
Be Part of the Ultimate Safety & Compliance Community
Trending news, knowledge-building content, and more – all personalized to you!
SUMMARY:
In this final rule, the Department of Labor (Department or DOL) updates regulations issued under the Davis-Bacon and Related Acts. As the first comprehensive regulatory review in nearly 40 years, revisions to these regulations will promote compliance, provide appropriate and updated guidance, and enhance their usefulness in the modern economy.
DATES:Effective date: This final rule is effective on October 23, 2023, published in the Federal Register August 23, 2023, page 57526.
View final rule.
Part 1-Procedures for predetermination of wage rates | ||
Authority | Revised | View text |
§1.1 Purpose and scope | ||
(a), (b) | Revised | View text |
§1.2 Definitions. | ||
Entire section | Revised | View text |
§1.3 Obtaining and compiling wage rate information. | ||
Entire section | Revised | View text |
§1.4 Report of agency construction programs. | ||
Entire section | Revised | View text |
§1.5 Publication of general wage determinations and procedure for requesting project wage determinations. | ||
Entire section | Revised | View text |
§1.6 Use and effectiveness of wage determinations. | ||
Entire section | Revised | View text |
§1.7 Scope of consideration. | ||
Entire section | Revised | View text |
§1.8 Reconsideration by the Administrator. | ||
Entire section | Revised | View text |
§1.10 Severability. | ||
Entire section | Added | View text |
Appendix A to Part 1 | ||
Entire appendix | Removed | View text |
Appendix B to Part 1 | ||
Entire appendix | Removed | View text |
§3.1 Purpose and scope. | ||
Entire section | Revised | View text |
§3.2 Definitions. | ||
Entire section | Revised | View text |
§3.3 Certified payrolls. | ||
Entire section | Revised | View text |
§3.4 Submission of certified payroll and the preservation and inspection of weekly payroll records. | ||
Entire section | Revised | View text |
§3.5 Payroll deductions permissible without application to or approval of the Secretary of Labor. | ||
Entire section | Revised | View text |
§3.7 Applications for the approval of the Secretary of Labor. | ||
Revised | View text | |
§3.8 Action by the Secretary of Labor upon applications. | ||
Revised | View text | |
§3.11 Regulations part of contract. | ||
Entire section | Revised | View text |
Part 5-Labor standards provisions applicable to contracts covering federally financed and assisted construction (also labor standards provisions applicable to nonconstruction | ||
Authority | Revised | View text |
§5.1 Purpose and scope. | ||
Entire section | Revised | View text |
§5.2 Definitions. | ||
Entire section | Revised | View text |
§5.5 Contract provisions and related matters. | ||
Entire section | Revised | View text |
§5.6 Enforcement | ||
Entire section | Revised | View text |
§5.7 Reports to the Secretary of Labor. | ||
(a) | Revised | View text |
§5.9 Suspension of funds. | ||
Entire section | Revised | View text |
§5.10 Restitution, criminal action. | ||
Entire section | Revised | View text |
§5.11 Disputes concerning payment of wages. | ||
Entire section | Revised | View text |
§5.12 Debarment proceedings. | ||
Entire section | Revised | View text |
§5.13 Rulings and interpretations. | ||
Entire section | Revised | View text |
§5.15 Limitations, variations, tolerances, and exemptions under the Contract Work Hours and Safety Standards Act. | ||
(c)(4) | Revised | View text |
(d)(1) | Revised | View text |
§5.16 Training plans approved or recognized by the Department of Labor prior to August 20, 1975. | ||
Entire section | Removed | View text |
§5.17 Withdrawal of approval of a training program. | ||
Entire section | Removed | View text |
§5.18 Remedies for retaliation. | ||
Entire section | Added | View text |
§5.20 Scope and significance of this subpart. | ||
Entire section | Revised | View text |
§5.22 Effect of the Davis-Bacon fringe benefits provisions | ||
Entire section | Revised | View text |
§5.23 The statutory provisions. | ||
Entire section | Revised | View text |
§5.25 Rate of contribution or cost for fringe benefits. | ||
(c) | Added | View text |
§5.26 “* * * contribution irrevocably made * * * to a trustee or to a third person”. | ||
Entire section | Revised | View text |
§5.28 Unfunded plans. | ||
Entire section | Revised | View text |
§5.29 Specific fringe benefits. | ||
(e) | Revised | View text |
(g) | Revised | View text |
§5.30 Types of wage determinations. | ||
Entire section | Revised | View text |
§5.31 Meeting wage determination obligations. | ||
Entire section | Revised | View text |
§5.33 Administrative expenses of a contractor or subcontractor. | ||
Entire section | Added | View text |
§5.40 Severability. | ||
Entire section | Revised | View text |
New Text
Part 1-Procedures for predetermination of wage rates
Authority: 5 U.S.C. 301; Reorganization Plan No. 14 of 1950, 5 U.S.C. appendix; 40 U.S.C. 3141 et seq.; 40 U.S.C. 3145; 40 U.S.C. 3148; Secretary of Labor’s Order 01-2014, 79 FR 77527; and the laws referenced by 29 CFR 5.1.
§1.1 Purpose and scope
(a) The procedural rules in this part apply under the Davis-Bacon Act (46 Stat. 1494, as amended; 40 U.S.C. 3141 et seq.), and any laws now existing or subsequently enacted, which require the payment of minimum wages, including fringe benefits, to laborers and mechanics engaged in construction activity under contracts entered into or financed by or with the assistance of agencies of the United States or the District of Columbia, based on determinations by the Secretary of Labor of the wage rates and fringe benefits prevailing for the corresponding classes of laborers and mechanics employed on projects similar to the contract work in the local areas where such work is to be performed.
(1) A listing of laws requiring the payment of wages at rates predetermined by the Secretary of Labor under the Davis-Bacon Act can be found at www.dol.gov/agencies/whd/government-contracts or its successor website.
(2) Functions of the Secretary of Labor under these statutes and under Reorganization Plan No. 14 of 1950 (15 FR 3176, effective May 24, 1950, reprinted as amended in 5 U.S.C. app. 1 and in 64 Stat. 1267), except for functions assigned to the Office of Administrative Law Judges (see part 6 of this subtitle) and appellate functions assigned to the Administrative Review Board (see part 7 of this subtitle) or reserved by the Secretary of Labor (see Secretary’s Order 01-2020 (Feb. 21, 2020)), have been delegated to the Administrator of the Wage and Hour Division and authorized representatives.
(b) The regulations in this part set forth the procedures for making and applying such determinations of prevailing wage rates and fringe benefits pursuant to the Davis-Bacon Act and any laws now existing or subsequently enacted providing for determinations of such wages by the Secretary of Labor in accordance with the provisions of the Davis-Bacon Act.
§1.2 Definitions.
Administrator. The term “Administrator” means the Administrator of the Wage and Hour Division, U.S. Department of Labor, or authorized representative.
Agency. The term “agency” means any Federal, State, or local agency or instrumentality, or other similar entity, that enters into a contract or provides assistance through loan, grant, loan guarantee or insurance, or otherwise, to a project subject to the Davis-Bacon labor standards, as defined in §5.2 of this subtitle.
(1) Federal agency. The term “Federal agency” means an agency or instrumentality of the United States or the District of Columbia, as defined in this section, that enters into a contract or provides assistance through loan, grant, loan guarantee or insurance, or otherwise, to a project subject to the Davis-Bacon labor standards.
(2) [Reserved]
Area. The term “area” means the city, town, village, county or other civil subdivision of the State in which the work is to be performed.
(1) For highway projects, the area may be State department of transportation highway districts or other similar State geographic subdivisions.
(2) Where a project requires work in multiple counties, the area may include all counties in which the work will be performed.
Department of Labor-approved website for wage determinations (DOL-approved website). The term “Department of Labor-approved website for wage determinations” means the government website for both Davis-Bacon Act and Service Contract Act wage determinations. In addition, the DOL-approved website provides compliance assistance information. The term will also apply to any other website or electronic means that the Department of Labor may approve for these purposes.
Employed. Every person performing the duties of a laborer or mechanic in the construction, prosecution, completion, or repair of a public building or public work, or building or work financed in whole or in part by assistance from the United States through loan, grant, loan guarantee or insurance, or otherwise, is employed regardless of any contractual relationship alleged to exist between the contractor and such person.
Prevailing wage. The term “prevailing wage” means:
(1) The wage paid to the majority (more than 50 percent) of the laborers or mechanics in the classification on similar projects in the area during the period in question;
(2) If the same wage is not paid to a majority of those employed in the classification, the prevailing wage will be the wage paid to the greatest number, provided that such greatest number constitutes at least 30 percent of those employed; or
(3) If no wage rate is paid to 30 percent or more of those so employed, the prevailing wage will be the average of the wages paid to those employed in the classification, weighted by the total employed in the classification.
Type of construction (or construction type). The term “type of construction (or construction type)” means the general category of construction, as established by the Administrator, for the publication of general wage determinations. Types of construction may include, but are not limited to, building, residential, heavy, and highway. As used in this part, the terms “type of construction” and “construction type” are synonymous and interchangeable.
United States or the District of Columbia. The term “United States or the District of Columbia” means the United States, the District of Columbia, and all executive departments, independent establishments, administrative agencies, and instrumentalities of the United States and of the District of Columbia, and any corporation for which all or substantially all of the stock of which is beneficially owned by the United States, by the District of Columbia, or any of the foregoing departments, establishments, agencies, and instrumentalities.
§1.3 Obtaining and compiling wage rate information.
For the purpose of making wage determinations, the Administrator will conduct a continuing program for the obtaining and compiling of wage rate information. In determining the prevailing wages at the time of issuance of a wage determination, the Administrator will be guided by the definition of prevailing wage in a and will consider the types of information listed in this section.
(a) The Administrator will encourage the voluntary submission of wage rate data by contractors, contractors’ associations, labor organizations, public officials and other interested parties, reflecting wage rates paid to laborers and mechanics on various types of construction in the area. The Administrator may also obtain data from agencies on wage rates paid on construction projects under their jurisdiction. The information submitted should reflect the wage rates paid to workers employed in a particular classification in an area, the type or types of construction on which such rate or rates are paid, and whether or not such wage rates were paid on Federal or federally assisted projects subject to Davis-Bacon prevailing wage requirements.
(b) The following types of information may be considered in making wage rate determinations:
(1) Statements showing wage rates paid on projects, including the names and addresses of contractors, including subcontractors; the locations, approximate costs, dates of construction and types of projects, as well as whether or not the projects are Federal or federally assisted projects subject to Davis-Bacon prevailing wage requirements; and the number of workers employed in each classification on each project and the respective wage rates paid such workers.
(2) Signed collective bargaining agreements, for which the Administrator may request that the parties to such agreements submit statements certifying to their scope and application.
(3) Wage rates determined for public construction by State and local officials pursuant to State and local prevailing wage legislation.
(4) Wage rate data submitted to the Department of Labor by contracting agencies pursuant to §5.5(a)(1)(iii) of this subtitle.
(5) For Federal-aid highway projects under 23 U.S.C. 113, information obtained from the highway department(s) of the State(s) in which the project is to be performed. For such projects, the Administrator must consult the relevant State highway department and give due regard to the information thus obtained.
(6) Any other information pertinent to the determination of prevailing wage rates.
(c) The Administrator may initially obtain or supplement such information obtained on a voluntary basis by such means, including the holding of hearings, and from any sources determined to be necessary. All information of the types described in paragraph (b) of this section, pertinent to the determination of the wages prevailing at the time of issuance of the wage determination, will be evaluated in light of the definition of prevailing wage in §1.2.
(d) In compiling wage rate data for building and residential wage determinations, the Administrator will not use data from Federal or federally assisted projects subject to DavisBacon prevailing wage requirements unless it is determined that there is insufficient wage data to determine the prevailing wages in the absence of such data. Data from Federal or federally assisted projects will be used in compiling wage rate data for heavy and highway wage determinations.
(e) In determining the prevailing wage, the Administrator may treat variable wage rates paid by a contractor or contractors to workers within the same classification as the same wage where the pay rates are functionally equivalent, as explained by one or more collective bargaining agreements or written policies otherwise maintained by a contractor or contractors.
(f) If the Administrator determines that there is insufficient wage survey data to determine the prevailing wage for a classification for which conformance requests are regularly submitted pursuant to §5.5(a)(1)(iii) of this subtitle, the Administrator may list the classification and wage and fringe benefit rates for the classification on the wage determination, provided that:
(1) The work performed by the classification is not performed by a classification in the wage determination;
(2) The classification is used in the area by the construction industry; and (3) The wage rate for the classification bears a reasonable relationship to the wage rates contained in the wage determination.
(g) Under the circumstances described in paragraph (h) of this section, the Administrator may make a wage determination by adopting, with or without modification, one or more prevailing wage rates determined for public construction by State and/or local officials. Provided that the conditions in paragraph (h) are met, the Administrator may do so even if the methods and criteria used by State or local officials differ in some respects from those that the Administrator would otherwise use under the Davis-Bacon Act and the regulations in this part. Such differences may include, but are not limited to, a definition of prevailing wage under a State or local prevailing wage law or regulation that differs from the definition in §1.2, a geographic area or scope that differs from the standards in §1.7, and/or the restrictions on data use in paragraph (d) of this section.
(h) The Administrator may adopt a State or local wage rate as described in paragraph (g) of this section if the Administrator, after reviewing the rate and the processes used to derive the rate, determines that:
(1) The State or local government sets wage rates, and collects relevant data, using a survey or other process that is open to full participation by all interested parties;
(2) The wage rate reflects both a basic hourly rate of pay as well as any prevailing fringe benefits, each of which can be calculated separately;
(3) The State or local government classifies laborers and mechanics in a manner that is recognized within the field of construction; and
(4) The State or local government’s criteria for setting prevailing wage rates are substantially similar to those the Administrator uses in making wage determinations under this part. This determination will be based on the totality of the circumstances, including, but not limited to, the State or local government’s definition of prevailing wage; the types of fringe benefits it accepts; the information it solicits from interested parties; its classification of construction projects, laborers, and mechanics; and its method for determining the appropriate geographic area(s).
(i) In order to adopt wage rates of a State or local government entity pursuant to paragraphs (g) and (h) of this section, the Administrator must obtain the wage rates and any relevant supporting documentation and data from the State or local government entity. Such information may be submitted via email to dba.statelocalwagerates@dol.gov, via mail to U.S. Department of Labor, Wage and Hour Division, Branch of Wage Surveys, 200 Constitution Avenue NW, Washington, DC 20210, or through other means directed by the Administrator.
(j) Nothing in paragraphs (g), (h), and (i) of this section precludes the Administrator from otherwise considering State or local prevailing wage rates, consistent with paragraph (b)(3) of this section, or from giving due regard to information obtained from State highway departments, consistent with paragraph (b)(4) of this section, as part of the Administrator’s process of making prevailing wage determinations under this part.
§1.4 Report of agency construction programs.
On an annual basis, each Federal agency using wage determinations under the DavisBacon Act or any of the laws referenced by §5.1 of this subtitle, must furnish the Administrator with a report that contains a general outline of its proposed construction programs for the upcoming 3 fiscal years based on information in the Federal agency’s possession at the time it furnishes its report. This report must include a list of proposed projects (including those for which options to extend the contract term of an existing construction contract are expected during the period covered by the report); the estimated start date of construction; the anticipated type or types of construction; the estimated cost of construction; the location or locations of construction; and any other project-specific information that the Administrator requests. The report must also include notification of any significant changes to previously reported construction programs, such as the delay or cancellation of previously reported projects. Reports must be submitted no later than April 10 of each year by email to DavisBaconFedPlan@dol.gov, and must include the name, telephone number, and email address of the official responsible for coordinating the submission
§1.5 Publication of general wage determinations and procedure for requesting project wage determinations.
(a) General wage determinations. A “general wage determination” contains, among other information, a list of wage and fringe benefit rates determined to be prevailing for various classifications of laborers or mechanics for specified type(s) of construction in a given area. The Department of Labor publishes “general wage determinations” under the Davis-Bacon Act on the DOL-approved website.
(b) Project wage determinations. (1) A “project wage determination” is specific to a particular project. An agency may request a “project wage determination” for an individual project under any of the following circumstances:
(i) The project involves work in more than one county and will employ workers who may work in more than one county;
(ii) There is no general wage determination in effect for the relevant area and type(s) of construction for an upcoming project, or
(iii) All or virtually all of the work on a contract will be performed by a classification that is not listed in the general wage determination that would otherwise apply, and contract award (or bid opening, in contracts entered into using sealed bidding procedures) has not yet taken place.
(2) To request a project wage determination, the agency must submit Standard Form (SF) 308, Request for Wage Determination and Response to Request, to the Department of Labor, either by mailing the form to U.S. Department of Labor, Wage and Hour Division, Branch of Construction Wage Determinations, Washington, DC 20210, or by submitting the form through other means directed by the Administrator.
(3) In completing Form SF-308, the agency must include the following information:
(i) A sufficiently detailed description of the work to indicate the type(s) of construction involved, as well as any additional description or separate attachment, if necessary, for identification of the type(s) of work to be performed. If the project involves multiple types of construction, the requesting agency must attach information indicating the expected cost breakdown by type of construction.
(ii) The location (city, county, state, zip code) or locations in which the proposed project is located.
(iii) The classifications needed for the project. The agency must identify only those classifications that will be needed in the performance of the work. Inserting a note such as “entire schedule” or “all applicable classifications” is not sufficient. Additional classifications needed that are not on the form may be typed in the blank spaces or on a separate list and attached to the form.
(iv) Any other information requested in Form SF-308.
(4) A request for a project wage determination must be accompanied by any pertinent wage information that may be available. When the requesting agency is a State highway department under the Federal-Aid Highway Acts as codified in 23 U.S.C. 113, such agency must also include its recommendations as to the wages which are prevailing for each classification of laborers and mechanics on similar construction in the area.
(5) The time required for processing requests for project wage determinations varies according to the facts and circumstances in each case. An agency should anticipate that such processing by the Department of Labor will take at least 30 days.
§1.6 Use and effectiveness of wage determinations.
(a) Application, validity, and expiration of wage determinations—(1) Application of incorporated wage determinations. Once a wage determination is incorporated into a contract (or once construction has started when there is no contract award), the wage determination generally applies for the duration of the contract or project, except as specified in this section.
(2) General wage determinations. (i) “General wage determinations” published on the DOL-approved website contain no expiration date. Once issued, a general wage determination remains valid until revised, superseded, or canceled.
(ii) If there is a current general wage determination applicable to a project, an agency may use it without notifying the Administrator, Provided that questions concerning its use are referred to the Administrator in accordance with paragraph (b) of this section.
(iii) When a wage determination is revised, superseded, or canceled, it becomes inactive. Inactive wage determinations may be accessed on the DOL-approved website for informational purposes only. Contracting officers may not use such an inactive wage determination in a contract action unless the inactive wage determination is the appropriate wage determination that must be incorporated to give retroactive effect to the post-award incorporation of a contract clause under §5.6(a)(1)(ii) of this subtitle or a wage determination under paragraph (f) of this section. Under such circumstances, the agency must provide prior notice to the Administrator of its intent to incorporate an inactive wage determination and may not incorporate it if the Administrator instructs otherwise.
(3) Project wage determinations. (i) “Project wage determinations” initially issued will be effective for 180 calendar days from the date of such determinations. If a project wage determination is not incorporated into a contract (or, if there is no contract award, if construction has not started) in the period of its effectiveness it is void.
(ii) Accordingly, if it appears that a project wage determination may expire between bid opening and contract award (or between initial endorsement under the National Housing Act or the execution of an agreement to enter into a housing assistance payments contract under section 8 of the U.S. Housing Act of 1937, and the start of construction) the agency must request a new project wage determination sufficiently in advance of the bid opening to assure receipt prior thereto.
(iii) However, when due to unavoidable circumstances a project wage determination expires before award but after bid opening (or before the start of construction, but after initial endorsement under the National Housing Act, or before the start of construction but after the execution of an agreement to enter into a housing assistance payments contract under section 8 of the U.S. Housing Act of 1937), the head of the agency or the agency head’s designee may request the Administrator to extend the expiration date of the project wage determination in the bid specifications instead of issuing a new project wage determination. Such request must be supported by a written finding, which must include a brief statement of factual support, that the extension of the expiration date of the project wage determination is necessary and proper in the public interest to prevent injustice or undue hardship or to avoid serious impairment in the conduct of Government business. The Administrator will either grant or deny the request for an extension after consideration of all of the circumstances, including an examination to determine if the previously issued rates remain prevailing. If the request for extension is denied, the Administrator will proceed to issue a new wage determination for the project.
(b) Identifying and incorporating appropriate wage determinations. (1) Contracting agencies are responsible for making the initial determination of the appropriate wage determination(s) for a project and for ensuring that the appropriate wage determination(s) are incorporated in bid solicitations and contract specifications and that inapplicable wage determinations are not incorporated. When a contract involves construction in more than one area, and no multi-county project wage determination has been obtained, the solicitation and contract must incorporate the applicable wage determination for each area. When a contract involves more than one type of construction, the solicitation and contract must incorporate the applicable wage determination for each type of construction involved that is anticipated to be substantial. The contracting agency is responsible for designating the specific work to which each incorporated wage determination applies.
(2) The contractor or subcontractor has an affirmative obligation to ensure that its pay practices are in compliance with the Davis-Bacon Act labor standards.
(3) Any question regarding application of wage rate schedules or wage determinations must be referred to the Administrator for resolution. The Administrator should consider any relevant factors when resolving such questions, including, but not limited to, relevant area practice information.
(c) Revisions to wage determinations. (1) General and project wage determinations may be revised from time to time to keep them current. A revised wage determination replaces the previous wage determination. “Revisions,” as used in this section, refers both to modifications of some or all of the rates in a wage determination, such as periodic updates to reflect current rates, and to instances where a wage determination is re-issued entirely, such as after a new wage survey is conducted. Revisions include adjustments to non-collectively bargained prevailing wage and fringe benefit rates on general wage determinations, with the adjustments based on U.S. Bureau of Labor Statistics Employment Cost Index (ECI) data or its successor data. Such rates may be adjusted based on ECI data no more frequently than once every 3 years, and no sooner than 3 years after the date of the rate’s publication. Such periodic revisions to wage determinations are distinguished from the circumstances described in paragraphs (d), (e), and (f) of this section.
(2)(i) Whether a revised wage determination is effective with respect to a particular contract or project generally depends on the date on which the revised wage determination is issued. The date on which a revised wage determination is “issued,” as used in this section, means the date that a revised general wage determination is published on the DOL-approved website or the date that the contracting agency receives actual written notice of a revised project wage determination.
(ii) If a revised wage determination is issued before contract award (or the start of construction when there is no award), it is effective with respect to the project, except as follows:
(A) For contracts entered into pursuant to sealed bidding procedures, a revised wage determination issued at least 10 calendar days before the opening of bids is effective with respect to the solicitation and contract. If a revised wage determination is issued less than 10 calendar days before the opening of bids, it is effective with respect to the solicitation and contract unless the agency finds that there is not a reasonable time still available before bid opening to notify bidders of the revision and a report of the finding is inserted in the contract file. A copy of such report must be made available to the Administrator upon request. No such report is required if the revision is issued after bid opening.
(B) In the case of projects assisted under the National Housing Act, a revised wage determination is effective with respect to the project if it is issued prior to the beginning of construction or the date the mortgage is initially endorsed, whichever occurs first.
(C) In the case of projects to receive housing assistance payments under section 8 of the U.S. Housing Act of 1937, a revised wage determination is effective with respect to the project if it is issued prior to the beginning of construction or the date the agreement to enter into a housing assistance payments contract is signed, whichever occurs first.
(D) If, in the case of a contract entered into pursuant to sealed bidding procedures under paragraph (c)(2)(ii)(A) of this section the contract has not been awarded within 90 days after bid opening, or if, in the case of projects assisted under the National Housing Act or receiving housing assistance payments section 8 of the U.S. Housing Act of 1937 under paragraph (c)(2)(ii)(B) or (C) of this section, construction has not begun within 90 days after initial endorsement or the signing of the agreement to enter into a housing assistance payments contract, any revised general wage determination issued prior to award of the contract or the beginning of construction, as appropriate, is effective with respect to that contract unless the head of the agency or the agency head’s designee requests and obtains an extension of the 90-day period from the Administrator. Such request must be supported by a written finding, which includes a brief statement of the factual support, that the extension is necessary and proper in the public interest to prevent injustice or undue hardship or to avoid serious impairment in the conduct of Government business. The Administrator will either grant or deny the request for an extension after consideration of all the circumstances.
(iii) If a revised wage determination is issued after contract award (or after the beginning of construction where there is no contract award), it is not effective with respect to that project, except under the following circumstances:
(A) Where a contract or order is changed to include additional, substantial construction, alteration, and/or repair work not within the scope of work of the original contract or order, or to require the contractor to perform work for an additional time period not originally obligated, including where an option to extend the term of a contract is exercised, the contracting agency must include the most recent revision of any wage determination(s) at the time the contract is changed or the option is exercised. This does not apply where the contractor is simply given additional time to complete its original commitment or where the additional construction, alteration, and/or repair work in the modification is merely incidental.
(B) Some contracts call for construction, alteration, and/or repair work over a period of time that is not tied to the completion of any particular project. Examples of such contracts include, but are not limited to, indefinite-delivery-indefinite-quantity construction contracts to perform any necessary repairs to a Federal facility over a period of time; long-term operationsand-maintenance contracts that may include construction, alteration, and/or repair work covered by Davis-Bacon labor standards; or schedule contracts or blanket purchase agreements in which a contractor agrees to provide certain construction work at agreed-upon prices to Federal agencies. These types of contracts often involve a general commitment to perform necessary construction as the need arises, but do not necessarily specify the exact construction to be performed. For the types of contracts described here, the contracting agency must incorporate into the contract the most recent revision(s) of any applicable wage determination(s) on each anniversary date of the contract’s award (or each anniversary date of the beginning of construction when there is no award) unless the agency has sought and received prior written approval from the Department for an alternative process. The Department may grant such an exception when it is necessary and proper in the public interest or to prevent injustice and undue hardship. Such revised wage determination(s) will apply to any construction work that begins or is obligated under such a contract during the 12 months following that anniversary date until such construction work is completed, even if the completion of that work extends beyond the twelve-month period. Where such contracts have task orders, purchase orders, or other similar contract instruments awarded under the master contract, the master contract must specify that the applicable updated wage determination must be included in such task orders, purchase orders, or other similar contract instrument, and the ordering agency must so incorporate the applicable updated wage determinations into their orders. Once the applicable updated wage determination revision has been incorporated into such task orders, purchase orders, or other similar contract instruments, that wage determination revision remains applicable for the duration of such order, unless the order is changed to include additional, substantial construction, alteration, and/or repair work not within the scope of work, when the wage determination must be updated as set forth in paragraph (c)(2)(iii)(A) of this section, or the order itself includes the exercise of options. Where such orders do include the exercise of options, updated applicable wage determination revision, as incorporated into the master contract must be included when an option is exercised on such an order.
(C) For contracts to which both paragraphs (c)(2)(iii)(A) and (B) of this section apply, updated wage determinations must be incorporated pursuant to the requirements of both paragraphs. For example, if a contract calls for construction, alteration, and/or repair work over a period of time that is not tied to the completion of any particular project and also has an option provision to extend the contract’s term, the most recent revision(s) of any applicable wage determination(s) must be incorporated any time an option is exercised, as described in paragraph (c)(2)(iii)(A) of this section, and on the contract anniversary date, as described in paragraph (c)(2)(iii)(B) of this section. However, when a contract has been changed as described in paragraph (c)(2)(iii)(A) of this section, including by the exercise of an option, the date of that modification will be considered the contract anniversary date for the purpose of annually updating the wage determination(s) in accordance with paragraph (c)(2)(iii)(B) of this section for that year and any subsequent years of contract performance.
(d) Corrections for clerical errors. Upon the Administrator’s own initiative or at the request of an agency, the Administrator may correct any wage determination, without regard to paragraph (a) or (c) of this section, whenever the Administrator finds that it contains clerical errors. Such corrections must be included in any solicitations, bidding documents, or ongoing contracts containing the wage determination in question, and such inclusion, and application of the correction(s), must be retroactive to the start of construction if construction has begun.
(e) Pre-award determinations that a wage determination may not be used. A wage determination may not be used for a contract, without regard to whether bid opening (or initial endorsement or the signing of a housing assistance payments contract) has occurred, if, prior to the award of a contract (or the start of construction under the National Housing Act, under section 8 of the U.S. Housing Act of 1937, or where there is no contract award), the Administrator provides written notice that:
(1) The wrong wage determination or the wrong schedule was included in the bidding documents or solicitation; or
(2) A wage determination included in the bidding documents or solicitation was withdrawn by the Department of Labor as a result of a decision by the Administrative Review Board.
(f) Post-award determinations and procedures. (1) If a contract subject to the labor standards provisions of the laws referenced by §5.1 of this subtitle is entered into without the correct wage determination(s), the agency must, upon the request of the Administrator or upon its own initiative, incorporate the correct wage determination into the contract or require its incorporation. Where the agency is not entering directly into such a contract but instead is providing Federal financial assistance, the agency must ensure that the recipient or sub-recipient of the Federal assistance similarly incorporates the correct wage determination(s) into its contracts.
(2) The Administrator may require the agency to incorporate a wage determination after contract award or after the beginning of construction if the agency has failed to incorporate a wage determination in a contract required to contain prevailing wage rates determined in accordance with the Davis-Bacon Act or has used a wage determination which by its terms or the provisions of this part clearly does not apply to the contract. Further, the Administrator may require the application of the correct wage determination to a contract after contract award or after the beginning of construction when it is found that the wrong wage determination has been incorporated in the contract because of an inaccurate description of the project or its location in the agency’s request for the wage determination.
(3) Under any of the circumstances described in paragraphs (f)(1) and (2) of this section, the agency must either terminate and resolicit the contract with the correct wage determination or incorporate the correct wage determination into the contract (or ensure it is so incorporated) through supplemental agreement, change order, or any other authority that may be needed. The method of incorporation of the correct wage determination, and adjustment in contract price, where appropriate, should be in accordance with applicable law. Additionally, the following requirements apply:
(i) Unless the Administrator directs otherwise, the incorporation of the correct wage determination(s) must be retroactive to the date of contract award or start of construction if there is no award.
(ii) If incorporation occurs as the result of a request from the Administrator, the incorporation must take place within 30 days of the date of that request, unless the agency has obtained an extension from the Administrator.
(iii) Before the agency requires incorporation upon its own initiative, it must provide notice to the Administrator of the proposed action.
(iv) The contractor must be compensated for any increases in wages resulting from incorporation of a missing wage determination.
(v) If a recipient or sub-recipient of Federal assistance under any of the applicable laws referenced by §5.1 of this subtitle refuses to incorporate the wage determination as required, the agency must make no further payment, advance, grant, loan, or guarantee of funds in connection with the contract until the recipient incorporates the required wage determination into its contract, and must promptly refer the dispute to the Administrator for further proceedings under §5.13 of this subtitle.
(vi) Before terminating a contract pursuant to this section, the agency must withhold or cross-withhold sufficient funds to remedy any back-wage liability resulting from the failure to incorporate the correct wage determination or otherwise identify and obligate sufficient funds through a termination settlement agreement, bond, or other satisfactory mechanism.
(4) Under any of the above circumstances, notwithstanding the requirement to incorporate the correct wage determination(s) within 30 days, the correct wage determination(s) will be effective by operation of law, retroactive to the date of award or the beginning of construction (under the National Housing Act, under section 8 of the U.S. Housing Act of 1937, or where there is no contract award), in accordance with §5.5(e) of this subtitle.
(g) Approval of Davis-Bacon Related Act Federal funding or assistance after contract award. If Federal funding or assistance under a statute requiring payment of wages determined in accordance with the Davis-Bacon Act is not approved prior to contract award (or the beginning of construction where there is no contract award), the applicable wage determination must be incorporated based upon the wages and fringe benefits found to be prevailing on the date of award or the beginning of construction (under the National Housing Act, under section 8 of the U.S. Housing Act of 1937, or where there is no contract award), as appropriate, and must be incorporated in the contract specifications retroactively to that date, Provided that upon the request of the head of the Federal agency providing the Federal funding or assistance, in individual cases the Administrator may direct incorporation of the wage determination to be effective on the date of approval of Federal funds or assistance whenever the Administrator finds that it is necessary and proper in the public interest to prevent injustice or undue hardship, Provided further that the Administrator finds no evidence of intent to apply for Federal funding or assistance prior to contract award or the start of construction, as appropriate.
§1.7 Scope of consideration.
