and Development are currently developing and evaluating methodologies for broader PFAS analysis in drinking water, however, the measurement approaches are subject to significant technical challenges. The sensitivity of TOF is currently in the low μg/L range, as opposed to the low ng/L range of interest required for PFAS analysis in drinking water. TOF is also not specific to PFAS. TOP, while focusing on PFAS, is limited to measuring compounds that can be detected by LC/MS/MS and the technique requires two LC/MS/MS analyses; one before oxidation and one after oxidation. EPA is evaluating the TOP approach to understand the degree to which certain precursors are oxidized, and subsequently measurable by LC/MS/MS, as well as the degree to which PFAS that were measured in the pre-oxidation sample are still measured post-oxidation.

EPA is also monitoring progress by commercial laboratories and academia. In 2020 and 2021, EPA contacted commercial laboratories that advertised TOF capability, and these laboratories indicated that they had not yet commercialized the TOF method (see Appendix 4 in “Response to Comments on the Fifth Unregulated Contaminant Monitoring Rule (UCMR 5) Proposal,” (USEPA, 2021i), which can be found in the electronic docket listed in the ADDRESSES section of this preamble). TOP has been more widely commercialized but is often used as an exploratory tool to estimate precursors.

In summary, there are still analytical challenges leading to uncertainties in the results using the TOF and TOP techniques. More research and method refinement are needed before a peer-reviewed validated method that meets UCMR quality control needs is available to address PFAS more broadly.

b. Legionella Pneumophila

Some comments supported EPA's proposal to not include Legionella pneumophila in UCMR 5, while others encouraged EPA to add it. EPA has decided not to include Legionella pneumophila in the final UCMR 5.

Under EPA's Surface Water Treatment Rule (SWTR), EPA established NPDWRs for Giardia, viruses, Legionella, turbidity and heterotrophic bacteria and set maximum contaminant level goals of zero for Giardia lamblia, viruses and Legionella pneumophila (54 FR 27486, June 29, 1989 (USEPA, 1989)). EPA is currently examining opportunities to enhance protection against Legionella pneumophila through revisions to the suite of Microbial and Disinfection Byproduct (MDBP) rules. In addition to the SWTR, the MDBP suite includes the Stage 1 and Stage 2 Disinfectants and Disinfection Byproduct Rules; the Interim Enhanced Surface Water Treatment Rule; and the Long Term 1 Enhanced Surface Water Treatment Rule.

As stated in the conclusions from EPA's third “Six-Year Review of Drinking Water Standards” (82 FR 3518, January 11, 2017 (USEPA, 2017)), “EPA identified the following NPDWRs under the SWTR as candidates for revision, because of the opportunity to further reduce residual risk from pathogens (including opportunistic pathogens such as Legionella ) beyond the risk addressed by the current SWTR.” In accordance with the dates in the Settlement Agreement between EPA and Waterkeeper Alliance ( Waterkeeper Alliance, Inc. v. U.S. EPA, No. 1:19-cv-00899-LJL (S.D.N.Y. Jun. 1, 2020)), the agency anticipates signing a proposal for revisions to the MDBP rules and a final action on the proposal by July 31, 2024 and September 30, 2027, respectively. EPA has concluded that UCMR 5 data collection for Legionella pneumophila would not be completed in time to meaningfully inform MDBP revision and that UCMR 5 data for Legionella pneumophila would soon lack significance because it would not reflect conditions in water systems after any regulatory revisions become effective (because water quality would be expected to change as a result of PWSs complying with such regulatory revisions).

EPA estimates that Legionella pneumophila monitoring under UCMR 5 would have added $10.5 million in new expenses for large PWSs, $20 million in new expenses for the agency for small system monitoring, and $0.5 million in new expenses for small PWSs and states over the 5-year UCMR period. Because the data would not be available in time to inform MDBP regulatory revisions and because MDBP revisions could change the presence of Legionella pneumophila in drinking water distribution systems ( Legionella occurrence may change, for example, if the required minimum disinfectant residual concentration is higher following MDBP revisions), EPA concluded that the expense of this monitoring is not warranted given the limited utility of the data.

c. Haloacetonitriles

Some commenters agreed with EPA's rationale for not including the four unregulated haloacetonitrile disinfection byproducts (DBPs) in UCMR 5, while others encouraged EPA to include them. EPA has decided not to include haloacetonitrile DBPs in the final UCMR 5.

As was the case with Legionella pneumophila, EPA has concluded that UCMR 5 data collection for haloacetonitriles would not be completed in time to meaningfully inform MDBP revision and that UCMR 5 data would not reflect conditions in water systems after any regulatory revisions become effective (haloacetonitrile occurrence may change, for example, if the required minimum disinfectant residual concentration is higher following MDBP revisions).

As with Legionella pneumophila, inclusion of haloacetonitriles in UCMR 5 would introduce significant monitoring and reporting complexity and cost compared to the sampling design for PFAS and lithium. If haloacetonitriles were to be added to UCMR 5, most of the additional expenses would be borne by large PWSs (for analysis of their samples) and EPA (for analysis of samples from small PWSs). EPA estimates this would result in $13 million in new expenses for large PWSs, $19 million in new expenses for the agency, and $0.5 million in new expenses for small PWSs and states over the 5-year UCMR period.

Because the data would not be available in time to inform MDBP regulatory revisions and because MDBP revisions could change the presence of haloacetonitriles in drinking water distribution systems, EPA concluded that the expense of this monitoring is not warranted given the limited utility of the data.

d. 1,2,3-Trichloropropane

EPA received some comments that support the agency's proposed decision to not include 1,2,3-trichloropropane (1,2,3-TCP) monitoring in UCMR 5, and others recommending that 1,2,3-TCP be included. EPA concluded that appropriate analytical methods are not currently available to support additional UCMR data collection ( i.e., above and beyond the data collection under UCMR 3 (USEPA, 2019c)).

Several commenters suggested that EPA consider analytical methods to monitor for 1,2,3-trichloropropane at lower levels. They suggested, for example, that the agency use California method SRL-524M (California DHS, 2002), which is prescribed by the state for compliance monitoring at 0.005 μg/L (5 ng/L). EPA has reviewed SRL 524M and determined that the associated quality control (QC) and IDC criteria do not meet the EPA's needs for drinking water analysis. See also EPA's “Response to Comments on the Fifth Unregulated Contaminant Monitoring Rule (UCMR 5) Proposal,” (USEPA, 2021i), which can be found in the electronic docket listed in the ADDRESSES section of this preamble.

Occurrence data collected during UCMR 3 (77 FR 26072, May 2, 2012 (USEPA, 2012)) for 1,2,3-trichloropropane may be found at https://www.epa.gov/dwucmr/occurrence-data-unregulated-contaminant-monitoring-rule#3.

B. What is the UCMR 5 sampling design?

1. This Final Rule

EPA has utilized up to three different tiers of contaminant monitoring, associated with three different “lists” of contaminants, in past UCMRs. EPA designed the monitoring tiers to reflect the availability and complexity of analytical methods, laboratory capacity, sampling frequency, and cost. The Assessment Monitoring tier is the largest in scope and is used to collect data to determine the national occurrence of “List 1” contaminants for the purpose of estimating national population exposure. Assessment Monitoring has been used in the four previous UCMRs to collect occurrence data from all systems serving more than 10,000 people and a representative sample of 800 smaller systems. Consistent with AWIA, the Assessment Monitoring approach was redesigned for UCMR 5 and reflects the plan, subject to additional appropriations being made available for this purpose, that would require all systems serving 3,300 or more people and a representative sample of systems serving 25 to 3,299 people to perform monitoring (USEPA, 2021a). The population-weighted sampling design for the nationally representative sample of small systems (used in previous UCMR cycles to select 800 systems serving 25 to 10,000 people and used in UCMR 5 to select 800 systems serving 25 to 3,299 people) calls for the sample to be stratified by water source type (ground water or surface water), service size category, and state (where each state is allocated a minimum of two systems in its State Monitoring Plan). The allowable margin of error at the 99 percent confidence level is ±1 percent for an expected contaminant occurrence of 1 percent at the national level. Assessment Monitoring is the primary tier used for contaminants and generally relies on analytical methods that use more common techniques that are expected to be widely available. EPA has used an Assessment Monitoring tier for 72 contaminants and contaminant groups over the course of UCMR 1 through UCMR 4. The agency is exclusively requiring Assessment Monitoring in UCMR 5. This monitoring approach yields the most complete set of occurrence data to support EPA's decision making.

2. Summary of Major Comments and EPA Responses

Many commenters expressed support for the increase in small system Assessment Monitoring, with no opposition to the inclusion of all PWSs serving 3,300 to 10,000 people in UCMR 5. The U.S. Small Business Administration asked that EPA clarify small-system responsibilities in the event of inadequate EPA funding to fully support the envisioned monitoring.

Recognizing the uncertainty in funding from year-to-year, the agency will implement a “monitor if notified” approach for PWSs serving 25 to 10,000 people. In 2022, EPA will notify the approximately 6,000 small PWSs tentatively selected for the expanded UCMR 5 (all PWSs serving 3,300 to 10,000 people and a statistically-based, nationally representative set of 800 PWSs serving 25 to 3,299 people) of their anticipated UCMR 5 monitoring requirements; that initial notification will specify that monitoring is conditioned on EPA having sufficient funds and will be confirmed in a second notification. Upon receiving appropriations for a particular year, EPA will determine the number of small PWSs whose monitoring is covered by the appropriations, and notify the included small PWSs of their upcoming requirements at least six months prior to their scheduled monitoring. EPA has made minor edits to 40 CFR 141.35 and 40 CFR 141.40 for consistency with this approach.

Additionally, to ensure that EPA has access to a nationally representative set of small-system data, even in the absence of sufficient appropriations to support the planned monitoring by small systems, a statistically-based nationally representative set of 800 PWSs will also be selected from among the PWSs serving 25 to 10,000 people. An updated description of the statistical approach for the nationally representative samples for UCMR 5 is available in the docket as “Selection of Nationally Representative Public Water Systems for the Unregulated Contaminant Monitoring Rule: 2021 Update” (USEPA 2021a).

To minimize the impact of the final rule on small systems (those serving 25 to 10,000 people), EPA pays for their sample kit preparation, sample shipping fees, and sample analysis. Large systems (those serving more than 10,000 people) pay for all costs associated with their monitoring. Exhibit 5 of this preamble shows a summary of the estimated number of PWSs subject to monitoring.

Exhibit 5—Systems Expected To Participate in UCMR 5 Monitoring
List 1 chemicals
1 EPA pays for all analytical costs associated with monitoring at small systems.
2 Counts for small PWSs serving 3,300-10,000 people are approximate.
3 Large system counts are approximate.
4 In the absence of appropriations to support monitoring at all PWSs serving 3,300 to 10,000 people, EPA could instead include as few as 400 PWSs serving 25 to 3,299 people and 400 PWSs serving 3,300 to 10,000 people (for a representative sample of 800 PWSs serving 25 to 10,000 people).
System size (number of people served)National sample: Assessment monitoring designTotal number of systems per size category
List 1 chemicals
Small Systems1 (25-3,299)800 randomly selected systems (CWSs and NTNCWSs)4 800
Small Systems12 (3,300-10,000)All systems (CWSs and NTNCWSs) subject to the availability of appropriations4 5,147
Large Systems3 (10,001 and over)All systems (CWSs and NTNCWSs)4,364
Total10,311

C. What is the sampling frequency and timing?

1. This Final Rule

This final rule maintains the proposed sampling frequency and timeframe for Assessment Monitoring. On a per-system basis, the anticipated number of samples collected by each system is consistent with sample collection during prior UCMR cycles (although, as described elsewhere in this document, the number of water systems expected to participate in UCMR 5 is significantly greater under this final rule per AWIA). Water systems will be required to collect samples based on the typical UCMR sampling frequency and timeframe as follows: For surface water, ground water under the direct influence of surface water, and mixed locations, sampling will take place for four consecutive quarters over the course of 12 months (total of 4 sampling events). Sampling events will occur three months apart. For example, if the first sample is taken in January, the second will then occur anytime in April, the third will occur anytime in July, and the fourth will occur anytime in October. For ground water locations, sampling will take place twice over the course of 12 months (total of 2 sampling events). Sampling events will occur five to seven months apart. For example, if the first sample is taken in April, the second sample will then occur anytime in September, October, or November.

EPA, in conjunction with the states, will initially determine schedules (year and months of monitoring) for large water systems. Thereafter, large PWSs will have an opportunity to modify this initial schedule for planning purposes or other reasons ( e.g., to spread costs over multiple years, if a sampling location will be closed during the scheduled month of monitoring, etc.). EPA will schedule and coordinate small system monitoring (for PWSs serving 3,300 to 10,000 people and for the nationally representative sample of smaller PWSs) by working closely with partnering states. State Monitoring Plans provide an opportunity for states to review and revise the initial sampling schedules developed by EPA (see discussion of State Monitoring Plans in Section III.D of this preamble).

2. Summary of Major Comments and EPA Responses

EPA received two comments recommending that the agency reduce the sampling frequency for both ground water (GW) and surface water (SW) systems, including a suggestion that UCMR 5 require only one sample per system. EPA concluded that less frequent data collection would affect the integrity of the data and result in insufficient data to fulfill the needs envisioned by the 1996 SDWA Amendments, particularly with regard to supporting the Administrator's regulatory determinations and drinking water regulation development. Maintaining the proposed sampling frequency allows the resulting contaminant data to be analyzed for temporal variability, in addition to between-system variability. These analyses are not possible with a single-sample structure. When making regulatory determinations, EPA evaluates the number of systems (and populations) with means or single measured values above health levels of concern, as both values provide important information.

