- Key definitions for the steel erection industry are found in this section.
Column: A load-carrying vertical member that is part of the primary skeletal framing system. Columns do not include posts.
Competent person: One who is capable of identifying existing and predictable hazards in the surroundings or working conditions that are unsanitary, hazardous, or dangerous to employees, and who has authorization to take prompt corrective measures to eliminate them.
Controlling contractor: A prime contractor, general contractor, construction manager or any other legal entity which has the overall responsibility for the construction of the project — its planning, quality and completion.
Multiple lift rigging: A rigging assembly manufactured by wire rope rigging suppliers that facilitates the attachment of up to five independent loads to the hoist rigging of a crane.
Opening: A gap or void 12 inches (30.5 cm) or more in its least dimension in a floor, roof or other walking/working surface. For the purposes of this subpart, skylights and smoke domes that do not meet the strength requirements of 1926.754(e)(3) shall be regarded as openings.
Multiple lift rigging: A rigging assembly manufactured by wire rope rigging suppliers that facilitates the attachment of up to five independent loads to the hoist rigging of a crane.
Qualified person: One who, by possession of a recognized degree, certificate, or professional standing, or who by extensive knowledge, training, and experience, has successfully demonstrated the ability to solve or resolve problems relating to the subject matter, the work, or the project.