(a) In making a wage determination, the “area” from which wage data will be drawn will normally be the county unless sufficient current wage data (data on wages paid on current projects or, where necessary, projects under construction no more than 1 year prior to the beginning of the survey or the request for a wage determination, as appropriate) is unavailable to make a wage determination.
(b) If sufficient current wage data is not available from projects within the county to make a wage determination, wages paid on similar construction in surrounding counties may be considered.
(c) If sufficient current wage data is not available in surrounding counties, the Administrator may consider wage data from similar construction in comparable counties or groups of counties in the State, and, if necessary, overall statewide data.
(d) If sufficient current statewide wage data is not available, wages paid on projects completed more than 1 year prior to the beginning of the survey or the request for a wage determination, as appropriate, may be considered.
(e) The use of “helpers and apprentices” is permitted in accordance with part 5 of this subtitle.
§1.8 Reconsideration by the Administrator.
(a) Any interested party may seek reconsideration of a wage determination issued under this part or of a decision of the Administrator regarding application of a wage determination.
(b) Such a request for reconsideration must be in writing, accompanied by a full statement of the interested party’s views and any supporting wage data or other pertinent information. Requests must be submitted via email to dba.reconsideration@dol.gov; by mail to Administrator, Wage and Hour Division, U.S. Department of Labor, 200 Constitution Ave., NW, Washington, DC 20210; or through other means directed by the Administrator. The Administrator will respond within 30 days of receipt thereof, or will notify the requestor within the 30-day period that additional time is necessary.
(c) If the decision for which reconsideration is sought was made by an authorized representative of the Administrator of the Wage and Hour Division, the interested party seeking reconsideration may request further reconsideration by the Administrator of the Wage and Hour Division. Such a request must be submitted within 30 days from the date the decision is issued; this time may be extended for good cause at the discretion of the Administrator upon a request by the interested party. The procedures in paragraph (b) of this section apply to any such reconsideration requests.
§3.1 Purpose and scope.
This part prescribes “anti-kickback” regulations under section 2 of the Act of June 13, 1934, as amended (40 U.S.C. 3145), popularly known as the Copeland Act. This part applies to any contract which is subject to Federal wage standards and which is for the construction, prosecution, completion, or repair of public buildings, public works or buildings or works financed in whole or in part by loans or grants from the United States. The part is intended to aid in the enforcement of the minimum wage provisions of the Davis-Bacon Act and the various statutes dealing with federally assisted construction that contain similar minimum wage provisions, including those provisions which are not subject to Reorganization Plan No. 14 of 1950 ( e.g., the College Housing Act of 1950, the Federal Water Pollution Control Act, and the Housing Act of 1959), and in the enforcement of the overtime provisions of the Contract Work Hours and Safety Standards Act whenever they are applicable to construction work. The part details the obligation of contractors and subcontractors relative to the weekly submission of statements regarding the wages paid on work covered thereby; sets forth the circumstances and procedures governing the making of payroll deductions from the wages of those employed on such work; and delineates the methods of payment permissible on such work.
§3.2 Definitions.
As used in the regulations in this part:
Affiliated person.
The term “affiliated person” includes a spouse, child, parent, or other close relative of the contractor or subcontractor; a partner or officer of the contractor or subcontractor; a corporation closely connected with the contractor or subcontractor as parent, subsidiary, or otherwise, and an officer or agent of such corporation.
Agency.
The term “agency” means any Federal, State, or local government agency or instrumentality, or other similar entity, that enters into a contract or provides assistance through loan, grant, loan guarantee or insurance, or otherwise, for a project subject to the Davis-Bacon labor standards, as defined in §5.2 of this subtitle.
(1) Federal agency. The term “Federal agency” means an agency or instrumentality of the United States or the District of Columbia, as defined in this section, that enters into a contract or provides assistance through loan, grant, loan guarantee or insurance, or otherwise, to a project subject to the Davis-Bacon labor standards.
(2) [Reserved]
Building or work.
The term “building or work” generally includes construction activity of all types, as distinguished from manufacturing, furnishing of materials, or servicing and maintenance work. The term includes, without limitation, buildings, structures, and improvements of all types, such as bridges, dams, solar panels, wind turbines, broadband installation, installation of electric car chargers, plants, highways, parkways, streets, subways, tunnels, sewers, mains, powerlines, pumping stations, heavy generators, railways, airports, terminals, docks, piers, wharves, ways, lighthouses, buoys, jetties, breakwaters, levees, and canals; dredging, shoring, rehabilitation and reactivation of plants, scaffolding, drilling, blasting, excavating, clearing, and landscaping. The term “building or work” also includes a portion of a building or work, or the installation (where appropriate) of equipment or components into a building or work.
(1) Building or work financed in whole or in part by loans or grants from the United States. The term “building or work financed in whole or in part by loans or grants from the United States” includes any building or work for which construction, prosecution, completion, or repair, as defined in this section, payment or part payment is made directly or indirectly from funds provided by loans or grants by a Federal agency. The term includes any building or work for which the Federal assistance granted is in the form of loan guarantees or insurance.
(2) [Reserved]
Construction, prosecution, completion, or repair.
The term “construction, prosecution, completion, or repair” mean all types of work done on a particular building or work at the site thereof as specified in §5.2 of this subtitle, including, without limitation, altering, remodeling, painting and decorating, installation on the site of the work of items fabricated offsite, covered transportation as reflected in §5.2, demolition and/or removal as reflected in §5.2, and the manufacturing or furnishing of materials, articles, supplies, or equipment on the site of the building or work, performed by laborers and mechanics at the site.
Employed (and wages).
Every person paid by a contractor or subcontractor in any manner for their labor in the construction, prosecution, completion, or repair of a public building or public work or building or work financed in whole or in part by assistance from the United States through loan, grant, loan guarantee or insurance, or otherwise, is “employed” and receiving “wages”, regardless of any contractual relationship alleged to exist between the contractor and such person.
Public building (or public work).
The term “public building (or public work)” includes a building or work the construction, prosecution, completion, or repair of which, as defined in this section, is carried on directly by authority of or with funds of a Federal agency to serve the general public regardless of whether title thereof is in a Federal agency. The construction, prosecution, completion, or repair of a portion of a building or work, or the installation (where appropriate) of equipment or components into a building or work, may still be considered a public building or work, even where the entire building or work is not owned, leased by, or to be used by the Federal agency, as long as the construction, prosecution, completion, or repair of that portion of the building or work, or the installation (where appropriate) of equipment or components into that building or work, is carried on by authority of or with funds of a Federal agency to serve the interest of the general public.
United States or the District of Columbia.
The term “United States or the District of Columbia” means the United States, the District of Columbia, and all executive departments, independent establishments, administrative agencies, and instrumentalities of the United States and of the District of Columbia, and any corporation for which all or substantially all of the stock of which is beneficially owned by the United States, by the District of Columbia, or any of the foregoing departments, establishments, agencies, and instrumentalities.
§3.3 Certified payrolls.
(a) [Reserved]
(b) Each contractor or subcontractor engaged in the construction, prosecution, completion, or repair of any public building or public work, or building or work financed in whole or in part by loans or grants from the United States, each week must provide a copy of its weekly payroll for all laborers and mechanics engaged on work covered by this part and part 5 of this chapter during the preceding weekly payroll period, accompanied by a statement of compliance certifying the accuracy of the weekly payroll information. This statement must be executed by the contractor or subcontractor or by an authorized officer or employee of the contractor or subcontractor who supervises the payment of wages, and must be on the back of Form WH–347, “Payroll (For Contractors Optional Use)” or on any form with identical wording. Copies of WH–347 may be obtained from the contracting or sponsoring agency or from the Wage and Hour Division website at https://www.dol.gov/agencies/whd/government-contracts/construction/forms or its successor site. The signature by the contractor, subcontractor, or the authorized officer or employee must be an original handwritten signature or a legally valid electronic signature.
(c) The requirements of this section do not apply to any contract of $2,000 or less.
(d) Upon a written finding by the head of a Federal agency, the Secretary of Labor may provide reasonable limitations, variations, tolerances, and exemptions from the requirements of this section subject to such conditions as the Secretary of Labor may specify.
§3.4 Submission of certified payroll and the preservation and inspection of weekly payroll records.
(a) Certified payroll. Each certified payroll required under §3.3 must be delivered by the contractor or subcontractor, within 7 days after the regular payment date of the payroll period, to a representative at the site of the building or work of the agency contracting for or financing the work, or, if there is no representative of the agency at the site of the building or work, the statement must be delivered by mail or by any other means normally assuring delivery by the contractor or subcontractor, within that 7 day time period, to the agency contracting for or financing the building or work. After the certified payrolls have been reviewed in accordance with the contracting or sponsoring agency's procedures, such certified payrolls must be preserved by the agency for a period of 3 years after all the work on the prime contract is completed and must be produced for inspection, copying, and transcription by the Department of Labor upon request. The certified payrolls must also be transmitted together with a report of any violation, in accordance with applicable procedures prescribed by the United States Department of Labor.
(b) Recordkeeping. Each contractor or subcontractor must preserve the regular payroll records for a period of 3 years after all the work on the prime contract is completed. The regular payroll records must set out accurately and completely the name; Social Security number; last known address, telephone number, and email address of each laborer and mechanic; each worker's correct classification(s) of work actually performed; hourly rates of wages paid (including rates of contributions or costs anticipated for bona fide fringe benefits or cash equivalents thereof); daily and weekly number of hours actually worked in total and on each covered contract; deductions made; and actual wages paid. The contractor or subcontractor must make such regular payroll records, as well as copies of the certified payrolls provided to the contracting or sponsoring agency, available at all times for inspection, copying, and transcription by the contracting officer or their authorized representative, and by authorized representatives of the Department of Labor.
§3.5 Payroll deductions permissible without application to or approval of the Secretary of Labor.
Deductions made under the circumstances or in the situations described in the paragraphs of this section may be made without application to and approval of the Secretary of Labor:
(a) Any deduction made in compliance with the requirements of Federal, State, or local law, such as Federal or State withholding income taxes and Federal social security taxes.
(b) Any deduction of sums previously paid to the laborer or mechanic as a bona fide prepayment of wages when such prepayment is made without discount or interest. A bona fide prepayment of wages is considered to have been made only when cash or its equivalent has been advanced to the person employed in such manner as to give him complete freedom of disposition of the advanced funds.
(c) Any deduction of amounts required by court process to be paid to another, unless the deduction is in favor of the contractor, subcontractor, or any affiliated person, or when collusion or collaboration exists.
(d) Any deduction constituting a contribution on behalf of the laborer or mechanic employed to funds established by the contractor or representatives of the laborers or mechanics, or both, for the purpose of providing either from principal or income, or both, medical or hospital care, pensions or annuities on retirement, death benefits, compensation for injuries, illness, accidents, sickness, or disability, or for insurance to provide any of the foregoing, or unemployment benefits, vacation pay, savings accounts, or similar payments for the benefit of the laborers or mechanics, their families and dependents: Provided, however, That the following standards are met:
(1) The deduction is not otherwise prohibited by law;
(2) It is either:
(i) Voluntarily consented to by the laborer or mechanic in writing and in advance of the period in which the work is to be done and such consent is not a condition either for the obtaining of or for the continuation of employment; or
(ii) Provided for in a bona fide collective bargaining agreement between the contractor or subcontractor and representatives of its laborers or mechanics;
(3) No profit or other benefit is otherwise obtained, directly or indirectly, by the contractor or subcontractor or any affiliated person in the form of commission, dividend, or otherwise; and
(4) The deductions must serve the convenience and interest of the laborer or mechanic.
(e) Any deduction requested by the laborer or mechanic to enable him or her to repay loans to or to purchase shares in credit unions organized and operated in accordance with Federal and State credit union statutes.
(f) Any deduction voluntarily authorized by the laborer or mechanic for the making of contributions to governmental or quasi-governmental agencies, such as the American Red Cross.
(g) Any deduction voluntarily authorized by the laborer or mechanic for the making of contributions to charitable organizations as defined by 26 U.S.C. 501(c)(3).
(h) Any deductions to pay regular union initiation fees and membership dues, not including fines or special assessments: Provided, however, That a collective bargaining agreement between the contractor or subcontractor and representatives of its laborers or mechanics provides for such deductions and the deductions are not otherwise prohibited by law.
(i) Any deduction not more than for the “reasonable cost” of board, lodging, or other facilities meeting the requirements of section 3(m) of the Fair Labor Standards Act of 1938, as amended, and 29 CFR part 531. When such a deduction is made the additional records required under 29 CFR 516.25(a) must be kept.
(j) Any deduction for the cost of safety equipment of nominal value purchased by the laborer or mechanic as their own property for their personal protection in their work, such as safety shoes, safety glasses, safety gloves, and hard hats, if such equipment is not required by law to be furnished by the contractor, if such deduction does not violate the Fair Labor Standards Act or any other law, if the cost on which the deduction is based does not exceed the actual cost to the contractor where the equipment is purchased from the contractor and does not include any direct or indirect monetary return to the contractor where the equipment is purchased from a third person, and if the deduction is either:
(1) Voluntarily consented to by the laborer or mechanic in writing and in advance of the period in which the work is to be done and such consent is not a condition either for the obtaining of employment or its continuance; or
(2) Provided for in a bona fide collective bargaining agreement between the contractor or subcontractor and representatives of its laborers and mechanics.
§3.7 Applications for the approval of the Secretary of Labor.
Any application for the making of payroll deductions under §3.6 must comply with the requirements prescribed in the following paragraphs of this section:
(a) The application must be in writing and addressed to the Secretary of Labor. The application must be submitted by email to dbadeductions@dol.gov , by mail to the United States Department of Labor, Wage and Hour Division, Director, Division of Government Contracts Enforcement, 200 Constitution Ave., NW, Room S–3502, Washington, DC 20210, or by any other means normally assuring delivery.
(b) The application need not identify the contract or contracts under which the work in question is to be performed. Permission will be given for deductions on all current and future contracts of the applicant for a period of 1 year. A renewal of permission to make such payroll deduction will be granted upon the submission of an application which makes reference to the original application, recites the date of the Secretary of Labor's approval of such deductions, states affirmatively that there is continued compliance with the standards set forth in the provisions of §3.6, and specifies any conditions which have changed in regard to the payroll deductions.
(c) The application must state affirmatively that there is compliance with the standards set forth in the provisions of §3.6. The affirmation must be accompanied by a full statement of the facts indicating such compliance.
(d) The application must include a description of the proposed deduction, the purpose of the deduction, and the classes of laborers or mechanics from whose wages the proposed deduction would be made.
(e) The application must state the name and business of any third person to whom any funds obtained from the proposed deductions are to be transmitted and the affiliation of such person, if any, with the applicant.
§3.8 Action by the Secretary of Labor upon applications.
The Secretary of Labor will decide whether or not the requested deduction is permissible under provisions of §3.6; and will notify the applicant in writing of the decision.
§3.11 Regulations part of contract.
All contracts made with respect to the construction, prosecution, completion, or repair of any public building or public work or building or work financed in whole or in part by loans or grants from the United States covered by the regulations in this part must expressly bind the contractor or subcontractor to comply with such of the regulations in this part as may be applicable. In this regard, see §5.5(a) of this subtitle. However, these requirements will be considered to be effective by operation of law, whether or not they are incorporated into such contracts, as set forth in §5.5(e) of this subtitle.
Part 5-Labor standards provisions applicable to contracts covering federally financed and assisted construction (also labor standards provisions applicable to nonconstruction
Authority:
5 U.S.C. 301; Reorganization Plan No. 14 of 1950, 5 U.S.C. appendix; 28 U.S.C. 2461 note; 40 U.S.C. 3141 et seq.; 40 U.S.C. 3145; 40 U.S.C. 3148; 40 U.S.C. 3701 et seq.; Secretary's Order No. 01–2014, 79 FR 77527; and the laws referenced by §5.1(a).
§5.1 Purpose and scope.
(a) The regulations contained in this part are promulgated under the authority conferred upon the Secretary of Labor by Reorganization Plan No. 14 of 1950 (64 Stat. 1267, as amended, 5 U.S.C. appendix) and the Copeland Act (48 Stat. 948; 18 U.S.C. 874; 40 U.S.C. 3145) in order to coordinate the administration and enforcement of labor standards provisions contained in the Davis-Bacon Act (46 Stat. 1494, as amended; 40 U.S.C. 3141 et seq. ) and its related statutes (“Related Acts”).
(1) A listing of laws requiring Davis-Bacon labor standards provisions can be found at www.dol.gov/agencies/whd/government-contracts or its successor website.
(2) [Reserved]
(b) Part 1 of this subtitle contains the Department's procedural rules governing requests for wage determinations and the issuance and use of such wage determinations under the Davis-Bacon Act and its Related Acts.
§5.2 Definitions.
Administrator. The term “Administrator” means the Administrator of the Wage and Hour Division, U.S. Department of Labor, or authorized representative.
Agency. The term “agency” means any Federal, State, or local government agency or instrumentality, or other similar entity, that enters into a contract or provides assistance through loan, grant, loan guarantee or insurance, or otherwise, to a project subject to the Davis-Bacon labor standards, as defined in this section.
(1) Federal agency. The term “Federal agency” means an agency or instrumentality of the United States or the District of Columbia, as defined in this section, that enters into a contract or provides assistance through loan, grant, loan guarantee or insurance, or otherwise, to a project subject to the Davis-Bacon labor standards.
(2) [Reserved]
Agency Head. The term “Agency Head” means the principal official of an agency and includes those persons duly authorized to act on behalf of the Agency Head.
Apprentice and helper. The terms “apprentice” and “helper” are defined as follows:
(1) “Apprentice” means:
(i) A person employed and individually registered in a bona fide apprenticeship program registered with the U.S. Department of Labor, Employment and Training Administration, Office of Apprenticeship, or with a State Apprenticeship Agency recognized by the Office of Apprenticeship; or
(ii) A person in the first 90 days of probationary employment as an apprentice in such an apprenticeship program, who is not individually registered in the program, but who has been certified by the Office of Apprenticeship or a State Apprenticeship Agency (where appropriate) to be eligible for probationary employment as an apprentice;
(2) These provisions do not apply to apprentices and trainees employed on projects subject to 23 U.S.C. 113 who are enrolled in programs which have been certified by the Secretary of Transportation in accordance with 23 U.S.C. 113(c).
(3) A distinct classification of helper will be issued in wage determinations applicable to work performed on construction projects covered by the labor standards provisions of the Davis-Bacon and Related Acts only where:
(i) The duties of the helper are clearly defined and distinct from those of any other classification on the wage determination;
(ii) The use of such helpers is an established prevailing practice in the area; and
(iii) The helper is not employed as a trainee in an informal training program. A “helper” classification will be added to wage determinations pursuant to §5.5(a)(1)(iii)(A) only where, in addition, the work to be performed by the helper is not performed by a classification in the wage determination.
Building or work. The term “building or work” generally includes construction activities of all types, as distinguished from manufacturing, furnishing of materials, or servicing and maintenance work. The term includes, without limitation, buildings, structures, and improvements of all types, such as bridges, dams, solar panels, wind turbines, broadband installation, installation of electric car chargers, plants, highways, parkways, streets, subways, tunnels, sewers, mains, power lines, pumping stations, heavy generators, railways, airports, terminals, docks, piers, wharves, ways, lighthouses, buoys, jetties, breakwaters, levees, canals, dredging, shoring, rehabilitation and reactivation of plants, scaffolding, drilling, blasting, excavating, clearing, and landscaping. The term “building or work” also includes a portion of a building or work, or the installation (where appropriate) of equipment or components into a building or work.
Construction, prosecution, completion, or repair. The term “construction, prosecution, completion, or repair ” means the following:
(1) These terms include all types of work done—
(i) On a particular building or work at the site of the work, as defined in this section, by laborers and mechanics employed by a contractor or subcontractor, or
(ii) In the construction or development of a project under a development statute.
(2) These terms include, without limitation (except as specified in this definition):
(i) Altering, remodeling, installation (where appropriate) on the site of the work of items fabricated offsite;
(ii) Painting and decorating;
(iii) Manufacturing or furnishing of materials, articles, supplies or equipment, but only if such work is done by laborers or mechanics
(A) Employed by a contractor or subcontractor, as defined in this section, on the site of the work, as defined in this section, or
(B) In the construction or development of a project under a development statute;
(iv) “Covered transportation,” defined as any of the following activities:
(A) Transportation that takes place entirely within a location meeting the definition of “site of the work” in this section;
(B) Transportation of one or more “significant portion(s)” of the building or work between a “secondary construction site” as defined in this section and a “primary construction site” as defined in this section;
(C) Transportation between an “adjacent or virtually adjacent dedicated support site” as defined in this section and a “primary construction site” or “secondary construction site” as defined in this section;
(D) “Onsite activities essential or incidental to offsite transportation,” defined as activities conducted by a truck driver or truck driver's assistant on the site of the work that are essential or incidental to the transportation of materials or supplies to or from the site of the work, such as loading, unloading, or waiting for materials to be loaded or unloaded, but only where the driver or driver's assistant's time spent on the site of the work is not de minimis; and
(E) Any transportation and related activities, whether on or off the site of the work, by laborers and mechanics employed in the construction or development of the project under a development statute.
(v) Demolition and/or removal, under any of the following circumstances:
(A) Where the demolition and/or removal activities themselves constitute construction, alteration, and/or repair of an existing building or work. Examples of such activities include the removal of asbestos, paint, components, systems, or parts from a facility that will not be demolished; as well as contracts for hazardous waste removal, land recycling, or reclamation that involve substantial earth moving, removal of contaminated soil, re-contouring surfaces, and/or habitat restoration.
(B) Where subsequent construction covered in whole or in part by the labor standards in this part is contemplated at the site of the demolition or removal, either as part of the same contract or as part of a future contract. In determining whether covered construction is contemplated within the meaning of this provision, relevant factors include, but are not limited to, the existence of engineering or architectural plans or surveys of the site; the allocation of, or an application for, Federal funds; contract negotiations or bid solicitations; the stated intent of the relevant government officials; and the disposition of the site after demolition.
(C) Where otherwise required by statute.
(3) Except for transportation that constitutes “covered transportation” as defined in this section, construction, prosecution, completion, or repair does not include the transportation of materials or supplies to or from the site of the work.
Contract. The term “contract” means any prime contract which is subject wholly or in part to the labor standards provisions of any of the laws referenced by §5.1 and any subcontract of any tier thereunder, let under the prime contract. With the exception of work performed under a development statute, the terms contract and subcontract do not include agreements with employers that meet the definition of a material supplier under this section.
Contracting officer. The term “contracting officer” means the individual, a duly appointed successor, or authorized representative who is designated and authorized to enter into contracts on behalf of an agency, sponsor, owner, applicant, or other similar entity.
Contractor. The term “contractor” means any individual or other legal entity that enters into or is awarded a contract that is subject wholly or in part to the labor standards provisions of any of the laws referenced by §5.1, including any prime contract or subcontract of any tier under a covered prime contract. In addition, the term contractor includes any surety that is completing performance for a defaulted contractor pursuant to a performance bond. The U.S. Government, its agencies, and instrumentalities are not contractors, subcontractors, employers or joint employers for purposes of the labor standards provisions of any of the laws referenced by §5.1. A State or local government is not regarded as a contractor or subcontractor under statutes providing loans, grants, or other Federal assistance in situations where construction is performed by its own employees. However, under development statutes or other statutes requiring payment of prevailing wages to all laborers and mechanics employed on the assisted project, such as the U.S. Housing Act of 1937, State and local recipients of Federal-aid must pay these workers according to Davis-Bacon labor standards. The term “contractor” does not include an entity that is a material supplier, except if the entity is performing work under a development statute.
Davis-Bacon labor standards. The term “Davis-Bacon labor standards” as used in this part means the requirements of the Davis-Bacon Act, the Contract Work Hours and Safety Standards Act (other than those relating to safety and health), the Copeland Act, and the prevailing wage provisions of the other statutes referenced in §5.1, and the regulations in this part and in parts 1 and 3 of this subtitle.
Development statute. The term “development statute” includes the United States Housing Act of 1937; the Housing Act of 1949; and the Native American Housing Assistance and Self-Determination Act of 1996, and any other Davis-Bacon Related Act that requires payment of prevailing wages under the Davis-Bacon labor standards to all laborers and mechanics employed in the development of a project and for which the Administrator determines that the statute's language and/or legislative history reflected clear congressional intent to apply a coverage standard different from the Davis-Bacon Act itself.
Employed. Every person performing the duties of a laborer or mechanic in the construction, prosecution, completion, or repair of a public building or public work, or building or work financed in whole or in part by assistance from the United States through loan, grant, loan guarantee or insurance, or otherwise, is “employed” regardless of any contractual relationship alleged to exist between the contractor and such person.
Laborer or mechanic. The term “laborer or mechanic” includes at least those workers whose duties are manual or physical in nature (including those workers who use tools or who are performing the work of a trade), as distinguished from mental or managerial. The term “laborer” or “mechanic” includes apprentices, helpers, and, in the case of contracts subject to the Contract Work Hours and Safety Standards Act, watchpersons or guards. The term does not apply to workers whose duties are primarily administrative, executive, or clerical, rather than manual. Persons employed in a bona fide executive, administrative, or professional capacity as defined in 29 CFR part 541 are not deemed to be laborers or mechanics. Forepersons who devote more than 20 percent of their time during a workweek to mechanic or laborer duties, and who do not meet the criteria of part 541, are laborers and mechanics for the time so spent.
Material supplier. The term “material supplier” is defined as follows:
(1) A material supplier is an entity meeting all of the following criteria:
(i) Its only obligations for work on the contract or project are the delivery of materials, articles, supplies, or equipment, which may include pickup of the same in addition to, but not exclusive of, delivery, and which may also include activities incidental to such delivery and pickup, such as loading, unloading, or waiting for materials to be loaded or unloaded; and
(ii) Its facility or facilities that manufactures the materials, articles, supplies, or equipment used for the contract or project:
(A) Is not located on, or does not itself constitute, the project or contract's primary construction site or secondary construction site as defined in this section; and
(B) Either was established before opening of bids on the contract or project, or is not dedicated exclusively, or nearly so, to the performance of the contract or project.
(2) If an entity, in addition to being engaged in the activities specified in paragraph (1)(i) of this definition, also engages in other construction, prosecution, completion, or repair work at the site of the work, it is not a material supplier.
Prime contractor. The term “prime contractor” means any person or entity that enters into a contract with an agency. For the purposes of the labor standards provisions of any of the laws referenced by §5.1, the term prime contractor also includes the controlling shareholders or members of any entity holding a prime contract, the joint venturers or partners in any joint venture or partnership holding a prime contract, and any contractor ( e.g., a general contractor) that has been delegated the responsibility for overseeing all or substantially all of the construction anticipated by the prime contract. For the purposes of the provisions in §§5.5 and 5.9, any such related entities holding different prime contracts are considered to be the same prime contractor.
Public building or public work. The term “public building or public work” includes a building or work, the construction, prosecution, completion, or repair of which, as defined in this section, is carried on directly by authority of or with funds of a Federal agency to serve the interest of the general public regardless of whether title thereof is in a Federal agency. The construction, prosecution, completion, or repair of a portion of a building or work, or the installation (where appropriate) of equipment or components into a building or work, may still be considered a public building or work, even where the entire building or work is not owned, leased by, or to be used by a Federal agency, as long as the construction, prosecution, completion, or repair of that portion of the building or work, or the installation (where appropriate) of equipment or components into that building or work, is carried on by authority of or with funds of a Federal agency to serve the interest of the general public.
Secretary. The term “Secretary” includes the Secretary of Labor, and their authorized representative.
Site of the work. The term “site of the work” is defined as follows:
(1) “Site of the work” includes all of the following:
(i) The primary construction site(s), defined as the physical place or places where the building or work called for in the contract will remain.
(ii) Any secondary construction site(s), defined as any other site(s) where a significant portion of the building or work is constructed, provided that such construction is for specific use in that building or work and does not simply reflect the manufacture or construction of a product made available to the general public, and provided further that the site is either established specifically for the performance of the contract or project, or is dedicated exclusively, or nearly so, to the performance of the contract or project for a specific period of time. A “significant portion” of a building or work means one or more entire portion(s) or module(s) of the building or work, such as a completed room or structure, with minimal construction work remaining other than the installation and/or final assembly of the portions or modules at the place where the building or work will remain. A “significant portion” does not include materials or prefabricated component parts such as prefabricated housing components. A “specific period of time” means a period of weeks, months, or more, and does not include circumstances where a site at which multiple projects are in progress is shifted exclusively or nearly so to a single project for a few hours or days in order to meet a deadline.
(iii) Any adjacent or virtually adjacent dedicated support sites, defined as:
(A) Job headquarters, tool yards, batch plants, borrow pits, and similar facilities of a contractor or subcontractor that are dedicated exclusively, or nearly so, to performance of the contract or project, and adjacent or virtually adjacent to either a primary construction site or a secondary construction site, and
(B) Locations adjacent or virtually adjacent to a primary construction site at which workers perform activities associated with directing vehicular or pedestrian traffic around or away from the primary construction site.
(2) With the exception of locations that are on, or that themselves constitute, primary or secondary construction sites as defined in paragraphs (1)(i) and (ii) of this definition, site of the work does not include:
(i) Permanent home offices, branch plant establishments, fabrication plants, tool yards, etc., of a contractor or subcontractor whose location and continuance in operation are determined wholly without regard to a particular Federal or federally assisted contract or project; or
(ii) Fabrication plants, batch plants, borrow pits, job headquarters, tool yards, etc., of a material supplier, which are established by a material supplier for the project before opening of bids and not on the primary construction site or a secondary construction site, even where the operations for a period of time may be dedicated exclusively, or nearly so, to the performance of a contract.
Subcontractor. The term “subcontractor” means any contractor that agrees to perform or be responsible for the performance of any part of a contract that is subject wholly or in part to the labor standards provisions of any of the laws referenced in §5.1. The term subcontractor includes subcontractors of any tier.
United States or the District of Columbia. The term “United States or the District of Columbia” means the United States, the District of Columbia, and all executive departments, independent establishments, administrative agencies, and instrumentalities of the United States and of the District of Columbia, including non-appropriated fund instrumentalities and any corporation for which all or substantially all of its stock is beneficially owned by the United States or by the foregoing departments, establishments, agencies, or instrumentalities.
Wages. The term “wages” means the basic hourly rate of pay; any contribution irrevocably made by a contractor or subcontractor to a trustee or to a third person pursuant to a bona fide fringe benefit fund, plan, or program; and the rate of costs to the contractor or subcontractor which may be reasonably anticipated in providing bona fide fringe benefits to laborers and mechanics pursuant to an enforceable commitment to carry out a financially responsible plan or program, which was communicated in writing to the laborers and mechanics affected. The fringe benefits enumerated in the Davis-Bacon Act include medical or hospital care, pensions on retirement or death, compensation for injuries or illness resulting from occupational activity, or insurance to provide any of the foregoing; unemployment benefits; life insurance, disability insurance, sickness insurance, or accident insurance; vacation or holiday pay; defraying costs of apprenticeship or other similar programs; or other bona fide fringe benefits. Fringe benefits do not include benefits required by other Federal, State, or local law.
Wage determination. The term “wage determination” includes the original decision and any subsequent decisions revising, modifying, superseding, correcting, or otherwise changing the provisions of the original decision. The application of the wage determination must be in accordance with the provisions of §1.6 of this subtitle.
§5.5 Contract provisions and related matters.
(a) Required contract clauses. The Agency head will cause or require the contracting officer to require the contracting officer to insert in full, or (for contracts covered by the Federal Acquisition Regulation (48 CFR chapter 1)) by reference, in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the laws referenced by §5.1, the following clauses (or any modifications thereof to meet the particular needs of the agency, Provided, That such modifications are first approved by the Department of Labor):
(1) Minimum wages —(i) Wage rates and fringe benefits. All laborers and mechanics employed or working upon the site of the work (or otherwise working in construction or development of the project under a development statute), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of basic hourly wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. As provided in paragraphs (d) and (e) of this section, the appropriate wage determinations are effective by operation of law even if they have not been attached to the contract. Contributions made or costs reasonably anticipated for bona fide fringe benefits under the Davis-Bacon Act (40 U.S.C. 3141(2)(B)) on behalf of laborers or mechanics are considered wages paid to such laborers or mechanics, subject to the provisions of paragraph (a)(1)(v) of this section; also, regular contributions made or costs incurred for more than a weekly period (but not less often than quarterly) under plans, funds, or programs which cover the particular weekly period, are deemed to be constructively made or incurred during such weekly period. Such laborers and mechanics must be paid the appropriate wage rate and fringe benefits on the wage determination for the classification(s) of work actually performed, without regard to skill, except as provided in paragraph (a)(4) of this section. Laborers or mechanics performing work in more than one classification may be compensated at the rate specified for each classification for the time actually worked therein: Provided, That the employer's payroll records accurately set forth the time spent in each classification in which work is performed. The wage determination (including any additional classifications and wage rates conformed under paragraph (a)(1)(iii) of this section) and the Davis-Bacon poster (WH–1321) must be posted at all times by the contractor and its subcontractors at the site of the work in a prominent and accessible place where it can be easily seen by the workers.