EPA acknowledges that based on UCMR 3 (77 FR 26072, May 2, 2012 (USEPA, 2012)) data, the correlation between results from multiple sample events can be high; however, the approach suggested by commenters would yield less accurate data for several reasons. EPA's assessment of sampling frequency using UCMR 3 and UCMR 4 data (see Appendix 2 in “Response to Comments on the Fifth Unregulated Contaminant Monitoring Rule (UCMR 5) Proposal,” (USEPA, 2021i), which can be found in the electronic docket listed in the ADDRESSES section of this preamble) shows that for both SW and GW systems, there are numerous cases where occurrence is notably different between sample events. Focusing first on UCMR 3 results for PWS with SW sources, the number of sample points at which PFOS was measured at or above the MRL was 108 percent greater when considering multiple sample events, versus only considering the first sample event. There were multiple occasions where the results from the first sample event were below the health-based reference concentration while subsequent results were above it. Looking at UCMR 3 results for PWSs with GW sources, PFOS was measured at or above the MRL at 26 percent more sample points in the second sample event relative to the first. Similar to the UCMR 3 results for SW systems, there were multiple occasions where the second result from a GW system exceeded the reference concentration while the first result did not.

Some commenters suggested that between-system variability is much greater for PFAS than within-system variability. While it may be less than between-system variability, within-system variability can still be important. Shifting to a single sample prevents reasonable assessments of within-system variability and limits the ability to observe between-system variability estimates. This would then drastically reduce the ability to characterize uncertainty.

Additionally, although the provisions of AWIA could include the addition of approximately 5,200 more PWSs to UCMR 5 relative to earlier cycles and thus capture more spatial variation in the resulting dataset, it is important to note that spatial variation is different than temporal or seasonal variation. Capturing more of one does not diminish the influence of the others on national occurrence data and reducing the frequency of sampling eliminates the possibility of analyzing the resulting data for temporal variation. In addition, statistical means based on two measurements have considerably less error than a single measurement per system, and provide a more robust dataset for future regulatory decisions. Having more than one sample event also greatly reduces the chance of underestimating the true proportion of occurrence of the contaminant in drinking water ( i.e., exposure).

Regarding monitoring frequency and burden, EPA notes that the agency allows large GW systems the opportunity to reduce monitoring burden by using approved representative entry points (40 CFR 141.35(c)(3)) as described in Section IV.D of this preamble. Representative monitoring plans will result in fewer samples and thus time and cost savings to the PWS. Consecutive systems with multiple connections from a particular wholesaler are also permitted to choose one entry point as representative, thus reducing burden.

D. Where are the sampling locations and what is representative monitoring?

1. This Final Rule

Consistent with past UCMR cycles, sample collection for UCMR 5 contaminants will take place at the entry point to the distribution system (EPTDS). As during past UCMRs and as described in 40 CFR 141.35(c)(3) of this preamble, this final rule will allow large ground water systems (or large surface water systems with ground water sources) that have multiple ground water EPTDSs to request approval to sample at representative monitoring locations rather than at each ground water EPTDS. GWRMPs approved under prior UCMRs may be used for UCMR 5, presuming no significant changes in the configuration of the ground water EPTDSs since the prior approval. Water systems that intend to use a previously approved plan must send EPA a copy of the approval documents received under prior UCMRs from their state (if reviewed by the state) or EPA.

Relative to the rules for prior UCMR cycles, this final rule provides greater flexibility to PWSs in submitting GWRMPs to EPA. Plans must be submitted to EPA six months prior to the PWS's scheduled sample collection, instead of by a specified date; those PWSs scheduled to collect samples in 2024 or 2025 will have significant additional time to develop and propose representative plans. PWSs, particularly those scheduled for sample collection in 2023, are encouraged to submit proposals for a new GWRMP by December 31, 2022, to allow time for review by EPA and, as appropriate, the state. EPA will work closely with the states to coordinate the review of GWRMPs in those cases where such review is part of the state's Partnership Agreement. Changes to inventory data in SDWARS that impact a PWS's representative plan before or during the UCMR sampling period must be reported within 30 days of the change. EPA will collaborate with small systems (particularly those with many ground water locations) to develop a GWRMP when warranted, recognizing that EPA pays for the analysis of samples from small systems.

2. Summary of Major Comments and EPA Responses

EPA received multiple comments regarding GWRMPs and representative sampling for wholesale systems and consecutive connections. Generally, commenters supported the continued use of GWRMPS and the use of previously approved monitoring plans. An additional supporting document, titled, “Instructions for Preparing a Ground Water Representative Monitoring Plan for the Unregulated Contaminant Monitoring Rule,” (USEPA, 2021j) has been placed in the electronic docket listed in the ADDRESSES section of this preamble.

Several commenters recommended that EPA not require monitoring by consecutive systems that purchase 100 percent of their water from wholesale systems that are already subject to UCMR 5 monitoring. They requested that EPA instead require wholesalers to identify the PWSIDs of consecutive systems receiving water from the wholesaler, and that EPA rely on wholesaler monitoring in lieu of monitoring by the consecutive systems. EPA has decided to require monitoring by consecutive systems to conduct monitoring in accordance with UCMR 5. Previous UCMR data demonstrate that wholesalers and purchasers can have different analytical results (see Appendix 3 in “Response to Comments on the Fifth Unregulated Contaminant Monitoring Rule (UCMR 5) Proposal,” (USEPA, 2021i), which can be found in the electronic docket listed in the ADDRESSES section of this preamble). For example, pairing the results from wholesaler to consecutive connections for 190 manganese results from UCMR 4 (81 FR 92666, December 20, 2016 (USEPA, 2016)), one-third of the results are higher at the wholesaler and one-third of the results are higher at the consecutive connection, with one-third of all results being comparable [±0.4 μg/L]. The agency therefore elected to maintain the proposed approach in which all eligible consecutive systems must monitor, irrespective of monitoring being conducted by the wholesale system from which they purchase drinking water.

E. How long do laboratories and PWSs have to report data?

1. This Final Rule

EPA is maintaining the revised reporting timeframes for laboratories and PWSs as proposed. For UCMR 5, laboratories have 90 days (versus 120 days in prior UCMR cycles) from the sample collection date to post and approve analytical results in SDWARS for PWS review. Large PWSs have 30 days (versus 60 days in prior UCMR cycles) to review and approve the analytical results posted to SDWARS. As with the UCMR 4 requirements, data will be considered approved and available for state and EPA review if the PWS takes no action within their allotted review period.

In the proposed rule for UCMR 5, EPA noted that multiple states have expressed an interest in earlier access to UCMR data (see Docket ID No. EPA-HQ-OW-2020-0530). EPA believes that the shorter timeframes for posting and approving data are feasible and reasonable based on our experience with UCMR reporting to date.

2. Summary of Major Comments and EPA Responses

Commenters generally agreed with the revised timeframes for laboratories to post and approve analytical results in SDWARS. The 90-day laboratory timeframe makes UCMR results more readily available to interested stakeholders and states. Some commenters supported the timely reporting of data by laboratories to ensure that PWSs have adequate time to reconcile QC issues, especially those that may require a PWS to resample. Some expressed concerns that the revised timeframe could be challenging for laboratories. Some suggested that the shorter timeframe be conditioned on consistent functionality and availability of SDWARS.

Commenters generally agreed with the changes in the timeframes for large PWSs to review and approve analytical results posted to SDWARS, though several requested that EPA maintain the 60-day review period.

EPA has observed that many laboratories are routinely posting data to SDWARS within 90 days of sample collection and that many large PWSs are approving and submitting data within 30 days of their laboratory posting the data. Judging by reporting for 2020 monitoring under UCMR 4 (81 FR 92666, December 20, 2016 (USEPA, 2016)), more than 75 percent of laboratories posted and approved data within 90 days, and more than 85 percent of large PWSs who chose to act on their data, did so within 30 days of the laboratory posting it. During UCMR 3 and UCMR 4, less than half of large PWSs chose to actively review and approve their data, as opposed to letting the results default to “approved” status after the review period. The many large PWSs that have routinely chosen to not review and approve their data will not be impacted by the revised timeframe for PWS data review for UCMR 5. See also Appendix 5 in “Response to Comments on the Fifth Unregulated Contaminant Monitoring Rule (UCMR 5) Proposal,” (USEPA, 2021i), which can be found in the electronic docket listed in the ADDRESSES section of this preamble.

EPA does not anticipate functionality or availability issues with SDWARS during UCMR 5 but is prepared to make case-by-case exceptions for reporting timeframes should significant issues occur with the reporting system.

F. What are the reporting requirements for UCMR 5?

1. This Final Rule

Today's final rule removes 1 of the proposed data elements (“Direct Potable Reuse Water Information”) and maintains the 27 others described in the proposed rule. EPA has updated some of the data-element definitions for clarity and consistency in the reporting requirements. Please see Table 1 of 40 CFR 141.35(e) of this preamble for the complete list of data elements, definitions and drop-down options that will be provided in the data reporting system.

2. Summary of Major Comments and EPA Responses

a. Data Elements

EPA received multiple comments on the proposed contaminant-specific data elements, with some commenters questioning the quality, reliability, and utility of some of the data that would be provided to the agency per the proposed data element requirements. Several commenters requested that EPA include rationale explaining the intended use of such data. EPA has updated the data elements for clarity ( e.g., clarifying treatment types, and abbreviations for them; adding the treatment option “NMT = not modified after testing”) and has provided additional rationale (including describing how the information could impact regulatory decision making and risk-management strategies) in the “Response to Comments on the Fifth Unregulated Contaminant Monitoring Rule (UCMR 5) Proposal,” (USEPA, 2021i), available in the UCMR 5 public docket (see the ADDRESSES section of this preamble). EPA acknowledges the data collected will have some limitations but believes that the collection of the information is still valuable. In addition, EPA notes the modest burden associated with the collection.

b. Reporting State Data

EPA received several comments suggesting that PWSs be permitted to submit occurrence data collected under state-based monitoring, in lieu of conducting UCMR 5 monitoring, to reduce the monitoring burden. In those cases where the monitoring required by a state is aligned with the requirements of UCMR 5, PWSs may be able to conduct PFAS monitoring that meets the needs of their state and UCMR 5, with the understanding that UCMR 5 requirements must be met. This includes the requirement that PFAS samples be analyzed by a UCMR 5-approved laboratory using EPA Method 533 and Method 537.1. EPA offers flexibility for PWSs to reschedule their UCMR 5 monitoring, and PWSs may do so to coordinate it with their state-required monitoring. PWSs wishing to conduct “dual purpose” monitoring ( i.e., concurrently meeting the state and UCMR 5 needs) may contact their state or EPA, as appropriate, if there are questions about whether the state and UCMR 5 requirements are being met.

G. What are the UCMR 5 Minimum Reporting Levels (MRLs) and how were they determined?

1. This Final Rule

EPA is maintaining the proposed minimum reporting levels for the UCMR 5 contaminants. EPA establishes MRLs to ensure consistency in the quality of the information reported to the agency. As defined in 40 CFR 141.40(a)(5)(iii) of this preamble, the MRL is the minimum quantitation level that, with 95 percent confidence, can be achieved by capable analysts at 75 percent or more of the laboratories using a specified analytical method. More detailed explanation of the MRL calculation is in the “Technical Basis for the Lowest Concentration Minimum Reporting Level (LCMRL) Calculator” (USEPA, 2010), available at ( https://www.epa.gov/dwanalyticalmethods/lowest-concentration-minimum-reporting-level-lcmrl-calculator ).

EPA requires each laboratory interested in supporting UCMR analyses to demonstrate that they can reliably make quality measurements at or below the established MRL to ensure that high quality results are being reported by participating laboratories. EPA established the proposed MRLs in 40 CFR 141.40(a)(3), Table 1 of this preamble, for each analyte/method by obtaining data from at least three laboratories that performed “lowest concentration minimum reporting level” (LCMRL) studies. The results from these laboratory LCMRL studies can be found in the “UCMR 5 Laboratory Approval Manual” (USEPA, 2021f), available in the electronic docket (see the ADDRESSES section of this preamble).

The multiple laboratory LCMRLs were then processed through a statistical routine to derive an MRL that, with 95 percent confidence, is predicted to be attainable by 75 percent of laboratories using the prescribed method. EPA considers these to be the lowest reporting levels that can practically and consistently be achieved on a national basis (recognizing that individual laboratories may be able to measure at lower levels).

2. Summary of Major Comments and EPA Responses

Some commenters recommended that EPA establish lower MRLs for the 29 PFAS in UCMR 5. MRLs used for the UCMR program are based on calculations that account for the ability of laboratories to report accurate and precise measurements with a specific statistical confidence. Based on the results from multiple laboratories that participated in MRL-setting studies, EPA concluded that the proposed MRLs represent the lowest feasible levels for a national MRL measure. Sensitivity ( i.e., quantitation limit) may improve with time, experience, and instrumentation advances.

H. What are the requirements for laboratory analysis of field reagent blank samples?

1. This Final Rule

EPA initially proposed that laboratories analyze all field reagent blank (FRB) samples, along with the corresponding field samples, to reduce the possibility of invalidating a positive field sample result ( i.e., a field sample result at or above the MRL) because of FRB hold times being exceeded.

2. Summary of Major Comments and EPA Responses

EPA did not receive any comments expressing concerns with the laboratory approval process; however, the agency did receive a comment on the FRB sample analysis criteria, suggesting that the agency not require analysis of every FRB sample. EPA Method 537.1 and Method 533, used for PFAS analysis, require collection of a corresponding FRB sample from each unique sampling location for each sampling event. The methods require that the FRB be analyzed if there is a positive result for a PFAS analyte in a corresponding field sample. Based on further consideration, EPA is now providing laboratories with discretion as to whether they analyze every FRB sample proactively or only those associated with positive field sample results. This is with the understanding that laboratories must analyze field samples promptly enough such that the corresponding FRB analyses, if needed, may be completed within the prescribed hold time. Compliance with the method hold-time requirements, and other provisions of the methods, is a condition of maintaining laboratory approval. EPA is studying the possibility of extending the FRB hold times for EPA Method 537.1 and Method 533, and will communicate the results of the studies with the approved laboratories.

I. How will EPA support risk communication for UCMR 5 results?

EPA received comments requesting that the agency develop and provide risk communication materials to support interpretation and characterization of UCMR 5 results. EPA intends to publish a “reference concentration” summary document with available EPA health values; provide a template for PWSs to consider using in communicating with their customers about the detection of PFAS in drinking water; and provide other supporting material as risk-related information becomes available.