(ii) Frequently recurring classifications. (A) In addition to wage and fringe benefit rates that have been determined to be prevailing under the procedures set forth in 29 CFR part 1, a wage determination may contain, pursuant to §1.3(f), wage and fringe benefit rates for classifications of laborers and mechanics for which conformance requests are regularly submitted pursuant to paragraph (a)(1)(iii) of this section, provided that:
( 1 ) The work performed by the classification is not performed by a classification in the wage determination for which a prevailing wage rate has been determined;
( 2 ) The classification is used in the area by the construction industry; and
( 3 ) The wage rate for the classification bears a reasonable relationship to the prevailing wage rates contained in the wage determination.
(B) The Administrator will establish wage rates for such classifications in accordance with paragraph (a)(1)(iii)(A)( 3 ) of this section. Work performed in such a classification must be paid at no less than the wage and fringe benefit rate listed on the wage determination for such classification.
(iii) Conformance. (A) The contracting officer must require that any class of laborers or mechanics, including helpers, which is not listed in the wage determination and which is to be employed under the contract be classified in conformance with the wage determination. Conformance of an additional classification and wage rate and fringe benefits is appropriate only when the following criteria have been met:
( 1 ) The work to be performed by the classification requested is not performed by a classification in the wage determination; and
( 2 ) The classification is used in the area by the construction industry; and
( 3 ) The proposed wage rate, including any bona fide fringe benefits, bears a reasonable relationship to the wage rates contained in the wage determination.
(B) The conformance process may not be used to split, subdivide, or otherwise avoid application of classifications listed in the wage determination.
(C) If the contractor and the laborers and mechanics to be employed in the classification (if known), or their representatives, and the contracting officer agree on the classification and wage rate (including the amount designated for fringe benefits where appropriate), a report of the action taken will be sent by the contracting officer by email to DBAconformance@dol.gov . The Administrator, or an authorized representative, will approve, modify, or disapprove every additional classification action within 30 days of receipt and so advise the contracting officer or will notify the contracting officer within the 30–day period that additional time is necessary.
(D) In the event the contractor, the laborers or mechanics to be employed in the classification or their representatives, and the contracting officer do not agree on the proposed classification and wage rate (including the amount designated for fringe benefits, where appropriate), the contracting officer will, by email to DBAconformance@dol.gov, refer the questions, including the views of all interested parties and the recommendation of the contracting officer, to the Administrator for determination. The Administrator, or an authorized representative, will issue a determination within 30 days of receipt and so advise the contracting officer or will notify the contracting officer within the 30–day period that additional time is necessary.
(E) The contracting officer must promptly notify the contractor of the action taken by the Wage and Hour Division under paragraphs (a)(1)(iii)(C) and (D) of this section. The contractor must furnish a written copy of such determination to each affected worker or it must be posted as a part of the wage determination. The wage rate (including fringe benefits where appropriate) determined pursuant to paragraph (a)(1)(iii)(C) or (D) of this section must be paid to all workers performing work in the classification under this contract from the first day on which work is performed in the classification.
(iv) Fringe benefits not expressed as an hourly rate. Whenever the minimum wage rate prescribed in the contract for a class of laborers or mechanics includes a fringe benefit which is not expressed as an hourly rate, the contractor may either pay the benefit as stated in the wage determination or may pay another bona fide fringe benefit or an hourly cash equivalent thereof.
(v) Unfunded plans. If the contractor does not make payments to a trustee or other third person, the contractor may consider as part of the wages of any laborer or mechanic the amount of any costs reasonably anticipated in providing bona fide fringe benefits under a plan or program, Provided, That the Secretary of Labor has found, upon the written request of the contractor, in accordance with the criteria set forth in §5.28, that the applicable standards of the Davis-Bacon Act have been met. The Secretary of Labor may require the contractor to set aside in a separate account assets for the meeting of obligations under the plan or program.
(vi) Interest. In the event of a failure to pay all or part of the wages required by the contract, the contractor will be required to pay interest on any underpayment of wages.
(2) Withholding— (i) Withholding requirements. The [write in name of Federal agency or the recipient of Federal assistance] may, upon its own action, or must, upon written request of an authorized representative of the Department of Labor, withhold or cause to be withheld from the contractor so much of the accrued payments or advances as may be considered necessary to satisfy the liabilities of the prime contractor or any subcontractor for the full amount of wages and monetary relief, including interest, required by the clauses set forth in paragraph (a) of this section for violations of this contract, or to satisfy any such liabilities required by any other Federal contract, or federally assisted contract subject to Davis-Bacon labor standards, that is held by the same prime contractor (as defined in §5.2). The necessary funds may be withheld from the contractor under this contract, any other Federal contract with the same prime contractor, or any other federally assisted contract that is subject to Davis-Bacon labor standards requirements and is held by the same prime contractor, regardless of whether the other contract was awarded or assisted by the same agency, and such funds may be used to satisfy the contractor liability for which the funds were withheld. In the event of a contractor's failure to pay any laborer or mechanic, including any apprentice or helper working on the site of the work (or otherwise working in construction or development of the project under a development statute) all or part of the wages required by the contract, or upon the contractor's failure to submit the required records as discussed in paragraph (a)(3)(iv) of this section, the [Agency] may on its own initiative and after written notice to the contractor, sponsor, applicant, owner, or other entity, as the case may be, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds until such violations have ceased.
(ii) Priority to withheld funds. The Department has priority to funds withheld or to be withheld in accordance with paragraph (a)(2)(i) or (b)(3)(i) of this section, or both, over claims to those funds by:
(A) A contractor's surety(ies), including without limitation performance bond sureties and payment bond sureties;
(B) A contracting agency for its reprocurement costs;
(C) A trustee(s) (either a court-appointed trustee or a U.S. trustee, or both) in bankruptcy of a contractor, or a contractor's bankruptcy estate;
(D) A contractor's assignee(s);
(E) A contractor's successor(s); or
(F) A claim asserted under the Prompt Payment Act, 31 U.S.C. 3901–3907.
(3) Records and certified payrolls —(i) Basic record requirements —(A) Length of record retention. All regular payrolls and other basic records must be maintained by the contractor and any subcontractor during the course of the work and preserved for all laborers and mechanics working at the site of the work (or otherwise working in construction or development of the project under a development statute) for a period of at least 3 years after all the work on the prime contract is completed.
(B) Information required. Such records must contain the name; Social Security number; last known address, telephone number, and email address of each such worker; each worker's correct classification(s) of work actually performed; hourly rates of wages paid (including rates of contributions or costs anticipated for bona fide fringe benefits or cash equivalents thereof of the types described in 40 U.S.C. 3141(2)(B) of the Davis-Bacon Act); daily and weekly number of hours actually worked in total and on each covered contract; deductions made; and actual wages paid.
(C) Additional records relating to fringe benefits. Whenever the Secretary of Labor has found under paragraph (a)(1)(v) of this section that the wages of any laborer or mechanic include the amount of any costs reasonably anticipated in providing benefits under a plan or program described in 40 U.S.C. 3141(2)(B) of the Davis-Bacon Act, the contractor must maintain records which show that the commitment to provide such benefits is enforceable, that the plan or program is financially responsible, and that the plan or program has been communicated in writing to the laborers or mechanics affected, and records which show the costs anticipated or the actual cost incurred in providing such benefits.
(D) Additional records relating to apprenticeship. Contractors with apprentices working under approved programs must maintain written evidence of the registration of apprenticeship programs, the registration of the apprentices, and the ratios and wage rates prescribed in the applicable programs.
(ii) Certified payroll requirements— (A) Frequency and method of submission. The contractor or subcontractor must submit weekly, for each week in which any DBA- or Related Acts-covered work is performed, certified payrolls to the [write in name of appropriate Federal agency] if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the certified payrolls to the applicant, sponsor, owner, or other entity, as the case may be, that maintains such records, for transmission to the [write in name of agency]. The prime contractor is responsible for the submission of all certified payrolls by all subcontractors. A contracting agency or prime contractor may permit or require contractors to submit certified payrolls through an electronic system, as long as the electronic system requires a legally valid electronic signature; the system allows the contractor, the contracting agency, and the Department of Labor to access the certified payrolls upon request for at least 3 years after the work on the prime contract has been completed; and the contracting agency or prime contractor permits other methods of submission in situations where the contractor is unable or limited in its ability to use or access the electronic system.
(B) Information required. The certified payrolls submitted must set out accurately and completely all of the information required to be maintained under paragraph (a)(3)(i)(B) of this section, except that full Social Security numbers and last known addresses, telephone numbers, and email addresses must not be included on weekly transmittals. Instead, the certified payrolls need only include an individually identifying number for each worker ( e.g., the last four digits of the worker's Social Security number). The required weekly certified payroll information may be submitted using Optional Form WH–347 or in any other format desired. Optional Form WH–347 is available for this purpose from the Wage and Hour Division website at https://www.dol.gov/sites/dolgov/files/WHD/legacy/files/wh347/.pdf or its successor website. It is not a violation of this section for a prime contractor to require a subcontractor to provide full Social Security numbers and last known addresses, telephone numbers, and email addresses to the prime contractor for its own records, without weekly submission by the subcontractor to the sponsoring government agency (or the applicant, sponsor, owner, or other entity, as the case may be, that maintains such records).
(C) Statement of Compliance. Each certified payroll submitted must be accompanied by a “Statement of Compliance,” signed by the contractor or subcontractor, or the contractor's or subcontractor's agent who pays or supervises the payment of the persons working on the contract, and must certify the following:
( 1 ) That the certified payroll for the payroll period contains the information required to be provided under paragraph (a)(3)(ii) of this section, the appropriate information and basic records are being maintained under paragraph (a)(3)(i) of this section, and such information and records are correct and complete;
( 2 ) That each laborer or mechanic (including each helper and apprentice) working on the contract during the payroll period has been paid the full weekly wages earned, without rebate, either directly or indirectly, and that no deductions have been made either directly or indirectly from the full wages earned, other than permissible deductions as set forth in 29 CFR part 3; and
( 3 ) That each laborer or mechanic has been paid not less than the applicable wage rates and fringe benefits or cash equivalents for the classification(s) of work actually performed, as specified in the applicable wage determination incorporated into the contract.
(D) Use of Optional Form WH–347. The weekly submission of a properly executed certification set forth on the reverse side of Optional Form WH–347 will satisfy the requirement for submission of the “Statement of Compliance” required by paragraph (a)(3)(ii)(C) of this section.
(E) Signature. The signature by the contractor, subcontractor, or the contractor's or subcontractor's agent must be an original handwritten signature or a legally valid electronic signature.
(F) Falsification. The falsification of any of the above certifications may subject the contractor or subcontractor to civil or criminal prosecution under 18 U.S.C. 1001 and 31 U.S.C. 3729.
(G) Length of certified payroll retention. The contractor or subcontractor must preserve all certified payrolls during the course of the work and for a period of 3 years after all the work on the prime contract is completed.
(iii) Contracts, subcontracts, and related documents. The contractor or subcontractor must maintain this contract or subcontract and related documents including, without limitation, bids, proposals, amendments, modifications, and extensions. The contractor or subcontractor must preserve these contracts, subcontracts, and related documents during the course of the work and for a period of 3 years after all the work on the prime contract is completed.
(iv) Required disclosures and access— (A) Required record disclosures and access to workers. The contractor or subcontractor must make the records required under paragraphs (a)(3)(i) through (iii) of this section, and any other documents that the [write the name of the agency] or the Department of Labor deems necessary to determine compliance with the labor standards provisions of any of the applicable statutes referenced by §5.1, available for inspection, copying, or transcription by authorized representatives of the [write the name of the agency] or the Department of Labor, and must permit such representatives to interview workers during working hours on the job.
(B) Sanctions for non-compliance with records and worker access requirements. If the contractor or subcontractor fails to submit the required records or to make them available, or refuses to permit worker interviews during working hours on the job, the Federal agency may, after written notice to the contractor, sponsor, applicant, owner, or other entity, as the case may be, that maintains such records or that employs such workers, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds. Furthermore, failure to submit the required records upon request or to make such records available, or to permit worker interviews during working hours on the job, may be grounds for debarment action pursuant to §5.12. In addition, any contractor or other person that fails to submit the required records or make those records available to WHD within the time WHD requests that the records be produced will be precluded from introducing as evidence in an administrative proceeding under 29 CFR part 6 any of the required records that were not provided or made available to WHD. WHD will take into consideration a reasonable request from the contractor or person for an extension of the time for submission of records. WHD will determine the reasonableness of the request and may consider, among other things, the location of the records and the volume of production.
(C) Required information disclosures. Contractors and subcontractors must maintain the full Social Security number and last known address, telephone number, and email address of each covered worker, and must provide them upon request to the [write in name of appropriate Federal agency] if the agency is a party to the contract, or to the Wage and Hour Division of the Department of Labor. If the Federal agency is not such a party to the contract, the contractor, subcontractor, or both, must, upon request, provide the full Social Security number and last known address, telephone number, and email address of each covered worker to the applicant, sponsor, owner, or other entity, as the case may be, that maintains such records, for transmission to the [write in name of agency], the contractor, or the Wage and Hour Division of the Department of Labor for purposes of an investigation or other compliance action.
(4) Apprentices and equal employment opportunity —(i) Apprentices —(A) Rate of pay. Apprentices will be permitted to work at less than the predetermined rate for the work they perform when they are employed pursuant to and individually registered in a bona fide apprenticeship program registered with the U.S. Department of Labor, Employment and Training Administration, Office of Apprenticeship (OA), or with a State Apprenticeship Agency recognized by the OA. A person who is not individually registered in the program, but who has been certified by the OA or a State Apprenticeship Agency (where appropriate) to be eligible for probationary employment as an apprentice, will be permitted to work at less than the predetermined rate for the work they perform in the first 90 days of probationary employment as an apprentice in such a program. In the event the OA or a State Apprenticeship Agency recognized by the OA withdraws approval of an apprenticeship program, the contractor will no longer be permitted to use apprentices at less than the applicable predetermined rate for the work performed until an acceptable program is approved.
(B) Fringe benefits. Apprentices must be paid fringe benefits in accordance with the provisions of the apprenticeship program. If the apprenticeship program does not specify fringe benefits, apprentices must be paid the full amount of fringe benefits listed on the wage determination for the applicable classification. If the Administrator determines that a different practice prevails for the applicable apprentice classification, fringe benefits must be paid in accordance with that determination.
(C) Apprenticeship ratio. The allowable ratio of apprentices to journeyworkers on the job site in any craft classification must not be greater than the ratio permitted to the contractor as to the entire work force under the registered program or the ratio applicable to the locality of the project pursuant to paragraph (a)(4)(i)(D) of this section. Any worker listed on a payroll at an apprentice wage rate, who is not registered or otherwise employed as stated in paragraph (a)(4)(i)(A) of this section, must be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed. In addition, any apprentice performing work on the job site in excess of the ratio permitted under this section must be paid not less than the applicable wage rate on the wage determination for the work actually performed.
(D) Reciprocity of ratios and wage rates. Where a contractor is performing construction on a project in a locality other than the locality in which its program is registered, the ratios and wage rates (expressed in percentages of the journeyworker's hourly rate) applicable within the locality in which the construction is being performed must be observed. If there is no applicable ratio or wage rate for the locality of the project, the ratio and wage rate specified in the contractor's registered program must be observed.
(ii) Equal employment opportunity. The use of apprentices and journeyworkers under this part must be in conformity with the equal employment opportunity requirements of Executive Order 11246, as amended, and 29 CFR part 30.
(5) Compliance with Copeland Act requirements. The contractor shall comply with the requirements of 29 CFR part 3, which are incorporated by reference in this contract.
(6) Subcontracts. The contractor or subcontractor must insert in any subcontracts the clauses contained in paragraphs (a)(1) through (11) of this section, along with the applicable wage determination(s) and such other clauses or contract modifications as the [write in the name of the Federal agency] may by appropriate instructions require, and a clause requiring the subcontractors to include these clauses and wage determination(s) in any lower tier subcontracts. The prime contractor is responsible for the compliance by any subcontractor or lower tier subcontractor with all the contract clauses in this section. In the event of any violations of these clauses, the prime contractor and any subcontractor(s) responsible will be liable for any unpaid wages and monetary relief, including interest from the date of the underpayment or loss, due to any workers of lower-tier subcontractors, and may be subject to debarment, as appropriate.
(7) Contract termination: debarment. A breach of the contract clauses in 29 CFR 5.5 may be grounds for termination of the contract, and for debarment as a contractor and a subcontractor as provided in 29 CFR 5.12.
(8) Compliance with Davis-Bacon and Related Act requirements. All rulings and interpretations of the Davis-Bacon and Related Acts contained in 29 CFR parts 1, 3, and 5 are herein incorporated by reference in this contract.
(9) Disputes concerning labor standards. Disputes arising out of the labor standards provisions of this contract shall not be subject to the general disputes clause of this contract. Such disputes shall be resolved in accordance with the procedures of the Department of Labor set forth in 29 CFR parts 5, 6, and 7. Disputes within the meaning of this clause include disputes between the contractor (or any of its subcontractors) and the contracting agency, the U.S. Department of Labor, or the employees or their representatives.
(10) Certification of eligibility. (i) By entering into this contract, the contractor certifies that neither it nor any person or firm who has an interest in the contractor's firm is a person or firm ineligible to be awarded Government contracts by virtue of 40 U.S.C. 3144(b) or §5.12(a).
(ii) No part of this contract shall be subcontracted to any person or firm ineligible for award of a Government contract by virtue of 40 U.S.C. 3144(b) or §5.12(a).
(iii) The penalty for making false statements is prescribed in the U.S. Code, Title 18 Crimes and Criminal Procedure, 18 U.S.C. 1001.
(11) Anti-retaliation. It is unlawful for any person to discharge, demote, intimidate, threaten, restrain, coerce, blacklist, harass, or in any other manner discriminate against, or to cause any person to discharge, demote, intimidate, threaten, restrain, coerce, blacklist, harass, or in any other manner discriminate against, any worker or job applicant for:
(i) Notifying any contractor of any conduct which the worker reasonably believes constitutes a violation of the DBA, Related Acts, this part, or 29 CFR part 1 or 3;
(ii) Filing any complaint, initiating or causing to be initiated any proceeding, or otherwise asserting or seeking to assert on behalf of themselves or others any right or protection under the DBA, Related Acts, this part, or 29 CFR part 1 or 3;
(iii) Cooperating in any investigation or other compliance action, or testifying in any proceeding under the DBA, Related Acts, this part, or 29 CFR part 1 or 3; or
(iv) Informing any other person about their rights under the DBA, Related Acts, this part, or 29 CFR part 1 or 3.
(b) Contract Work Hours and Safety Standards Act (CWHSSA). The Agency Head must cause or require the contracting officer to insert the following clauses set forth in paragraphs (b)(1) through (5) of this section in full, or (for contracts covered by the Federal Acquisition Regulation) by reference, in any contract in an amount in excess of $100,000 and subject to the overtime provisions of the Contract Work Hours and Safety Standards Act. These clauses must be inserted in addition to the clauses required by paragraph (a) of this section or 29 CFR 4.6. As used in this paragraph (b), the terms “laborers and mechanics” include watchpersons and guards.
(1) Overtime requirements. No contractor or subcontractor contracting for any part of the contract work which may require or involve the employment of laborers or mechanics shall require or permit any such laborer or mechanic in any workweek in which he or she is employed on such work to work in excess of forty hours in such workweek unless such laborer or mechanic receives compensation at a rate not less than one and one-half times the basic rate of pay for all hours worked in excess of forty hours in such workweek.
(2) Violation; liability for unpaid wages; liquidated damages. In the event of any violation of the clause set forth in paragraph (b)(1) of this section the contractor and any subcontractor responsible therefor shall be liable for the unpaid wages and interest from the date of the underpayment. In addition, such contractor and subcontractor shall be liable to the United States (in the case of work done under contract for the District of Columbia or a territory, to such District or to such territory), for liquidated damages. Such liquidated damages shall be computed with respect to each individual laborer or mechanic, including watchpersons and guards, employed in violation of the clause set forth in paragraph (b)(1) of this section, in the sum of $31 for each calendar day on which such individual was required or permitted to work in excess of the standard workweek of forty hours without payment of the overtime wages required by the clause set forth in paragraph (b)(1).
(3) Withholding for unpaid wages and liquidated damages —(i) Withholding process. The [write in the name of the Federal agency or the recipient of Federal assistance] may, upon its own action, or must, upon written request of an authorized representative of the Department of Labor, withhold or cause to be withheld from the contractor so much of the accrued payments or advances as may be considered necessary to satisfy the liabilities of the prime contractor or any subcontractor for any unpaid wages; monetary relief, including interest; and liquidated damages required by the clauses set forth in this paragraph (b) on this contract, any other Federal contract with the same prime contractor, or any other federally assisted contract subject to the Contract Work Hours and Safety Standards Act that is held by the same prime contractor (as defined in §5.2). The necessary funds may be withheld from the contractor under this contract, any other Federal contract with the same prime contractor, or any other federally assisted contract that is subject to the Contract Work Hours and Safety Standards Act and is held by the same prime contractor, regardless of whether the other contract was awarded or assisted by the same agency, and such funds may be used to satisfy the contractor liability for which the funds were withheld.
(ii) Priority to withheld funds. The Department has priority to funds withheld or to be withheld in accordance with paragraph (a)(2)(i) or (b)(3)(i) of this section, or both, over claims to those funds by:
(A) A contractor's surety(ies), including without limitation performance bond sureties and payment bond sureties;
(B) A contracting agency for its reprocurement costs;
(C) A trustee(s) (either a court-appointed trustee or a U.S. trustee, or both) in bankruptcy of a contractor, or a contractor's bankruptcy estate;
(D) A contractor's assignee(s);
(E) A contractor's successor(s); or
(F) A claim asserted under the Prompt Payment Act, 31 U.S.C. 3901–3907.
(4) Subcontracts. The contractor or subcontractor must insert in any subcontracts the clauses set forth in paragraphs (b)(1) through (5) of this section and a clause requiring the subcontractors to include these clauses in any lower tier subcontracts. The prime contractor is responsible for compliance by any subcontractor or lower tier subcontractor with the clauses set forth in paragraphs (b)(1) through (5). In the event of any violations of these clauses, the prime contractor and any subcontractor(s) responsible will be liable for any unpaid wages and monetary relief, including interest from the date of the underpayment or loss, due to any workers of lower-tier subcontractors, and associated liquidated damages and may be subject to debarment, as appropriate.
(5) Anti-retaliation. It is unlawful for any person to discharge, demote, intimidate, threaten, restrain, coerce, blacklist, harass, or in any other manner discriminate against, or to cause any person to discharge, demote, intimidate, threaten, restrain, coerce, blacklist, harass, or in any other manner discriminate against, any worker or job applicant for:
(i) Notifying any contractor of any conduct which the worker reasonably believes constitutes a violation of the Contract Work Hours and Safety Standards Act (CWHSSA) or its implementing regulations in this part;
(ii) Filing any complaint, initiating or causing to be initiated any proceeding, or otherwise asserting or seeking to assert on behalf of themselves or others any right or protection under CWHSSA or this part;
(iii) Cooperating in any investigation or other compliance action, or testifying in any proceeding under CWHSSA or this part; or
(iv) Informing any other person about their rights under CWHSSA or this part.
(c) CWHSSA required records clause. In addition to the clauses contained in paragraph (b) of this section, in any contract subject only to the Contract Work Hours and Safety Standards Act and not to any of the other laws referenced by §5.1, the Agency Head must cause or require the contracting officer to insert a clause requiring that the contractor or subcontractor must maintain regular payrolls and other basic records during the course of the work and must preserve them for a period of 3 years after all the work on the prime contract is completed for all laborers and mechanics, including guards and watchpersons, working on the contract. Such records must contain the name; last known address, telephone number, and email address; and social security number of each such worker; each worker's correct classification(s) of work actually performed; hourly rates of wages paid; daily and weekly number of hours actually worked; deductions made; and actual wages paid. Further, the Agency Head must cause or require the contracting officer to insert in any such contract a clause providing that the records to be maintained under this paragraph must be made available by the contractor or subcontractor for inspection, copying, or transcription by authorized representatives of the (write the name of agency) and the Department of Labor, and the contractor or subcontractor will permit such representatives to interview workers during working hours on the job.
(d) Incorporation of contract clauses and wage determinations by reference. Although agencies are required to insert the contract clauses set forth in this section, along with appropriate wage determinations, in full into covered contracts, and contractors and subcontractors are required to insert them in any lower-tier subcontracts, the incorporation by reference of the required contract clauses and appropriate wage determinations will be given the same force and effect as if they were inserted in full text.
(e) Incorporation by operation of law. The contract clauses set forth in this section (or their equivalent under the Federal Acquisition Regulation), along with the correct wage determinations, will be considered to be a part of every prime contract required by the applicable statutes referenced by §5.1 to include such clauses, and will be effective by operation of law, whether or not they are included or incorporated by reference into such contract, unless the Administrator grants a variance, tolerance, or exemption from the application of this paragraph. Where the clauses and applicable wage determinations are effective by operation of law under this paragraph, the prime contractor must be compensated for any resulting increase in wages in accordance with applicable law.
§5.6 Enforcement
(a) Agency responsibilities. (1)(i) The Federal agency has the initial responsibility to ascertain whether the clauses required by §5.5 and the appropriate wage determination(s) have been incorporated into the contracts subject to the labor standards provisions of the laws referenced by §5.1. Additionally, a Federal agency that provides Federal financial assistance that is subject to the labor standards provisions of the Act must promulgate the necessary regulations or procedures to require the recipient or sub-recipient of the Federal assistance to insert in its contracts the provisions of §5.5. No payment, advance, grant, loan, or guarantee of funds will be approved by the Federal agency unless it ensures that the clauses required by §5.5 and the appropriate wage determination(s) are incorporated into such contracts. Furthermore, no payment, advance, grant, loan, or guarantee of funds will be approved by the Federal agency after the beginning of construction unless there is on file with the Federal agency a certification by the contractor that the contractor and its subcontractors have complied with the provisions of §5.5 or unless there is on file with the Federal agency a certification by the contractor that there is a substantial dispute with respect to the required provisions.
(ii) If a contract subject to the labor standards provisions of the applicable statutes referenced by §5.1 is entered into without the incorporation of the clauses required by §5.5, the agency must, upon the request of the Administrator or upon its own initiative, either terminate and resolicit the contract with the required contract clauses, or incorporate the required clauses into the contract (or ensure they are so incorporated) through supplemental agreement, change order, or any and all authority that may be needed. Where an agency has not entered directly into such a contract but instead has provided Federal financial assistance, the agency must ensure that the recipient or sub-recipient of the Federal assistance similarly incorporates the clauses required into its contracts. The method of incorporation of the correct wage determination, and adjustment in contract price, where appropriate, should be in accordance with applicable law. Additionally, the following requirements apply:
(A) Unless the Administrator directs otherwise, the incorporation of the clauses required by §5.5 must be retroactive to the date of contract award or start of construction if there is no award.
(B) If this incorporation occurs as the result of a request from the Administrator, the incorporation must take place within 30 days of the date of that request, unless the agency has obtained an extension from the Administrator.
(C) The contractor must be compensated for any increases in wages resulting from incorporation of a missing contract clause.
(D) If the recipient refuses to incorporate the clauses as required, the agency must make no further payment, advance, grant, loan, or guarantee of funds in connection with the contract until the recipient incorporates the required clauses into its contract, and must promptly refer the dispute to the Administrator for further proceedings under §5.13.
(E) Before terminating a contract pursuant to this section, the agency must withhold or cross-withhold sufficient funds to remedy any back wage liability resulting from the failure to incorporate the correct wage determination or otherwise identify and obligate sufficient funds through a termination settlement agreement, bond, or other satisfactory mechanism.
(F) Notwithstanding the requirement to incorporate the contract clauses and correct wage determination within 30 days, the contract clauses and correct wage determination will be effective by operation of law, retroactive to the beginning of construction, in accordance with §5.5(e).
(2)(i) Certified payrolls submitted pursuant to §5.5(a)(3)(ii) must be preserved by the Federal agency for a period of 3 years after all the work on the prime contract is completed, and must be produced at the request of the Department of Labor at any time during the 3-year period, regardless of whether the Department of Labor has initiated an investigation or other compliance action.
(ii) In situations where the Federal agency does not itself maintain certified payrolls required to be submitted pursuant to §5.5(a)(3)(ii), upon the request of the Department of Labor the Federal agency must ensure that such certified payrolls are provided to the Department of Labor. Such certified payrolls may be provided by the applicant, sponsor, owner, or other entity, as the case may be, directly to the Department of Labor, or to the Federal agency which, in turn, must provide those records to the Department of Labor.
(3) The Federal agency will cause such investigations to be made as may be necessary to assure compliance with the labor standards clauses required by §5.5 and the applicable statutes referenced in §5.1. Investigations will be made of all contracts with such frequency as may be necessary to assure compliance. Such investigations will include interviews with workers, which must be taken in confidence, and examinations of certified payrolls, regular payrolls, and other basic records required to be maintained under §5.5(a)(3). In making such examinations, particular care must be taken to determine the correctness of classification(s) of work actually performed, and to determine whether there is a disproportionate amount of work by laborers and of apprentices registered in approved programs. Such investigations must also include evidence of fringe benefit plans and payments thereunder. Federal agencies must give priority to complaints of alleged violations.
(4) In accordance with normal operating procedures, the contracting agency may be furnished various investigatory material from the investigation files of the Department of Labor. None of the material, other than computations of back wages, liquidated damages, and monetary relief for violations of §5.5(a)(11) or (b)(5), and the summary of back wages due, may be disclosed in any manner to anyone other than Federal officials charged with administering the contract or program providing Federal assistance to the contract, without requesting the permission and views of the Department of Labor.
(b) Department of Labor investigations and other compliance actions. (1) The Administrator will investigate and conduct other compliance actions as deemed necessary in order to obtain compliance with the labor standards provisions of the applicable statutes referenced by §5.1, or to affirm or reject the recommendations by the Agency Head with respect to labor standards matters arising under the statutes referenced by §5.1.
(2) Federal agencies, contractors, subcontractors, sponsors, applicants, owners, or other entities, as the case may be, must cooperate with any authorized representative of the Department of Labor in the inspection of records, in interviews with workers, and in all other aspects of the investigations or other compliance actions.
(3) The findings of such an investigation or other compliance action, including amounts found due, may not be altered or reduced without the approval of the Department of Labor.
(4) Where the underpayments disclosed by such an investigation or other compliance action total $1,000 or more, where there is reason to believe that the contractor or subcontractor has disregarded its obligations to workers or subcontractors, or where liquidated damages may be assessed under CWHSSA, the Department of Labor will furnish the Federal agency an enforcement report detailing the labor standards violations disclosed by the investigation or other compliance action and any action taken by the contractor or subcontractor to correct the violations, including any payment of back wages or any other relief provided workers or remedial actions taken for violations of §5.5(a)(11) or (b)(5). In other circumstances, the Department of Labor will furnish the Federal agency a notification summarizing the findings of the investigation or other compliance action.
(c) Confidentiality requirements. It is the policy of the Department of Labor to protect from disclosure the identity of its confidential sources and to prevent an unwarranted invasion of personal privacy. Accordingly, the identity of a worker or other informant who makes a written or oral statement as a complaint or in the course of an investigation or other compliance action, as well as portions of the statement which would tend to reveal the identity of the informant, will not be disclosed in any manner to anyone other than Federal officials without the prior consent of the informant. Disclosure of such statements is also governed by the provisions of the “Freedom of Information Act” (5 U.S.C. 552, see part 70 of this subtitle) and the “Privacy Act of 1974” (5 U.S.C. 552a, see part 71 of this subtitle).
§5.7 Reports to the Secretary of Labor.
(a) Enforcement reports. (1) Where underpayments by a contractor or subcontractor total less than $1,000, where there is no reason to believe that the contractor or subcontractor has disregarded its obligations to workers or subcontractors, and where restitution has been effected and future compliance assured, the Federal agency need not submit its investigative findings and recommendations to the Administrator, unless the investigation or other compliance action was made at the request of the Department of Labor. In the latter case, the Federal agency will submit a factual summary report detailing any violations including any data on the amount of restitution paid, the number of workers who received restitution, liquidated damages assessed under the Contract Work Hours and Safety Standards Act, corrective measures taken (such as “letters of notice” or remedial action taken for violations of §5.5(a)(11) or (b)(5)), and any information that may be necessary to review any recommendations for an appropriate adjustment in liquidated damages under §5.8.