V. Statutory and Executive Order Reviews

Additional information about these statutes and Executive Orders can be found at http://www2.epa.gov/laws-regulations/laws-and-executive-orders.

A. Executive Order 12866: Regulatory Planning and Review and Executive Order 13563: Improving Regulation and Regulatory Review

This action is a significant regulatory action that was submitted to the Office of Management and Budget (OMB) for review. Any changes made in response to OMB recommendations have been documented in the docket. A full analysis of potential costs associated with this action, the “Information Collection Request for the Final Unregulated Contaminant Monitoring Rule (UCMR 5),” (USEPA, 2021b) ICR Number 2040-0304, is also available in the docket (Docket ID No. EPA-HQ-OW-2020-0530). A summary of the ICR can be found in Section I.C of this preamble.

B. Paperwork Reduction Act (PRA)

The information collection activities in this final rule have been submitted for approval to the Office of Management and Budget (OMB) under the PRA. The Information Collection Request (ICR) document (USEPA, 2021b) that EPA prepared has been assigned EPA ICR number ICR 2683.02. You can find a copy of the ICR in the docket for this final rule, and it is briefly summarized here. The information collection requirements are not enforceable until OMB approves them.

The information that EPA will collect under this final rule fulfills the statutory requirements of Section1445(a)(2) of SDWA, as amended in 1996, 2018, and 2019. The data will describe the source of the water, location, and test results for samples taken from public water systems (PWSs) as described in 40 CFR 141.35(e). The information collected will support EPA's decisions as to whether or not to regulate particular contaminants under SDWA. Reporting is mandatory. The data are not subject to confidentiality protection.

The 5-year UCMR 5 period spans 2022-2026. UCMR 5 sample collection begins in 2023 and continues through 2025. Since ICRs cannot be approved by OMB for a period longer than three years pursuant to 5 CFR 1320.10, the primary analysis in the ICR only covers the first three years of the UCMR 5 period ( i.e., 2022-2024). Prior to expiration of the initial UCMR 5 ICR, EPA will seek to extend the ICR and thus receive approval to collect information under the PRA in the remaining two years of the UCMR 5 period (2025-2026).

EPA received several comments regarding cost and burden of the proposed rule. Those comments recommended that EPA provide more accurate cost estimates. EPA's response is detailed more fully in the “Response to Comments on the Fifth Unregulated Contaminant Monitoring Rule (UCMR 5) Proposal,” (USEPA, 2021i), which can be found in the electronic docket listed in the ADDRESSES section of this preamble.

EPA has reviewed and, as appropriate, revised the cost and burden figures for UCMR 5; this includes using updated unit cost estimates for sample analysis. The annual burden and cost estimates described in this section are based on the implementation assumptions described in Section III of this preamble, among them the inclusion of all systems serving 3,300 to 10,000 people and a representative sample of smaller systems. As such, those estimates represent an upper bound. If EPA does not receive the necessary appropriations in one or more of the collections years—and thus collects data from fewer small systems—the actual costs would be lower than those estimated here. In general, burden hours were calculated by:

1. Determining the activities that PWSs and states would complete to comply with UCMR activity;

2. Estimating the number of hours per activity;

3. Estimating the number of respondents per activity; and

4. Multiplying the hours per activity by the number of respondents for that activity.

Respondents/affected entities: The respondents/affected entities are small PWSs (those serving 25 to 10,000 people); large PWSs (those serving 10,001 to 100,000 people); very large PWSs (those serving more than 100,000 people); and states.

Respondent's obligation to respond: Mandatory (40 CFR 141.35).

Estimated number of respondents: Respondents to UCMR 5 include 5,947 small PWSs, 4,364 large PWSs, and the 56 primacy agencies (50 States, one Tribal nation, and five Territories) for a total of 10,367 respondents.

Frequency of response: The frequency of response varies across respondents and years. Across the initial 3-year ICR period for UCMR 5, small PWSs will sample an average of 2.8 times per PWS ( i.e., number of responses per PWS); large PWSs will sample and report an average of 3.2 times per PWS; and very large PWSs will sample and report an average of 3.7 times per PWS.

Total estimated burden: 48,469 hours (per year). Burden is defined at 5 CFR 1320.3(b).

Total estimated cost: $9,404,007 annualized capital or operation & maintenance costs.

An agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. The OMB control numbers for the EPA's regulations in 40 CFR are listed in 40 CFR part 9. When OMB approves this ICR, the agency will announce that approval in the Federal Register and publish a technical amendment to 40 CFR part 9 to display the OMB control number for the approved information collection activities contained in this final rule.

C. Regulatory Flexibility Act (RFA)

For purposes of assessing the impacts of this final rule on small entities, EPA considered small entities to be PWSs serving 25 to 10,000 people. As required by the RFA, EPA proposed using this alternative definition in the Federal Register (63 FR 7606, February 13, 1998 (USEPA, 1998a)), sought public comment, consulted with the Small Business Administration (SBA) Office of Advocacy, and finalized the alternative definition in the Consumer Confidence Reports rulemaking (63 FR 44512, August 19, 1998 (USEPA, 1998b)). As stated in that document, the alternative definition applies to this regulation.

Exhibit 6—Number of Publicly- and Privately-Owned Small Systems Subject to UCMR 5 1
1 In the absence of appropriations to support monitoring at all PWSs serving 3,300 to 10,000 people, EPA could instead include as few as 400 PWSs serving 25 to 3,299 people and 400 PWSs serving 3,300 to 10,000 people (for a representative sample of 800 PWSs serving 25 to 10,000 people).
2 PWS counts were adjusted to display as whole numbers in each size category.
System size (number of people served)Publicly-ownedPrivately-ownedTotal 2
Ground Water
500 and under42126168
501 to 3,300320121441
3,301 to 10,0002,3345412,875
Subtotal Ground Water2,6967883,484
Surface Water (and Ground Water Under the Direct Influence of Surface Water)
500 and under91120
501 to 3,30012645171
3,301 to 10,0001,7625102,272
Subtotal Surface Water1,8975662,463
Total of Small Water Systems4,5931,3545,947

The basis for the UCMR 5 RFA certification is as follows: For the 5,947 small water systems that EPA anticipates will be affected, per the planned monitoring, the average annual cost for complying with this final rule represents an average of 0.02 percent of system revenues. The average yearly cost to small systems to comply with UCMR 5 over the 5-year period of 2022-2026, is approximately $0.3 million. EPA anticipates that approximately one third of the 5,947 small PWSs will collect samples in each of three years (2023, 2024, and 2025).

PWS costs are attributed to the labor required for reading about UCMR 5 requirements, monitoring, reporting, and record keeping. The estimated average annual burden across the 5-year UCMR 5 implementation period of 2022-2026 is 1.3 hours at $52 per small system. By assuming all costs for laboratory analyses, shipping and quality control for small entities, EPA incurs the entirety of the non-labor costs associated with UCMR 5 small system monitoring, or 96 percent of total small system testing costs. Exhibit 7 and Exhibit 8 of this preamble present the estimated economic impacts in the form of a revenue test for publicly- and privately-owned systems.

Exhibit 7—UCMR 5 Relative Cost Analysis for Small Publicly-Owned Systems [2022-2026] 1
System size (number of people served)Annual number of systems impacted 2Average annual hours per systemAverage annual cost per systemSBREFA criteria- revenue test 3 (%)
1 In the absence of appropriations to support monitoring at all PWSs serving 3,300 to 10,000 people, EPA could instead include as few as 400 PWSs serving 25 to 3,299 people and 400 PWSs serving 3,300 to 10,000 people (for a representative sample of 800 PWSs serving 25 to 10,000 people).
2 PWS counts were adjusted to display as whole numbers in each size category. Includes the publicly-owned portion of small systems subject to UCMR 5.
3 Costs are presented as a percentage of median annual revenue for each size category.
Ground Water Systems
500 and under81.0$40.650.09
501 to 3,300641.143.370.02
3,301 to 10,0004671.349.920.01
Surface Water (and Ground Water Under the Direct Influence of Surface Water) Systems
500 and under21.454.390.07
501 to 3,300251.456.190.02
3,301 to 10,0003531.557.390.004
Exhibit 8—UCMR 5 Relative Cost Analysis for Small Privately-Owned Systems [2022-2026] 1
System size (number of people served)Annual number of systems impacted 2Average annual hours per systemAverage annual cost per systemSBREFA criteria- revenue test 3 (%)
1 In the absence of appropriations to support monitoring at all PWSs serving 3,300 to 10,000 people, EPA could instead include as few as 400 PWSs serving 25 to 3,299 people and 400 PWSs serving 3,300 to 10,000 people (for a representative sample of 800 PWSs serving 25 to 10,000 people).
2 PWS counts were adjusted to display as whole numbers in each size category. Includes the privately-owned portion of small systems subject to UCMR 5.
3 Costs are presented as a percentage of median annual revenue for each size category.
Ground Water Systems
500 and under251.0$40.650.48
501 to 3,300241.1$43.370.03
3,301 to 10,0001081.3$49.920.004
Surface Water (and Ground Water Under the Direct Influence of Surface Water) Systems
500 and under21.4$54.390.11
501 to 3,30091.4$56.190.02
3,301 to 10,0001021.5$57.390.004

Up to 9.4 percent of all small systems ( i.e., up to 5,947 small PWSs serving 25 to 10,000 people) will participate in UCMR 5 if EPA receives the necessary appropriations to support its plan. EPA has determined that participating small systems will experience an average impact of 0.02 percent of revenues. This accounts for small PWSs familiarizing themselves with the regulatory requirements; reading sampling instructions; traveling to the sampling location; collecting and shipping the samples; and maintaining their records. The 5,947 small PWSs are comprised of all 5,147 systems serving between 3,300 and 10,000 people, and the representative group of 800 systems serving between 25 and 3,299 people; the remainder of small systems will not participate in UCMR 5 monitoring and will not be impacted.

I certify that this action will not have a significant economic impact on a substantial number of small entities under the RFA. The small entities subject to the requirements of this action along with a description of the very minor impacts are previously addressed in this section. Although this final rule will not have a significant economic impact on a substantial number of small entities, EPA has attempted to reduce impacts by assuming all costs for analyses of the samples, and for shipping the samples from small systems to laboratories contracted by EPA to analyze the UCMR 5 samples (the cost of shipping is included in the cost of each analytical method). EPA has historically set aside $2.0 million each year from the Drinking Water State Revolving Fund (DWSRF) with its authority to use DWSRF monies for the purposes of implementing this provision of SDWA. EPA anticipates drawing on these and additional funds, if available, to implement the plan and carry out the expanded UCMR monitoring approach outlined in AWIA. We have therefore concluded that this action will have no significant impact on any directly regulated small entities.

D. Unfunded Mandates Reform Act (UMRA)

This action does not contain an unfunded mandate of $100 million or more as described in UMRA, 2 U.S.C. 1531-1538, and does not significantly or uniquely affect small governments. The action implements mandate(s) specifically and explicitly set forth in SDWA Section 1445(a)(2), Monitoring Program for Unregulated Contaminants.

E. Executive Order 13132: Federalism

This action does not have federalism implications. It will not have substantial direct effects on the states, on the relationship between the national government and the states, or on the distribution of power and responsibilities among the various levels of government.

F. Executive Order 13175: Consultation and Coordination With Indian Tribal Governments

This action has Tribal implications. However, it will neither impose substantial direct compliance costs on federally recognized Tribal governments, nor preempt Tribal law. As described previously in this document, this final rule requires monitoring by all large PWSs. Information in the SDWIS/Fed water system inventory indicates there are approximately 27 large Tribal PWSs (serving 10,001 to 40,000 people). EPA estimates the average annual cost to each of these large PWSs, over the 5-year rule period, to be $1,783. This cost is based on a labor component (associated with the collection of samples), and a non-labor component (associated with shipping and laboratory fees). As planned, UCMR 5 is expected to also require monitoring by all small PWSs serving 3,300 to 10,000 people and a nationally representative sample of small PWSs serving 25 to 3,299 people. Information in the SDWIS/Fed water system inventory indicates there are approximately 75 small Tribal PWSs (serving 3,300 to 10,000 people). EPA estimates that less than 2 percent of small Tribal systems serving 25 to 3,299 people will be selected as part of the nationally representative sample. EPA estimates the average annual cost to small Tribal systems over the 5-year rule period to be $52. Such cost is based on the labor associated with collecting a sample and preparing it for shipping. All other small-PWS expenses (associated with shipping and laboratory fees) are paid by EPA.

EPA consulted with Tribal officials under the EPA Policy on Consultation and Coordination with Indian Tribes early in the process of developing this regulation to permit them to have meaningful and timely input into its development. A summary of that consultation, titled, “Summary of the Tribal Coordination and Consultation Process for the Fifth Unregulated Contaminant Monitoring Rule (UCMR 5) Proposal,” is provided in the electronic docket listed in the ADDRESSES section of this preamble.

As required by section 7(a), the EPA's Tribal Consultation Official has certified that the requirements of the executive order have been met in a meaningful and timely manner. A copy of the certification is included in the docket for this action.

G. Executive Order 13045: Protection of Children From Environmental Health Risks and Safety Risks

EPA interprets Executive Order 13045 as applying only to those regulatory actions that concern environmental health or safety risks that EPA has reason to believe may disproportionately affect children, per the definition of “covered regulatory action” in section 2-202 of the Executive Order. This action is not subject to Executive Order 13045 because it does not concern such an environmental health risk or safety risk.

H. Executive Order 13211: Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution or Use

This action is not a “significant energy action” because it is not likely to have a significant adverse effect on the supply, distribution or use of energy and has not otherwise been designated by the Administrator of the Office of Information and Regulatory Affairs as a significant energy action. This is a national drinking water occurrence study that was submitted to OMB for review.

I. National Technology Transfer and Advancement Act (NTTAA)

This action involves technical standards. EPA has identified options that involve using analytical methods developed by the agency and three major voluntary consensus method organizations to support UCMR 5 monitoring. The voluntary consensus method organizations are Standard Methods for the Examination of Water and Wastewater, and ASTM International. EPA identified acceptable consensus method organization standards for the analysis of lithium. A summary of each method along with how the method specifically applies to UCMR 5 can be found in Section III.I of this preamble.

All of these standards are reasonably available for public use. EPA methods are free for download on the agency's website. The methods in the Standard Methods for the Examination of Water and Wastewater 23rd edition are consensus standards, available for purchase from the publisher, and are commonly used by the drinking water laboratory community. The methods in the Standard Methods Online are consensus standards, available for purchase from the publisher's website, and are commonly used by the drinking water laboratory community. The methods from ASTM International are consensus standards, are available for purchase from the publisher's website, and are commonly used by the drinking water laboratory community.

J. Executive Order 12898: Federal Actions To Address Environmental Justice in Minority Populations and Low-Income Populations

EPA believes that this action is not subject to Executive Order 12898 (59 FR 7629, February 16, 1994) because it does not establish an environmental health or safety standard. Background information regarding EPA's consideration of Executive Order 12898 in the development of this final rule is provided in Section III.F of this preamble, and an additional supporting document, titled, “Summary of Environmental Justice Considerations for the Fifth Unregulated Contaminant Monitoring Rule (UCMR 5) Proposal,” has been placed in the electronic docket listed in the ADDRESSES section of this preamble.

K. Congressional Review Act (CRA)

This action is subject to the CRA, and EPA will submit a rule report to each House of the Congress and to the Comptroller General of the United States. This action is not a “major rule” as defined by 5 U.S.C. 804(2).

VI. References

(i) ASDWA. 2013. Insufficient Resources for State Drinking Water Programs Threaten Public Health: An Analysis of State Drinking Water Programs' Resources and Needs. December 2013. Available at https://www.asdwa.org/asdwa-reports/.

(ii) ASTM. 2020. ASTM D1976-20— Standard Test Method for Elements in Water by Inductively-Coupled Plasma Atomic Emission Spectroscopy. ASTM, 100 Barr Harbor Drive, West Conshohocken, PA, 19428. Approved May 1, 2020. Available for purchase at https://www.astm.org/Standards/D1976.htm.

(iii) California DHS. 2002. California Department of Health Services. Determination of 1,2,3-Trichloropropane in Drinking Water by Purge and Trap Gas Chromatography/Mass Spectrometry. Division of Drinking Water and Environmental Management, Sanitation and Radiation Laboratories Branch, Berkeley, CA. Available at https://www.waterboards.ca.gov/drinking_water/certlic/drinkingwater/documents/123-tcp/tcp_by_pt_gcms.pdf.

(iv) Settlement Agreement, Waterkeeper Alliance, Inc. v. U.S. EPA, No. 1:19-cv-00899-LJL (S.D.N.Y. Jun. 1, 2020).

(v) SM. 2017. 3120B—Metals by Plasma Emission Spectroscopy (2017): Inductively Coupled Plasma (ICP) Method. Standard Methods for the Examination of Water and Wastewater, 23rd edition. American Public Health Association, 800 I Street NW, Washington, DC 20001-3710.

(vi) SM Online. 1999. 3120B-99—Metals by Plasma Emission Spectroscopy: Inductively Coupled Plasma (ICP) Method (Editorial Revisions, 2020). Standard Methods Online. Available for purchase at http://www.standardmethods.org.

(vii) USEPA. 1989. National Primary Drinking Water Regulations; Filtration, Disinfection; Turbidity, Giardia lamblia, Viruses, Legionella, and Heterotrophic Bacteria; Final Rule. Federal Register . Vol. 54, No. 124, p. 27486, June 29, 1989.

(viii) USEPA. 1994. EPA Method 200.7—Determination of Metals and Trace Elements in Water and Wastes by Inductively Coupled Plasma-Atomic Emission Spectrometry, Revision 4.4. Office of Research and Development, Cincinnati, OH. Available at https://www.epa.gov/esam/method-2007-determination-metals-and-trace-elements-water-and-wastes-inductively-coupled-plasma.

(ix) USEPA. 1998a. National Primary Drinking Water Regulations: Consumer Confidence Reports; Proposed Rule. Federal Register . Vol. 63, No. 30, p. 7606, February 13, 1998.

(x) USEPA. 1998b. National Primary Drinking Water Regulation: Consumer Confidence Reports; Final Rule. Federal Register . Vol. 63, No. 160, p. 44512, August 19, 1998.

(xi) USEPA. 2010. Technical Basis for the Lowest Concentration Minimum Reporting Level (LCMRL) Calculator. EPA 815-R-11-001. Office of Water. December 2010. Available at https://www.epa.gov/dwanalyticalmethods.

(xii) USEPA. 2011. Exposure Factors Handbook 2011 Edition (Final Report). U.S. EPA, Washington, DC, EPA/600/R-09/052F. Office of Research and Development, Washington, DC. September 2011. Available at https://www.epa.gov/expobox/about-exposure-factors-handbook.

(xiii) USEPA. 2012. Revisions to the Unregulated Contaminant Monitoring Regulation (UCMR 3) for Public Water Systems; Final Rule. Federal Register . Vol. 77, No. 85, p. 26072, May 2, 2012.

(xiv) USEPA. 2016. Revisions to the Unregulated Contaminant Monitoring Rule (UCMR 4) for Public Water Systems and Announcement of Public Meeting. Federal Register . Vol. 81, No. 244, p. 92666, December 20, 2016.

(xv) USEPA. 2017. National Primary Drinking Water Regulations; Announcement of the Results of EPA's Review of Existing Drinking Water Standards and Request for Public Comment and/or Information on Related Issues. Federal Register . Vol. 82, No. 7, p. 3518, January 11, 2017.

(xvi) USEPA. 2018. Method Development for Unregulated Contaminants in Drinking Water: Public Meeting and Webinar. EPA 815-A-18-001. Office of Water. June 2018. Available at https://www.epa.gov/dwanalyticalmethods.

(xvii) USEPA. 2019a. Development of the Proposed Unregulated Contaminant Monitoring Rule for the Fifth Monitoring Cycle (UCMR 5). Presentation Slides. EPA 815-A-19-001. Office of Water. Available at https://www.epa.gov/dwucmr/unregulated-contaminant-monitoring-rule-ucmr-meetings-and-materials.

(xviii) USEPA. 2019b. EPA Method 533—Determination of Per- and Polyfluoroalkyl Substances in Drinking Water by Isotope Dilution Anion Exchange Solid Phase Extraction and Liquid Chromatography/Tandem Mass Spectrometry. EPA 815-B-19-020. Office of Water, Cincinnati, OH. November 2019. Available at https://www.epa.gov/dwanalyticalmethods.

(xix) USEPA. 2019c. Appendix C: 1,2,3-Trichloropropane in Regulatory Determination 4 Support Document for Selected Contaminants from the Fourth Drinking Water Contaminant Candidate List (CCL 4). EPA 815-R-19-006. Docket ID EPA-HQ-OW-2019-0583. Available at https://www.regulations.gov.

(xx) USEPA. 2020. EPA Method 537.1—Determination of Selected Per- and Polyfluorinated Alkyl Substances in Drinking Water by Solid Phase Extraction and Liquid Chromatography/Tandem Mass Spectrometry (LC/MS/MS). Version 2.0. EPA/600/R-20/006. Office of Research and Development, Cincinnati, OH. March 2020. Available at https://www.epa.gov/dwanalyticalmethods.

(xxii) USEPA. 2021a. Selection of Nationally Representative Public Water Systems for the Unregulated Contaminant Monitoring Rule: 2021 Update. EPA 815-B-21-012. Office of Water. December 2021.

(xxiii) USEPA. 2021b. Information Collection Request for the Final Unregulated Contaminant Monitoring Rule (UCMR 5). EPA 815-B-21-008. Office of Water. December 2021.

(xxiv) USEPA. 2021c. Revisions to the Unregulated Contaminant Monitoring Rule for the Fifth Monitoring Cycle (UCMR 5): Public Meeting and Webinar. Presentation Slides. EPA 815-A-21-001. Office of Water. April 2021. Available at https://www.epa.gov/dwucmr/unregulated-contaminant-monitoring-rule-ucmr-meetings-and-materials.

(xxv) USEPA. 2021d. Drinking Water Contaminant Candidate List 5—Draft. Federal Register . Vol. 86, No. 135 p. 37948, July 19, 2021.

(xxvi) USEPA. 2021e. Information Compendium for Contaminants for the Final Unregulated Contaminant Monitoring Rule (UCMR 5). EPA 815-B-21-009. Office of Water. December 2021.

(xxvii) USEPA. 2021f. UCMR 5 Laboratory Approval Manual. EPA 815-B-21-010. Office of Water. December 2021.

(xxviii) USEPA. 2021g. Revisions to the Unregulated Contaminant Monitoring Rule for Public Water Systems and Announcement of Public Meeting; Proposed Rule and Notice of Public Meeting. Federal Register . Vol. 86, No. 46, p. 13846, March 11, 2021.

(xxix) USEPA. 2021h. Revisions to 40 CFR 141.35 and 141.40. EPA 815-B-21-011. Office of Water. December 2021. Available in EPA's public docket (under Docket ID No. EPA-HQ-OW-2020-0530) at https://www.regulations.gov.

(xxx) USEPA. 2021i. Response to Comments on the Fifth Unregulated Contaminant Monitoring Rule (UCMR 5) Proposal. EPA 815-R-21-008. Office of Water. December 2021.

(xxi) USEPA. 2021j. Instructions for Preparing a Ground Water Representative Monitoring Plan for the Unregulated Contaminant Monitoring Rule. EPA 815-B-21-013. Office of Water. December 2021.

List of Subjects in 40 CFR Part 141

Environmental protection, Chemicals, Incorporation by reference, Indian—lands, Intergovernmental relations, Reporting and recordkeeping requirements, Water supply.

Michael S. Regan,

Administrator.

For the reasons set forth in the preamble, EPA amends 40 CFR part 141 as follows:

PART 141—NATIONAL PRIMARY DRINKING WATER REGULATIONS

1. The authority citation for part 141 continues to read as follows:

Authority:

42 U.S.C. 300f, 300g-1, 300g-2, 300g-3, 300g-4, 300g-5, 300g-6, 300j-4, 300j-9, and 300j-11.

Subpart D—Reporting and Recordkeeping

2. Amend §141.35 as follows:

a. In paragraph (a), revise the fourth sentence;

b. In paragraph (c)(1), remove the text “December 31, 2017” and add, in its place the text “December 31, 2022”;

c. Revise paragraphs (c)(2), (c)(3)(i) through (iii), (c)(4), (c)(5)(i), and (c)(6)(ii);

d. In paragraph (d)(2), revise the first, second, and third sentences; and

f. Revise paragraph (e).

The revisions read as follows:

§141.35 Reporting for unregulated contaminant monitoring results.

(a) * * * For the purposes of this section, PWS “population served” is the retail population served directly by the PWS as reported to the Federal Safe Drinking Water Information System (SDWIS/Fed). * * *

* * * * *

(c) * * *

(2) Sampling location inventory information. You must provide your inventory information by December 31, 2022, using EPA's electronic data reporting system, as specified in paragraph (b)(1) of this section. You must submit, verify, or update data elements 1-9 (as defined in Table 1 of paragraph (e) of this section) for each sampling location, or for each approved representative sampling location (as specified in paragraph (c)(3) of this section) regarding representative sampling locations. If this information changes, you must report updates, including new sources, and sampling locations that are put in use before or during the UCMR sampling period, to EPA's electronic data reporting system within 30 days of the change.

(3) * * *

(i) Qualifications. Large PWSs that have EPA- or State-approved representative EPTDS sampling locations from a previous UCMR cycle, or as provided for under 40 CFR 141.23(a)(1), 40 CFR 141.24(f)(1), or 40 CFR 141.24(h)(1), may submit a copy of documentation from your State or EPA that approves your representative sampling plan. PWSs that do not have an approved representative EPTDS sampling plan may submit a proposal to sample at representative EPTDS(s) rather than at each individual EPTDS if: You use ground water as a source; all of your well sources have either the same treatment or no treatment; and you have multiple EPTDSs from the same source ( i.e., same aquifer). You must submit a copy of the existing or proposed representative EPTDS sampling plan, as appropriate, at least six months prior to your scheduled sample collection, as specified in paragraph (b)(1) of this section. If changes to your inventory that impact your representative plan occur before or during the UCMR sampling period, you must report updates within 30 days of the change.

(ii) Demonstration. If you are submitting a proposal to sample at representative EPTDS(s) rather than at each individual EPTDS, you must demonstrate that any EPTDS that you propose as representative of multiple wells is associated with a well that draws from the same aquifer as the wells it will represent. The proposed well must be representative of the highest annual volume and most consistently active wells in the representative array. If that representative well is not in use at the scheduled sampling time, you must select and sample an alternative representative well. You must submit the information defined in Table 1, paragraph (e) of this section for each proposed representative sampling location. You must also include documentation to support your proposal that the specified wells are representative of other wells. This documentation can include system-maintained well logs or construction drawings indicating that the representative well(s) is/are at a representative depth, and details of well casings and grouting; data demonstrating relative homogeneity of water quality constituents ( e.g., pH, dissolved oxygen, conductivity, iron, manganese) in samples drawn from each well; and data showing that your wells are located in a limited geographic area ( e.g., all wells within a 0.5 mile radius) and/or, if available, the hydrogeologic data indicating the ground water travel time between the representative well and each of the individual wells it represents ( e.g., all wells within a five-year time of travel delineation). Your proposal must be sent in writing to EPA, as specified in paragraph (b)(1) of this section.

(iii) Approval. EPA or the State (as specified in the Partnership Agreement reached between the State and EPA) will review your proposal and coordinate any necessary changes with you. Your plan will not be final until you receive written approval from EPA, identifying the final list of EPTDSs where you will be required to monitor.