(2) Where underpayments by a contractor or subcontractor total $1,000 or more, or where there is reason to believe that the contractor or subcontractor has disregarded its obligations to workers or subcontractors, the Federal agency will furnish within 60 days after completion of its investigation, a detailed enforcement report to the Administrator.
§5.9 Suspension of funds.
(a) Suspension and withholding. In the event of failure or refusal of the contractor or any subcontractor to comply with the applicable statutes referenced by §5.1 and the labor standards clauses contained in §5.5, whether incorporated into the contract physically, by reference, or by operation of law, the Federal agency (and any other agency), may, upon its own action, or must, upon written request of an authorized representative of the Department of Labor, take such action as may be necessary to cause the suspension of the payment, advance, or guarantee of funds until such time as the violations are discontinued and/or until sufficient funds are withheld as may be considered necessary to compensate workers for the full amount of wages and monetary relief to which they are entitled, and to cover any liquidated damages and pre-judgment or post-judgment interest which may be due.
(b) Cross-withholding. To satisfy a contractor's liability for back wages on a contract, in addition to the suspension and withholding of funds from the contract(s) under which the violation(s) occurred, the necessary funds also may be withheld under any other Federal contract with the same prime contractor, or any other federally assisted contract that is subject to Davis-Bacon labor standards and/or the Contract Work Hours and Safety Standards Act and is held by the same prime contractor, regardless of whether the other contract was awarded or assisted by the same agency.
(c) Cross-withholding from different legal entities. Cross-withholding of funds may be requested from contracts held by other entities that may be considered to be the same prime contractor as that term is defined in §5.2. Such cross-withholding is appropriate where the separate legal entities have independently consented to it by entering into contracts containing the withholding provisions at §5.5(a)(2) and (b)(3). Cross-withholding from a contract held by a different legal entity is not appropriate unless the withholding provisions were incorporated in full or by reference in that different legal entity's contract. Absent exceptional circumstances, cross-withholding is not permitted from a contract held by a different legal entity where the Davis-Bacon labor standards were incorporated only by operation of law into that contract.
§5.10 Restitution, criminal action.
(a) In cases other than those forwarded to the Attorney General of the United States under paragraph (b) of this section where violations of the labor standards clauses contained in §5.5 and the applicable statutes referenced by §5.1 result in underpayment of wages to workers or monetary damages caused by violations of §5.5(a)(11) or (b)(5), the Federal agency or an authorized representative of the Department of Labor will request that restitution be made to such workers or on their behalf to plans, funds, or programs for any type of bona fide fringe benefits within the meaning of 40 U.S.C. 3141(2)(B), including interest from the date of the underpayment or loss. Interest on any back wages or monetary relief provided for in this part will be calculated using the percentage established for the underpayment of taxes under 26 U.S.C. 6621 and will be compounded daily.
(b) In cases where the Agency Head or the Administrator finds substantial evidence that such violations are willful and in violation of a criminal statute, the matter will be forwarded to the Attorney General of the United States for prosecution if the facts warrant. In all such cases the Administrator will be informed simultaneously of the action taken.
§5.11 Disputes concerning payment of wages.
(a) This section sets forth the procedure for resolution of disputes of fact or law concerning payment of prevailing wage rates, overtime pay, proper classification, or monetary relief for violations of §5.5(a)(11) or (b)(5). The procedures in this section may be initiated upon the Administrator's own motion, upon referral of the dispute by a Federal agency pursuant to §5.5(a)(9), or upon request of the contractor or subcontractor.
(b)(1) In the event of a dispute described in paragraph (a) of this section in which it appears that relevant facts are at issue, the Administrator will notify the affected contractor and subcontractor, if any, by registered or certified mail to the last known address or by any other means normally assuring delivery, of the investigation findings. If the Administrator determines that there is reasonable cause to believe that either the contractor, the subcontractor, or both, should also be subject to debarment under the Davis-Bacon Act or any of the other applicable statutes referenced by §5.1, the notification will so indicate.
(2) A contractor or subcontractor desiring a hearing concerning the Administrator's investigation findings must request such a hearing by letter or by any other means normally assuring delivery, sent within 30 days of the date of the Administrator's notification. The request must set forth those findings which are in dispute and the reasons therefor, including any affirmative defenses.
(3) Upon receipt of a timely request for a hearing, the Administrator will refer the case to the Chief Administrative Law Judge by Order of Reference, with an attached copy of the notification from the Administrator and the response of the contractor or subcontractor, for designation of an Administrative Law Judge to conduct such hearings as may be necessary to resolve the disputed matters. The hearings will be conducted in accordance with the procedures set forth in part 6 of this subtitle.
(c)(1) In the event of a dispute described in paragraph (a) of this section in which it appears that there are no relevant facts at issue, and where there is not at that time reasonable cause to institute debarment proceedings under §5.12, the Administrator will notify the contractor and subcontractor, if any, by registered or certified mail to the last known address or by any other means normally assuring delivery, of the investigation findings, and will issue a ruling on any issues of law known to be in dispute.
(2)(i) If the contractor or subcontractor disagrees with the factual findings of the Administrator or believes that there are relevant facts in dispute, the contractor or subcontractor must advise the Administrator by letter or by any other means normally assuring delivery, sent within 30 days of the date of the Administrator's notification. In the response, the contractor or subcontractor must explain in detail the facts alleged to be in dispute and attach any supporting documentation.
(ii) Upon receipt of a response under paragraph (c)(2)(i) of this section alleging the existence of a factual dispute, the Administrator will examine the information submitted. If the Administrator determines that there is a relevant issue of fact, the Administrator will refer the case to the Chief Administrative Law Judge in accordance with paragraph (b)(3) of this section. If the Administrator determines that there is no relevant issue of fact, the Administrator will so rule and advise the contractor and subcontractor, if any, accordingly.
(3) If the contractor or subcontractor desires review of the ruling issued by the Administrator under paragraph (c)(1) or (2) of this section, the contractor or subcontractor must file a petition for review thereof with the Administrative Review Board within 30 days of the date of the ruling, with a copy thereof to the Administrator. The petition for review must be filed in accordance with part 7 of this subtitle.
(d) If a timely response to the Administrator's findings or ruling is not made or a timely petition for review is not filed, the Administrator's findings or ruling will be final, except that with respect to debarment under the Davis-Bacon Act, the Administrator will advise the Comptroller General of the Administrator's recommendation in accordance with §5.12(a)(2). If a timely response or petition for review is filed, the findings or ruling of the Administrator will be inoperative unless and until the decision is upheld by the Administrative Law Judge or the Administrative Review Board.
§5.12 Debarment proceedings.
(a) Debarment standard and ineligible list. (1) Whenever any contractor or subcontractor is found by the Secretary of Labor to have disregarded their obligations to workers or subcontractors under the Davis-Bacon Act, any of the other applicable statutes referenced by §5.1, this part, or part 3 of this subtitle, such contractor or subcontractor and their responsible officers, if any, and any firm, corporation, partnership, or association in which such contractor, subcontractor, or responsible officer has an interest will be ineligible for a period of 3 years to be awarded any contract or subcontract of the United States or the District of Columbia and any contract or subcontract subject to the labor standards provisions of any of the statutes referenced by §5.1.
(2) In cases arising under contracts covered by the Davis-Bacon Act, the Administrator will transmit to the Comptroller General the name(s) of the contractors or subcontractors and their responsible officers, if any, and any firms, corporations, partnerships, or associations in which the contractors, subcontractors, or responsible officers are known to have an interest, who have been found to have disregarded their obligations to workers or subcontractors, and the recommendation of the Secretary of Labor or authorized representative regarding debarment. In cases arising under contracts covered by any of the applicable statutes referenced by §5.1 other than the Davis-Bacon Act, the Administrator determines the name(s) of the contractors or subcontractors and their responsible officers, if any, and any firms, corporations, partnerships, or associations in which the contractors, subcontractors, or responsible officers are known to have an interest, to be debarred. The names of such ineligible persons or firms will be published on SAM or its successor website, and an ineligible person or firm will be ineligible for a period of 3 years from the date of publication of their name on the ineligible list, to be awarded any contract or subcontract of the United States or the District of Columbia and any contract or subcontract subject to the labor standards provisions of any of the statutes referenced by §5.1.
(b) Procedure. (1) In addition to cases under which debarment action is initiated pursuant to §5.11, whenever as a result of an investigation conducted by the Federal agency or the Department of Labor, and where the Administrator finds reasonable cause to believe that a contractor or subcontractor has committed violations which constitute a disregard of its obligations to workers or subcontractors under the Davis-Bacon Act, the labor standards provisions of any of the other applicable statutes referenced by §5.1, this part, or part 3 of this subtitle, the Administrator will notify by registered or certified mail to the last known address or by any other means normally assuring delivery, the contractor or subcontractor and responsible officers, if any, and any firms, corporations, partnerships, or associations in which the contractors, subcontractors, or responsible officers are known to have an interest of the finding.
(i) The Administrator will afford such contractor, subcontractor, responsible officer, and any other parties notified an opportunity for a hearing as to whether debarment action should be taken under paragraph (a) of this section. The Administrator will furnish to those notified a summary of the investigative findings.
(ii) If the contractor, subcontractor, responsible officer, or any other parties notified wish to request a hearing as to whether debarment action should be taken, such a request must be made by letter or by any other means normally assuring delivery, sent within 30 days of the date of the notification from the Administrator, and must set forth any findings which are in dispute and the basis for such disputed findings, including any affirmative defenses to be raised.
(iii) Upon timely receipt of such request for a hearing, the Administrator will refer the case to the Chief Administrative Law Judge by Order of Reference, with an attached copy of the notification from the Administrator and the responses of the contractor, subcontractor, responsible officers, or any other parties notified, for designation of an Administrative Law Judge to conduct such hearings as may be necessary to determine the matters in dispute.
(iv) In considering debarment under any of the statutes referenced by §5.1 other than the Davis-Bacon Act, the Administrative Law Judge will issue an order concerning whether the contractor, subcontractor, responsible officer, or any other party notified is to be debarred in accordance with paragraph (a) of this section. In considering debarment under the Davis-Bacon Act, the Administrative Law Judge will issue a recommendation as to whether the contractor, subcontractor, responsible officers, or any other party notified should be debarred under 40 U.S.C. 3144(b).
(2) Hearings under this section will be conducted in accordance with part 6 of this subtitle. If no hearing is requested within 30 days of the date of the notification from the Administrator, the Administrator's findings will be final, except with respect to recommendations regarding debarment under the Davis-Bacon Act, as set forth in paragraph (a)(2) of this section.
(c) Interests of debarred parties. (1) A finding as to whether persons or firms whose names appear on the ineligible list have an interest under 40 U.S.C. 3144(b) or paragraph (a) of this section in any other firm, corporation, partnership, or association, may be made through investigation, hearing, or otherwise.
(2)(i) The Administrator, on their own motion or after receipt of a request for a determination pursuant to paragraph (c)(3) of this section, may make a finding on the issue of interest.
(ii) If the Administrator determines that there may be an interest but finds that there is insufficient evidence to render a final ruling thereon, the Administrator may refer the issue to the Chief Administrative Law Judge in accordance with paragraph (c)(4) of this section.
(iii) If the Administrator finds that no interest exists, or that there is not sufficient information to warrant the initiation of an investigation, the requesting party, if any, will be so notified and no further action taken.
(iv)(A) If the Administrator finds that an interest exists, the person or firm affected will be notified of the Administrator's finding (by certified mail to the last known address or by any other means normally assuring delivery), which will include the reasons therefore, and such person or firm will be afforded an opportunity to request that a hearing be held to decide the issue.
(B) Such person or firm will have 20 days from the date of the Administrator's ruling to request a hearing. A person or firm desiring a hearing must request it by letter or by any other means normally assuring delivery, sent within 20 days of the date of the Administrator's notification. A detailed statement of the reasons why the Administrator's ruling is in error, including facts alleged to be in dispute, if any, must be submitted with the request for a hearing.
(C) If no hearing is requested within the time mentioned in paragraph (c)(2)(iv)(B) of this section, the Administrator's finding will be final and the Administrator will notify the Comptroller General in cases arising under the DBA. If a hearing is requested, the ruling of the Administrator will be inoperative unless and until the Administrative Law Judge or the Administrative Review Board issues an order that there is an interest.
(3)(i) A request for a determination of interest may be made by any interested party, including contractors or prospective contractors and associations of contractors, representatives of workers, and interested agencies. Such a request must be submitted in writing to the Administrator, Wage and Hour Division, U.S. Department of Labor, 200 Constitution Avenue NW, Washington, DC 20210.
(ii) The request must include a statement setting forth in detail why the petitioner believes that a person or firm whose name appears on the ineligible list has an interest in any firm, corporation, partnership, or association that is seeking or has been awarded a contract or subcontract of the United States or the District of Columbia, or a contract or subcontract that is subject to the labor standards provisions of any of the statutes referenced by §5.1. No particular form is prescribed for the submission of a request under this section.
(4) The Administrator, on their own motion under paragraph (c)(2)(ii) of this section or upon a request for hearing where the Administrator determines that relevant facts are in dispute, will by order refer the issue to the Chief Administrative Law Judge, for designation of an Administrative Law Judge who will conduct such hearings as may be necessary to render a decision solely on the issue of interest. Such proceedings must be conducted in accordance with the procedures set forth in part 6 of this subtitle.
(5) If the person or firm affected requests a hearing and the Administrator determines that relevant facts are not in dispute, the Administrator will refer the issue and the record compiled thereon to the Administrative Review Board to render a decision solely on the issue of interest. Such proceeding must be conducted in accordance with the procedures set forth in part 7 of this subtitle.
§5.13 Rulings and interpretations.
(a) All questions relating to the application and interpretation of wage determinations (including the classifications therein) issued pursuant to part 1 of this subtitle, of the rules contained in this part and in parts 1 and 3 of this subtitle, and of the labor standards provisions of any of the laws referenced in §5.1 must be referred to the Administrator for appropriate ruling or interpretation. These rulings and interpretations are authoritative and those under the Davis-Bacon Act may be relied upon as provided for in section 10 of the Portal-to-Portal Act of 1947 (29 U.S.C. 259). Requests for such rulings and interpretations should be submitted via email to dgceinquiries@dol.gov ; by mail to Administrator, Wage and Hour Division, U.S. Department of Labor, 200 Constitution Ave., NW, Washington, DC 20210; or through other means directed by the Administrator.
(b) If any such ruling or interpretation is made by an authorized representative of the Administrator of the Wage and Hour Division, any interested party may seek reconsideration of the ruling or interpretation by the Administrator of the Wage and Hour Division. The procedures and time limits set out in §1.8 of this subtitle apply to any such request for reconsideration.
§5.15 Limitations, variations, tolerances, and exemptions under the Contract Work Hours and Safety Standards Act.
(c)(4)(i) Time spent in an organized program of related, supplemental instruction by laborers or mechanics employed under bona fide apprenticeship programs may be excluded from working time if the criteria prescribed in paragraphs (c)(4)(ii) and (iii) of this section are met.
(ii) The apprentice comes within the definition contained in §5.2.
(iii) The time in question does not involve productive work or performance of the apprentice's regular duties.
(d)(1) In the event of failure or refusal of the contractor or any subcontractor to comply with overtime pay requirements of the Contract Work Hours and Safety Standards Act, if the funds withheld by Federal agencies for the violations are not sufficient to pay fully the unpaid wages and any back pay or other monetary relief due laborers and mechanics, with interest, and the liquidated damages due the United States, the available funds will be used first to compensate the laborers and mechanics for the wages to which they are entitled (or an equitable portion thereof when the funds are not adequate for this purpose); and the balance, if any, will be used for the payment of liquidated damages.
§5.20 Scope and significance of this subpart.
The 1964 amendments (Pub. L. 88–349) to the Davis-Bacon Act require, among other things, that the prevailing wage determined for Federal and federally assisted construction include the basic hourly rate of pay and the amount contributed by the contractor or subcontractor for certain fringe benefits (or the cost to them of such benefits). The purpose of this subpart is to explain the provisions of these amendments and make available in one place official interpretations of the fringe benefits provisions of the Davis-Bacon Act. These interpretations will guide the Department of Labor in carrying out its responsibilities under these provisions. These interpretations are intended also to provide guidance to contractors and their associations; laborers and mechanics and their organizations; and local, State, and Federal agencies. The interpretations contained in this subpart are authoritative and may be relied upon as provided for in section 10 of the Portal-to-Portal Act of 1947 (29 U.S.C. 259). The omission to discuss a particular problem in this subpart or in interpretations supplementing it should not be taken to indicate the adoption of any position by the Secretary of Labor with respect to such problem or to constitute an administrative interpretation, practice, or enforcement policy. Questions on matters not fully covered by this subpart may be referred to the Secretary for interpretation as provided in §5.13.
§5.22 Effect of the Davis-Bacon fringe benefits provisions
The Davis-Bacon Act and the prevailing wage provisions of the statutes referenced in §1.1 of this subtitle confer upon the Secretary of Labor the authority to predetermine, as minimum wages, those wage rates found to be prevailing for corresponding classes of laborers and mechanics employed on projects of a character similar to the contract work in the area in which the work is to be performed. See the definitions of the terms “prevailing wage” and “area” in §1.2 of this subtitle. The fringe benefits amendments enlarge the scope of this authority by including certain bona fide fringe benefits within the meaning of the terms “wages”, “scale of wages”, “wage rates”, “minimum wages”, and “prevailing wages”, as used in the Davis-Bacon Act.
§5.23 The statutory provisions.
Pursuant to the Davis-Bacon Act, as amended and codified at 40 U.S.C. 3141(2), the term “prevailing wages” and similar terms include the basic hourly rate of pay and, for the listed fringe benefits and other bona fide fringe benefits not required by other law, the contributions irrevocably made by a contractor or subcontractor to a trustee or third party pursuant to a bona fide fringe benefit fund, plan, or program, and the costs to the contractor or subcontractor that may be reasonably anticipated in providing bona fide fringe benefits pursuant to an enforceable commitment to carry out a financially responsible plan or program, which was communicated in writing to the affected laborers and mechanics. Section 5.29 discusses specific fringe benefits that may be considered to be bona fide.
§5.26 “* * * contribution irrevocably made * * * to a trustee or to a third person”.
(a) Requirements. The following requirements apply to any fringe benefit contributions made to a trustee or to a third person pursuant to a fund, plan, or program:
(1) Such contributions must be made irrevocably;
(2) The trustee or third person may not be affiliated with the contractor or subcontractor;
(3) A trustee must adhere to any fiduciary responsibilities applicable under law; and
(4) The trust or fund must not permit the contractor or subcontractor to recapture any of the contributions paid in or any way divert the funds to its own use or benefit.
(b) Excess payments. Notwithstanding the above, a contractor or subcontractor may recover sums which it had paid to a trustee or third person in excess of the contributions actually called for by the plan, such as excess payments made in error or in order to cover the estimated cost of contributions at a time when the exact amount of the necessary contributions is not yet known. For example, a benefit plan may provide for definite insurance benefits for employees in the event of contingencies such as death, sickness, or accident, with the cost of such definite benefits borne by the contractor or subcontractor. In such a case, if the insurance company returns the amount that the contractor or subcontractor paid in excess of the amount required to provide the benefits, this will not be deemed a recapture or diversion by the employer of contributions made pursuant to the plan. ( See Report of the Senate Committee on Labor and Public Welfare, S. Rep. No. 963, 88th Cong., 2d Sess., p. 5.)
§5.28 Unfunded plans.
(a) The costs to a contractor or subcontractor which may be reasonably anticipated in providing benefits of the types described in the Act, pursuant to an enforceable commitment to carry out a financially responsible plan or program, are considered fringe benefits within the meaning of the Act ( see 40 U.S.C. 3141(2)(B)(ii)). The legislative history suggests that these provisions were intended to permit the consideration of fringe benefits meeting these requirements, among others, and which are provided from the general assets of a contractor or subcontractor. (Report of the House Committee on Education and Labor, H. Rep. No. 308, 88th Cong., 1st Sess., p. 4; see also S. Rep. No. 963, p. 6.)
(b) Such a benefit plan or program, commonly referred to as an unfunded plan, may not constitute a fringe benefit within the meaning of the Act unless:
(1) It could be reasonably anticipated to provide the benefits described in the Act;
(2) It represents a commitment that can be legally enforced;
(3) It is carried out under a financially responsible plan or program;
(4) The plan or program providing the benefits has been communicated in writing to the laborers and mechanics affected; and
(5) The contractor or subcontractor requests and receives approval of the plan or program from the Secretary, as described in paragraph (c) of this section.
(c) To receive approval of an unfunded plan or program, a contractor or subcontractor must demonstrate in its request to the Secretary that the unfunded plan or program, and the benefits provided under such plan or program, are “bona fide,” meet the requirements set forth in paragraphs (b)(1) through (4) of this section, and are otherwise consistent with the Act. The request must include sufficient documentation to enable the Secretary to evaluate these criteria. Contractors and subcontractors may request approval of an unfunded plan or program by submitting a written request in one of the following manners:
(1) By mail to the United States Department of Labor, Wage and Hour Division, Director, Division of Government Contracts Enforcement, 200 Constitution Ave. NW, Room S–3502, Washington, DC 20210;
(2) By email to unfunded@dol.gov (or its successor email address); or
(3) By any other means directed by the Administrator.
(d) Unfunded plans or programs may not be used as a means of avoiding the Act's requirements. The words “reasonably anticipated” require that any unfunded plan or program be able to withstand a test of actuarial soundness. Moreover, as in the case of other fringe benefits payable under the Act, an unfunded plan or program must be “bona fide” and not a mere simulation or sham for avoiding compliance with the Act. To prevent these provisions from being used to avoid compliance with the Act, the Secretary may direct a contractor or subcontractor to set aside in an account assets which, under sound actuarial principles, will be sufficient to meet future obligations under the plan. Such an account must be preserved for the purpose intended. (S. Rep. No. 963, p. 6.)
§5.29 Specific fringe benefits.
* * * *
(e) Where the plan is not of the conventional type described in paragraph (d) of this section, the Secretary must examine the facts and circumstances to determine whether fringe benefits under the plan are “bona fide” in accordance with requirements of the Act. This is particularly true with respect to unfunded plans discussed in §5.28. Contractors or subcontractors seeking credit under the Act for costs incurred for such plans must request specific approval from the Secretary under §5.5(a)(1)(iv).
§5.30 Types of wage determinations.
(a) When fringe benefits are prevailing for various classes of laborers and mechanics in the area of proposed construction, such benefits are includable in any Davis-Bacon wage determination. The examples contained in paragraph (c) of this section demonstrate how fringe benefits may be listed on wage determinations in such cases.
(b) Wage determinations do not include fringe benefits for various classes of laborers and mechanics whenever such benefits do not prevail in the area of proposed construction. When this occurs, the wage determination will contain only the basic hourly rates of pay which are prevailing for the various classes of laborers and mechanics. An illustration of this situation is contained in paragraph (c) of this section.
(c) The following illustrates examples of the situations discussed in paragraph (a) and (b) of this section:
Figure 1 to Paragraph (c)
§5.31 Meeting wage determination obligations.
(a) A contractor or subcontractor performing work subject to a Davis-Bacon wage determination may discharge their minimum wage obligations for the payment of both straight time wages and fringe benefits by paying in cash, making payments or incurring costs for “bona fide” fringe benefits of the types listed in the applicable wage determination or otherwise found prevailing by the Secretary of Labor, or by a combination thereof.
(b) A contractor or subcontractor may discharge their obligations for the payment of the basic hourly rates and the fringe benefits where both are contained in a wage determination applicable to their laborers or mechanics in the following ways:
(1) By paying not less than the basic hourly rate to the laborers or mechanics and by making contributions for “bona fide” fringe benefits in a total amount not less than the total of the fringe benefits required by the wage determination. For example, the obligations for “Laborer: common or general” in §5.30, figure 1 to paragraph (c), will be met by the payment of a straight time hourly rate of not less than $21.93 and by contributions of not less than a total of $6.27 an hour for “bona fide” fringe benefits; or
(2) By paying in cash directly to laborers or mechanics for the basic hourly rate and by making an additional cash payment in lieu of the required benefits. For example, where an employer does not make payments or incur costs for fringe benefits, they would meet their obligations for “Laborer: common or general” in §5.30, figure 1 to paragraph (c), by paying directly to the laborers a straight time hourly rate of not less than $28.60 ($21.93 basic hourly rate plus $6.27 for fringe benefits); or
(3) As stated in paragraph (a) of this section, the contractor or subcontractor may discharge their minimum wage obligations for the payment of straight time wages and fringe benefits by a combination of the methods illustrated in paragraphs (b)(1) and (2) of this section. Thus, for example, their obligations for “Laborer: common or general” may be met by an hourly rate, partly in cash and partly in payments or costs for fringe benefits which total not less than $28.60 ($21.93 basic hourly rate plus $6.27 for fringe benefits).
SUMMARY:
In this final rule, the Department of Labor (Department or DOL) updates regulations issued under the Davis-Bacon and Related Acts. As the first comprehensive regulatory review in nearly 40 years, revisions to these regulations will promote compliance, provide appropriate and updated guidance, and enhance their usefulness in the modern economy.
DATES:Effective date: This final rule is effective on October 23, 2023, published in the Federal Register August 23, 2023, page 57526.
View final rule.
Part 1-Procedures for predetermination of wage rates | ||
Authority | Revised | View text |
§1.1 Purpose and scope | ||
(a), (b) | Revised | View text |
§1.2 Definitions. | ||
Entire section | Revised | View text |
§1.3 Obtaining and compiling wage rate information. | ||
Entire section | Revised | View text |
§1.4 Report of agency construction programs. | ||
Entire section | Revised | View text |
§1.5 Publication of general wage determinations and procedure for requesting project wage determinations. | ||
Entire section | Revised | View text |
§1.6 Use and effectiveness of wage determinations. | ||
Entire section | Revised | View text |
§1.7 Scope of consideration. | ||
Entire section | Revised | View text |
§1.8 Reconsideration by the Administrator. | ||
Entire section | Revised | View text |
§1.10 Severability. | ||
Entire section | Added | View text |
Appendix A to Part 1 | ||
Entire appendix | Removed | View text |
Appendix B to Part 1 | ||
Entire appendix | Removed | View text |
§3.1 Purpose and scope. | ||
Entire section | Revised | View text |
§3.2 Definitions. | ||
Entire section | Revised | View text |
§3.3 Certified payrolls. | ||
Entire section | Revised | View text |
§3.4 Submission of certified payroll and the preservation and inspection of weekly payroll records. | ||
Entire section | Revised | View text |
§3.5 Payroll deductions permissible without application to or approval of the Secretary of Labor. | ||
Entire section | Revised | View text |
§3.7 Applications for the approval of the Secretary of Labor. | ||
Revised | View text | |
§3.8 Action by the Secretary of Labor upon applications. | ||
Revised | View text | |
§3.11 Regulations part of contract. | ||
Entire section | Revised | View text |
Part 5-Labor standards provisions applicable to contracts covering federally financed and assisted construction (also labor standards provisions applicable to nonconstruction | ||
Authority | Revised | View text |
§5.1 Purpose and scope. | ||
Entire section | Revised | View text |
§5.2 Definitions. | ||
Entire section | Revised | View text |
§5.5 Contract provisions and related matters. | ||
Entire section | Revised | View text |
§5.6 Enforcement | ||
Entire section | Revised | View text |
§5.7 Reports to the Secretary of Labor. | ||
(a) | Revised | View text |
§5.9 Suspension of funds. | ||
Entire section | Revised | View text |
§5.10 Restitution, criminal action. | ||
Entire section | Revised | View text |
§5.11 Disputes concerning payment of wages. | ||
Entire section | Revised | View text |
§5.12 Debarment proceedings. | ||
Entire section | Revised | View text |
§5.13 Rulings and interpretations. | ||
Entire section | Revised | View text |
§5.15 Limitations, variations, tolerances, and exemptions under the Contract Work Hours and Safety Standards Act. | ||
(c)(4) | Revised | View text |
(d)(1) | Revised | View text |
§5.16 Training plans approved or recognized by the Department of Labor prior to August 20, 1975. | ||
Entire section | Removed | View text |
§5.17 Withdrawal of approval of a training program. | ||
Entire section | Removed | View text |
§5.18 Remedies for retaliation. | ||
Entire section | Added | View text |
§5.20 Scope and significance of this subpart. | ||
Entire section | Revised | View text |
§5.22 Effect of the Davis-Bacon fringe benefits provisions | ||
Entire section | Revised | View text |
§5.23 The statutory provisions. | ||
Entire section | Revised | View text |
§5.25 Rate of contribution or cost for fringe benefits. | ||
(c) | Added | View text |
§5.26 “* * * contribution irrevocably made * * * to a trustee or to a third person”. | ||
Entire section | Revised | View text |
§5.28 Unfunded plans. | ||
Entire section | Revised | View text |
§5.29 Specific fringe benefits. | ||
(e) | Revised | View text |
(g) | Revised | View text |
§5.30 Types of wage determinations. | ||
Entire section | Revised | View text |
§5.31 Meeting wage determination obligations. | ||
Entire section | Revised | View text |
§5.33 Administrative expenses of a contractor or subcontractor. | ||
Entire section | Added | View text |
§5.40 Severability. | ||
Entire section | Revised | View text |
New Text
Part 1-Procedures for predetermination of wage rates
Authority: 5 U.S.C. 301; Reorganization Plan No. 14 of 1950, 5 U.S.C. appendix; 40 U.S.C. 3141 et seq.; 40 U.S.C. 3145; 40 U.S.C. 3148; Secretary of Labor’s Order 01-2014, 79 FR 77527; and the laws referenced by 29 CFR 5.1.
§1.1 Purpose and scope
(a) The procedural rules in this part apply under the Davis-Bacon Act (46 Stat. 1494, as amended; 40 U.S.C. 3141 et seq.), and any laws now existing or subsequently enacted, which require the payment of minimum wages, including fringe benefits, to laborers and mechanics engaged in construction activity under contracts entered into or financed by or with the assistance of agencies of the United States or the District of Columbia, based on determinations by the Secretary of Labor of the wage rates and fringe benefits prevailing for the corresponding classes of laborers and mechanics employed on projects similar to the contract work in the local areas where such work is to be performed.
(1) A listing of laws requiring the payment of wages at rates predetermined by the Secretary of Labor under the Davis-Bacon Act can be found at www.dol.gov/agencies/whd/government-contracts or its successor website.
(2) Functions of the Secretary of Labor under these statutes and under Reorganization Plan No. 14 of 1950 (15 FR 3176, effective May 24, 1950, reprinted as amended in 5 U.S.C. app. 1 and in 64 Stat. 1267), except for functions assigned to the Office of Administrative Law Judges (see part 6 of this subtitle) and appellate functions assigned to the Administrative Review Board (see part 7 of this subtitle) or reserved by the Secretary of Labor (see Secretary’s Order 01-2020 (Feb. 21, 2020)), have been delegated to the Administrator of the Wage and Hour Division and authorized representatives.
(b) The regulations in this part set forth the procedures for making and applying such determinations of prevailing wage rates and fringe benefits pursuant to the Davis-Bacon Act and any laws now existing or subsequently enacted providing for determinations of such wages by the Secretary of Labor in accordance with the provisions of the Davis-Bacon Act.
§1.2 Definitions.
Administrator. The term “Administrator” means the Administrator of the Wage and Hour Division, U.S. Department of Labor, or authorized representative.
Agency. The term “agency” means any Federal, State, or local agency or instrumentality, or other similar entity, that enters into a contract or provides assistance through loan, grant, loan guarantee or insurance, or otherwise, to a project subject to the Davis-Bacon labor standards, as defined in §5.2 of this subtitle.
(1) Federal agency. The term “Federal agency” means an agency or instrumentality of the United States or the District of Columbia, as defined in this section, that enters into a contract or provides assistance through loan, grant, loan guarantee or insurance, or otherwise, to a project subject to the Davis-Bacon labor standards.
(2) [Reserved]
Area. The term “area” means the city, town, village, county or other civil subdivision of the State in which the work is to be performed.
(1) For highway projects, the area may be State department of transportation highway districts or other similar State geographic subdivisions.
(2) Where a project requires work in multiple counties, the area may include all counties in which the work will be performed.
Department of Labor-approved website for wage determinations (DOL-approved website). The term “Department of Labor-approved website for wage determinations” means the government website for both Davis-Bacon Act and Service Contract Act wage determinations. In addition, the DOL-approved website provides compliance assistance information. The term will also apply to any other website or electronic means that the Department of Labor may approve for these purposes.
Employed. Every person performing the duties of a laborer or mechanic in the construction, prosecution, completion, or repair of a public building or public work, or building or work financed in whole or in part by assistance from the United States through loan, grant, loan guarantee or insurance, or otherwise, is employed regardless of any contractual relationship alleged to exist between the contractor and such person.