(4) Contacting EPA if your PWS has not been notified of requirements. If you believe you are subject to UCMR requirements, as defined in 40 CFR 141.40(a)(1) and (a)(2)(i), and you have not been contacted by either EPA or your State by April 26, 2022, you must send a letter to EPA, as specified in paragraph (b)(1) of this section. The letter must be from your PWS Official and must include an explanation as to why the UCMR requirements are applicable to your system along with the appropriate contact information. A copy of the letter must also be submitted to the State as directed by the State. EPA will make an applicability determination based on your letter, and in consultation with the State when necessary and will notify you regarding your applicability status and required sampling schedule. However, if your PWS meets the applicability criteria specified in 40 CFR 141.40(a)(2)(i), you are subject to the UCMR monitoring and reporting requirements, regardless of whether you have been contacted by the State or EPA.

(5) * * *

(i) General rescheduling notification requirements. Large systems may independently change their monitoring schedules up to December 31, 2022, using EPA's electronic data reporting system, as specified in paragraph (b)(1) of this section. After this date has passed, if your PWS cannot sample according to your assigned sampling schedule ( e.g., because of budget constraints, or if a sampling location will be closed during the scheduled month of monitoring), you must mail or email a letter to EPA, as specified in paragraph (b)(1) of this section, prior to the scheduled sampling date. You must include an explanation of why the samples cannot be taken according to the assigned schedule, and you must provide the alternative schedule you are requesting. You must not reschedule monitoring specifically to avoid sample collection during a suspected vulnerable period. You are subject to your assigned UCMR sampling schedule or the schedule that you revised on or before December 31, 2022, unless and until you receive a letter from EPA specifying a new schedule.

* * * * *

(6) * * *

(ii) Reporting schedule. You must require your laboratory, on your behalf, to post and approve the data in EPA's electronic data reporting system, accessible at https://www.epa.gov/dwucmr, for your review within 90 days from the sample collection date (sample collection must occur as specified in 40 CFR 141.40(a)(4)). You then have 30 days from when the laboratory posts and approves your data to review, approve, and submit the data to the State and EPA via the agency's electronic data reporting system. If you do not electronically approve and submit the laboratory data to EPA within 30 days of the laboratory posting approved data, the data will be considered approved by you and available for State and EPA review.

* * * * *

(d) * * *

(2) Sampling location inventory information. You must provide your inventory information by December 31, 2022, using EPA's electronic data reporting system, as specified in paragraph (b)(1) of this section. If this information changes, you must report updates, including new sources, and sampling locations that are put in use before or during the UCMR sampling period, to EPA's electronic data reporting system within 30 days of the change, as specified in paragraph (b)(1) of this section. * * *

(e) Data elements. Table 1 defines the data elements that must be provided for UCMR monitoring.

Table 1 to Paragraph (e)—Unregulated Contaminant Monitoring Reporting Requirements
Data elementDefinition
1. Public Water System Identification (PWSID) CodeThe code used to identify each PWS. The code begins with the standard 2-character postal State abbreviation or Region code; the remaining 7 numbers are unique to each PWS in the State. The same identification code must be used to represent the PWS identification for all current and future UCMR monitoring.
2. Public Water System NameUnique name, assigned once by the PWS.
3. Public Water System Facility Identification CodeAn identification code established by the State or, at the State's discretion, by the PWS, following the format of a 5-digit number unique within each PWS for each applicable facility (i.e., for each source of water, treatment plant, distribution system, or any other facility associated with water treatment or delivery). The same identification code must be used to represent the facility for all current and future UCMR monitoring.
4. Public Water System Facility NameUnique name, assigned once by the PWS, for every facility ID ( e.g., Treatment Plant).
5. Public Water System Facility TypeThat code that identifies that type of facility as either: CC = Consecutive connection. SS = Sampling station. TP = Treatment plant. OT = Other.
6. Water Source TypeThe type of source water that supplies a water system facility. Systems must report one of the following codes for each sampling location:
SW = Surface water (to be reported for water facilities that are served entirely by a surface water source during the 12-month period).
GU = Ground water under the direct influence of surface water (to be reported for water facilities that are served all or in part by ground water under the direct influence of surface water at any time during the 12-month sampling period), and are not served at all by surface water during this period.
MX = Mixed water (to be reported for water facilities that are served by a mix of surface water, ground water, and/or ground water under the direct influence of surface water during the 12-month period).
GW = Ground water (to be reported for water facilities that are served entirely by a ground water source during the 12-month period).
7. Sampling Point Identification CodeAn identification code established by the State, or at the State's discretion, by the PWS, that uniquely identifies each sampling point. Each sampling code must be unique within each applicable facility, for each applicable sampling location (i.e ., entry point to the distribution system). The same identification code must be used to represent the sampling location for all current and future UCMR monitoring.
8. Sampling Point NameUnique sample point name, assigned once by the PWS, for every sample point ID ( e.g., Entry Point).
9. Sampling Point Type CodeA code that identifies the location of the sampling point as: EP = Entry point to the distribution system.
10. Disinfectant TypeAll of the disinfectants/oxidants that have been added prior to and at the entry point to the distribution system. Please select all that apply:
PEMB = Permanganate.
HPXB = Hydrogen peroxide.
CLGA = Gaseous chlorine.
CLOF = Offsite generated hypochlorite (stored as a liquid form).
CLON = Onsite generated hypochlorite.
CAGC = Chloramine (formed with gaseous chlorine).
CAOF = Chloramine (formed with offsite hypochlorite).
CAON = Chloramine (formed with onsite hypochlorite).
CLDB = Chlorine dioxide.
OZON = Ozone.
ULVL = Ultraviolet light.
OTHD = All other types of disinfectant/oxidant.
NODU = No disinfectant/oxidant used.
11. Treatment InformationTreatment information associated with the sample point. Please select all that apply.
CON = Conventional (non-softening, consisting of at least coagulation/sedimentation basins and filtration).
SFN = Softening.
RBF = River bank filtration.
PSD = Pre-sedimentation.
INF = In-line filtration.
DFL = Direct filtration.
SSF = Slow sand filtration.
BIO = Biological filtration (operated with an intention of maintaining biological activity within filter).
UTR = Unfiltered treatment for surface water source.
GWD = Groundwater system with disinfection only.
PAC = Application of powder activated carbon.
GAC = Granular activated carbon adsorption (not part of filters in CON, SFN, INF, DFL, or SSF).
AIR = Air stripping (packed towers, diffused gas contactors).
POB = Pre-oxidation with chlorine (applied before coagulation for CON or SFN plants or before filtration for other filtration plants).
MFL = Membrane filtration.
IEX = Ionic exchange.
DAF = Dissolved air floatation.
CWL = Clear well/finished water storage without aeration.
CWA = Clear well/finished water storage with aeration.
ADS = Aeration in distribution system (localized treatment).
OTH = All other types of treatment.
NTU = No treatment used.
DKN = Do not know.
12. Sample Collection DateThe date the sample is collected, reported as 4-digit year, 2-digit month, and 2-digit day (YYYYMMDD).
13. Sample Identification CodeAn alphanumeric value up to 30 characters assigned by the laboratory to uniquely identify containers, or groups of containers, containing water samples collected at the same sampling location for the same sampling date.
14. ContaminantThe unregulated contaminant for which the sample is being analyzed.
15. Analytical Method CodeThe identification code of the analytical method used.
16. Extraction Batch Identification CodeLaboratory assigned extraction batch ID. Must be unique for each extraction batch within the laboratory for each method. For CCC samples report the Analysis Batch Identification Code as the value for this field. For methods without an extraction batch, leave this field null.
17. Extraction DateDate for the start of the extraction batch (YYYYMMDD). For methods without an extraction batch, leave this field null.
18. Analysis Batch Identification CodeLaboratory assigned analysis batch ID. Must be unique for each analysis batch within the laboratory for each method.
19. Analysis DateDate for the start of the analysis batch (YYYYMMDD).
20. Sample Analysis TypeThe type of sample collected and/or prepared, as well as the fortification level. Permitted values include: CCCL = MRL level continuing calibration check; a calibration standard containing the contaminant, the internal standard, and surrogate analyzed to verify the existing calibration for those contaminants.
CCCM = Medium level continuing calibration check; a calibration standard containing the contaminant, the internal standard, and surrogate analyzed to verify the existing calibration for those contaminants.
CCCH = High level continuing calibration check; a calibration standard containing the contaminant, the internal standard, and surrogate analyzed to verify the existing calibration for those contaminants.
FS = Field sample; sample collected and submitted for analysis under this final rule.
LFB = Laboratory fortified blank; an aliquot of reagent water fortified with known quantities of the contaminants and all preservation compounds.
LRB = Laboratory reagent blank; an aliquot of reagent water treated exactly as a field sample, including the addition of preservatives, internal standards, and surrogates to determine if interferences are present in the laboratory, reagents, or other equipment.
LFSM = Laboratory fortified sample matrix; a UCMR field sample with a known amount of the contaminant of interest and all preservation compounds added.
LFSMD = Laboratory fortified sample matrix duplicate; duplicate of the laboratory fortified sample matrix.
QCS = Quality control sample; a sample prepared with a source external to the one used for initial calibration and CCC. The QCS is used to check calibration standard integrity.
FRB = Field reagent blank; an aliquot of reagent water treated as a sample including exposure to sampling conditions to determine if interferences or contamination are present from sample collection through analysis.
21. Analytical Result—SignA value indicating whether the sample analysis result was: (<) “less than” means the contaminant was not detected, or was detected at a level below the Minimum Reporting Level. (=) “equal to” means the contaminant was detected at the level reported in “Analytical Result— Measured Value.”
22. Analytical Result—Measured ValueThe actual numeric value of the analytical results for: Field samples; laboratory fortified matrix samples; laboratory fortified sample matrix duplicates; and concentration fortified.
23. Additional ValueRepresents the true value or the fortified concentration for spiked samples for QC Sample Analysis Types (CCCL, CCCM, CCCH, QCS, LFB, LFSM, and LFSMD).
24. Laboratory Identification CodeThe code, assigned by EPA, used to identify each laboratory. The code begins with the standard two-character State postal abbreviation; the remaining five numbers are unique to each laboratory in the State.
25. Sample Event CodeA code assigned by the PWS for each sample event. This will associate samples with the PWS monitoring plan to allow EPA to track compliance and completeness. Systems must assign the following codes:
SE1, SE2, SE3, and SE4—Represent samples collected to meet UCMR Assessment Monitoring requirements; where “SE1” and “SE2” represent the first and second sampling period for all water types; and “SE3” and “SE4” represent the third and fourth sampling period for SW, GU, and MX sources only.
26. Historical Information for Contaminant Detections and TreatmentA yes or no answer provided by the PWS for each entry point to the distribution system. Question: Have you tested for the contaminant in your drinking water in the past? YES = If yes, did you modify your treatment and if so, what types of treatment did you implement? Select all that apply.
PAC = Application of powder activated carbon.
GAC = Granular activated carbon adsorption (not part of filters in CON, SFN, INF, DFL, or SSF).
IEX = Ionic exchange.
NRO = Nanofiltration and reverse osmosis.
OZN = Ozone.
BAC = Biologically active carbon.
MFL = Membrane filtration.
UVL = Ultraviolet light.
OTH = Other.
NMT = Not modified after testing.
NO = Have never tested for the contaminant.
DK = Do not know.
27. Potential PFAS SourcesA yes or no answer provided by the PWS for each entry point to the distribution system. Question: Are you aware of any potential current and/or historical sources of PFAS that may have impacted the drinking water sources at your water system?
YES = If yes, select all that apply:
MB = Military base.
FT = Firefighting training school.
AO = Airport operations.
CW = Car wash or industrial launderers.
PS = Public safety activities ( e.g., fire and rescue services).
WM = Waste management.
HW = Hazardous waste collection, treatment, and disposal.
UW = Underground injection well.
SC = Solid waste collection, combustors, incinerators.
MF = Manufacturing.
FP = Food packaging.
TA = Textile and apparel ( e.g., stain- and water-resistant, fiber/thread, carpet, house furnishings, leather).
PP = Paper.
CC = Chemical.
PR = Plastics and rubber products.
MM = Machinery.
CE = Computer and electronic products.
FM = Fabricated metal products (e.g., nonstick cookware).
PC = Petroleum and coal products.
FF = Furniture.
OG = Oil and gas production.
UT = Utilities (e.g ., sewage treatment facilities).
CT = Construction (e.g ., wood floor finishing, electrostatic painting).
OT = Other.
NO = Not aware of any potential current and/or historical sources.
DK = Do not know.

Subpart E—Special Regulations, Including Monitoring Regulations and Prohibition on Lead Use

3. Amend §141.40 as follows:

a. In paragraph (a) introductory text, remove the text “December 31, 2015” and add in its place the text “February 1, 2021 or subsequent corrections from the State”;

b. Revise paragraphs (a)(2)(ii) introductory text, (a)(2)(ii)(A), and (a)(3);

c. In paragraph (a)(4)(i) introductory text, remove the text “December 31, 2017” and add in its place the text “December 31, 2022”;

d. Revise paragraphs (a)(4)(i)(A) through (C), (a)(4)(ii) introductory text, and the first sentence in paragraph (a)(4)(ii)(A);

e. Remove paragraph (a)(4)(iii);

f. In paragraph (a)(5)(ii), revise the fifth and sixth sentences;

g. Revise paragraph (a)(5)(iii) introductory text;

h. Remove and reserve paragraph (a)(5)(iv); and

i. Revise paragraphs (a)(5)(v) and (vi) and paragraph (c).

The revisions read as follows:

§141.40 Monitoring requirements for unregulated contaminants.

(a) * * *

(2) * * *

(ii) Small systems. EPA will provide sample containers, provide pre-paid air bills for shipping the sampling materials, conduct the laboratory analysis, and report and review monitoring results for all small systems selected to conduct monitoring under paragraphs (a)(2)(ii)(A) through (C) of this section. If you own or operate a PWS (other than a transient non-community water system) that serves a retail population of 10,000 or fewer people and you are notified of monitoring requirements by the State or EPA, you must monitor as follows:

(A) Assessment Monitoring. You must monitor for the contaminants on List 1 per table 1 to paragraph (a)(3) if you are notified by your State or EPA that you are part of the State Monitoring Plan for Assessment Monitoring.