Prevailing wage. The term “prevailing wage” means:
(1) The wage paid to the majority (more than 50 percent) of the laborers or mechanics in the classification on similar projects in the area during the period in question;
(2) If the same wage is not paid to a majority of those employed in the classification, the prevailing wage will be the wage paid to the greatest number, provided that such greatest number constitutes at least 30 percent of those employed; or
(3) If no wage rate is paid to 30 percent or more of those so employed, the prevailing wage will be the average of the wages paid to those employed in the classification, weighted by the total employed in the classification.
Type of construction (or construction type). The term “type of construction (or construction type)” means the general category of construction, as established by the Administrator, for the publication of general wage determinations. Types of construction may include, but are not limited to, building, residential, heavy, and highway. As used in this part, the terms “type of construction” and “construction type” are synonymous and interchangeable.
United States or the District of Columbia. The term “United States or the District of Columbia” means the United States, the District of Columbia, and all executive departments, independent establishments, administrative agencies, and instrumentalities of the United States and of the District of Columbia, and any corporation for which all or substantially all of the stock of which is beneficially owned by the United States, by the District of Columbia, or any of the foregoing departments, establishments, agencies, and instrumentalities.
§1.3 Obtaining and compiling wage rate information.
For the purpose of making wage determinations, the Administrator will conduct a continuing program for the obtaining and compiling of wage rate information. In determining the prevailing wages at the time of issuance of a wage determination, the Administrator will be guided by the definition of prevailing wage in a and will consider the types of information listed in this section.
(a) The Administrator will encourage the voluntary submission of wage rate data by contractors, contractors’ associations, labor organizations, public officials and other interested parties, reflecting wage rates paid to laborers and mechanics on various types of construction in the area. The Administrator may also obtain data from agencies on wage rates paid on construction projects under their jurisdiction. The information submitted should reflect the wage rates paid to workers employed in a particular classification in an area, the type or types of construction on which such rate or rates are paid, and whether or not such wage rates were paid on Federal or federally assisted projects subject to Davis-Bacon prevailing wage requirements.
(b) The following types of information may be considered in making wage rate determinations:
(1) Statements showing wage rates paid on projects, including the names and addresses of contractors, including subcontractors; the locations, approximate costs, dates of construction and types of projects, as well as whether or not the projects are Federal or federally assisted projects subject to Davis-Bacon prevailing wage requirements; and the number of workers employed in each classification on each project and the respective wage rates paid such workers.
(2) Signed collective bargaining agreements, for which the Administrator may request that the parties to such agreements submit statements certifying to their scope and application.
(3) Wage rates determined for public construction by State and local officials pursuant to State and local prevailing wage legislation.
(4) Wage rate data submitted to the Department of Labor by contracting agencies pursuant to §5.5(a)(1)(iii) of this subtitle.
(5) For Federal-aid highway projects under 23 U.S.C. 113, information obtained from the highway department(s) of the State(s) in which the project is to be performed. For such projects, the Administrator must consult the relevant State highway department and give due regard to the information thus obtained.
(6) Any other information pertinent to the determination of prevailing wage rates.
(c) The Administrator may initially obtain or supplement such information obtained on a voluntary basis by such means, including the holding of hearings, and from any sources determined to be necessary. All information of the types described in paragraph (b) of this section, pertinent to the determination of the wages prevailing at the time of issuance of the wage determination, will be evaluated in light of the definition of prevailing wage in §1.2.
(d) In compiling wage rate data for building and residential wage determinations, the Administrator will not use data from Federal or federally assisted projects subject to DavisBacon prevailing wage requirements unless it is determined that there is insufficient wage data to determine the prevailing wages in the absence of such data. Data from Federal or federally assisted projects will be used in compiling wage rate data for heavy and highway wage determinations.
(e) In determining the prevailing wage, the Administrator may treat variable wage rates paid by a contractor or contractors to workers within the same classification as the same wage where the pay rates are functionally equivalent, as explained by one or more collective bargaining agreements or written policies otherwise maintained by a contractor or contractors.
(f) If the Administrator determines that there is insufficient wage survey data to determine the prevailing wage for a classification for which conformance requests are regularly submitted pursuant to §5.5(a)(1)(iii) of this subtitle, the Administrator may list the classification and wage and fringe benefit rates for the classification on the wage determination, provided that:
(1) The work performed by the classification is not performed by a classification in the wage determination;
(2) The classification is used in the area by the construction industry; and (3) The wage rate for the classification bears a reasonable relationship to the wage rates contained in the wage determination.
(g) Under the circumstances described in paragraph (h) of this section, the Administrator may make a wage determination by adopting, with or without modification, one or more prevailing wage rates determined for public construction by State and/or local officials. Provided that the conditions in paragraph (h) are met, the Administrator may do so even if the methods and criteria used by State or local officials differ in some respects from those that the Administrator would otherwise use under the Davis-Bacon Act and the regulations in this part. Such differences may include, but are not limited to, a definition of prevailing wage under a State or local prevailing wage law or regulation that differs from the definition in §1.2, a geographic area or scope that differs from the standards in §1.7, and/or the restrictions on data use in paragraph (d) of this section.
(h) The Administrator may adopt a State or local wage rate as described in paragraph (g) of this section if the Administrator, after reviewing the rate and the processes used to derive the rate, determines that:
(1) The State or local government sets wage rates, and collects relevant data, using a survey or other process that is open to full participation by all interested parties;
(2) The wage rate reflects both a basic hourly rate of pay as well as any prevailing fringe benefits, each of which can be calculated separately;
(3) The State or local government classifies laborers and mechanics in a manner that is recognized within the field of construction; and
(4) The State or local government’s criteria for setting prevailing wage rates are substantially similar to those the Administrator uses in making wage determinations under this part. This determination will be based on the totality of the circumstances, including, but not limited to, the State or local government’s definition of prevailing wage; the types of fringe benefits it accepts; the information it solicits from interested parties; its classification of construction projects, laborers, and mechanics; and its method for determining the appropriate geographic area(s).
(i) In order to adopt wage rates of a State or local government entity pursuant to paragraphs (g) and (h) of this section, the Administrator must obtain the wage rates and any relevant supporting documentation and data from the State or local government entity. Such information may be submitted via email to dba.statelocalwagerates@dol.gov, via mail to U.S. Department of Labor, Wage and Hour Division, Branch of Wage Surveys, 200 Constitution Avenue NW, Washington, DC 20210, or through other means directed by the Administrator.
(j) Nothing in paragraphs (g), (h), and (i) of this section precludes the Administrator from otherwise considering State or local prevailing wage rates, consistent with paragraph (b)(3) of this section, or from giving due regard to information obtained from State highway departments, consistent with paragraph (b)(4) of this section, as part of the Administrator’s process of making prevailing wage determinations under this part.
§1.4 Report of agency construction programs.
On an annual basis, each Federal agency using wage determinations under the DavisBacon Act or any of the laws referenced by §5.1 of this subtitle, must furnish the Administrator with a report that contains a general outline of its proposed construction programs for the upcoming 3 fiscal years based on information in the Federal agency’s possession at the time it furnishes its report. This report must include a list of proposed projects (including those for which options to extend the contract term of an existing construction contract are expected during the period covered by the report); the estimated start date of construction; the anticipated type or types of construction; the estimated cost of construction; the location or locations of construction; and any other project-specific information that the Administrator requests. The report must also include notification of any significant changes to previously reported construction programs, such as the delay or cancellation of previously reported projects. Reports must be submitted no later than April 10 of each year by email to DavisBaconFedPlan@dol.gov, and must include the name, telephone number, and email address of the official responsible for coordinating the submission
§1.5 Publication of general wage determinations and procedure for requesting project wage determinations.
(a) General wage determinations. A “general wage determination” contains, among other information, a list of wage and fringe benefit rates determined to be prevailing for various classifications of laborers or mechanics for specified type(s) of construction in a given area. The Department of Labor publishes “general wage determinations” under the Davis-Bacon Act on the DOL-approved website.
(b) Project wage determinations. (1) A “project wage determination” is specific to a particular project. An agency may request a “project wage determination” for an individual project under any of the following circumstances:
(i) The project involves work in more than one county and will employ workers who may work in more than one county;
(ii) There is no general wage determination in effect for the relevant area and type(s) of construction for an upcoming project, or
(iii) All or virtually all of the work on a contract will be performed by a classification that is not listed in the general wage determination that would otherwise apply, and contract award (or bid opening, in contracts entered into using sealed bidding procedures) has not yet taken place.
(2) To request a project wage determination, the agency must submit Standard Form (SF) 308, Request for Wage Determination and Response to Request, to the Department of Labor, either by mailing the form to U.S. Department of Labor, Wage and Hour Division, Branch of Construction Wage Determinations, Washington, DC 20210, or by submitting the form through other means directed by the Administrator.
(3) In completing Form SF-308, the agency must include the following information:
(i) A sufficiently detailed description of the work to indicate the type(s) of construction involved, as well as any additional description or separate attachment, if necessary, for identification of the type(s) of work to be performed. If the project involves multiple types of construction, the requesting agency must attach information indicating the expected cost breakdown by type of construction.
(ii) The location (city, county, state, zip code) or locations in which the proposed project is located.
(iii) The classifications needed for the project. The agency must identify only those classifications that will be needed in the performance of the work. Inserting a note such as “entire schedule” or “all applicable classifications” is not sufficient. Additional classifications needed that are not on the form may be typed in the blank spaces or on a separate list and attached to the form.
(iv) Any other information requested in Form SF-308.
(4) A request for a project wage determination must be accompanied by any pertinent wage information that may be available. When the requesting agency is a State highway department under the Federal-Aid Highway Acts as codified in 23 U.S.C. 113, such agency must also include its recommendations as to the wages which are prevailing for each classification of laborers and mechanics on similar construction in the area.
(5) The time required for processing requests for project wage determinations varies according to the facts and circumstances in each case. An agency should anticipate that such processing by the Department of Labor will take at least 30 days.
§1.6 Use and effectiveness of wage determinations.
(a) Application, validity, and expiration of wage determinations—(1) Application of incorporated wage determinations. Once a wage determination is incorporated into a contract (or once construction has started when there is no contract award), the wage determination generally applies for the duration of the contract or project, except as specified in this section.
(2) General wage determinations. (i) “General wage determinations” published on the DOL-approved website contain no expiration date. Once issued, a general wage determination remains valid until revised, superseded, or canceled.
(ii) If there is a current general wage determination applicable to a project, an agency may use it without notifying the Administrator, Provided that questions concerning its use are referred to the Administrator in accordance with paragraph (b) of this section.
(iii) When a wage determination is revised, superseded, or canceled, it becomes inactive. Inactive wage determinations may be accessed on the DOL-approved website for informational purposes only. Contracting officers may not use such an inactive wage determination in a contract action unless the inactive wage determination is the appropriate wage determination that must be incorporated to give retroactive effect to the post-award incorporation of a contract clause under §5.6(a)(1)(ii) of this subtitle or a wage determination under paragraph (f) of this section. Under such circumstances, the agency must provide prior notice to the Administrator of its intent to incorporate an inactive wage determination and may not incorporate it if the Administrator instructs otherwise.
(3) Project wage determinations. (i) “Project wage determinations” initially issued will be effective for 180 calendar days from the date of such determinations. If a project wage determination is not incorporated into a contract (or, if there is no contract award, if construction has not started) in the period of its effectiveness it is void.
(ii) Accordingly, if it appears that a project wage determination may expire between bid opening and contract award (or between initial endorsement under the National Housing Act or the execution of an agreement to enter into a housing assistance payments contract under section 8 of the U.S. Housing Act of 1937, and the start of construction) the agency must request a new project wage determination sufficiently in advance of the bid opening to assure receipt prior thereto.
(iii) However, when due to unavoidable circumstances a project wage determination expires before award but after bid opening (or before the start of construction, but after initial endorsement under the National Housing Act, or before the start of construction but after the execution of an agreement to enter into a housing assistance payments contract under section 8 of the U.S. Housing Act of 1937), the head of the agency or the agency head’s designee may request the Administrator to extend the expiration date of the project wage determination in the bid specifications instead of issuing a new project wage determination. Such request must be supported by a written finding, which must include a brief statement of factual support, that the extension of the expiration date of the project wage determination is necessary and proper in the public interest to prevent injustice or undue hardship or to avoid serious impairment in the conduct of Government business. The Administrator will either grant or deny the request for an extension after consideration of all of the circumstances, including an examination to determine if the previously issued rates remain prevailing. If the request for extension is denied, the Administrator will proceed to issue a new wage determination for the project.
(b) Identifying and incorporating appropriate wage determinations. (1) Contracting agencies are responsible for making the initial determination of the appropriate wage determination(s) for a project and for ensuring that the appropriate wage determination(s) are incorporated in bid solicitations and contract specifications and that inapplicable wage determinations are not incorporated. When a contract involves construction in more than one area, and no multi-county project wage determination has been obtained, the solicitation and contract must incorporate the applicable wage determination for each area. When a contract involves more than one type of construction, the solicitation and contract must incorporate the applicable wage determination for each type of construction involved that is anticipated to be substantial. The contracting agency is responsible for designating the specific work to which each incorporated wage determination applies.
(2) The contractor or subcontractor has an affirmative obligation to ensure that its pay practices are in compliance with the Davis-Bacon Act labor standards.
(3) Any question regarding application of wage rate schedules or wage determinations must be referred to the Administrator for resolution. The Administrator should consider any relevant factors when resolving such questions, including, but not limited to, relevant area practice information.
(c) Revisions to wage determinations. (1) General and project wage determinations may be revised from time to time to keep them current. A revised wage determination replaces the previous wage determination. “Revisions,” as used in this section, refers both to modifications of some or all of the rates in a wage determination, such as periodic updates to reflect current rates, and to instances where a wage determination is re-issued entirely, such as after a new wage survey is conducted. Revisions include adjustments to non-collectively bargained prevailing wage and fringe benefit rates on general wage determinations, with the adjustments based on U.S. Bureau of Labor Statistics Employment Cost Index (ECI) data or its successor data. Such rates may be adjusted based on ECI data no more frequently than once every 3 years, and no sooner than 3 years after the date of the rate’s publication. Such periodic revisions to wage determinations are distinguished from the circumstances described in paragraphs (d), (e), and (f) of this section.
(2)(i) Whether a revised wage determination is effective with respect to a particular contract or project generally depends on the date on which the revised wage determination is issued. The date on which a revised wage determination is “issued,” as used in this section, means the date that a revised general wage determination is published on the DOL-approved website or the date that the contracting agency receives actual written notice of a revised project wage determination.
(ii) If a revised wage determination is issued before contract award (or the start of construction when there is no award), it is effective with respect to the project, except as follows:
(A) For contracts entered into pursuant to sealed bidding procedures, a revised wage determination issued at least 10 calendar days before the opening of bids is effective with respect to the solicitation and contract. If a revised wage determination is issued less than 10 calendar days before the opening of bids, it is effective with respect to the solicitation and contract unless the agency finds that there is not a reasonable time still available before bid opening to notify bidders of the revision and a report of the finding is inserted in the contract file. A copy of such report must be made available to the Administrator upon request. No such report is required if the revision is issued after bid opening.
(B) In the case of projects assisted under the National Housing Act, a revised wage determination is effective with respect to the project if it is issued prior to the beginning of construction or the date the mortgage is initially endorsed, whichever occurs first.
(C) In the case of projects to receive housing assistance payments under section 8 of the U.S. Housing Act of 1937, a revised wage determination is effective with respect to the project if it is issued prior to the beginning of construction or the date the agreement to enter into a housing assistance payments contract is signed, whichever occurs first.
(D) If, in the case of a contract entered into pursuant to sealed bidding procedures under paragraph (c)(2)(ii)(A) of this section the contract has not been awarded within 90 days after bid opening, or if, in the case of projects assisted under the National Housing Act or receiving housing assistance payments section 8 of the U.S. Housing Act of 1937 under paragraph (c)(2)(ii)(B) or (C) of this section, construction has not begun within 90 days after initial endorsement or the signing of the agreement to enter into a housing assistance payments contract, any revised general wage determination issued prior to award of the contract or the beginning of construction, as appropriate, is effective with respect to that contract unless the head of the agency or the agency head’s designee requests and obtains an extension of the 90-day period from the Administrator. Such request must be supported by a written finding, which includes a brief statement of the factual support, that the extension is necessary and proper in the public interest to prevent injustice or undue hardship or to avoid serious impairment in the conduct of Government business. The Administrator will either grant or deny the request for an extension after consideration of all the circumstances.
(iii) If a revised wage determination is issued after contract award (or after the beginning of construction where there is no contract award), it is not effective with respect to that project, except under the following circumstances:
(A) Where a contract or order is changed to include additional, substantial construction, alteration, and/or repair work not within the scope of work of the original contract or order, or to require the contractor to perform work for an additional time period not originally obligated, including where an option to extend the term of a contract is exercised, the contracting agency must include the most recent revision of any wage determination(s) at the time the contract is changed or the option is exercised. This does not apply where the contractor is simply given additional time to complete its original commitment or where the additional construction, alteration, and/or repair work in the modification is merely incidental.
(B) Some contracts call for construction, alteration, and/or repair work over a period of time that is not tied to the completion of any particular project. Examples of such contracts include, but are not limited to, indefinite-delivery-indefinite-quantity construction contracts to perform any necessary repairs to a Federal facility over a period of time; long-term operationsand-maintenance contracts that may include construction, alteration, and/or repair work covered by Davis-Bacon labor standards; or schedule contracts or blanket purchase agreements in which a contractor agrees to provide certain construction work at agreed-upon prices to Federal agencies. These types of contracts often involve a general commitment to perform necessary construction as the need arises, but do not necessarily specify the exact construction to be performed. For the types of contracts described here, the contracting agency must incorporate into the contract the most recent revision(s) of any applicable wage determination(s) on each anniversary date of the contract’s award (or each anniversary date of the beginning of construction when there is no award) unless the agency has sought and received prior written approval from the Department for an alternative process. The Department may grant such an exception when it is necessary and proper in the public interest or to prevent injustice and undue hardship. Such revised wage determination(s) will apply to any construction work that begins or is obligated under such a contract during the 12 months following that anniversary date until such construction work is completed, even if the completion of that work extends beyond the twelve-month period. Where such contracts have task orders, purchase orders, or other similar contract instruments awarded under the master contract, the master contract must specify that the applicable updated wage determination must be included in such task orders, purchase orders, or other similar contract instrument, and the ordering agency must so incorporate the applicable updated wage determinations into their orders. Once the applicable updated wage determination revision has been incorporated into such task orders, purchase orders, or other similar contract instruments, that wage determination revision remains applicable for the duration of such order, unless the order is changed to include additional, substantial construction, alteration, and/or repair work not within the scope of work, when the wage determination must be updated as set forth in paragraph (c)(2)(iii)(A) of this section, or the order itself includes the exercise of options. Where such orders do include the exercise of options, updated applicable wage determination revision, as incorporated into the master contract must be included when an option is exercised on such an order.
(C) For contracts to which both paragraphs (c)(2)(iii)(A) and (B) of this section apply, updated wage determinations must be incorporated pursuant to the requirements of both paragraphs. For example, if a contract calls for construction, alteration, and/or repair work over a period of time that is not tied to the completion of any particular project and also has an option provision to extend the contract’s term, the most recent revision(s) of any applicable wage determination(s) must be incorporated any time an option is exercised, as described in paragraph (c)(2)(iii)(A) of this section, and on the contract anniversary date, as described in paragraph (c)(2)(iii)(B) of this section. However, when a contract has been changed as described in paragraph (c)(2)(iii)(A) of this section, including by the exercise of an option, the date of that modification will be considered the contract anniversary date for the purpose of annually updating the wage determination(s) in accordance with paragraph (c)(2)(iii)(B) of this section for that year and any subsequent years of contract performance.
(d) Corrections for clerical errors. Upon the Administrator’s own initiative or at the request of an agency, the Administrator may correct any wage determination, without regard to paragraph (a) or (c) of this section, whenever the Administrator finds that it contains clerical errors. Such corrections must be included in any solicitations, bidding documents, or ongoing contracts containing the wage determination in question, and such inclusion, and application of the correction(s), must be retroactive to the start of construction if construction has begun.
(e) Pre-award determinations that a wage determination may not be used. A wage determination may not be used for a contract, without regard to whether bid opening (or initial endorsement or the signing of a housing assistance payments contract) has occurred, if, prior to the award of a contract (or the start of construction under the National Housing Act, under section 8 of the U.S. Housing Act of 1937, or where there is no contract award), the Administrator provides written notice that:
(1) The wrong wage determination or the wrong schedule was included in the bidding documents or solicitation; or
(2) A wage determination included in the bidding documents or solicitation was withdrawn by the Department of Labor as a result of a decision by the Administrative Review Board.
(f) Post-award determinations and procedures. (1) If a contract subject to the labor standards provisions of the laws referenced by §5.1 of this subtitle is entered into without the correct wage determination(s), the agency must, upon the request of the Administrator or upon its own initiative, incorporate the correct wage determination into the contract or require its incorporation. Where the agency is not entering directly into such a contract but instead is providing Federal financial assistance, the agency must ensure that the recipient or sub-recipient of the Federal assistance similarly incorporates the correct wage determination(s) into its contracts.
(2) The Administrator may require the agency to incorporate a wage determination after contract award or after the beginning of construction if the agency has failed to incorporate a wage determination in a contract required to contain prevailing wage rates determined in accordance with the Davis-Bacon Act or has used a wage determination which by its terms or the provisions of this part clearly does not apply to the contract. Further, the Administrator may require the application of the correct wage determination to a contract after contract award or after the beginning of construction when it is found that the wrong wage determination has been incorporated in the contract because of an inaccurate description of the project or its location in the agency’s request for the wage determination.
(3) Under any of the circumstances described in paragraphs (f)(1) and (2) of this section, the agency must either terminate and resolicit the contract with the correct wage determination or incorporate the correct wage determination into the contract (or ensure it is so incorporated) through supplemental agreement, change order, or any other authority that may be needed. The method of incorporation of the correct wage determination, and adjustment in contract price, where appropriate, should be in accordance with applicable law. Additionally, the following requirements apply:
(i) Unless the Administrator directs otherwise, the incorporation of the correct wage determination(s) must be retroactive to the date of contract award or start of construction if there is no award.
(ii) If incorporation occurs as the result of a request from the Administrator, the incorporation must take place within 30 days of the date of that request, unless the agency has obtained an extension from the Administrator.
(iii) Before the agency requires incorporation upon its own initiative, it must provide notice to the Administrator of the proposed action.
(iv) The contractor must be compensated for any increases in wages resulting from incorporation of a missing wage determination.
(v) If a recipient or sub-recipient of Federal assistance under any of the applicable laws referenced by §5.1 of this subtitle refuses to incorporate the wage determination as required, the agency must make no further payment, advance, grant, loan, or guarantee of funds in connection with the contract until the recipient incorporates the required wage determination into its contract, and must promptly refer the dispute to the Administrator for further proceedings under §5.13 of this subtitle.
(vi) Before terminating a contract pursuant to this section, the agency must withhold or cross-withhold sufficient funds to remedy any back-wage liability resulting from the failure to incorporate the correct wage determination or otherwise identify and obligate sufficient funds through a termination settlement agreement, bond, or other satisfactory mechanism.
(4) Under any of the above circumstances, notwithstanding the requirement to incorporate the correct wage determination(s) within 30 days, the correct wage determination(s) will be effective by operation of law, retroactive to the date of award or the beginning of construction (under the National Housing Act, under section 8 of the U.S. Housing Act of 1937, or where there is no contract award), in accordance with §5.5(e) of this subtitle.
(g) Approval of Davis-Bacon Related Act Federal funding or assistance after contract award. If Federal funding or assistance under a statute requiring payment of wages determined in accordance with the Davis-Bacon Act is not approved prior to contract award (or the beginning of construction where there is no contract award), the applicable wage determination must be incorporated based upon the wages and fringe benefits found to be prevailing on the date of award or the beginning of construction (under the National Housing Act, under section 8 of the U.S. Housing Act of 1937, or where there is no contract award), as appropriate, and must be incorporated in the contract specifications retroactively to that date, Provided that upon the request of the head of the Federal agency providing the Federal funding or assistance, in individual cases the Administrator may direct incorporation of the wage determination to be effective on the date of approval of Federal funds or assistance whenever the Administrator finds that it is necessary and proper in the public interest to prevent injustice or undue hardship, Provided further that the Administrator finds no evidence of intent to apply for Federal funding or assistance prior to contract award or the start of construction, as appropriate.
§1.7 Scope of consideration.
(a) In making a wage determination, the “area” from which wage data will be drawn will normally be the county unless sufficient current wage data (data on wages paid on current projects or, where necessary, projects under construction no more than 1 year prior to the beginning of the survey or the request for a wage determination, as appropriate) is unavailable to make a wage determination.
(b) If sufficient current wage data is not available from projects within the county to make a wage determination, wages paid on similar construction in surrounding counties may be considered.
(c) If sufficient current wage data is not available in surrounding counties, the Administrator may consider wage data from similar construction in comparable counties or groups of counties in the State, and, if necessary, overall statewide data.
(d) If sufficient current statewide wage data is not available, wages paid on projects completed more than 1 year prior to the beginning of the survey or the request for a wage determination, as appropriate, may be considered.
(e) The use of “helpers and apprentices” is permitted in accordance with part 5 of this subtitle.
§1.8 Reconsideration by the Administrator.
(a) Any interested party may seek reconsideration of a wage determination issued under this part or of a decision of the Administrator regarding application of a wage determination.
(b) Such a request for reconsideration must be in writing, accompanied by a full statement of the interested party’s views and any supporting wage data or other pertinent information. Requests must be submitted via email to dba.reconsideration@dol.gov; by mail to Administrator, Wage and Hour Division, U.S. Department of Labor, 200 Constitution Ave., NW, Washington, DC 20210; or through other means directed by the Administrator. The Administrator will respond within 30 days of receipt thereof, or will notify the requestor within the 30-day period that additional time is necessary.
(c) If the decision for which reconsideration is sought was made by an authorized representative of the Administrator of the Wage and Hour Division, the interested party seeking reconsideration may request further reconsideration by the Administrator of the Wage and Hour Division. Such a request must be submitted within 30 days from the date the decision is issued; this time may be extended for good cause at the discretion of the Administrator upon a request by the interested party. The procedures in paragraph (b) of this section apply to any such reconsideration requests.
§3.1 Purpose and scope.
This part prescribes “anti-kickback” regulations under section 2 of the Act of June 13, 1934, as amended (40 U.S.C. 3145), popularly known as the Copeland Act. This part applies to any contract which is subject to Federal wage standards and which is for the construction, prosecution, completion, or repair of public buildings, public works or buildings or works financed in whole or in part by loans or grants from the United States. The part is intended to aid in the enforcement of the minimum wage provisions of the Davis-Bacon Act and the various statutes dealing with federally assisted construction that contain similar minimum wage provisions, including those provisions which are not subject to Reorganization Plan No. 14 of 1950 ( e.g., the College Housing Act of 1950, the Federal Water Pollution Control Act, and the Housing Act of 1959), and in the enforcement of the overtime provisions of the Contract Work Hours and Safety Standards Act whenever they are applicable to construction work. The part details the obligation of contractors and subcontractors relative to the weekly submission of statements regarding the wages paid on work covered thereby; sets forth the circumstances and procedures governing the making of payroll deductions from the wages of those employed on such work; and delineates the methods of payment permissible on such work.
§3.2 Definitions.
As used in the regulations in this part:
Affiliated person.
The term “affiliated person” includes a spouse, child, parent, or other close relative of the contractor or subcontractor; a partner or officer of the contractor or subcontractor; a corporation closely connected with the contractor or subcontractor as parent, subsidiary, or otherwise, and an officer or agent of such corporation.
Agency.
The term “agency” means any Federal, State, or local government agency or instrumentality, or other similar entity, that enters into a contract or provides assistance through loan, grant, loan guarantee or insurance, or otherwise, for a project subject to the Davis-Bacon labor standards, as defined in §5.2 of this subtitle.
(1) Federal agency. The term “Federal agency” means an agency or instrumentality of the United States or the District of Columbia, as defined in this section, that enters into a contract or provides assistance through loan, grant, loan guarantee or insurance, or otherwise, to a project subject to the Davis-Bacon labor standards.
(2) [Reserved]
Building or work.
The term “building or work” generally includes construction activity of all types, as distinguished from manufacturing, furnishing of materials, or servicing and maintenance work. The term includes, without limitation, buildings, structures, and improvements of all types, such as bridges, dams, solar panels, wind turbines, broadband installation, installation of electric car chargers, plants, highways, parkways, streets, subways, tunnels, sewers, mains, powerlines, pumping stations, heavy generators, railways, airports, terminals, docks, piers, wharves, ways, lighthouses, buoys, jetties, breakwaters, levees, and canals; dredging, shoring, rehabilitation and reactivation of plants, scaffolding, drilling, blasting, excavating, clearing, and landscaping. The term “building or work” also includes a portion of a building or work, or the installation (where appropriate) of equipment or components into a building or work.
(1) Building or work financed in whole or in part by loans or grants from the United States. The term “building or work financed in whole or in part by loans or grants from the United States” includes any building or work for which construction, prosecution, completion, or repair, as defined in this section, payment or part payment is made directly or indirectly from funds provided by loans or grants by a Federal agency. The term includes any building or work for which the Federal assistance granted is in the form of loan guarantees or insurance.
(2) [Reserved]
Construction, prosecution, completion, or repair.
The term “construction, prosecution, completion, or repair” mean all types of work done on a particular building or work at the site thereof as specified in §5.2 of this subtitle, including, without limitation, altering, remodeling, painting and decorating, installation on the site of the work of items fabricated offsite, covered transportation as reflected in §5.2, demolition and/or removal as reflected in §5.2, and the manufacturing or furnishing of materials, articles, supplies, or equipment on the site of the building or work, performed by laborers and mechanics at the site.
Employed (and wages).
Every person paid by a contractor or subcontractor in any manner for their labor in the construction, prosecution, completion, or repair of a public building or public work or building or work financed in whole or in part by assistance from the United States through loan, grant, loan guarantee or insurance, or otherwise, is “employed” and receiving “wages”, regardless of any contractual relationship alleged to exist between the contractor and such person.
Public building (or public work).
The term “public building (or public work)” includes a building or work the construction, prosecution, completion, or repair of which, as defined in this section, is carried on directly by authority of or with funds of a Federal agency to serve the general public regardless of whether title thereof is in a Federal agency. The construction, prosecution, completion, or repair of a portion of a building or work, or the installation (where appropriate) of equipment or components into a building or work, may still be considered a public building or work, even where the entire building or work is not owned, leased by, or to be used by the Federal agency, as long as the construction, prosecution, completion, or repair of that portion of the building or work, or the installation (where appropriate) of equipment or components into that building or work, is carried on by authority of or with funds of a Federal agency to serve the interest of the general public.
United States or the District of Columbia.
The term “United States or the District of Columbia” means the United States, the District of Columbia, and all executive departments, independent establishments, administrative agencies, and instrumentalities of the United States and of the District of Columbia, and any corporation for which all or substantially all of the stock of which is beneficially owned by the United States, by the District of Columbia, or any of the foregoing departments, establishments, agencies, and instrumentalities.
§3.3 Certified payrolls.
(a) [Reserved]
(b) Each contractor or subcontractor engaged in the construction, prosecution, completion, or repair of any public building or public work, or building or work financed in whole or in part by loans or grants from the United States, each week must provide a copy of its weekly payroll for all laborers and mechanics engaged on work covered by this part and part 5 of this chapter during the preceding weekly payroll period, accompanied by a statement of compliance certifying the accuracy of the weekly payroll information. This statement must be executed by the contractor or subcontractor or by an authorized officer or employee of the contractor or subcontractor who supervises the payment of wages, and must be on the back of Form WH–347, “Payroll (For Contractors Optional Use)” or on any form with identical wording. Copies of WH–347 may be obtained from the contracting or sponsoring agency or from the Wage and Hour Division website at https://www.dol.gov/agencies/whd/government-contracts/construction/forms or its successor site. The signature by the contractor, subcontractor, or the authorized officer or employee must be an original handwritten signature or a legally valid electronic signature.
(c) The requirements of this section do not apply to any contract of $2,000 or less.
(d) Upon a written finding by the head of a Federal agency, the Secretary of Labor may provide reasonable limitations, variations, tolerances, and exemptions from the requirements of this section subject to such conditions as the Secretary of Labor may specify.
§3.4 Submission of certified payroll and the preservation and inspection of weekly payroll records.
(a) Certified payroll. Each certified payroll required under §3.3 must be delivered by the contractor or subcontractor, within 7 days after the regular payment date of the payroll period, to a representative at the site of the building or work of the agency contracting for or financing the work, or, if there is no representative of the agency at the site of the building or work, the statement must be delivered by mail or by any other means normally assuring delivery by the contractor or subcontractor, within that 7 day time period, to the agency contracting for or financing the building or work. After the certified payrolls have been reviewed in accordance with the contracting or sponsoring agency's procedures, such certified payrolls must be preserved by the agency for a period of 3 years after all the work on the prime contract is completed and must be produced for inspection, copying, and transcription by the Department of Labor upon request. The certified payrolls must also be transmitted together with a report of any violation, in accordance with applicable procedures prescribed by the United States Department of Labor.
(b) Recordkeeping. Each contractor or subcontractor must preserve the regular payroll records for a period of 3 years after all the work on the prime contract is completed. The regular payroll records must set out accurately and completely the name; Social Security number; last known address, telephone number, and email address of each laborer and mechanic; each worker's correct classification(s) of work actually performed; hourly rates of wages paid (including rates of contributions or costs anticipated for bona fide fringe benefits or cash equivalents thereof); daily and weekly number of hours actually worked in total and on each covered contract; deductions made; and actual wages paid. The contractor or subcontractor must make such regular payroll records, as well as copies of the certified payrolls provided to the contracting or sponsoring agency, available at all times for inspection, copying, and transcription by the contracting officer or their authorized representative, and by authorized representatives of the Department of Labor.
§3.5 Payroll deductions permissible without application to or approval of the Secretary of Labor.
Deductions made under the circumstances or in the situations described in the paragraphs of this section may be made without application to and approval of the Secretary of Labor:
(a) Any deduction made in compliance with the requirements of Federal, State, or local law, such as Federal or State withholding income taxes and Federal social security taxes.
(b) Any deduction of sums previously paid to the laborer or mechanic as a bona fide prepayment of wages when such prepayment is made without discount or interest. A bona fide prepayment of wages is considered to have been made only when cash or its equivalent has been advanced to the person employed in such manner as to give him complete freedom of disposition of the advanced funds.
(c) Any deduction of amounts required by court process to be paid to another, unless the deduction is in favor of the contractor, subcontractor, or any affiliated person, or when collusion or collaboration exists.
(d) Any deduction constituting a contribution on behalf of the laborer or mechanic employed to funds established by the contractor or representatives of the laborers or mechanics, or both, for the purpose of providing either from principal or income, or both, medical or hospital care, pensions or annuities on retirement, death benefits, compensation for injuries, illness, accidents, sickness, or disability, or for insurance to provide any of the foregoing, or unemployment benefits, vacation pay, savings accounts, or similar payments for the benefit of the laborers or mechanics, their families and dependents: Provided, however, That the following standards are met:
(1) The deduction is not otherwise prohibited by law;
(2) It is either:
(i) Voluntarily consented to by the laborer or mechanic in writing and in advance of the period in which the work is to be done and such consent is not a condition either for the obtaining of or for the continuation of employment; or
(ii) Provided for in a bona fide collective bargaining agreement between the contractor or subcontractor and representatives of its laborers or mechanics;
(3) No profit or other benefit is otherwise obtained, directly or indirectly, by the contractor or subcontractor or any affiliated person in the form of commission, dividend, or otherwise; and
(4) The deductions must serve the convenience and interest of the laborer or mechanic.
(e) Any deduction requested by the laborer or mechanic to enable him or her to repay loans to or to purchase shares in credit unions organized and operated in accordance with Federal and State credit union statutes.
(f) Any deduction voluntarily authorized by the laborer or mechanic for the making of contributions to governmental or quasi-governmental agencies, such as the American Red Cross.
(g) Any deduction voluntarily authorized by the laborer or mechanic for the making of contributions to charitable organizations as defined by 26 U.S.C. 501(c)(3).
(h) Any deductions to pay regular union initiation fees and membership dues, not including fines or special assessments: Provided, however, That a collective bargaining agreement between the contractor or subcontractor and representatives of its laborers or mechanics provides for such deductions and the deductions are not otherwise prohibited by law.
(i) Any deduction not more than for the “reasonable cost” of board, lodging, or other facilities meeting the requirements of section 3(m) of the Fair Labor Standards Act of 1938, as amended, and 29 CFR part 531. When such a deduction is made the additional records required under 29 CFR 516.25(a) must be kept.
(j) Any deduction for the cost of safety equipment of nominal value purchased by the laborer or mechanic as their own property for their personal protection in their work, such as safety shoes, safety glasses, safety gloves, and hard hats, if such equipment is not required by law to be furnished by the contractor, if such deduction does not violate the Fair Labor Standards Act or any other law, if the cost on which the deduction is based does not exceed the actual cost to the contractor where the equipment is purchased from the contractor and does not include any direct or indirect monetary return to the contractor where the equipment is purchased from a third person, and if the deduction is either:
(1) Voluntarily consented to by the laborer or mechanic in writing and in advance of the period in which the work is to be done and such consent is not a condition either for the obtaining of employment or its continuance; or
(2) Provided for in a bona fide collective bargaining agreement between the contractor or subcontractor and representatives of its laborers and mechanics.
§3.7 Applications for the approval of the Secretary of Labor.
Any application for the making of payroll deductions under §3.6 must comply with the requirements prescribed in the following paragraphs of this section:
(a) The application must be in writing and addressed to the Secretary of Labor. The application must be submitted by email to dbadeductions@dol.gov , by mail to the United States Department of Labor, Wage and Hour Division, Director, Division of Government Contracts Enforcement, 200 Constitution Ave., NW, Room S–3502, Washington, DC 20210, or by any other means normally assuring delivery.
(b) The application need not identify the contract or contracts under which the work in question is to be performed. Permission will be given for deductions on all current and future contracts of the applicant for a period of 1 year. A renewal of permission to make such payroll deduction will be granted upon the submission of an application which makes reference to the original application, recites the date of the Secretary of Labor's approval of such deductions, states affirmatively that there is continued compliance with the standards set forth in the provisions of §3.6, and specifies any conditions which have changed in regard to the payroll deductions.
(c) The application must state affirmatively that there is compliance with the standards set forth in the provisions of §3.6. The affirmation must be accompanied by a full statement of the facts indicating such compliance.
(d) The application must include a description of the proposed deduction, the purpose of the deduction, and the classes of laborers or mechanics from whose wages the proposed deduction would be made.
(e) The application must state the name and business of any third person to whom any funds obtained from the proposed deductions are to be transmitted and the affiliation of such person, if any, with the applicant.
§3.8 Action by the Secretary of Labor upon applications.
The Secretary of Labor will decide whether or not the requested deduction is permissible under provisions of §3.6; and will notify the applicant in writing of the decision.
§3.11 Regulations part of contract.
All contracts made with respect to the construction, prosecution, completion, or repair of any public building or public work or building or work financed in whole or in part by loans or grants from the United States covered by the regulations in this part must expressly bind the contractor or subcontractor to comply with such of the regulations in this part as may be applicable. In this regard, see §5.5(a) of this subtitle. However, these requirements will be considered to be effective by operation of law, whether or not they are incorporated into such contracts, as set forth in §5.5(e) of this subtitle.
Part 5-Labor standards provisions applicable to contracts covering federally financed and assisted construction (also labor standards provisions applicable to nonconstruction
Authority:
5 U.S.C. 301; Reorganization Plan No. 14 of 1950, 5 U.S.C. appendix; 28 U.S.C. 2461 note; 40 U.S.C. 3141 et seq.; 40 U.S.C. 3145; 40 U.S.C. 3148; 40 U.S.C. 3701 et seq.; Secretary's Order No. 01–2014, 79 FR 77527; and the laws referenced by §5.1(a).
§5.1 Purpose and scope.
(a) The regulations contained in this part are promulgated under the authority conferred upon the Secretary of Labor by Reorganization Plan No. 14 of 1950 (64 Stat. 1267, as amended, 5 U.S.C. appendix) and the Copeland Act (48 Stat. 948; 18 U.S.C. 874; 40 U.S.C. 3145) in order to coordinate the administration and enforcement of labor standards provisions contained in the Davis-Bacon Act (46 Stat. 1494, as amended; 40 U.S.C. 3141 et seq. ) and its related statutes (“Related Acts”).
(1) A listing of laws requiring Davis-Bacon labor standards provisions can be found at www.dol.gov/agencies/whd/government-contracts or its successor website.
(2) [Reserved]
(b) Part 1 of this subtitle contains the Department's procedural rules governing requests for wage determinations and the issuance and use of such wage determinations under the Davis-Bacon Act and its Related Acts.
§5.2 Definitions.
Administrator. The term “Administrator” means the Administrator of the Wage and Hour Division, U.S. Department of Labor, or authorized representative.
Agency. The term “agency” means any Federal, State, or local government agency or instrumentality, or other similar entity, that enters into a contract or provides assistance through loan, grant, loan guarantee or insurance, or otherwise, to a project subject to the Davis-Bacon labor standards, as defined in this section.
(1) Federal agency. The term “Federal agency” means an agency or instrumentality of the United States or the District of Columbia, as defined in this section, that enters into a contract or provides assistance through loan, grant, loan guarantee or insurance, or otherwise, to a project subject to the Davis-Bacon labor standards.
(2) [Reserved]
Agency Head. The term “Agency Head” means the principal official of an agency and includes those persons duly authorized to act on behalf of the Agency Head.
Apprentice and helper. The terms “apprentice” and “helper” are defined as follows:
(1) “Apprentice” means:
(i) A person employed and individually registered in a bona fide apprenticeship program registered with the U.S. Department of Labor, Employment and Training Administration, Office of Apprenticeship, or with a State Apprenticeship Agency recognized by the Office of Apprenticeship; or
(ii) A person in the first 90 days of probationary employment as an apprentice in such an apprenticeship program, who is not individually registered in the program, but who has been certified by the Office of Apprenticeship or a State Apprenticeship Agency (where appropriate) to be eligible for probationary employment as an apprentice;
(2) These provisions do not apply to apprentices and trainees employed on projects subject to 23 U.S.C. 113 who are enrolled in programs which have been certified by the Secretary of Transportation in accordance with 23 U.S.C. 113(c).
(3) A distinct classification of helper will be issued in wage determinations applicable to work performed on construction projects covered by the labor standards provisions of the Davis-Bacon and Related Acts only where:
(i) The duties of the helper are clearly defined and distinct from those of any other classification on the wage determination;
(ii) The use of such helpers is an established prevailing practice in the area; and
(iii) The helper is not employed as a trainee in an informal training program. A “helper” classification will be added to wage determinations pursuant to §5.5(a)(1)(iii)(A) only where, in addition, the work to be performed by the helper is not performed by a classification in the wage determination.
Building or work. The term “building or work” generally includes construction activities of all types, as distinguished from manufacturing, furnishing of materials, or servicing and maintenance work. The term includes, without limitation, buildings, structures, and improvements of all types, such as bridges, dams, solar panels, wind turbines, broadband installation, installation of electric car chargers, plants, highways, parkways, streets, subways, tunnels, sewers, mains, power lines, pumping stations, heavy generators, railways, airports, terminals, docks, piers, wharves, ways, lighthouses, buoys, jetties, breakwaters, levees, canals, dredging, shoring, rehabilitation and reactivation of plants, scaffolding, drilling, blasting, excavating, clearing, and landscaping. The term “building or work” also includes a portion of a building or work, or the installation (where appropriate) of equipment or components into a building or work.
Construction, prosecution, completion, or repair. The term “construction, prosecution, completion, or repair ” means the following:
(1) These terms include all types of work done—
(i) On a particular building or work at the site of the work, as defined in this section, by laborers and mechanics employed by a contractor or subcontractor, or
(ii) In the construction or development of a project under a development statute.
(2) These terms include, without limitation (except as specified in this definition):
(i) Altering, remodeling, installation (where appropriate) on the site of the work of items fabricated offsite;
(ii) Painting and decorating;
(iii) Manufacturing or furnishing of materials, articles, supplies or equipment, but only if such work is done by laborers or mechanics
(A) Employed by a contractor or subcontractor, as defined in this section, on the site of the work, as defined in this section, or
(B) In the construction or development of a project under a development statute;
(iv) “Covered transportation,” defined as any of the following activities:
(A) Transportation that takes place entirely within a location meeting the definition of “site of the work” in this section;
(B) Transportation of one or more “significant portion(s)” of the building or work between a “secondary construction site” as defined in this section and a “primary construction site” as defined in this section;
(C) Transportation between an “adjacent or virtually adjacent dedicated support site” as defined in this section and a “primary construction site” or “secondary construction site” as defined in this section;
(D) “Onsite activities essential or incidental to offsite transportation,” defined as activities conducted by a truck driver or truck driver's assistant on the site of the work that are essential or incidental to the transportation of materials or supplies to or from the site of the work, such as loading, unloading, or waiting for materials to be loaded or unloaded, but only where the driver or driver's assistant's time spent on the site of the work is not de minimis; and
(E) Any transportation and related activities, whether on or off the site of the work, by laborers and mechanics employed in the construction or development of the project under a development statute.
(v) Demolition and/or removal, under any of the following circumstances:
(A) Where the demolition and/or removal activities themselves constitute construction, alteration, and/or repair of an existing building or work. Examples of such activities include the removal of asbestos, paint, components, systems, or parts from a facility that will not be demolished; as well as contracts for hazardous waste removal, land recycling, or reclamation that involve substantial earth moving, removal of contaminated soil, re-contouring surfaces, and/or habitat restoration.
(B) Where subsequent construction covered in whole or in part by the labor standards in this part is contemplated at the site of the demolition or removal, either as part of the same contract or as part of a future contract. In determining whether covered construction is contemplated within the meaning of this provision, relevant factors include, but are not limited to, the existence of engineering or architectural plans or surveys of the site; the allocation of, or an application for, Federal funds; contract negotiations or bid solicitations; the stated intent of the relevant government officials; and the disposition of the site after demolition.
(C) Where otherwise required by statute.
(3) Except for transportation that constitutes “covered transportation” as defined in this section, construction, prosecution, completion, or repair does not include the transportation of materials or supplies to or from the site of the work.
Contract. The term “contract” means any prime contract which is subject wholly or in part to the labor standards provisions of any of the laws referenced by §5.1 and any subcontract of any tier thereunder, let under the prime contract. With the exception of work performed under a development statute, the terms contract and subcontract do not include agreements with employers that meet the definition of a material supplier under this section.
Contracting officer. The term “contracting officer” means the individual, a duly appointed successor, or authorized representative who is designated and authorized to enter into contracts on behalf of an agency, sponsor, owner, applicant, or other similar entity.
Contractor. The term “contractor” means any individual or other legal entity that enters into or is awarded a contract that is subject wholly or in part to the labor standards provisions of any of the laws referenced by §5.1, including any prime contract or subcontract of any tier under a covered prime contract. In addition, the term contractor includes any surety that is completing performance for a defaulted contractor pursuant to a performance bond. The U.S. Government, its agencies, and instrumentalities are not contractors, subcontractors, employers or joint employers for purposes of the labor standards provisions of any of the laws referenced by §5.1. A State or local government is not regarded as a contractor or subcontractor under statutes providing loans, grants, or other Federal assistance in situations where construction is performed by its own employees. However, under development statutes or other statutes requiring payment of prevailing wages to all laborers and mechanics employed on the assisted project, such as the U.S. Housing Act of 1937, State and local recipients of Federal-aid must pay these workers according to Davis-Bacon labor standards. The term “contractor” does not include an entity that is a material supplier, except if the entity is performing work under a development statute.
Davis-Bacon labor standards. The term “Davis-Bacon labor standards” as used in this part means the requirements of the Davis-Bacon Act, the Contract Work Hours and Safety Standards Act (other than those relating to safety and health), the Copeland Act, and the prevailing wage provisions of the other statutes referenced in §5.1, and the regulations in this part and in parts 1 and 3 of this subtitle.
Development statute. The term “development statute” includes the United States Housing Act of 1937; the Housing Act of 1949; and the Native American Housing Assistance and Self-Determination Act of 1996, and any other Davis-Bacon Related Act that requires payment of prevailing wages under the Davis-Bacon labor standards to all laborers and mechanics employed in the development of a project and for which the Administrator determines that the statute's language and/or legislative history reflected clear congressional intent to apply a coverage standard different from the Davis-Bacon Act itself.
Employed. Every person performing the duties of a laborer or mechanic in the construction, prosecution, completion, or repair of a public building or public work, or building or work financed in whole or in part by assistance from the United States through loan, grant, loan guarantee or insurance, or otherwise, is “employed” regardless of any contractual relationship alleged to exist between the contractor and such person.
Laborer or mechanic. The term “laborer or mechanic” includes at least those workers whose duties are manual or physical in nature (including those workers who use tools or who are performing the work of a trade), as distinguished from mental or managerial. The term “laborer” or “mechanic” includes apprentices, helpers, and, in the case of contracts subject to the Contract Work Hours and Safety Standards Act, watchpersons or guards. The term does not apply to workers whose duties are primarily administrative, executive, or clerical, rather than manual. Persons employed in a bona fide executive, administrative, or professional capacity as defined in 29 CFR part 541 are not deemed to be laborers or mechanics. Forepersons who devote more than 20 percent of their time during a workweek to mechanic or laborer duties, and who do not meet the criteria of part 541, are laborers and mechanics for the time so spent.
Material supplier. The term “material supplier” is defined as follows:
(1) A material supplier is an entity meeting all of the following criteria:
(i) Its only obligations for work on the contract or project are the delivery of materials, articles, supplies, or equipment, which may include pickup of the same in addition to, but not exclusive of, delivery, and which may also include activities incidental to such delivery and pickup, such as loading, unloading, or waiting for materials to be loaded or unloaded; and
(ii) Its facility or facilities that manufactures the materials, articles, supplies, or equipment used for the contract or project:
(A) Is not located on, or does not itself constitute, the project or contract's primary construction site or secondary construction site as defined in this section; and
(B) Either was established before opening of bids on the contract or project, or is not dedicated exclusively, or nearly so, to the performance of the contract or project.
(2) If an entity, in addition to being engaged in the activities specified in paragraph (1)(i) of this definition, also engages in other construction, prosecution, completion, or repair work at the site of the work, it is not a material supplier.
Prime contractor. The term “prime contractor” means any person or entity that enters into a contract with an agency. For the purposes of the labor standards provisions of any of the laws referenced by §5.1, the term prime contractor also includes the controlling shareholders or members of any entity holding a prime contract, the joint venturers or partners in any joint venture or partnership holding a prime contract, and any contractor ( e.g., a general contractor) that has been delegated the responsibility for overseeing all or substantially all of the construction anticipated by the prime contract. For the purposes of the provisions in §§5.5 and 5.9, any such related entities holding different prime contracts are considered to be the same prime contractor.
Public building or public work. The term “public building or public work” includes a building or work, the construction, prosecution, completion, or repair of which, as defined in this section, is carried on directly by authority of or with funds of a Federal agency to serve the interest of the general public regardless of whether title thereof is in a Federal agency. The construction, prosecution, completion, or repair of a portion of a building or work, or the installation (where appropriate) of equipment or components into a building or work, may still be considered a public building or work, even where the entire building or work is not owned, leased by, or to be used by a Federal agency, as long as the construction, prosecution, completion, or repair of that portion of the building or work, or the installation (where appropriate) of equipment or components into that building or work, is carried on by authority of or with funds of a Federal agency to serve the interest of the general public.
Secretary. The term “Secretary” includes the Secretary of Labor, and their authorized representative.
Site of the work. The term “site of the work” is defined as follows:
(1) “Site of the work” includes all of the following:
(i) The primary construction site(s), defined as the physical place or places where the building or work called for in the contract will remain.
(ii) Any secondary construction site(s), defined as any other site(s) where a significant portion of the building or work is constructed, provided that such construction is for specific use in that building or work and does not simply reflect the manufacture or construction of a product made available to the general public, and provided further that the site is either established specifically for the performance of the contract or project, or is dedicated exclusively, or nearly so, to the performance of the contract or project for a specific period of time. A “significant portion” of a building or work means one or more entire portion(s) or module(s) of the building or work, such as a completed room or structure, with minimal construction work remaining other than the installation and/or final assembly of the portions or modules at the place where the building or work will remain. A “significant portion” does not include materials or prefabricated component parts such as prefabricated housing components. A “specific period of time” means a period of weeks, months, or more, and does not include circumstances where a site at which multiple projects are in progress is shifted exclusively or nearly so to a single project for a few hours or days in order to meet a deadline.
(iii) Any adjacent or virtually adjacent dedicated support sites, defined as:
(A) Job headquarters, tool yards, batch plants, borrow pits, and similar facilities of a contractor or subcontractor that are dedicated exclusively, or nearly so, to performance of the contract or project, and adjacent or virtually adjacent to either a primary construction site or a secondary construction site, and
(B) Locations adjacent or virtually adjacent to a primary construction site at which workers perform activities associated with directing vehicular or pedestrian traffic around or away from the primary construction site.
(2) With the exception of locations that are on, or that themselves constitute, primary or secondary construction sites as defined in paragraphs (1)(i) and (ii) of this definition, site of the work does not include:
(i) Permanent home offices, branch plant establishments, fabrication plants, tool yards, etc., of a contractor or subcontractor whose location and continuance in operation are determined wholly without regard to a particular Federal or federally assisted contract or project; or
(ii) Fabrication plants, batch plants, borrow pits, job headquarters, tool yards, etc., of a material supplier, which are established by a material supplier for the project before opening of bids and not on the primary construction site or a secondary construction site, even where the operations for a period of time may be dedicated exclusively, or nearly so, to the performance of a contract.
Subcontractor. The term “subcontractor” means any contractor that agrees to perform or be responsible for the performance of any part of a contract that is subject wholly or in part to the labor standards provisions of any of the laws referenced in §5.1. The term subcontractor includes subcontractors of any tier.
United States or the District of Columbia. The term “United States or the District of Columbia” means the United States, the District of Columbia, and all executive departments, independent establishments, administrative agencies, and instrumentalities of the United States and of the District of Columbia, including non-appropriated fund instrumentalities and any corporation for which all or substantially all of its stock is beneficially owned by the United States or by the foregoing departments, establishments, agencies, or instrumentalities.
Wages. The term “wages” means the basic hourly rate of pay; any contribution irrevocably made by a contractor or subcontractor to a trustee or to a third person pursuant to a bona fide fringe benefit fund, plan, or program; and the rate of costs to the contractor or subcontractor which may be reasonably anticipated in providing bona fide fringe benefits to laborers and mechanics pursuant to an enforceable commitment to carry out a financially responsible plan or program, which was communicated in writing to the laborers and mechanics affected. The fringe benefits enumerated in the Davis-Bacon Act include medical or hospital care, pensions on retirement or death, compensation for injuries or illness resulting from occupational activity, or insurance to provide any of the foregoing; unemployment benefits; life insurance, disability insurance, sickness insurance, or accident insurance; vacation or holiday pay; defraying costs of apprenticeship or other similar programs; or other bona fide fringe benefits. Fringe benefits do not include benefits required by other Federal, State, or local law.
Wage determination. The term “wage determination” includes the original decision and any subsequent decisions revising, modifying, superseding, correcting, or otherwise changing the provisions of the original decision. The application of the wage determination must be in accordance with the provisions of §1.6 of this subtitle.
§5.5 Contract provisions and related matters.
(a) Required contract clauses. The Agency head will cause or require the contracting officer to require the contracting officer to insert in full, or (for contracts covered by the Federal Acquisition Regulation (48 CFR chapter 1)) by reference, in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the laws referenced by §5.1, the following clauses (or any modifications thereof to meet the particular needs of the agency, Provided, That such modifications are first approved by the Department of Labor):
(1) Minimum wages —(i) Wage rates and fringe benefits. All laborers and mechanics employed or working upon the site of the work (or otherwise working in construction or development of the project under a development statute), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of basic hourly wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. As provided in paragraphs (d) and (e) of this section, the appropriate wage determinations are effective by operation of law even if they have not been attached to the contract. Contributions made or costs reasonably anticipated for bona fide fringe benefits under the Davis-Bacon Act (40 U.S.C. 3141(2)(B)) on behalf of laborers or mechanics are considered wages paid to such laborers or mechanics, subject to the provisions of paragraph (a)(1)(v) of this section; also, regular contributions made or costs incurred for more than a weekly period (but not less often than quarterly) under plans, funds, or programs which cover the particular weekly period, are deemed to be constructively made or incurred during such weekly period. Such laborers and mechanics must be paid the appropriate wage rate and fringe benefits on the wage determination for the classification(s) of work actually performed, without regard to skill, except as provided in paragraph (a)(4) of this section. Laborers or mechanics performing work in more than one classification may be compensated at the rate specified for each classification for the time actually worked therein: Provided, That the employer's payroll records accurately set forth the time spent in each classification in which work is performed. The wage determination (including any additional classifications and wage rates conformed under paragraph (a)(1)(iii) of this section) and the Davis-Bacon poster (WH–1321) must be posted at all times by the contractor and its subcontractors at the site of the work in a prominent and accessible place where it can be easily seen by the workers.
(ii) Frequently recurring classifications. (A) In addition to wage and fringe benefit rates that have been determined to be prevailing under the procedures set forth in 29 CFR part 1, a wage determination may contain, pursuant to §1.3(f), wage and fringe benefit rates for classifications of laborers and mechanics for which conformance requests are regularly submitted pursuant to paragraph (a)(1)(iii) of this section, provided that:
( 1 ) The work performed by the classification is not performed by a classification in the wage determination for which a prevailing wage rate has been determined;
( 2 ) The classification is used in the area by the construction industry; and
( 3 ) The wage rate for the classification bears a reasonable relationship to the prevailing wage rates contained in the wage determination.
(B) The Administrator will establish wage rates for such classifications in accordance with paragraph (a)(1)(iii)(A)( 3 ) of this section. Work performed in such a classification must be paid at no less than the wage and fringe benefit rate listed on the wage determination for such classification.
(iii) Conformance. (A) The contracting officer must require that any class of laborers or mechanics, including helpers, which is not listed in the wage determination and which is to be employed under the contract be classified in conformance with the wage determination. Conformance of an additional classification and wage rate and fringe benefits is appropriate only when the following criteria have been met:
( 1 ) The work to be performed by the classification requested is not performed by a classification in the wage determination; and
( 2 ) The classification is used in the area by the construction industry; and
( 3 ) The proposed wage rate, including any bona fide fringe benefits, bears a reasonable relationship to the wage rates contained in the wage determination.
(B) The conformance process may not be used to split, subdivide, or otherwise avoid application of classifications listed in the wage determination.
(C) If the contractor and the laborers and mechanics to be employed in the classification (if known), or their representatives, and the contracting officer agree on the classification and wage rate (including the amount designated for fringe benefits where appropriate), a report of the action taken will be sent by the contracting officer by email to DBAconformance@dol.gov . The Administrator, or an authorized representative, will approve, modify, or disapprove every additional classification action within 30 days of receipt and so advise the contracting officer or will notify the contracting officer within the 30–day period that additional time is necessary.
(D) In the event the contractor, the laborers or mechanics to be employed in the classification or their representatives, and the contracting officer do not agree on the proposed classification and wage rate (including the amount designated for fringe benefits, where appropriate), the contracting officer will, by email to DBAconformance@dol.gov, refer the questions, including the views of all interested parties and the recommendation of the contracting officer, to the Administrator for determination. The Administrator, or an authorized representative, will issue a determination within 30 days of receipt and so advise the contracting officer or will notify the contracting officer within the 30–day period that additional time is necessary.
(E) The contracting officer must promptly notify the contractor of the action taken by the Wage and Hour Division under paragraphs (a)(1)(iii)(C) and (D) of this section. The contractor must furnish a written copy of such determination to each affected worker or it must be posted as a part of the wage determination. The wage rate (including fringe benefits where appropriate) determined pursuant to paragraph (a)(1)(iii)(C) or (D) of this section must be paid to all workers performing work in the classification under this contract from the first day on which work is performed in the classification.
(iv) Fringe benefits not expressed as an hourly rate. Whenever the minimum wage rate prescribed in the contract for a class of laborers or mechanics includes a fringe benefit which is not expressed as an hourly rate, the contractor may either pay the benefit as stated in the wage determination or may pay another bona fide fringe benefit or an hourly cash equivalent thereof.
(v) Unfunded plans. If the contractor does not make payments to a trustee or other third person, the contractor may consider as part of the wages of any laborer or mechanic the amount of any costs reasonably anticipated in providing bona fide fringe benefits under a plan or program, Provided, That the Secretary of Labor has found, upon the written request of the contractor, in accordance with the criteria set forth in §5.28, that the applicable standards of the Davis-Bacon Act have been met. The Secretary of Labor may require the contractor to set aside in a separate account assets for the meeting of obligations under the plan or program.
(vi) Interest. In the event of a failure to pay all or part of the wages required by the contract, the contractor will be required to pay interest on any underpayment of wages.
(2) Withholding— (i) Withholding requirements. The [write in name of Federal agency or the recipient of Federal assistance] may, upon its own action, or must, upon written request of an authorized representative of the Department of Labor, withhold or cause to be withheld from the contractor so much of the accrued payments or advances as may be considered necessary to satisfy the liabilities of the prime contractor or any subcontractor for the full amount of wages and monetary relief, including interest, required by the clauses set forth in paragraph (a) of this section for violations of this contract, or to satisfy any such liabilities required by any other Federal contract, or federally assisted contract subject to Davis-Bacon labor standards, that is held by the same prime contractor (as defined in §5.2). The necessary funds may be withheld from the contractor under this contract, any other Federal contract with the same prime contractor, or any other federally assisted contract that is subject to Davis-Bacon labor standards requirements and is held by the same prime contractor, regardless of whether the other contract was awarded or assisted by the same agency, and such funds may be used to satisfy the contractor liability for which the funds were withheld. In the event of a contractor's failure to pay any laborer or mechanic, including any apprentice or helper working on the site of the work (or otherwise working in construction or development of the project under a development statute) all or part of the wages required by the contract, or upon the contractor's failure to submit the required records as discussed in paragraph (a)(3)(iv) of this section, the [Agency] may on its own initiative and after written notice to the contractor, sponsor, applicant, owner, or other entity, as the case may be, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds until such violations have ceased.
(ii) Priority to withheld funds. The Department has priority to funds withheld or to be withheld in accordance with paragraph (a)(2)(i) or (b)(3)(i) of this section, or both, over claims to those funds by:
(A) A contractor's surety(ies), including without limitation performance bond sureties and payment bond sureties;
(B) A contracting agency for its reprocurement costs;
(C) A trustee(s) (either a court-appointed trustee or a U.S. trustee, or both) in bankruptcy of a contractor, or a contractor's bankruptcy estate;
(D) A contractor's assignee(s);
(E) A contractor's successor(s); or
(F) A claim asserted under the Prompt Payment Act, 31 U.S.C. 3901–3907.
(3) Records and certified payrolls —(i) Basic record requirements —(A) Length of record retention. All regular payrolls and other basic records must be maintained by the contractor and any subcontractor during the course of the work and preserved for all laborers and mechanics working at the site of the work (or otherwise working in construction or development of the project under a development statute) for a period of at least 3 years after all the work on the prime contract is completed.
(B) Information required. Such records must contain the name; Social Security number; last known address, telephone number, and email address of each such worker; each worker's correct classification(s) of work actually performed; hourly rates of wages paid (including rates of contributions or costs anticipated for bona fide fringe benefits or cash equivalents thereof of the types described in 40 U.S.C. 3141(2)(B) of the Davis-Bacon Act); daily and weekly number of hours actually worked in total and on each covered contract; deductions made; and actual wages paid.
(C) Additional records relating to fringe benefits. Whenever the Secretary of Labor has found under paragraph (a)(1)(v) of this section that the wages of any laborer or mechanic include the amount of any costs reasonably anticipated in providing benefits under a plan or program described in 40 U.S.C. 3141(2)(B) of the Davis-Bacon Act, the contractor must maintain records which show that the commitment to provide such benefits is enforceable, that the plan or program is financially responsible, and that the plan or program has been communicated in writing to the laborers or mechanics affected, and records which show the costs anticipated or the actual cost incurred in providing such benefits.
(D) Additional records relating to apprenticeship. Contractors with apprentices working under approved programs must maintain written evidence of the registration of apprenticeship programs, the registration of the apprentices, and the ratios and wage rates prescribed in the applicable programs.