* * * * *

(3) Analytes to be monitored. Lists 1, 2, and 3 contaminants are provided in table 1 to paragraph (a)(3):

Table 1 to Paragraph(a)(3)—UCMR Contaminant List
1—Contaminant2—CASRN3—Analytical methods a4—Minimum reporting level b5—Sampling location c6—Period during which sample collection to be completed
Column headings are:
1—Contaminant: The name of the contaminant to be analyzed.
2—CASRN (Chemical Abstracts Service Registry Number) or Identification Number: A unique number identifying the chemical contaminants.
3—Analytical Methods: Method numbers identifying the methods that must be used to test the contaminants.
4—Minimum Reporting Level (MRL): The value and unit of measure at or above which the concentration of the contaminant must be measured using the approved analytical methods. If EPA determines, after the first six months of monitoring that the specified MRLs result in excessive resampling, EPA will establish alternate MRLs and will notify affected PWSs and laboratories of the new MRLs. N/A is defined as non-applicable.
5—Sampling Location: The locations within a PWS at which samples must be collected.
6—Period During Which Sample Collection to be Completed: The time period during which the sampling and testing will occur for the indicated contaminant.
a The analytical procedures shall be performed in accordance with the documents associated with each method, see paragraph (c) of this section.
b The MRL is the minimum concentration of each analyte that must be reported to EPA.
c Sampling must occur at your PWS's entry points to the distribution system (EPTDSs), after treatment is applied, that represent each non-emergency water source in routine use over the 12-month period of monitoring. Systems that purchase water with multiple connections from the same wholesaler may select one representative connection from that wholesaler. The representative EPTDS must be a location within the purchaser's water system. This EPTDS sampling location must be representative of the highest annual volume connections. If the connection selected as the representative EPTDS is not available for sampling, an alternate highest volume representative connection must be sampled. See 40 CFR 141.35(c)(3) for an explanation of the requirements related to the use of representative GW EPTDSs.
List 1: Assessment Monitoring
Per- and Polyfluoroalkyl Substances (PFAS)
11-chloroeicosafluoro-3-oxaundecane-1-sulfonic acid (11Cl-PF3OUdS)763051-92-9EPA 5330.005 µg/LEPTDS1/1/2023-12/31/2025
1H, 1H, 2H, 2H-perfluorodecane sulfonic acid (8:2 FTS)39108-34-4EPA 5330.005 µg/LEPTDS1/1/2023-12/31/2025
1H, 1H, 2H, 2H-perfluorohexane sulfonic acid (4:2 FTS)757124-72-4EPA 5330.003 µg/LEPTDS1/1/2023-12/31/2025
1H, 1H, 2H, 2H-perfluorooctane sulfonic acid (6:2 FTS)27619-97-2EPA 5330.005 µg/LEPTDS1/1/2023-12/31/2025
4,8-dioxa-3H-perfluorononanoic acid (ADONA)919005-14-4EPA 5330.003 µg/LEPTDS1/1/2023-12/31/2025
9-chlorohexadecafluoro-3-oxanone-1-sulfonic acid (9Cl-PF3ONS)756426-58-1EPA 5330.002 µg/LEPTDS1/1/2023-12/31/2025
hexafluoropropylene oxide dimer acid (HFPO-DA) (GenX)13252-13-6EPA 5330.005 µg/LEPTDS1/1/2023-12/31/2025
nonafluoro‐3,6‐dioxaheptanoic acid (NFDHA)151772-58-6EPA 5330.02 µg/LEPTDS1/1/2023-12/31/2025
perfluoro (2‐ethoxyethane) sulfonic acid (PFEESA)113507-82-7EPA 5330.003 µg/LEPTDS1/1/2023-12/31/2025
perfluoro‐3‐methoxypropanoic acid (PFMPA)377-73-1EPA 5330.004 µg/LEPTDS1/1/2023-12/31/2025
perfluoro‐4‐methoxybutanoic acid (PFMBA)863090-89-5EPA 5330.003 µg/LEPTDS1/1/2023-12/31/2025
perfluorobutanesulfonic acid (PFBS)375-73-5EPA 5330.003 µg/LEPTDS1/1/2023-12/31/2025
perfluorobutanoic acid (PFBA)375-22-4EPA 5330.005 µg/LEPTDS1/1/2023-12/31/2025
perfluorodecanoic acid (PFDA)335-76-2EPA 5330.003 µg/LEPTDS1/1/2023-12/31/2025
perfluorododecanoic acid (PFDoA)307-55-1EPA 5330.003 µg/LEPTDS1/1/2023-12/31/2025
perfluoroheptanesulfonic acid (PFHpS)375-92-8EPA 5330.003 µg/LEPTDS1/1/2023-12/31/2025
perfluoroheptanoic acid (PFHpA)375-85-9EPA 5330.003 µg/LEPTDS1/1/2023-12/31/2025
perfluorohexanesulfonic acid (PFHxS)355-46-4EPA 5330.003 µg/LEPTDS1/1/2023-12/31/2025
perfluorohexanoic acid (PFHxA)307-24-4EPA 5330.003 µg/LEPTDS1/1/2023-12/31/2025
perfluorononanoic acid (PFNA)375-95-1EPA 5330.004 µg/LEPTDS1/1/2023-12/31/2025
perfluorooctanesulfonic acid (PFOS)1763-23-1EPA 5330.004 µg/LEPTDS1/1/2023-12/31/2025
perfluorooctanoic acid (PFOA)335-67-1EPA 5330.004 µg/LEPTDS1/1/2023-12/31/2025
perfluoropentanesulfonic acid (PFPeS)2706-91-4EPA 5330.004 µg/LEPTDS1/1/2023-12/31/2025
perfluoropentanoic acid (PFPeA)2706-90-3EPA 5330.003 µg/LEPTDS1/1/2023-12/31/2025
perfluoroundecanoic acid (PFUnA)2058-94-8EPA 5330.002 µg/LEPTDS1/1/2023-12/31/2025
n-ethyl perfluorooctanesulfonamidoacetic acid (NEtFOSAA)2991-50-6EPA 537.10.005 µg/LEPTDS1/1/2023-12/31/2025
n-methyl perfluorooctanesulfonamidoacetic acid (NMeFOSAA)2355-31-9EPA 537.10.006 µg/LEPTDS1/1/2023-12/31/2025
perfluorotetradecanoic acid (PFTA)376-06-7EPA 537.10.008 µg/LEPTDS1/1/2023-12/31/2025
perfluorotridecanoic acid (PFTrDA)72629-94-8EPA 537.10.007 µg/LEPTDS1/1/2023-12/31/2025
Metal/Pharmaceutical
Lithium7439-93-2EPA 200.7, SM 3120 B, ASTM D1976-209 µg/LEPTDS1/1/2023-12/31/2025
List 2: Screening Survey
ReservedReservedReservedReservedReservedReserved
List 3: Pre-Screen Testing
ReservedReservedReservedReservedReservedReserved

(4) * * *

(i) * * *

(A) Sample collection period. You must collect the samples in one continuous 12-month period for List 1 Assessment Monitoring, and, if applicable, for List 2 Screening Survey, or List 3 Pre-Screen Testing, during the timeframe indicated in column 6 of table 1 to paragraph (a)(3) of this section. EPA or your State will specify the month(s) and year(s) in which your monitoring must occur. As specified in 40 CFR 141.35(c)(5), you must contact EPA if you believe you cannot collect samples according to your schedule.

(B) Frequency. You must collect the samples within the timeframe and according to the frequency specified by contaminant type and water source type for each sampling location, as specified in table 2 to this paragraph (a)(4)(i)(B). For the second or subsequent round of sampling, if a sample location is non-operational for more than one month before and one month after the scheduled sampling month ( i.e., it is not possible for you to sample within the window specified in table 2), you must notify EPA as specified in 40 CFR 141.35(c)(5) to reschedule your sampling.

Table 2 to Paragraph ( )(4)( )(B)—Monitoring Frequency by Contaminant and Water Source Types
Contaminant typeWater source typeTimeframeFrequency 1
1 Systems must assign a sample event code for each contaminant listed in Table 1. Sample event codes must be assigned by the PWS for each sample event. For more information on sample event codes see 40 CFR 141.35(e) Table 1.
List 1 ContaminantsSurface water, Mixed, or GWUDI12 monthsYou must monitor for four consecutive quarters. Sample events must occur three months apart. (Example: If first monitoring is in January, the second monitoring must occur any time in April, the third any time in July, and the fourth any time in October).
Ground water12 monthsYou must monitor twice in a consecutive 12-month period. Sample events must occur 5-7 months apart. (Example: If the first monitoring event is in April, the second monitoring event must occur any time in September, October, or November.)

(C) Location. You must collect samples for each List 1 Assessment Monitoring contaminant, and, if applicable, for each List 2 Screening Survey, or List 3 Pre-Screen Testing contaminant, as specified in table 1 to paragraph (a)(3) of this section. Samples must be collected at each sample point that is specified in column 5 and footnote c of table 1 to paragraph (a)(3) of this section. If you are a GW system with multiple EPTDSs, and you request and receive approval from EPA or the State for sampling at representative EPTDS(s), as specified in 40 CFR 141.35(c)(3), you must collect your samples from the approved representative sampling location(s).

* * * * *

(ii) Small systems. If you serve a population of 10,000 or fewer people and are notified that you are part of the State Monitoring Plan, you must comply with the requirements specified in paragraphs (a)(4)(ii)(A) through (H) of this section. If EPA or the State informs you that they will be collecting your UCMR samples, you must assist them in identifying the appropriate sampling locations and in collecting the samples.

(A) Sample collection and frequency. You must collect samples at the times specified for you by the State or EPA. Your schedule must follow both the timing of monitoring specified in table 1 to paragraph (a)(3) of this section, List 1, and, if applicable, List 2, or List 3, and the frequency of monitoring in table 2 to paragraph (a)(4)(i)(B) of this section.

* * * * *

(5) * * *

(ii) * * * To participate in the UCMR Laboratory Approval Program, the laboratory must register and complete the necessary application materials by August 1, 2022. Correspondence must be addressed to: UCMR Laboratory Approval Coordinator, USEPA, Technical Support Center, 26 West Martin Luther King Drive, (MS 140), Cincinnati, Ohio 45268; or emailed to EPA at: UCMR_Lab_Approval@epa.gov.

(iii) Minimum Reporting Level. The MRL is defined by EPA as the quantitation limit achievable, with 95 percent confidence, by 75 percent of laboratories nationwide, assuming the use of good instrumentation and experienced analysts.

* * * * *

(v) Method defined quality control. You must ensure that your laboratory analyzes Laboratory Fortified Blanks and conducts Laboratory Performance Checks, as appropriate to the method's requirements, for those methods listed in column 3 in table 1 to paragraph (a)(3) of this section. Each method specifies acceptance criteria for these QC checks.

(vi) Reporting. You must require your laboratory, on your behalf, to post and approve these data in EPA's electronic data reporting system, accessible at https://www.epa.gov/dwucmr, for your review within 90 days from the sample collection date. You then have 30 days from when the laboratory posts and approves your data to review, approve, and submit the data to the State and EPA, via the agency's electronic data reporting system. If you do not electronically approve and submit the laboratory data to EPA within 30 days of the laboratory posting approved data, the data will be considered approved by you and available for State and EPA review.

* * * * *

(c) Incorporation by reference. The standards required in this section are incorporated by reference into this section with the approval of the Director of the Federal Register under 5 U.S.C. 552(a) and 1 CFR part 51. All approved material is available for inspection at U.S. Environmental Protection Agency, Water Docket, EPA/DC, EPA West, Room 3334, 1301 Constitution Ave. NW, Washington, DC 20004, (202) 566-1744, email Docket-customerservice@epa.gov, or go to https://www.epa.gov/dockets/epa-docket-center-reading-room, and is available from the sources indicated elsewhere in this paragraph. The material is also available for inspection at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, email fr.inspection@nara.gov, or go to www.archives.gov/federal-register/cfr/ibr-locations.html.

(1) U.S. Environmental Protection Agency, EPA West, Room 3334, 1301 Constitution Ave. NW, Washington, DC 20004; telephone: (202) 566-1744.

(i) Method 200.7, “Determination of Metals and Trace Elements in Water and Wastes by Inductively Coupled Plasma-Atomic Emission Spectrometry,” Revision 4.4, EMMC Version, 1994. Available at https://www.epa.gov/esam/method-2007-determination-metals-and-trace-elements-water-and-wastes-inductively-coupled-plasma.

(ii) Method 537.1, “Determination of Selected Per- and Polyfluorinated Alkyl Substances in Drinking Water by Solid Phase Extraction and Liquid Chromatography/Tandem Mass Spectrometry,” Version 2.0, 2020. Available at https://www.epa.gov/water-research/epa-drinking-water-research-methods.

(iii) Method 533, “Determination of Per- and Polyfluoroalkyl Substances in Drinking Water by Isotope Dilution Anion Exchange Solid Phase Extraction and Liquid Chromatography/Tandem Mass Spectrometry,” November 2019, EPA 815-B-19-020. Available at https://www.epa.gov/dwanalyticalmethods.

(2) American Public Health Association, 800 I Street NW, Washington, DC 20001-3710; telephone: (202) 777-2742; email: comments@apha.org; www.apha.org.

(i) “Standard Methods for the Examination of Water & Wastewater,” 23rd edition (2017).

(A) SM 3120 B, “Metals by Plasma Emission Spectroscopy (2017): Inductively Coupled Plasma (ICP) Method.”

(B) [Reserved]

(ii) “Standard Methods Online,” approved 1999; https://www.standardmethods.org.

(A) SM 3120 B, “Metals by Plasma Emission Spectroscopy: Inductively Coupled Plasma (ICP) Method,” revised December 14, 2020.

(B) [Reserved]

(3) ASTM International, 100 Barr Harbor Drive, West Conshohocken, PA 19428-2959; telephone: (610) 832-9500; email: service@astm.org; www.astm.org.

(i) ASTM D1976-20, “Standard Test Method for Elements in Water by Inductively-Coupled Plasma Atomic Emission Spectroscopy,” approved May 1, 2020.