(ii) Certified payroll requirements— (A) Frequency and method of submission. The contractor or subcontractor must submit weekly, for each week in which any DBA- or Related Acts-covered work is performed, certified payrolls to the [write in name of appropriate Federal agency] if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the certified payrolls to the applicant, sponsor, owner, or other entity, as the case may be, that maintains such records, for transmission to the [write in name of agency]. The prime contractor is responsible for the submission of all certified payrolls by all subcontractors. A contracting agency or prime contractor may permit or require contractors to submit certified payrolls through an electronic system, as long as the electronic system requires a legally valid electronic signature; the system allows the contractor, the contracting agency, and the Department of Labor to access the certified payrolls upon request for at least 3 years after the work on the prime contract has been completed; and the contracting agency or prime contractor permits other methods of submission in situations where the contractor is unable or limited in its ability to use or access the electronic system.
(B) Information required. The certified payrolls submitted must set out accurately and completely all of the information required to be maintained under paragraph (a)(3)(i)(B) of this section, except that full Social Security numbers and last known addresses, telephone numbers, and email addresses must not be included on weekly transmittals. Instead, the certified payrolls need only include an individually identifying number for each worker ( e.g., the last four digits of the worker's Social Security number). The required weekly certified payroll information may be submitted using Optional Form WH–347 or in any other format desired. Optional Form WH–347 is available for this purpose from the Wage and Hour Division website at https://www.dol.gov/sites/dolgov/files/WHD/legacy/files/wh347/.pdf or its successor website. It is not a violation of this section for a prime contractor to require a subcontractor to provide full Social Security numbers and last known addresses, telephone numbers, and email addresses to the prime contractor for its own records, without weekly submission by the subcontractor to the sponsoring government agency (or the applicant, sponsor, owner, or other entity, as the case may be, that maintains such records).
(C) Statement of Compliance. Each certified payroll submitted must be accompanied by a “Statement of Compliance,” signed by the contractor or subcontractor, or the contractor's or subcontractor's agent who pays or supervises the payment of the persons working on the contract, and must certify the following:
( 1 ) That the certified payroll for the payroll period contains the information required to be provided under paragraph (a)(3)(ii) of this section, the appropriate information and basic records are being maintained under paragraph (a)(3)(i) of this section, and such information and records are correct and complete;
( 2 ) That each laborer or mechanic (including each helper and apprentice) working on the contract during the payroll period has been paid the full weekly wages earned, without rebate, either directly or indirectly, and that no deductions have been made either directly or indirectly from the full wages earned, other than permissible deductions as set forth in 29 CFR part 3; and
( 3 ) That each laborer or mechanic has been paid not less than the applicable wage rates and fringe benefits or cash equivalents for the classification(s) of work actually performed, as specified in the applicable wage determination incorporated into the contract.
(D) Use of Optional Form WH–347. The weekly submission of a properly executed certification set forth on the reverse side of Optional Form WH–347 will satisfy the requirement for submission of the “Statement of Compliance” required by paragraph (a)(3)(ii)(C) of this section.
(E) Signature. The signature by the contractor, subcontractor, or the contractor's or subcontractor's agent must be an original handwritten signature or a legally valid electronic signature.
(F) Falsification. The falsification of any of the above certifications may subject the contractor or subcontractor to civil or criminal prosecution under 18 U.S.C. 1001 and 31 U.S.C. 3729.
(G) Length of certified payroll retention. The contractor or subcontractor must preserve all certified payrolls during the course of the work and for a period of 3 years after all the work on the prime contract is completed.
(iii) Contracts, subcontracts, and related documents. The contractor or subcontractor must maintain this contract or subcontract and related documents including, without limitation, bids, proposals, amendments, modifications, and extensions. The contractor or subcontractor must preserve these contracts, subcontracts, and related documents during the course of the work and for a period of 3 years after all the work on the prime contract is completed.
(iv) Required disclosures and access— (A) Required record disclosures and access to workers. The contractor or subcontractor must make the records required under paragraphs (a)(3)(i) through (iii) of this section, and any other documents that the [write the name of the agency] or the Department of Labor deems necessary to determine compliance with the labor standards provisions of any of the applicable statutes referenced by §5.1, available for inspection, copying, or transcription by authorized representatives of the [write the name of the agency] or the Department of Labor, and must permit such representatives to interview workers during working hours on the job.
(B) Sanctions for non-compliance with records and worker access requirements. If the contractor or subcontractor fails to submit the required records or to make them available, or refuses to permit worker interviews during working hours on the job, the Federal agency may, after written notice to the contractor, sponsor, applicant, owner, or other entity, as the case may be, that maintains such records or that employs such workers, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds. Furthermore, failure to submit the required records upon request or to make such records available, or to permit worker interviews during working hours on the job, may be grounds for debarment action pursuant to §5.12. In addition, any contractor or other person that fails to submit the required records or make those records available to WHD within the time WHD requests that the records be produced will be precluded from introducing as evidence in an administrative proceeding under 29 CFR part 6 any of the required records that were not provided or made available to WHD. WHD will take into consideration a reasonable request from the contractor or person for an extension of the time for submission of records. WHD will determine the reasonableness of the request and may consider, among other things, the location of the records and the volume of production.
(C) Required information disclosures. Contractors and subcontractors must maintain the full Social Security number and last known address, telephone number, and email address of each covered worker, and must provide them upon request to the [write in name of appropriate Federal agency] if the agency is a party to the contract, or to the Wage and Hour Division of the Department of Labor. If the Federal agency is not such a party to the contract, the contractor, subcontractor, or both, must, upon request, provide the full Social Security number and last known address, telephone number, and email address of each covered worker to the applicant, sponsor, owner, or other entity, as the case may be, that maintains such records, for transmission to the [write in name of agency], the contractor, or the Wage and Hour Division of the Department of Labor for purposes of an investigation or other compliance action.
(4) Apprentices and equal employment opportunity —(i) Apprentices —(A) Rate of pay. Apprentices will be permitted to work at less than the predetermined rate for the work they perform when they are employed pursuant to and individually registered in a bona fide apprenticeship program registered with the U.S. Department of Labor, Employment and Training Administration, Office of Apprenticeship (OA), or with a State Apprenticeship Agency recognized by the OA. A person who is not individually registered in the program, but who has been certified by the OA or a State Apprenticeship Agency (where appropriate) to be eligible for probationary employment as an apprentice, will be permitted to work at less than the predetermined rate for the work they perform in the first 90 days of probationary employment as an apprentice in such a program. In the event the OA or a State Apprenticeship Agency recognized by the OA withdraws approval of an apprenticeship program, the contractor will no longer be permitted to use apprentices at less than the applicable predetermined rate for the work performed until an acceptable program is approved.
(B) Fringe benefits. Apprentices must be paid fringe benefits in accordance with the provisions of the apprenticeship program. If the apprenticeship program does not specify fringe benefits, apprentices must be paid the full amount of fringe benefits listed on the wage determination for the applicable classification. If the Administrator determines that a different practice prevails for the applicable apprentice classification, fringe benefits must be paid in accordance with that determination.
(C) Apprenticeship ratio. The allowable ratio of apprentices to journeyworkers on the job site in any craft classification must not be greater than the ratio permitted to the contractor as to the entire work force under the registered program or the ratio applicable to the locality of the project pursuant to paragraph (a)(4)(i)(D) of this section. Any worker listed on a payroll at an apprentice wage rate, who is not registered or otherwise employed as stated in paragraph (a)(4)(i)(A) of this section, must be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed. In addition, any apprentice performing work on the job site in excess of the ratio permitted under this section must be paid not less than the applicable wage rate on the wage determination for the work actually performed.
(D) Reciprocity of ratios and wage rates. Where a contractor is performing construction on a project in a locality other than the locality in which its program is registered, the ratios and wage rates (expressed in percentages of the journeyworker's hourly rate) applicable within the locality in which the construction is being performed must be observed. If there is no applicable ratio or wage rate for the locality of the project, the ratio and wage rate specified in the contractor's registered program must be observed.
(ii) Equal employment opportunity. The use of apprentices and journeyworkers under this part must be in conformity with the equal employment opportunity requirements of Executive Order 11246, as amended, and 29 CFR part 30.
(5) Compliance with Copeland Act requirements. The contractor shall comply with the requirements of 29 CFR part 3, which are incorporated by reference in this contract.
(6) Subcontracts. The contractor or subcontractor must insert in any subcontracts the clauses contained in paragraphs (a)(1) through (11) of this section, along with the applicable wage determination(s) and such other clauses or contract modifications as the [write in the name of the Federal agency] may by appropriate instructions require, and a clause requiring the subcontractors to include these clauses and wage determination(s) in any lower tier subcontracts. The prime contractor is responsible for the compliance by any subcontractor or lower tier subcontractor with all the contract clauses in this section. In the event of any violations of these clauses, the prime contractor and any subcontractor(s) responsible will be liable for any unpaid wages and monetary relief, including interest from the date of the underpayment or loss, due to any workers of lower-tier subcontractors, and may be subject to debarment, as appropriate.
(7) Contract termination: debarment. A breach of the contract clauses in 29 CFR 5.5 may be grounds for termination of the contract, and for debarment as a contractor and a subcontractor as provided in 29 CFR 5.12.
(8) Compliance with Davis-Bacon and Related Act requirements. All rulings and interpretations of the Davis-Bacon and Related Acts contained in 29 CFR parts 1, 3, and 5 are herein incorporated by reference in this contract.
(9) Disputes concerning labor standards. Disputes arising out of the labor standards provisions of this contract shall not be subject to the general disputes clause of this contract. Such disputes shall be resolved in accordance with the procedures of the Department of Labor set forth in 29 CFR parts 5, 6, and 7. Disputes within the meaning of this clause include disputes between the contractor (or any of its subcontractors) and the contracting agency, the U.S. Department of Labor, or the employees or their representatives.
(10) Certification of eligibility. (i) By entering into this contract, the contractor certifies that neither it nor any person or firm who has an interest in the contractor's firm is a person or firm ineligible to be awarded Government contracts by virtue of 40 U.S.C. 3144(b) or §5.12(a).
(ii) No part of this contract shall be subcontracted to any person or firm ineligible for award of a Government contract by virtue of 40 U.S.C. 3144(b) or §5.12(a).
(iii) The penalty for making false statements is prescribed in the U.S. Code, Title 18 Crimes and Criminal Procedure, 18 U.S.C. 1001.
(11) Anti-retaliation. It is unlawful for any person to discharge, demote, intimidate, threaten, restrain, coerce, blacklist, harass, or in any other manner discriminate against, or to cause any person to discharge, demote, intimidate, threaten, restrain, coerce, blacklist, harass, or in any other manner discriminate against, any worker or job applicant for:
(i) Notifying any contractor of any conduct which the worker reasonably believes constitutes a violation of the DBA, Related Acts, this part, or 29 CFR part 1 or 3;
(ii) Filing any complaint, initiating or causing to be initiated any proceeding, or otherwise asserting or seeking to assert on behalf of themselves or others any right or protection under the DBA, Related Acts, this part, or 29 CFR part 1 or 3;
(iii) Cooperating in any investigation or other compliance action, or testifying in any proceeding under the DBA, Related Acts, this part, or 29 CFR part 1 or 3; or
(iv) Informing any other person about their rights under the DBA, Related Acts, this part, or 29 CFR part 1 or 3.
(b) Contract Work Hours and Safety Standards Act (CWHSSA). The Agency Head must cause or require the contracting officer to insert the following clauses set forth in paragraphs (b)(1) through (5) of this section in full, or (for contracts covered by the Federal Acquisition Regulation) by reference, in any contract in an amount in excess of $100,000 and subject to the overtime provisions of the Contract Work Hours and Safety Standards Act. These clauses must be inserted in addition to the clauses required by paragraph (a) of this section or 29 CFR 4.6. As used in this paragraph (b), the terms “laborers and mechanics” include watchpersons and guards.
(1) Overtime requirements. No contractor or subcontractor contracting for any part of the contract work which may require or involve the employment of laborers or mechanics shall require or permit any such laborer or mechanic in any workweek in which he or she is employed on such work to work in excess of forty hours in such workweek unless such laborer or mechanic receives compensation at a rate not less than one and one-half times the basic rate of pay for all hours worked in excess of forty hours in such workweek.
(2) Violation; liability for unpaid wages; liquidated damages. In the event of any violation of the clause set forth in paragraph (b)(1) of this section the contractor and any subcontractor responsible therefor shall be liable for the unpaid wages and interest from the date of the underpayment. In addition, such contractor and subcontractor shall be liable to the United States (in the case of work done under contract for the District of Columbia or a territory, to such District or to such territory), for liquidated damages. Such liquidated damages shall be computed with respect to each individual laborer or mechanic, including watchpersons and guards, employed in violation of the clause set forth in paragraph (b)(1) of this section, in the sum of $31 for each calendar day on which such individual was required or permitted to work in excess of the standard workweek of forty hours without payment of the overtime wages required by the clause set forth in paragraph (b)(1).
(3) Withholding for unpaid wages and liquidated damages —(i) Withholding process. The [write in the name of the Federal agency or the recipient of Federal assistance] may, upon its own action, or must, upon written request of an authorized representative of the Department of Labor, withhold or cause to be withheld from the contractor so much of the accrued payments or advances as may be considered necessary to satisfy the liabilities of the prime contractor or any subcontractor for any unpaid wages; monetary relief, including interest; and liquidated damages required by the clauses set forth in this paragraph (b) on this contract, any other Federal contract with the same prime contractor, or any other federally assisted contract subject to the Contract Work Hours and Safety Standards Act that is held by the same prime contractor (as defined in §5.2). The necessary funds may be withheld from the contractor under this contract, any other Federal contract with the same prime contractor, or any other federally assisted contract that is subject to the Contract Work Hours and Safety Standards Act and is held by the same prime contractor, regardless of whether the other contract was awarded or assisted by the same agency, and such funds may be used to satisfy the contractor liability for which the funds were withheld.
(ii) Priority to withheld funds. The Department has priority to funds withheld or to be withheld in accordance with paragraph (a)(2)(i) or (b)(3)(i) of this section, or both, over claims to those funds by:
(A) A contractor's surety(ies), including without limitation performance bond sureties and payment bond sureties;
(B) A contracting agency for its reprocurement costs;
(C) A trustee(s) (either a court-appointed trustee or a U.S. trustee, or both) in bankruptcy of a contractor, or a contractor's bankruptcy estate;
(D) A contractor's assignee(s);
(E) A contractor's successor(s); or
(F) A claim asserted under the Prompt Payment Act, 31 U.S.C. 3901–3907.
(4) Subcontracts. The contractor or subcontractor must insert in any subcontracts the clauses set forth in paragraphs (b)(1) through (5) of this section and a clause requiring the subcontractors to include these clauses in any lower tier subcontracts. The prime contractor is responsible for compliance by any subcontractor or lower tier subcontractor with the clauses set forth in paragraphs (b)(1) through (5). In the event of any violations of these clauses, the prime contractor and any subcontractor(s) responsible will be liable for any unpaid wages and monetary relief, including interest from the date of the underpayment or loss, due to any workers of lower-tier subcontractors, and associated liquidated damages and may be subject to debarment, as appropriate.
(5) Anti-retaliation. It is unlawful for any person to discharge, demote, intimidate, threaten, restrain, coerce, blacklist, harass, or in any other manner discriminate against, or to cause any person to discharge, demote, intimidate, threaten, restrain, coerce, blacklist, harass, or in any other manner discriminate against, any worker or job applicant for:
(i) Notifying any contractor of any conduct which the worker reasonably believes constitutes a violation of the Contract Work Hours and Safety Standards Act (CWHSSA) or its implementing regulations in this part;
(ii) Filing any complaint, initiating or causing to be initiated any proceeding, or otherwise asserting or seeking to assert on behalf of themselves or others any right or protection under CWHSSA or this part;
(iii) Cooperating in any investigation or other compliance action, or testifying in any proceeding under CWHSSA or this part; or
(iv) Informing any other person about their rights under CWHSSA or this part.
(c) CWHSSA required records clause. In addition to the clauses contained in paragraph (b) of this section, in any contract subject only to the Contract Work Hours and Safety Standards Act and not to any of the other laws referenced by §5.1, the Agency Head must cause or require the contracting officer to insert a clause requiring that the contractor or subcontractor must maintain regular payrolls and other basic records during the course of the work and must preserve them for a period of 3 years after all the work on the prime contract is completed for all laborers and mechanics, including guards and watchpersons, working on the contract. Such records must contain the name; last known address, telephone number, and email address; and social security number of each such worker; each worker's correct classification(s) of work actually performed; hourly rates of wages paid; daily and weekly number of hours actually worked; deductions made; and actual wages paid. Further, the Agency Head must cause or require the contracting officer to insert in any such contract a clause providing that the records to be maintained under this paragraph must be made available by the contractor or subcontractor for inspection, copying, or transcription by authorized representatives of the (write the name of agency) and the Department of Labor, and the contractor or subcontractor will permit such representatives to interview workers during working hours on the job.
(d) Incorporation of contract clauses and wage determinations by reference. Although agencies are required to insert the contract clauses set forth in this section, along with appropriate wage determinations, in full into covered contracts, and contractors and subcontractors are required to insert them in any lower-tier subcontracts, the incorporation by reference of the required contract clauses and appropriate wage determinations will be given the same force and effect as if they were inserted in full text.
(e) Incorporation by operation of law. The contract clauses set forth in this section (or their equivalent under the Federal Acquisition Regulation), along with the correct wage determinations, will be considered to be a part of every prime contract required by the applicable statutes referenced by §5.1 to include such clauses, and will be effective by operation of law, whether or not they are included or incorporated by reference into such contract, unless the Administrator grants a variance, tolerance, or exemption from the application of this paragraph. Where the clauses and applicable wage determinations are effective by operation of law under this paragraph, the prime contractor must be compensated for any resulting increase in wages in accordance with applicable law.
§5.6 Enforcement
(a) Agency responsibilities. (1)(i) The Federal agency has the initial responsibility to ascertain whether the clauses required by §5.5 and the appropriate wage determination(s) have been incorporated into the contracts subject to the labor standards provisions of the laws referenced by §5.1. Additionally, a Federal agency that provides Federal financial assistance that is subject to the labor standards provisions of the Act must promulgate the necessary regulations or procedures to require the recipient or sub-recipient of the Federal assistance to insert in its contracts the provisions of §5.5. No payment, advance, grant, loan, or guarantee of funds will be approved by the Federal agency unless it ensures that the clauses required by §5.5 and the appropriate wage determination(s) are incorporated into such contracts. Furthermore, no payment, advance, grant, loan, or guarantee of funds will be approved by the Federal agency after the beginning of construction unless there is on file with the Federal agency a certification by the contractor that the contractor and its subcontractors have complied with the provisions of §5.5 or unless there is on file with the Federal agency a certification by the contractor that there is a substantial dispute with respect to the required provisions.
(ii) If a contract subject to the labor standards provisions of the applicable statutes referenced by §5.1 is entered into without the incorporation of the clauses required by §5.5, the agency must, upon the request of the Administrator or upon its own initiative, either terminate and resolicit the contract with the required contract clauses, or incorporate the required clauses into the contract (or ensure they are so incorporated) through supplemental agreement, change order, or any and all authority that may be needed. Where an agency has not entered directly into such a contract but instead has provided Federal financial assistance, the agency must ensure that the recipient or sub-recipient of the Federal assistance similarly incorporates the clauses required into its contracts. The method of incorporation of the correct wage determination, and adjustment in contract price, where appropriate, should be in accordance with applicable law. Additionally, the following requirements apply:
(A) Unless the Administrator directs otherwise, the incorporation of the clauses required by §5.5 must be retroactive to the date of contract award or start of construction if there is no award.
(B) If this incorporation occurs as the result of a request from the Administrator, the incorporation must take place within 30 days of the date of that request, unless the agency has obtained an extension from the Administrator.
(C) The contractor must be compensated for any increases in wages resulting from incorporation of a missing contract clause.
(D) If the recipient refuses to incorporate the clauses as required, the agency must make no further payment, advance, grant, loan, or guarantee of funds in connection with the contract until the recipient incorporates the required clauses into its contract, and must promptly refer the dispute to the Administrator for further proceedings under §5.13.
(E) Before terminating a contract pursuant to this section, the agency must withhold or cross-withhold sufficient funds to remedy any back wage liability resulting from the failure to incorporate the correct wage determination or otherwise identify and obligate sufficient funds through a termination settlement agreement, bond, or other satisfactory mechanism.
(F) Notwithstanding the requirement to incorporate the contract clauses and correct wage determination within 30 days, the contract clauses and correct wage determination will be effective by operation of law, retroactive to the beginning of construction, in accordance with §5.5(e).
(2)(i) Certified payrolls submitted pursuant to §5.5(a)(3)(ii) must be preserved by the Federal agency for a period of 3 years after all the work on the prime contract is completed, and must be produced at the request of the Department of Labor at any time during the 3-year period, regardless of whether the Department of Labor has initiated an investigation or other compliance action.
(ii) In situations where the Federal agency does not itself maintain certified payrolls required to be submitted pursuant to §5.5(a)(3)(ii), upon the request of the Department of Labor the Federal agency must ensure that such certified payrolls are provided to the Department of Labor. Such certified payrolls may be provided by the applicant, sponsor, owner, or other entity, as the case may be, directly to the Department of Labor, or to the Federal agency which, in turn, must provide those records to the Department of Labor.
(3) The Federal agency will cause such investigations to be made as may be necessary to assure compliance with the labor standards clauses required by §5.5 and the applicable statutes referenced in §5.1. Investigations will be made of all contracts with such frequency as may be necessary to assure compliance. Such investigations will include interviews with workers, which must be taken in confidence, and examinations of certified payrolls, regular payrolls, and other basic records required to be maintained under §5.5(a)(3). In making such examinations, particular care must be taken to determine the correctness of classification(s) of work actually performed, and to determine whether there is a disproportionate amount of work by laborers and of apprentices registered in approved programs. Such investigations must also include evidence of fringe benefit plans and payments thereunder. Federal agencies must give priority to complaints of alleged violations.
(4) In accordance with normal operating procedures, the contracting agency may be furnished various investigatory material from the investigation files of the Department of Labor. None of the material, other than computations of back wages, liquidated damages, and monetary relief for violations of §5.5(a)(11) or (b)(5), and the summary of back wages due, may be disclosed in any manner to anyone other than Federal officials charged with administering the contract or program providing Federal assistance to the contract, without requesting the permission and views of the Department of Labor.
(b) Department of Labor investigations and other compliance actions. (1) The Administrator will investigate and conduct other compliance actions as deemed necessary in order to obtain compliance with the labor standards provisions of the applicable statutes referenced by §5.1, or to affirm or reject the recommendations by the Agency Head with respect to labor standards matters arising under the statutes referenced by §5.1.
(2) Federal agencies, contractors, subcontractors, sponsors, applicants, owners, or other entities, as the case may be, must cooperate with any authorized representative of the Department of Labor in the inspection of records, in interviews with workers, and in all other aspects of the investigations or other compliance actions.
(3) The findings of such an investigation or other compliance action, including amounts found due, may not be altered or reduced without the approval of the Department of Labor.
(4) Where the underpayments disclosed by such an investigation or other compliance action total $1,000 or more, where there is reason to believe that the contractor or subcontractor has disregarded its obligations to workers or subcontractors, or where liquidated damages may be assessed under CWHSSA, the Department of Labor will furnish the Federal agency an enforcement report detailing the labor standards violations disclosed by the investigation or other compliance action and any action taken by the contractor or subcontractor to correct the violations, including any payment of back wages or any other relief provided workers or remedial actions taken for violations of §5.5(a)(11) or (b)(5). In other circumstances, the Department of Labor will furnish the Federal agency a notification summarizing the findings of the investigation or other compliance action.
(c) Confidentiality requirements. It is the policy of the Department of Labor to protect from disclosure the identity of its confidential sources and to prevent an unwarranted invasion of personal privacy. Accordingly, the identity of a worker or other informant who makes a written or oral statement as a complaint or in the course of an investigation or other compliance action, as well as portions of the statement which would tend to reveal the identity of the informant, will not be disclosed in any manner to anyone other than Federal officials without the prior consent of the informant. Disclosure of such statements is also governed by the provisions of the “Freedom of Information Act” (5 U.S.C. 552, see part 70 of this subtitle) and the “Privacy Act of 1974” (5 U.S.C. 552a, see part 71 of this subtitle).
§5.7 Reports to the Secretary of Labor.
(a) Enforcement reports. (1) Where underpayments by a contractor or subcontractor total less than $1,000, where there is no reason to believe that the contractor or subcontractor has disregarded its obligations to workers or subcontractors, and where restitution has been effected and future compliance assured, the Federal agency need not submit its investigative findings and recommendations to the Administrator, unless the investigation or other compliance action was made at the request of the Department of Labor. In the latter case, the Federal agency will submit a factual summary report detailing any violations including any data on the amount of restitution paid, the number of workers who received restitution, liquidated damages assessed under the Contract Work Hours and Safety Standards Act, corrective measures taken (such as “letters of notice” or remedial action taken for violations of §5.5(a)(11) or (b)(5)), and any information that may be necessary to review any recommendations for an appropriate adjustment in liquidated damages under §5.8.
(2) Where underpayments by a contractor or subcontractor total $1,000 or more, or where there is reason to believe that the contractor or subcontractor has disregarded its obligations to workers or subcontractors, the Federal agency will furnish within 60 days after completion of its investigation, a detailed enforcement report to the Administrator.
§5.9 Suspension of funds.
(a) Suspension and withholding. In the event of failure or refusal of the contractor or any subcontractor to comply with the applicable statutes referenced by §5.1 and the labor standards clauses contained in §5.5, whether incorporated into the contract physically, by reference, or by operation of law, the Federal agency (and any other agency), may, upon its own action, or must, upon written request of an authorized representative of the Department of Labor, take such action as may be necessary to cause the suspension of the payment, advance, or guarantee of funds until such time as the violations are discontinued and/or until sufficient funds are withheld as may be considered necessary to compensate workers for the full amount of wages and monetary relief to which they are entitled, and to cover any liquidated damages and pre-judgment or post-judgment interest which may be due.
(b) Cross-withholding. To satisfy a contractor's liability for back wages on a contract, in addition to the suspension and withholding of funds from the contract(s) under which the violation(s) occurred, the necessary funds also may be withheld under any other Federal contract with the same prime contractor, or any other federally assisted contract that is subject to Davis-Bacon labor standards and/or the Contract Work Hours and Safety Standards Act and is held by the same prime contractor, regardless of whether the other contract was awarded or assisted by the same agency.
(c) Cross-withholding from different legal entities. Cross-withholding of funds may be requested from contracts held by other entities that may be considered to be the same prime contractor as that term is defined in §5.2. Such cross-withholding is appropriate where the separate legal entities have independently consented to it by entering into contracts containing the withholding provisions at §5.5(a)(2) and (b)(3). Cross-withholding from a contract held by a different legal entity is not appropriate unless the withholding provisions were incorporated in full or by reference in that different legal entity's contract. Absent exceptional circumstances, cross-withholding is not permitted from a contract held by a different legal entity where the Davis-Bacon labor standards were incorporated only by operation of law into that contract.
§5.10 Restitution, criminal action.
(a) In cases other than those forwarded to the Attorney General of the United States under paragraph (b) of this section where violations of the labor standards clauses contained in §5.5 and the applicable statutes referenced by §5.1 result in underpayment of wages to workers or monetary damages caused by violations of §5.5(a)(11) or (b)(5), the Federal agency or an authorized representative of the Department of Labor will request that restitution be made to such workers or on their behalf to plans, funds, or programs for any type of bona fide fringe benefits within the meaning of 40 U.S.C. 3141(2)(B), including interest from the date of the underpayment or loss. Interest on any back wages or monetary relief provided for in this part will be calculated using the percentage established for the underpayment of taxes under 26 U.S.C. 6621 and will be compounded daily.
(b) In cases where the Agency Head or the Administrator finds substantial evidence that such violations are willful and in violation of a criminal statute, the matter will be forwarded to the Attorney General of the United States for prosecution if the facts warrant. In all such cases the Administrator will be informed simultaneously of the action taken.
§5.11 Disputes concerning payment of wages.
(a) This section sets forth the procedure for resolution of disputes of fact or law concerning payment of prevailing wage rates, overtime pay, proper classification, or monetary relief for violations of §5.5(a)(11) or (b)(5). The procedures in this section may be initiated upon the Administrator's own motion, upon referral of the dispute by a Federal agency pursuant to §5.5(a)(9), or upon request of the contractor or subcontractor.
(b)(1) In the event of a dispute described in paragraph (a) of this section in which it appears that relevant facts are at issue, the Administrator will notify the affected contractor and subcontractor, if any, by registered or certified mail to the last known address or by any other means normally assuring delivery, of the investigation findings. If the Administrator determines that there is reasonable cause to believe that either the contractor, the subcontractor, or both, should also be subject to debarment under the Davis-Bacon Act or any of the other applicable statutes referenced by §5.1, the notification will so indicate.
(2) A contractor or subcontractor desiring a hearing concerning the Administrator's investigation findings must request such a hearing by letter or by any other means normally assuring delivery, sent within 30 days of the date of the Administrator's notification. The request must set forth those findings which are in dispute and the reasons therefor, including any affirmative defenses.
(3) Upon receipt of a timely request for a hearing, the Administrator will refer the case to the Chief Administrative Law Judge by Order of Reference, with an attached copy of the notification from the Administrator and the response of the contractor or subcontractor, for designation of an Administrative Law Judge to conduct such hearings as may be necessary to resolve the disputed matters. The hearings will be conducted in accordance with the procedures set forth in part 6 of this subtitle.
(c)(1) In the event of a dispute described in paragraph (a) of this section in which it appears that there are no relevant facts at issue, and where there is not at that time reasonable cause to institute debarment proceedings under §5.12, the Administrator will notify the contractor and subcontractor, if any, by registered or certified mail to the last known address or by any other means normally assuring delivery, of the investigation findings, and will issue a ruling on any issues of law known to be in dispute.
(2)(i) If the contractor or subcontractor disagrees with the factual findings of the Administrator or believes that there are relevant facts in dispute, the contractor or subcontractor must advise the Administrator by letter or by any other means normally assuring delivery, sent within 30 days of the date of the Administrator's notification. In the response, the contractor or subcontractor must explain in detail the facts alleged to be in dispute and attach any supporting documentation.
(ii) Upon receipt of a response under paragraph (c)(2)(i) of this section alleging the existence of a factual dispute, the Administrator will examine the information submitted. If the Administrator determines that there is a relevant issue of fact, the Administrator will refer the case to the Chief Administrative Law Judge in accordance with paragraph (b)(3) of this section. If the Administrator determines that there is no relevant issue of fact, the Administrator will so rule and advise the contractor and subcontractor, if any, accordingly.
(3) If the contractor or subcontractor desires review of the ruling issued by the Administrator under paragraph (c)(1) or (2) of this section, the contractor or subcontractor must file a petition for review thereof with the Administrative Review Board within 30 days of the date of the ruling, with a copy thereof to the Administrator. The petition for review must be filed in accordance with part 7 of this subtitle.
(d) If a timely response to the Administrator's findings or ruling is not made or a timely petition for review is not filed, the Administrator's findings or ruling will be final, except that with respect to debarment under the Davis-Bacon Act, the Administrator will advise the Comptroller General of the Administrator's recommendation in accordance with §5.12(a)(2). If a timely response or petition for review is filed, the findings or ruling of the Administrator will be inoperative unless and until the decision is upheld by the Administrative Law Judge or the Administrative Review Board.
§5.12 Debarment proceedings.
(a) Debarment standard and ineligible list. (1) Whenever any contractor or subcontractor is found by the Secretary of Labor to have disregarded their obligations to workers or subcontractors under the Davis-Bacon Act, any of the other applicable statutes referenced by §5.1, this part, or part 3 of this subtitle, such contractor or subcontractor and their responsible officers, if any, and any firm, corporation, partnership, or association in which such contractor, subcontractor, or responsible officer has an interest will be ineligible for a period of 3 years to be awarded any contract or subcontract of the United States or the District of Columbia and any contract or subcontract subject to the labor standards provisions of any of the statutes referenced by §5.1.
(2) In cases arising under contracts covered by the Davis-Bacon Act, the Administrator will transmit to the Comptroller General the name(s) of the contractors or subcontractors and their responsible officers, if any, and any firms, corporations, partnerships, or associations in which the contractors, subcontractors, or responsible officers are known to have an interest, who have been found to have disregarded their obligations to workers or subcontractors, and the recommendation of the Secretary of Labor or authorized representative regarding debarment. In cases arising under contracts covered by any of the applicable statutes referenced by §5.1 other than the Davis-Bacon Act, the Administrator determines the name(s) of the contractors or subcontractors and their responsible officers, if any, and any firms, corporations, partnerships, or associations in which the contractors, subcontractors, or responsible officers are known to have an interest, to be debarred. The names of such ineligible persons or firms will be published on SAM or its successor website, and an ineligible person or firm will be ineligible for a period of 3 years from the date of publication of their name on the ineligible list, to be awarded any contract or subcontract of the United States or the District of Columbia and any contract or subcontract subject to the labor standards provisions of any of the statutes referenced by §5.1.