(ii) [Reserved]

[FR Doc. 2021-27858 Filed 12-23-21; 8:45 am]

BILLING CODE 6560-50-P

Vehicle emissions defeat devices: Steer clear!
2024-10-07T05:00:00Z

Vehicle emissions defeat devices: Steer clear!

The Environmental Protection Agency (EPA) regulates emissions from motor vehicles, engines, and the fuels used to operate them. The agency requires vehicle manufacturers to install control devices that limit the amount of air pollutants a vehicle may emit. However, defeat devices attempt to detour around these controls and allow emissions beyond federal limits.

Excess vehicle emissions can threaten the health of others, impair state and local efforts to maintain national air quality standards, and — as one company and its owner learned — subject you and your business to steep monetary penalties.

Steer clear of defeat devices to ensure a smooth regulatory road.

Company learns multimillion-dollar lesson

EPA and the U.S. Department of Justice reached a settlement agreement with a North Carolina automotive parts company and its owner for violating the Clean Air Act (CAA) requirements for mobile sources by:

  • Manufacturing, selling, and installing more than 250,000 defeat devices on diesel pickup trucks; and
  • Installing aftermarket defeat devices on hundreds of diesel pickup trucks.

The company and its owner face civil and criminal consequences and will pay a total of $10 million in fees and penalties.

Civil enforcement

A July 2024 consent decree (pending court approval) requires both parties to pay a combined $7 million penalty. It also bans the company and owner from:

  • Manufacturing, selling, offering to sell, and installing defeat devices;
  • Transferring intellectual property to help others make or sell defeat devices; and
  • Investing in or profiting from other businesses’ defeat devices.

Criminal enforcement

Both the company and owner pleaded guilty to conspiring to violate the CAA. The federal court ordered the company to pay a $2.4 million fine and complete three years of organizational probation. It also ordered the owner to pay a $600,000 fine and serve three years of probation.

What are defeat devices?

A defeat device is any component that “bypasses, impairs, defeats, or disables the control of emissions of any regulated pollutant” (40 CFR 1068.101(b)(2)). Put simply, it’s an illegal device that removes or disables a vehicle’s emissions controls.

There are generally two types of defeat devices: hardware (such as modified automotive parts) and software (like delete tuners). In fact, many of the devices consist of both types that work in tandem. Federal law (and EPA regulations at 1068.101(b)) bans defeat devices used to swerve around vehicle emissions controls. Section 203(a)(3) of the CAA prohibits anyone from:

  • Tampering with an EPA-certified vehicle’s emissions control devices to remove them or make them inoperative before selling the vehicle,
  • Knowingly tampering with an EPA-certified vehicle’s emissions control devices to remove them or make them inoperative after the vehicle is sold and delivered to the purchaser, and
  • Knowingly manufacturing, selling, offering to sell, or installing defeat devices that bypass, defeat, or render inoperative any emission control device.

Common emission control devices include:

  • Onboard diagnostic systems,
  • Catalytic converters,
  • Electronic control units,
  • Fuel systems, and
  • Diesel particulate filters.

Who do the regulations affect?

The prohibition on defeat devices applies to everyone, from the original equipment manufacturer that installs the vehicle emissions controls to the vehicle owner and operators.

The 1990 CAA Amendments expanded the tampering provision in Section 203(a)(3) to include “any person.” Further, EPA’s regulations at 1068.101(b) “apply to everyone,” such as:

  • Vehicle manufacturers;
  • Vehicle dealers;
  • Automobile repair shops;
  • Commercial mechanics;
  • Fleet operators;
  • Aftermarket automotive part manufacturers, sellers, and installers;
  • Owners; and
  • Operators.

Compliance tips

Consider these helpful suggestions for maintaining compliance:

  • Check and comply with your state and local regulations, as they may be more stringent than federal requirements and impose additional rules. For example, states may require certified technicians to conduct automotive maintenance services on emission controls. States may also prohibit operating, selling, and/or registering tampered vehicles.
  • Purchase aftermarket automotive parts only from reputable sources. Obtain proof that the aftermarket parts won’t increase emissions.
  • Self-disclose any potential violations you find to EPA and/or the state environmental agency. EPA and many states will lower or waive civil penalties for self-reporting violations.

The case against this automotive parts company and owner serves as a multimillion-dollar reminder about making, selling, installing, or using defeat devices — steer clear!

Key to remember: Steer clear of defeat devices that try to detour around EPA’s vehicle emissions controls to ensure a smooth regulatory road.

Our Nation’s air — A recap of 2023
2024-09-30T05:00:00Z

Our Nation’s air — A recap of 2023

Implementation of the Clean Air Act in 1970 has fueled impressive long-term emissions reductions, improving the air we breathe. Still, approximately 140 million Americans live in counties where air quality concentrations are above set levels. While long-term trends continue to improve, the Environmental Protection Agency (EPA) states that there’s still work to be done.

Continued emissions reduction

The Clean Air Act requires EPA to set National Ambient Air Quality Standards (NAAQS) for six principal pollutants called criteria air pollutants, which can be harmful to public health and the environment.

Between 1970 and 2023, the combined emissions of these criteria pollutants have dropped by 78 percent. This is of particular significance due to the continued growth of the U.S. economy by 320 percent over that same period of time. Since 1990, air pollutant concentrations of these six key pollutants have declined as follows:

  • Carbon monoxide (CO) 8-hour is down 79 percent.
  • Lead (Pb) 3-month average is down 87 percent (since 2010).
  • Nitrogen dioxide (NO2) annual is down 62 percent.
  • Nitrogen dioxide (NO2) 1-hour is down 55 percent.
  • Ozone (O3) 8-hour is down 18 percent.
  • Particulate matter 10 microns (PM10) 24-hour is down 29 percent.
  • Particulate matter 2.5 microns (PM2.5) annual is down 37 percent (since 2000).
  • Particulate matter 2.5 microns (PM2.5) 24-hour is down 29 percent (since 2000).
  • Sulfur dioxide (SO2) 1-hour is down 92 percent.

Effects on health and the environment

The link between air pollution and these criteria air pollutants contributes to a variety of health problems and impacts on the environment. Breathing elevated levels of CO can decrease the amount of oxygen reaching a person's organs and tissues. Lead exposure can harm the development of children, leading to lower IQs, learning deficits, and behavioral problems. Short-term exposure to NO2 can aggravate asthma and other respiratory diseases. The environmental effects of ozone include damage to vegetation by injuring leaves, which reduces photosynthesis, therefore impairing growth and decreasing crop yields. Particulate matter in the air is the main cause of reduced visibility in parts of the U.S. It can settle on soils and surface waters, which can change the pH, deplete nutrients, and negatively affect ecosystems.

Actions being taken

EPA and states continue to track emissions data from industry, state, tribal, and local agencies from sources in their jurisdictions, including:

  • Highway vehicles;
  • Industrial and other processes (e.g., smelters, refineries, and dry cleaners);
  • Non-road mobile sources (e.g., recreational and construction equipment, marine vessels, aircraft, and locomotives); and
  • Stationary fuel combustion sources (e.g., electric utilities and industrial boilers).

The government continues to invest in climate pollution action efforts to improve the economic and public health of those living in the country, including:

  • Creating rules to reduce methane emissions from oil and natural gas operations,
  • Updating pollution standards for the transportation industry,
  • Establishing greenhouse gas standards for heavy-duty vehicles,
  • Implementing standards for existing coal-fired and natural gas-fired power plants,
  • Investing in infrastructure, and
  • Working to embed environmental justice in all of EPA’s work.

Key to remember: While long-term trends continue to show an improvement in the air we breathe, EPA states that there’s still work to be done.

EPA extends 2024 Chemical Data Reporting deadline
2024-09-25T05:00:00Z

EPA extends 2024 Chemical Data Reporting deadline

The Environmental Protection Agency (EPA) has extended the submission period for the Chemical Data Reporting (CDR) report. The submission period opened on June 1, and EPA has pushed the submission deadline from September 30 to November 22, 2024.

Who’s impacted?

Under the Toxic Substances Control Act (TSCA), EPA’s CDR rule requires manufacturers (including importers) of chemicals on TSCA’s Chemical Substance Inventory to report information on the production and use of the chemicals in commerce if they meet certain production volume thresholds at any one site.

Why the delay?

The deadline extension is due to technical errors with e-CDRweb, the electronic reporting tool on EPA’s Central Data Exchange system that reporters use to submit the CDR report (Form U). The specific issue only impacts submissions with multiple confidential business information (CBI) claims for chemical identity.

The tool’s copy function fails to properly capture the substantiations submitted by facilities making multiple CBI claims, leaving out some of the questions and answers. Additionally, it doesn’t let submitters who used the copy function add the missing information.

EPA expects to fix the reporting tool by the end of September.

About the 2024 CDR report

The CDR report is submitted to EPA every four years. The 2024 CDR report covers activities that occurred between the calendar years 2020 and 2023. Note that this extension applies only to the 2024 CDR submission period.

Key to remember: Due to technical difficulties with the electronic reporting tool, EPA has extended the 2024 Chemical Data Reporting submission deadline to November 22, 2024.

See More

Most Recent Highlights In Human Resources

3 compliance agencies dubbed hardest nuts to crack, per healthcare poll
2024-09-24T05:00:00Z

3 compliance agencies dubbed hardest nuts to crack, per healthcare poll

It’s no secret that the healthcare industry is swamped by government requirements from a host of federal, state, and local agencies. New survey results put three agencies in a near tie for the “greatest compliance challenge” category for leaders, managers, and others in healthcare.

Two of the agencies may be no surprise — the Centers for Medicare & Medicaid Services (CMS), and the Centers for Disease Control and Prevention (CDC). However, some might be taken aback to learn that the Occupational Safety and Health Administration (OSHA) ranked just as challenging to comply with for the healthcare industry.

The lion’s share of the attention in healthcare has long been on patient care and safety. Therefore, to discover that OSHA — a worker safety and health agency — weighed in as a huge pain point with the other two agencies should raise eyebrows.

Survey data

An August 2024 survey report from the J. J. Keller Center for Market Insights recently tapped 220 professionals from healthcare. This included respondents from clinics/offices; hospitals; ambulatory, nursing, and home care services; outpatient facilities; behavioral health services; medical/dental labs; and other healthcare service types.

As stated, the CMS, CDC, and OSHA each took over 20 percent of the findings in answer to the question, “What government entity’s standards pose the greatest compliance challenge(s) to your organization?” Together, these three stand out from any others for that survey question. In total, they racked up 75 percent of the results!

Other agencies and organizations made up another 10 percent in aggregate, while “none of the above” garnered 14 percent.

Healthcare is dogged by OSHA

OSHA’s mission is “to assure America’s workers have safe and healthful working conditions.” While patient safety is not part of that mission, worker safety and health efforts can spill over into that space. For example, ensuring that workers have proper means of egress and fire protections relates to patient safety. In fact, patient safety efforts may not succeed without safe healthcare workers.

OSHA requires private-sector healthcare employers to provide workers with a safe and healthful work setting free of known serious hazards. The agency has over 1,600 pages of regulations covering general industry, and that includes healthcare. These regulations are complex, but healthcare employers must comply with all applicable requirements.

Healthcare organizations have well over 100 applicable OSHA regulations. The top-cited OSHA regulations for hospitals in fiscal year 2023 include:

  1. 29 CFR 1910.134, Respiratory Protection;
  2. 29 CFR 1910.1030, Bloodborne Pathogens; and
  3. 29 CFR 1910.147, Lockout/tagout.

OSHA’s Healthcare topic page also showcases regulations for personal protective equipment, formaldehyde, ethylene oxide, ionizing radiation, chemical hazard communication, and laboratories.

Yet, the agency’s reach can go beyond regulations. Hazards related to ergonomics, workplace violence, and infectious diseases may be cited. The citations point to section 5(a)(1) of the Occupational Safety and Health Act, which calls for worker protections from serious, recognized hazards. Also, OSHA officers follow the agency’s “Inspection Guidance for Inpatient Healthcare Settings,” which targets lifting-related musculoskeletal disorders, workplace violence, tuberculosis, and other hazards.

OSHA and state-plan state inspections are unannounced — they can happen at any time! In addition, an OSHA penalty can reach over $161,000 per violation.

Industry hit by worker injuries/illnesses

Statistics show that healthcare settings are hazardous places to work! The injury/illness incidence rates for hospitals and nursing and residential care facilities are higher than in the construction industry!

Note that the Bureau of Labor Statistics reveals that the leading injury/illness events with days away from work in hospitals in 2021 and 2022 were:

Because of the severity of some injuries/illnesses and the potential for a worker to suffer one, it’s critical to meet OSHA regulations and beyond. Worker injuries/illnesses come at a high cost that most healthcare facilities likely cannot afford.

The good news is OSHA compliance can lead to a marked decline in worker injuries/illnesses. Even accreditation organizations like The Joint Commission expect to see compliance with applicable OSHA regulations. That’s because meeting OSHA worker safety and health regulations has been discovered to have a positive effect on patient safety. A stable workforce with few worker injuries/illnesses creates a setting conducive to patient confidence and satisfaction.

Where to start

OSHA has resources such as a small business handbook, quick start page, and Hospitals eTool. However, given the importance of OSHA compliance and the challenges it poses to healthcare, it may be wise to have a third party do a comprehensive OSHA compliance audit of each healthcare facility. This is particularly true if leadership is new to workplace safety or does not have the in-house expertise. This baseline may help the facility spot the major hazards and flag OSHA requirements for the site.

The agency recommends that employers conduct compliance inspections at least quarterly. This would be more often if conditions change frequently.

Key to remember

OSHA, along with the CMS and CDC, top the list of compliance challenges for healthcare. A third-party audit or inspection may help these facilities get a handle on the requirements.

How to conduct 3 types of solid waste assessments
2024-09-24T05:00:00Z

How to conduct 3 types of solid waste assessments

No organization wants to throw away the chance to improve operational efficiency. Yet, many businesses unknowingly discard such opportunities by overlooking a process that happens every day: nonhazardous (solid) waste management. That’s where a waste assessment comes in; it’s a tool that can help your facility avoid wasted opportunities.

Why conduct a solid waste assessment?

The ultimate goal of a solid waste assessment is to achieve operational efficiency by cutting the amount of waste a facility generates and improving management practices for waste that can’t be eliminated. As a result, facilities send less waste to landfills (minimizing environmental impact) and require fewer resources for waste management (cutting costs).

Through a waste assessment, your facility can:

  • Evaluate waste streams (i.e., the flow of waste from creation to disposal),
  • Analyze current waste management processes (including sorting, storing, and disposing methods), and
  • Identify ways to improve waste management (such as modifying products or recycling).

Types of solid waste assessments

The Environmental Protection Agency (or EPA) identifies three leading methods for conducting waste assessments: records examinations, walkthroughs, and sorts.

Records examinations

A records examination answers two questions: How does your facility remove solid waste (landfill vs. recycling), and how much does it cost your facility to remove it?

First, calculate the total amount of waste removed (typically in pounds) and total costs for:

  • Collection (conducted via a contractor or internally),
  • Container and dumpster rentals,
  • Removal (e.g., flat, per-weight/volume, or per-pull fees), and
  • Disposal, including landfill tipping fees (if applicable).

Next, using the same measurement units, sum up the number of recyclables collected and recycling costs for:

  • Collection (conducted via a contractor or internally),
  • Container and dumpster rentals,
  • Removal (e.g., flat, per-weight/volume, or per-pull fees), and
  • Revenues for each product or material (if applicable).

Finally:

  • Subtract the total weight of recyclables collected from the total weight of all waste removed to determine the total weight of waste sent to landfills, and
  • Subtract the total recyclables costs from the total waste costs to determine the various costs for landfill wastes (e.g., total waste collection costs – total recyclables collection cost = total landfill collection costs).

Facility walkthroughs

A facility walkthrough requires physical observation of the processes that generate waste and the types of waste they create.

Each facility can tailor the walkthrough process to its unique objectives. However, effective walkthroughs generally incorporate these elements:

  • Alert the department leaders of upcoming walkthroughs.
  • Interview workers in each walkthrough area. Employees can ask questions about waste management processes, and you can ask for valuable input from those directly involved.
  • Ask whether variations occur in the waste generated (e.g., increased waste during delivery days) and if any new equipment or procedures will affect the waste created.
  • Identify current waste-reduction efforts.
  • Look for processes that generate unnecessary waste.
  • Include waste generated by maintenance operations.

Waste sorts

Sometimes, the most effective assessment requires a hands-on approach, and that’s what a waste sort delivers. It enables you to estimate how much each type of waste contributes to the total amount of generated waste.

  1. Gather a representative sample of waste, such as daily waste generated.
  2. Sort the waste into major categories, like paper, plastics, etc.
  3. If applicable, sort the major categories into subcategories, such as glass by color.
  4. Weigh each container of waste.

Remember to weigh the containers when they’re empty. Subtract the weight of the empty containers from the weight of waste to obtain each subcategory’s net component weight. Add these measurements to obtain the total weight of waste generated.

Which waste assessment method is best for your facility?

The “right” waste assessment is unique to each facility. You can use one method or a combination. When selecting the waste assessment(s) to use, consider these factors:

  • What type of data do you need? Should the assessment provide quantitative data (e.g., the weight of waste produced), qualitative data (e.g., how the waste is produced), or both?
  • What types of waste do you want to assess? Do you want to look at just one or multiple kinds?
  • What’s the scope of your assessment? Do you want to target a specific process, one or more departments, or the entire facility?
  • What resources are available? How much time and manpower can you allocate toward conducting an assessment?

Key to remember: Waste assessments help facilities improve operational efficiency by identifying ways to reduce waste and enhance waste management practices.

Reclassification of major sources to area sources rule paves the way for cleaner air and streamlined compliance
2024-09-23T05:00:00Z

Reclassification of major sources to area sources rule paves the way for cleaner air and streamlined compliance

The "Review of Final Rule Reclassification of Major Sources as Area Sources Under Section 112 of the Clean Air Act” rule allows certain major sources to reclassify as area sources under specific conditions. The reclassification process typically involves a review of the source's emissions profile, its location within a specific air quality nonattainment area, and other relevant factors. If it’s determined that a major source isn’t making a substantial contribution to air quality problems, it may be eligible for reclassification as an area source. Under this rule (finalized on August 30, 2024), the Environmental Protection Agency (EPA) allows a major source of hazardous air pollutants (HAPs) to reclassify as an area source after acting to limit emissions under the National Emission Standards for Hazardous Air Pollutants (NESHAP) program. However, sources of persistent and bioaccumulative HAPs listed in Clean Air Act (CAA) Section 112(c)(6) must continue to comply with certain major source emission standards under Sections 112(d)(2) or 112(d)(4) even if these sources reclassify as area sources.

The seven persistent and bioaccumulative HAPs include:

  • Alkylated lead compounds,
  • Polycyclic organic matter (POM),
  • Mercury,
  • Hexachlorobenzene,
  • Polychlorinated biphenyls (PCBs),
  • 2,3,7,8-tetrachlorodibenzofurans (TCDF), and
  • 2,3,7,8-tetrachlorodibenzo-p-dioxin (TCDD).

The following subparts are included in the list of NESHAPs (see 40 CFR 63.1(c)(6)(iii)) that cannot be avoided through reclassification:

  • Subpart FFFF (miscellaneous organic chemical manufacturing),
  • Subpart JJJJ (paper and other web coating),
  • Subpart MMMM (surface coating of miscellaneous metal parts and products),
  • Subpart PPPP (surface coating of plastic parts and products),
  • Subpart ZZZZ (stationary reciprocating internal combustion engines),
  • Subpart CCCCC (coke oven pushing, quenching, and battery stacks),
  • Subpart DDDDD (boilers and process heaters),
  • Subpart FFFFF (iron and steel manufacturing facilities),
  • Subpart IIIII (mercury cell chlor-alkali plants),
  • Subpart LLLLL (asphalt processing and roofing manufacturing),
  • Subpart YYYYY (area source electric arc furnace steelmaking facilities),
  • Subpart JJJJJJ (area source boilers), and
  • Subpart EEEEEEE (area source gold mine ore processing and production ).

Implications for reclassified facilities

• Continued compliance: Facilities that have already reclassified from major to area source status and fall under one of the listed subparts will need to continue to comply with the associated maximum achievable control technology (MACT) requirements, including monitoring, recordkeeping, testing, and reporting. MACT standards are performance criteria that apply to major sources.

• Potential challenges: Reclassification may have been a strategy to reduce regulatory burden. However, the new limitations could increase the compliance costs and operational challenges for affected facilities.

Exemptions and uncertainties

• Stationary combustion turbines: The NESHAP for stationary combustion turbines isn’t included in the list of affected subparts, providing some relief for facilities using this technology.

• Retroactive applicability: The final rule doesn’t specifically address whether the effective date of reclassification is the revised permit, notification to EPA or date of change in potential emissions. This uncertainty could impact facilities that have recently reclassified.

Overall, the new reclassification limitations will have significant implications for facilities operating under the affected NESHAP subparts. It’s essential for affected facilities to carefully review the specific requirements and consider the potential impacts on their operations.

Key to remember: EPA finalized requirements for sources that reclassify from major source status to area source status under the National Emission Standards for Hazardous Air Pollutants (NESHAP) program. Sources subject to certain major source NESHAPs for seven specific pollutants must remain subject to those NESHAPs even if the sources reclassify to area source status.

Reclassifying facilities must keep stricter emission standards for 7 HAPs
2024-09-16T05:00:00Z

Reclassifying facilities must keep stricter emission standards for 7 HAPs

A final rule issued by the Environmental Protection Agency (EPA) in September 2024 requires facilities that reclassify from major to area source status under the National Emission Standards for Hazardous Air Pollutants (NESHAP) program to continue to meet the major source emission standards for seven persistent and bioaccumulative hazardous air pollutants (HAPs).

Who does this impact?

The final rule applies to facilities subject to any of the seven major source NESHAPs that reclassify from major to area source status. The major and area source categories differ based on the emissions and/or potential to emit (PTE) certain hazardous air pollutants. Major sources emit or have the PTE:

  • 10+ tons per year of one HAP, or
  • 25+ tons per year of a combination of HAPs.

Area sources are facilities with actual and/or potential emissions below these thresholds.

Which HAPs are affected?

The final rule targets seven HAPs:

  • Alkylated lead compounds,
  • Hexachlorobenzene,
  • Mercury,
  • Polychlorinated biphenyls (or PCBs),
  • Polycyclic organic matter (or POM),
  • 2,3,7,8-tetrachlorodibenzofurans (or TCDR), and
  • 2,3,7,8-tetrachlorodibenzo-p-dioxin (or TCDD).

What are the notification changes?

The final rule also made minor adjustments to the reclassification notification requirements. Specifically, the agency clarifies that facilities must:

  • Submit reclassification applications electronically through the Compliance and Emissions Data Reporting Interface on EPA’s Central Data Exchange, and
  • Include the required information listed at 40 CFR 63.9(j)(1)–(4).

EPA also added electronic submission procedures for confidential business information.

Key to remember: Facilities that reclassify from major to area source status under EPA’s NESHAP program must continue complying with the major source emission standards for seven hazardous air pollutants.

Guide to underground storage tank financial requirements
2024-09-13T05:00:00Z

Guide to underground storage tank financial requirements

With great hazards comes great financial responsibility. This certainly applies to owners and operators of underground storage tanks (USTs). The Environmental Protection Agency (EPA) requires most UST owners or operators to show that they have the financial resources to take corrective actions should an accidental leak happen.

Federal regulations aim to prevent potential releases from USTs. When a UST leaks, the substance can leach into the soil and contaminate groundwater, which supplies drinking water for nearly half of Americans. Leaks also pose risks of fire and explosions. With funds prepared in advance, owners and operators can start cleanups sooner and, therefore, reduce the risk of harm to human health and the environment.

Who’s covered, and what’s covered?

The financial responsibility regulations (40 CFR Part 280 Subpart H) apply to owners or operators of USTs that store petroleum. Owners or operators must show that they have the financial ability to pay for:

  • Cleanup costs,
  • Corrective actions to address environmental damage, and
  • Third-party injuries and property damage.

If the owner and operator are different individuals, it’s up to the organization to decide whether the owner or operator demonstrates financial responsibility. However, it’s important to note that both parties are liable for noncompliance.

What’s the amount of coverage required?

The amount of financial coverage required depends on your type of business, the throughput (i.e., the volume of petroleum loaded into or dispensed from the tank), and the number of USTs.

Type of business

EPA categorizes the types of businesses into two groups:

  • Petroleum producers, refiners, and marketers (i.e., those who sell gasoline to the public, like service stations); and
  • Nonmarketers (i.e., those who use petroleum only for internal operations, such as fleet operators).

Owners or operators must have both per-occurrence coverage (the total cost of one leak) and annual aggregate coverage (the total cost of all leaks that might occur in a year).

Throughput

A UST’s throughput determines the per-occurrence coverage:

  • Regardless of throughput, petroleum producers, refiners, and marketers must have $1 million of per-occurrence coverage.
  • Nonmarketers must have $500,000 of per-occurrence coverage if monthly throughput is 10,000 gallons or less. If monthly throughput exceeds 10,000 gallons, nonmarketers must have $1 million of per-occurrence coverage.

Number of USTs

The same thresholds for aggregate coverage apply to both types of businesses:

  • Owners or operators must have $1 million in aggregate coverage if they have no more than 100 USTs.
  • Owners or operators must have $2 million in aggregate coverage if they have more than 100 USTs.

What are the methods for demonstrating financial responsibility?

Owners or operators may show their financial responsibility through one or a combination of the methods detailed at 280.95–280.103. The method(s) you choose must cover all costs (cleanup, corrective actions, and third-party liability) and meet the required coverage amount.

The table lists the top advantages and disadvantages to consider for each method.

UST financial responsibility methods
MethodProCon
Financial testsLeverage existing assets without incurring extra costsRequires tangible net worth of at least $10 million
GuaranteesLeverage existing business relationship with another firmProvider must pass a financial test
Insurance and risk retention group coverage Expand existing insurance policyRequires additional costs (premiums, deductibles, etc.)
Surety bondsTypically, more cost-effective (requires minimum premium payment)May have to pay back the full bond amount as well as interest and fees
Letters of creditCustomizable terms and conditionsRequires additional costs (namely, service fees)
State fund or other state assurancesFinancial help for cleanup and third-party liability costsMay cover only part of the costs or require a deductible
Trust fundsCustomizable terms and conditionsGenerally, must pay the full aggregate amount upfront and additional costs (fees, taxes, etc.)
Standby trust fundsTypically, don’t have to pay upfront to establish the fundRequires additional costs to run the trust
*State-required methods*You may use any state-required methods approved by the regional administrator.

What happens if a financial assurer cancels my coverage?

Financial assurance providers may cancel or not renew your assurance. EPA requires assurers to notify the UST owner or operator before terminating coverage:

  • Insurance or risk retention coverage (except for nonpayment or misrepresentation) and state-funded assurance may not stop until at least 60 days after notification.
  • Guarantees, surety bonds, and letters of credit may not stop until at least 120 days after notification.

Generally, you must establish alternate coverage within 60 days of learning that your financial assurer will stop coverage.

Check your state’s regulations!

The regulations for tanks in a state with EPA approval to implement a state UST program may differ from federal rules. USTs in a state without EPA state program approval are subject to federal and state requirements.

Key to remember: EPA regulations require underground storage tank owners or operators to prove they can cover the financial costs of an accidental leak.

See More
New Network Poll
​What is the most effective step you take to help curb FMLA leave abuse?

​What is the most effective step you take to help curb FMLA leave abuse?


No active poll
Please come back soon!
See More
See More
See More
See More
Saved to my EVENT CALENDAR!
View your saved links by clicking the arrow next to your profile picture located in the header. Then, click “My Activity” to view the Event Calendar on your Activity page.