(b) Procedure. (1) In addition to cases under which debarment action is initiated pursuant to §5.11, whenever as a result of an investigation conducted by the Federal agency or the Department of Labor, and where the Administrator finds reasonable cause to believe that a contractor or subcontractor has committed violations which constitute a disregard of its obligations to workers or subcontractors under the Davis-Bacon Act, the labor standards provisions of any of the other applicable statutes referenced by §5.1, this part, or part 3 of this subtitle, the Administrator will notify by registered or certified mail to the last known address or by any other means normally assuring delivery, the contractor or subcontractor and responsible officers, if any, and any firms, corporations, partnerships, or associations in which the contractors, subcontractors, or responsible officers are known to have an interest of the finding.
(i) The Administrator will afford such contractor, subcontractor, responsible officer, and any other parties notified an opportunity for a hearing as to whether debarment action should be taken under paragraph (a) of this section. The Administrator will furnish to those notified a summary of the investigative findings.
(ii) If the contractor, subcontractor, responsible officer, or any other parties notified wish to request a hearing as to whether debarment action should be taken, such a request must be made by letter or by any other means normally assuring delivery, sent within 30 days of the date of the notification from the Administrator, and must set forth any findings which are in dispute and the basis for such disputed findings, including any affirmative defenses to be raised.
(iii) Upon timely receipt of such request for a hearing, the Administrator will refer the case to the Chief Administrative Law Judge by Order of Reference, with an attached copy of the notification from the Administrator and the responses of the contractor, subcontractor, responsible officers, or any other parties notified, for designation of an Administrative Law Judge to conduct such hearings as may be necessary to determine the matters in dispute.
(iv) In considering debarment under any of the statutes referenced by §5.1 other than the Davis-Bacon Act, the Administrative Law Judge will issue an order concerning whether the contractor, subcontractor, responsible officer, or any other party notified is to be debarred in accordance with paragraph (a) of this section. In considering debarment under the Davis-Bacon Act, the Administrative Law Judge will issue a recommendation as to whether the contractor, subcontractor, responsible officers, or any other party notified should be debarred under 40 U.S.C. 3144(b).
(2) Hearings under this section will be conducted in accordance with part 6 of this subtitle. If no hearing is requested within 30 days of the date of the notification from the Administrator, the Administrator's findings will be final, except with respect to recommendations regarding debarment under the Davis-Bacon Act, as set forth in paragraph (a)(2) of this section.
(c) Interests of debarred parties. (1) A finding as to whether persons or firms whose names appear on the ineligible list have an interest under 40 U.S.C. 3144(b) or paragraph (a) of this section in any other firm, corporation, partnership, or association, may be made through investigation, hearing, or otherwise.
(2)(i) The Administrator, on their own motion or after receipt of a request for a determination pursuant to paragraph (c)(3) of this section, may make a finding on the issue of interest.
(ii) If the Administrator determines that there may be an interest but finds that there is insufficient evidence to render a final ruling thereon, the Administrator may refer the issue to the Chief Administrative Law Judge in accordance with paragraph (c)(4) of this section.
(iii) If the Administrator finds that no interest exists, or that there is not sufficient information to warrant the initiation of an investigation, the requesting party, if any, will be so notified and no further action taken.
(iv)(A) If the Administrator finds that an interest exists, the person or firm affected will be notified of the Administrator's finding (by certified mail to the last known address or by any other means normally assuring delivery), which will include the reasons therefore, and such person or firm will be afforded an opportunity to request that a hearing be held to decide the issue.
(B) Such person or firm will have 20 days from the date of the Administrator's ruling to request a hearing. A person or firm desiring a hearing must request it by letter or by any other means normally assuring delivery, sent within 20 days of the date of the Administrator's notification. A detailed statement of the reasons why the Administrator's ruling is in error, including facts alleged to be in dispute, if any, must be submitted with the request for a hearing.
(C) If no hearing is requested within the time mentioned in paragraph (c)(2)(iv)(B) of this section, the Administrator's finding will be final and the Administrator will notify the Comptroller General in cases arising under the DBA. If a hearing is requested, the ruling of the Administrator will be inoperative unless and until the Administrative Law Judge or the Administrative Review Board issues an order that there is an interest.
(3)(i) A request for a determination of interest may be made by any interested party, including contractors or prospective contractors and associations of contractors, representatives of workers, and interested agencies. Such a request must be submitted in writing to the Administrator, Wage and Hour Division, U.S. Department of Labor, 200 Constitution Avenue NW, Washington, DC 20210.
(ii) The request must include a statement setting forth in detail why the petitioner believes that a person or firm whose name appears on the ineligible list has an interest in any firm, corporation, partnership, or association that is seeking or has been awarded a contract or subcontract of the United States or the District of Columbia, or a contract or subcontract that is subject to the labor standards provisions of any of the statutes referenced by §5.1. No particular form is prescribed for the submission of a request under this section.
(4) The Administrator, on their own motion under paragraph (c)(2)(ii) of this section or upon a request for hearing where the Administrator determines that relevant facts are in dispute, will by order refer the issue to the Chief Administrative Law Judge, for designation of an Administrative Law Judge who will conduct such hearings as may be necessary to render a decision solely on the issue of interest. Such proceedings must be conducted in accordance with the procedures set forth in part 6 of this subtitle.
(5) If the person or firm affected requests a hearing and the Administrator determines that relevant facts are not in dispute, the Administrator will refer the issue and the record compiled thereon to the Administrative Review Board to render a decision solely on the issue of interest. Such proceeding must be conducted in accordance with the procedures set forth in part 7 of this subtitle.
§5.13 Rulings and interpretations.
(a) All questions relating to the application and interpretation of wage determinations (including the classifications therein) issued pursuant to part 1 of this subtitle, of the rules contained in this part and in parts 1 and 3 of this subtitle, and of the labor standards provisions of any of the laws referenced in §5.1 must be referred to the Administrator for appropriate ruling or interpretation. These rulings and interpretations are authoritative and those under the Davis-Bacon Act may be relied upon as provided for in section 10 of the Portal-to-Portal Act of 1947 (29 U.S.C. 259). Requests for such rulings and interpretations should be submitted via email to dgceinquiries@dol.gov ; by mail to Administrator, Wage and Hour Division, U.S. Department of Labor, 200 Constitution Ave., NW, Washington, DC 20210; or through other means directed by the Administrator.
(b) If any such ruling or interpretation is made by an authorized representative of the Administrator of the Wage and Hour Division, any interested party may seek reconsideration of the ruling or interpretation by the Administrator of the Wage and Hour Division. The procedures and time limits set out in §1.8 of this subtitle apply to any such request for reconsideration.
§5.15 Limitations, variations, tolerances, and exemptions under the Contract Work Hours and Safety Standards Act.
(c)(4)(i) Time spent in an organized program of related, supplemental instruction by laborers or mechanics employed under bona fide apprenticeship programs may be excluded from working time if the criteria prescribed in paragraphs (c)(4)(ii) and (iii) of this section are met.
(ii) The apprentice comes within the definition contained in §5.2.
(iii) The time in question does not involve productive work or performance of the apprentice's regular duties.
(d)(1) In the event of failure or refusal of the contractor or any subcontractor to comply with overtime pay requirements of the Contract Work Hours and Safety Standards Act, if the funds withheld by Federal agencies for the violations are not sufficient to pay fully the unpaid wages and any back pay or other monetary relief due laborers and mechanics, with interest, and the liquidated damages due the United States, the available funds will be used first to compensate the laborers and mechanics for the wages to which they are entitled (or an equitable portion thereof when the funds are not adequate for this purpose); and the balance, if any, will be used for the payment of liquidated damages.
§5.20 Scope and significance of this subpart.
The 1964 amendments (Pub. L. 88–349) to the Davis-Bacon Act require, among other things, that the prevailing wage determined for Federal and federally assisted construction include the basic hourly rate of pay and the amount contributed by the contractor or subcontractor for certain fringe benefits (or the cost to them of such benefits). The purpose of this subpart is to explain the provisions of these amendments and make available in one place official interpretations of the fringe benefits provisions of the Davis-Bacon Act. These interpretations will guide the Department of Labor in carrying out its responsibilities under these provisions. These interpretations are intended also to provide guidance to contractors and their associations; laborers and mechanics and their organizations; and local, State, and Federal agencies. The interpretations contained in this subpart are authoritative and may be relied upon as provided for in section 10 of the Portal-to-Portal Act of 1947 (29 U.S.C. 259). The omission to discuss a particular problem in this subpart or in interpretations supplementing it should not be taken to indicate the adoption of any position by the Secretary of Labor with respect to such problem or to constitute an administrative interpretation, practice, or enforcement policy. Questions on matters not fully covered by this subpart may be referred to the Secretary for interpretation as provided in §5.13.
§5.22 Effect of the Davis-Bacon fringe benefits provisions
The Davis-Bacon Act and the prevailing wage provisions of the statutes referenced in §1.1 of this subtitle confer upon the Secretary of Labor the authority to predetermine, as minimum wages, those wage rates found to be prevailing for corresponding classes of laborers and mechanics employed on projects of a character similar to the contract work in the area in which the work is to be performed. See the definitions of the terms “prevailing wage” and “area” in §1.2 of this subtitle. The fringe benefits amendments enlarge the scope of this authority by including certain bona fide fringe benefits within the meaning of the terms “wages”, “scale of wages”, “wage rates”, “minimum wages”, and “prevailing wages”, as used in the Davis-Bacon Act.
§5.23 The statutory provisions.
Pursuant to the Davis-Bacon Act, as amended and codified at 40 U.S.C. 3141(2), the term “prevailing wages” and similar terms include the basic hourly rate of pay and, for the listed fringe benefits and other bona fide fringe benefits not required by other law, the contributions irrevocably made by a contractor or subcontractor to a trustee or third party pursuant to a bona fide fringe benefit fund, plan, or program, and the costs to the contractor or subcontractor that may be reasonably anticipated in providing bona fide fringe benefits pursuant to an enforceable commitment to carry out a financially responsible plan or program, which was communicated in writing to the affected laborers and mechanics. Section 5.29 discusses specific fringe benefits that may be considered to be bona fide.
§5.26 “* * * contribution irrevocably made * * * to a trustee or to a third person”.
(a) Requirements. The following requirements apply to any fringe benefit contributions made to a trustee or to a third person pursuant to a fund, plan, or program:
(1) Such contributions must be made irrevocably;
(2) The trustee or third person may not be affiliated with the contractor or subcontractor;
(3) A trustee must adhere to any fiduciary responsibilities applicable under law; and
(4) The trust or fund must not permit the contractor or subcontractor to recapture any of the contributions paid in or any way divert the funds to its own use or benefit.
(b) Excess payments. Notwithstanding the above, a contractor or subcontractor may recover sums which it had paid to a trustee or third person in excess of the contributions actually called for by the plan, such as excess payments made in error or in order to cover the estimated cost of contributions at a time when the exact amount of the necessary contributions is not yet known. For example, a benefit plan may provide for definite insurance benefits for employees in the event of contingencies such as death, sickness, or accident, with the cost of such definite benefits borne by the contractor or subcontractor. In such a case, if the insurance company returns the amount that the contractor or subcontractor paid in excess of the amount required to provide the benefits, this will not be deemed a recapture or diversion by the employer of contributions made pursuant to the plan. ( See Report of the Senate Committee on Labor and Public Welfare, S. Rep. No. 963, 88th Cong., 2d Sess., p. 5.)
§5.28 Unfunded plans.
(a) The costs to a contractor or subcontractor which may be reasonably anticipated in providing benefits of the types described in the Act, pursuant to an enforceable commitment to carry out a financially responsible plan or program, are considered fringe benefits within the meaning of the Act ( see 40 U.S.C. 3141(2)(B)(ii)). The legislative history suggests that these provisions were intended to permit the consideration of fringe benefits meeting these requirements, among others, and which are provided from the general assets of a contractor or subcontractor. (Report of the House Committee on Education and Labor, H. Rep. No. 308, 88th Cong., 1st Sess., p. 4; see also S. Rep. No. 963, p. 6.)
(b) Such a benefit plan or program, commonly referred to as an unfunded plan, may not constitute a fringe benefit within the meaning of the Act unless:
(1) It could be reasonably anticipated to provide the benefits described in the Act;
(2) It represents a commitment that can be legally enforced;
(3) It is carried out under a financially responsible plan or program;
(4) The plan or program providing the benefits has been communicated in writing to the laborers and mechanics affected; and
(5) The contractor or subcontractor requests and receives approval of the plan or program from the Secretary, as described in paragraph (c) of this section.
(c) To receive approval of an unfunded plan or program, a contractor or subcontractor must demonstrate in its request to the Secretary that the unfunded plan or program, and the benefits provided under such plan or program, are “bona fide,” meet the requirements set forth in paragraphs (b)(1) through (4) of this section, and are otherwise consistent with the Act. The request must include sufficient documentation to enable the Secretary to evaluate these criteria. Contractors and subcontractors may request approval of an unfunded plan or program by submitting a written request in one of the following manners:
(1) By mail to the United States Department of Labor, Wage and Hour Division, Director, Division of Government Contracts Enforcement, 200 Constitution Ave. NW, Room S–3502, Washington, DC 20210;
(2) By email to unfunded@dol.gov (or its successor email address); or
(3) By any other means directed by the Administrator.
(d) Unfunded plans or programs may not be used as a means of avoiding the Act's requirements. The words “reasonably anticipated” require that any unfunded plan or program be able to withstand a test of actuarial soundness. Moreover, as in the case of other fringe benefits payable under the Act, an unfunded plan or program must be “bona fide” and not a mere simulation or sham for avoiding compliance with the Act. To prevent these provisions from being used to avoid compliance with the Act, the Secretary may direct a contractor or subcontractor to set aside in an account assets which, under sound actuarial principles, will be sufficient to meet future obligations under the plan. Such an account must be preserved for the purpose intended. (S. Rep. No. 963, p. 6.)
§5.29 Specific fringe benefits.
* * * *
(e) Where the plan is not of the conventional type described in paragraph (d) of this section, the Secretary must examine the facts and circumstances to determine whether fringe benefits under the plan are “bona fide” in accordance with requirements of the Act. This is particularly true with respect to unfunded plans discussed in §5.28. Contractors or subcontractors seeking credit under the Act for costs incurred for such plans must request specific approval from the Secretary under §5.5(a)(1)(iv).
§5.30 Types of wage determinations.
(a) When fringe benefits are prevailing for various classes of laborers and mechanics in the area of proposed construction, such benefits are includable in any Davis-Bacon wage determination. The examples contained in paragraph (c) of this section demonstrate how fringe benefits may be listed on wage determinations in such cases.
(b) Wage determinations do not include fringe benefits for various classes of laborers and mechanics whenever such benefits do not prevail in the area of proposed construction. When this occurs, the wage determination will contain only the basic hourly rates of pay which are prevailing for the various classes of laborers and mechanics. An illustration of this situation is contained in paragraph (c) of this section.
(c) The following illustrates examples of the situations discussed in paragraph (a) and (b) of this section:
Figure 1 to Paragraph (c)
§5.31 Meeting wage determination obligations.
(a) A contractor or subcontractor performing work subject to a Davis-Bacon wage determination may discharge their minimum wage obligations for the payment of both straight time wages and fringe benefits by paying in cash, making payments or incurring costs for “bona fide” fringe benefits of the types listed in the applicable wage determination or otherwise found prevailing by the Secretary of Labor, or by a combination thereof.
(b) A contractor or subcontractor may discharge their obligations for the payment of the basic hourly rates and the fringe benefits where both are contained in a wage determination applicable to their laborers or mechanics in the following ways:
(1) By paying not less than the basic hourly rate to the laborers or mechanics and by making contributions for “bona fide” fringe benefits in a total amount not less than the total of the fringe benefits required by the wage determination. For example, the obligations for “Laborer: common or general” in §5.30, figure 1 to paragraph (c), will be met by the payment of a straight time hourly rate of not less than $21.93 and by contributions of not less than a total of $6.27 an hour for “bona fide” fringe benefits; or
(2) By paying in cash directly to laborers or mechanics for the basic hourly rate and by making an additional cash payment in lieu of the required benefits. For example, where an employer does not make payments or incur costs for fringe benefits, they would meet their obligations for “Laborer: common or general” in §5.30, figure 1 to paragraph (c), by paying directly to the laborers a straight time hourly rate of not less than $28.60 ($21.93 basic hourly rate plus $6.27 for fringe benefits); or
(3) As stated in paragraph (a) of this section, the contractor or subcontractor may discharge their minimum wage obligations for the payment of straight time wages and fringe benefits by a combination of the methods illustrated in paragraphs (b)(1) and (2) of this section. Thus, for example, their obligations for “Laborer: common or general” may be met by an hourly rate, partly in cash and partly in payments or costs for fringe benefits which total not less than $28.60 ($21.93 basic hourly rate plus $6.27 for fringe benefits).
Specialized Industries
Go beyond the regulations! Visit the Institute for in-depth guidance on a wide range of compliance subjects in safety and health, transportation, environment, and human resources.
J. J. Keller® COMPLIANCE NETWORK is a premier online safety and compliance community, offering members exclusive access to timely regulatory content in workplace safety (OSHA), transportation (DOT), environment (EPA), and human resources (DOL).
Interact With Our Compliance Experts
Puzzled by a regulatory question or issue? Let our renowned experts provide the answers and get your business on track to full compliance!
Upcoming Events
Reference the Compliance Network Safety Calendar to keep track of upcoming safety and compliance events. Browse by industry or search by keyword to see relevant dates and observances, including national safety months, compliance deadlines, and more.
SUMMARY: The EPA is proposing amendments to the National Emission Standards for Hazardous Air Pollutants for the oil and gas industry issued under the Clean Air Act. Specifically, the EPA is proposing to remove the affirmative defense provisions of the National Emission Standards for Hazardous Air Pollutants for both the Oil and Natural Gas Production source category and the Natural Gas Transmission and Storage source category.
DATES: This proposed rule is published in the Federal Register December 1, 2023, page 83889.
View proposed rule.
If you think you may have combustible dusts lurking in your facilities, you’ll want to know about recent updates to OSHA’s Combustible Dust National Emphasis Program (NEP). Have you been added to the list of higher-likelihood industries?
Employers are required to inspect their facilities for processes that generate or use combustible dusts and address associated fire, deflagration, and explosion hazards. So, what constitutes combustible dust? Combustible dusts are fine particles that present an explosion hazard when suspended in air under certain conditions.
The following combustible dusts can cause catastrophic loss of life, severe injuries, and building destruction:
Many combustible dust incidents occur without the employer or workers realizing they are in danger. They were either unaware of the potential for dust explosions or failed to recognize the serious nature of dust explosion hazards.
Hazard assessments must be performed to identify all physical and health hazards associated with combustible dusts and ensure Safety Data Sheets (SDSs) list potential exposures and controls. Employers must anticipate types of operations, material use, or downstream material processing that can generate or potentially generate combustible dusts. Operations and uses include:
How easily particles ignite, or cause explosions, is dependent upon the particle size, shape, moisture content or humidity, and available oxygen. These physical characteristics can change during manufacturing, use, or while the material is being processed. The regulation at 1910.272(j)(2)(ii) requires the removal of any fugitive grain dust accumulations whenever they exceed ⅛ inch (0.32 cm) at priority housekeeping areas or to demonstrate and assure, through the development and implementation of the housekeeping program, that equivalent protection is provided. The thickness of dust must be no more than the thickness of a dime. Essentially, if a footprint can be made in the dust, there’s too much.
OSHA replaced its March 2008 directive with a revised NEP on January 30, 2023. The NEP added several industries with a higher likelihood of having combustible dust hazards or that have experienced combustible dust-related fatalities/catastrophes. Industries added include:
Too often, employers and workers were unaware of the potential for dust explosions or failed to recognize the serious nature of dust explosion hazards. OSHA has added some industries with a higher likelihood of having combustible dust hazards to the Combustible Dust NEP.
The Environmental Protection Agency (EPA) published a final rule for New Source Performance Standards (NSPS) for secondary lead smelters, which include facilities that recycle lead-bearing scrap material, typically lead acid batteries. The final rule imposes stricter regulations on particulate matter (PM) emissions and adds testing, recordkeeping, and reporting requirements.
Who’s impacted?
Secondary lead smelters subject to the NSPS that were constructed, reconstructed, or modified after June 11, 1973, and on or before December 1, 2022, are regulated by 40 CFR 60 Subpart L. While PM emissions and opacity standards remain the same, the final rule adds these requirements:
Regulated secondary lead smelters that are constructed, reconstructed, or modified after December 1, 2022, are regulated by the newly added Subpart La, which requires the same additions to Subpart L as well as:
EPA also added Method 22 as an alternative for showing compliance with opacity standards in efforts to reduce testing burdens.
SUMMARY: The Environmental Protection Agency (EPA) is proposing revisions to the regulations for decabromodiphenyl ether (decaBDE) and phenol, isopropylated phosphate (3:1) (PIP (3:1)), two of the five persistent, bioaccumulative, and toxic (PBT) chemicals addressed in final rules issued under the Toxic Substances Control Act (TSCA) in January 2021. After receiving additional comments following the issuance of the 2021 PBT final rules, the Agency has determined that revisions to the decaBDE and PIP (3:1) regulations are necessary to address implementation issues and to reduce further exposures. As required under TSCA, these proposed requirements would, if finalized, reduce the potential for exposures to humans and the environment to decaBDE and PIP (3:1) to the extent practicable. The Agency is not proposing to revise the existing regulations for the other three PBT chemicals (2,4,6-TTBP, HCBD, and PCTP) at this time.
DATES: This proposed rule is published in the Federal Register November 24, 2023, page 82287.
View proposed rule.
SUMMARY: The Environmental Protection Agency (EPA) is finalizing amendments to the new source performance standards (NSPS) for secondary lead smelters pursuant to the periodic review required by the Clean Air Act (CAA). Specifically, the EPA is finalizing revisions to the NSPS that applies to affected secondary lead smelters constructed, reconstructed, or modified after December 1, 2022 (NSPS subpart La). The EPA is also finalizing amendments to the NSPS for secondary lead smelters constructed, reconstructed, or modified after June 11, 1973, and on or before December 1, 2022, (NSPS subpart L). In addition, we are finalizing the use of EPA Method 22 (Visual Determination of Fugitive Emissions from Material Sources and Smoke Emissions from Flares) as an alternative for demonstrating compliance with the opacity limit.
DATES: This final rule is effective on November 20, 2023, published in the Federal Register November 20, 2023, page 80594.
View final rule.
§60.17 Incorporations by reference. | ||
(h)(206) | Revised | View text |
(j)(2) | Revised | View text |
Subpart L - Standards of Performance for Secondary Lead Smelters for Which Construction, Reconstruction, or Modification Commenced After June 11, 1973, and On or Before December 1, 2022 | ||
Subpart heading | Revised | View text |
§60.120 Applicability and designation of affected facility. | ||
(b) | Revised | View text |
§60.122 Standard for particulate matter. | ||
(a)(1) | Revised | View text |
§60.123 Test methods and procedures. | ||
Entire section | Revised | View text |
§60.124 Monitoring requirements. | ||
Entire section | Added | View text |
§60.125 Notification, recordkeeping, and reporting requirements. | ||
Entire section | Added | View text |
Subpart La—Standards of Performance for Secondary Lead Smelters for Which Construction, Reconstruction, or Modification Commenced After December 1, 2022 | ||
Entire subpart | Added | View text |
View Text
§60.17 Incorporations by reference.
* * * * *
(h) * * *
(206) ASTM D7520–16, Standard Test Method for Determining the Opacity of a Plume in the Outdoor Ambient Atmosphere, approved April 1, 2016; IBR approved for §§60.271(k); and (b); 60.273(c) and (d); 60.274(h); 60.275(e); 60.276(c); 60.271a; 60.272a(a) and (b); 60.273a(c) and (d); 60.274a(h); 60.275a(e); 60.276a(f); 60.271b; 60.272b(a) and (b); 60.273b(c) and (d); 60.274b(h); 60.275b(e); 60.276b(f); 60.374a(d).
* * * * *
(j) * * *
(2) EPA–454/R–98–015, Office of Air Quality Planning and Standards (OAQPS), Fabric Filter Bag Leak Detection Guidance, September 1997, https://nepis.epa.gov/Exe/ZyPDF.cgi?Dockey=2000D5T6.PDF; IBR approved for §§60.273(e); 60.273a(e); 60.273b(e); 60.373a(b); 60.2145(r); 60.2710(r); 60.4905(b); 60.5225(b).
* * * * *
Subpart L - Standards of Performance for Secondary Lead Smelters
§60.120 Applicability and designation of affected facility.
* * * * *
(b) Any facility under paragraph (a) of this section that commences construction or modification after June 11, 1973, is subject to the requirements of this subpart.
§60.122 Standard for particulate matter.
(a) * * *
(1) Contain particulate matter in excess of 50 mg/dscm (0.022 gr/dscf).
* * * * *
§60.123 Test methods and procedures.
(a) In conducting the performance tests required in §60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A of this part or other methods and procedures as specified in this section, except as provided in §60.8(b).
(b) The owner or operator shall determine compliance with the particulate matter standards in §60.122 as follows:
(1) Method 5 shall be used to determine the particulate matter concentration during representative periods of furnace operation, including charging and tapping. The sampling time and sample volume for each run shall be at least 60 minutes and 0.90 dscm (31.8 dscf).
(2) Method 9 and the procedures in §60.11 shall be used to determine opacity.
SUMMARY: The Environmental Protection Agency (EPA) is finalizing amendments to the regulations that govern the processes and timelines for state and Federal plans to implement emission guidelines under Clean Air Act (CAA) New Source Performance Standards for existing sources (the “implementing regulations”). The amendments include revisions to the timing requirements for state and the EPA actions related to plans; the addition of mechanisms to improve flexibility and efficiency in plan processes; and new requirements for demonstration of timely meaningful engagement with pertinent stakeholders—including, but not limited to, industry, small businesses, and communities most affected by and vulnerable to the impacts of the plan. This action additionally provides a process for states' consideration of `remaining useful life and other factors' (RULOF) in applying a standard of performance; amends the definition of standard of performance in the implementing regulations; and clarifies compliance flexibilities that states may choose to incorporate into state plans, including trading or averaging. Finally, this action adds requirements for the electronic submission of state plans and provides several other clarifications and minor revisions to the implementing regulations.
DATES: This final rule is effective on December 18, 2023, published in the Federal Register November 17, 2023, page 80480.
View final rule.
§60.1 Applicability. | ||
(a) | Revised | View Text |
§60.20a Applicability. | ||
(a) introductory text | Revised | View Text |
§60.21a Definitions. | ||
(e), (f) | Revised | View Text |
(k), (l) | Added | View Text |
§60.22a Publication of emission guidelines. | ||
(b)(3), (c) | Revised | View Text |
§60.23a Adoption and submittal of State plans; public hearings. | ||
(a)(1) | Revised | View Text |
(a)(3) | Added | View Text |
(b) | Revised | View Text |
(i) | Added | View Text |
§60.24a Standards of performance and compliance schedules. | ||
(b)-(f) | Revised | View Text |
(g)-(i) | Added | View Text |
§60.25a Emission inventories, source surveillance, reports. | ||
(a) | Revised | View Text |
§60.27a Actions by the Administrator. | ||
(a) | Revised | View Text |
(b)(1)-(2) | Added | View Text |
(c)-(d) | Revised | View Text |
(f) introductory text | Revised | View Text |
(g)(1) | Revised | View Text |
(g)(2)(viii) | Revised | View Text |
(g)(2)(ix), (x) | Redesignated | View Text |
(h)-(j) | Added | View Text |
§60.28a Plan revisions by the State. | ||
(a) | Revised | View Text |
§60.29a Plan revisions by the Administrator. | ||
Introductory text | Revised | View Text |
Previous Text
§60.1 Applicability.
(a) Except as provided in subparts B and C, the provisions of this part apply to the owner or operator of any stationary source which contains an affected facility, the construction or modification of which is commenced after the date of publication in this part of any standard (or, if earlier, the date of publication of any proposed standard) applicable to that facility.
§60.20a Applicability.
(a) The provisions of this subpart apply upon publication of a final emission guideline under §60.22a(a) if implementation of such final guideline is ongoing as of July 8, 2019 or if the final guideline is published after July 8, 2019.
§60.21a Definitions.
* * * *
(e) Emission guideline means a guideline set forth in subpart C of this part, or in a final guideline document published under §60.22a(a), which reflects the degree of emission limitation achievable through the application of the best system of emission reduction which (taking into account the cost of such reduction and any non-air quality health and environmental impact and energy requirements) the Administrator has determined has been adequately demonstrated for designated facilities.
(f) Standard of performance means a standard for emissions of air pollutants which reflects the degree of emission limitation achievable through the application of the best system of emission reduction which (taking into account the cost of achieving such reduction and any nonair quality health and environmental impact and energy requirements) the Administrator determines has been adequately demonstrated, including, but not limited to a legally enforceable regulation setting forth an allowable rate or limit of emissions into the atmosphere, or prescribing a design, equipment, work practice, or operational standard, or combination thereof.
§60.22a Publication of emission guidelines.
* * * *
(b)(3) Information on the degree of emission limitation which is achievable with each system, together with information on the costs, nonair quality health environmental effects, and energy requirements of applying each system to designated facilities.
* * * *
(c) The emission guidelines and compliance times referred to in paragraph (b)(5) of this section will be proposed for comment upon publication of the draft guideline document, and after consideration of comments will be promulgated in subpart C of this part with such modifications as may be appropriate.
§60.23a Adoption and submittal of State plans; public hearings.
(a)(1) Unless otherwise specified in the applicable subpart, within three years after notice of the availability of a final emission guideline is published under §60.22a(a), each State shall adopt and submit to the Administrator, in accordance with §60.4, a plan for the control of the designated pollutant to which the emission guideline applies.
* * * *
(b) If no designated facility is located within a State, the State shall submit a letter of certification to that effect to the Administrator within the time specified in paragraph (a) of this section. Such certification shall exempt the State from the requirements of this subpart for that designated pollutant.
§60.24a Standards of performance and compliance schedules.
* * * *
(b) Standards of performance shall either be based on allowable rate or limit of emissions, except when it is not feasible to prescribe or enforce a standard of performance. The EPA shall identify such cases in the emission guidelines issued under §60.22a. Where standards of performance prescribing design, equipment, work practice, or operational standard, or combination thereof are established, the plan shall, to the degree possible, set forth the emission reductions achievable by implementation of such standards, and may permit compliance by the use of equipment determined by the State to be equivalent to that prescribed.
* * * *
(c) Except as provided in paragraph (e) of this section, standards of performance shall be no less stringent than the corresponding emission guideline(s) specified in subpart C of this part, and final compliance shall be required as expeditiously as practicable, but no later than the compliance times specified in an applicable subpart of this part.
(d) Any compliance schedule extending more than 24 months from the date required for submittal of the plan must include legally enforceable increments of progress to achieve compliance for each designated facility or category of facilities. Unless otherwise specified in the applicable subpart, increments of progress must include, where practicable, each increment of progress specified in §60.21a(h) and must include such additional increments of progress as may be necessary to permit close and effective supervision of progress toward final compliance.
(e) In applying a standard of performance to a particular source, the State may take into consideration factors, such as the remaining useful life of such source, provided that the State demonstrates with respect to each such facility (or class of such facilities):
(1) Unreasonable cost of control resulting from plant age, location, or basic process design;
(2) Physical impossibility of installing necessary control equipment; or
(3) Other factors specific to the facility (or class of facilities) that make application of a less stringent standard or final compliance time significantly more reasonable.
(f) Nothing in this subpart shall be construed to preclude any State or political subdivision thereof from adopting or enforcing:
(1) Standards of performance more stringent than emission guidelines specified in subpart C of this part or in applicable emission guidelines; or
(2) Compliance schedules requiring final compliance at earlier times than those specified in subpart C of this part or in applicable emission guidelines.
§60.25a Emission inventories, source surveillance, reports.
(a) Each plan shall include an inventory of all designated facilities, including emission data for the designated pollutants and information related to emissions as specified in appendix D to this part. Such data shall be summarized in the plan, and emission rates of designated pollutants from designated facilities shall be correlated with applicable standards of performance. As used in this subpart, “correlated” means presented in such a manner as to show the relationship between measured or estimated amounts of emissions and the amounts of such emissions allowable under applicable standards of performance.
§60.27a Actions by the Administrator.
* * * *
(a) The Administrator may, whenever he determines necessary, shorten the period for submission of any plan or plan revision or portion thereof.
(c) The Administrator will promulgate, through notice-and-comment rulemaking, a federal plan, or portion thereof, at any time within two years after the Administrator:
(1) Finds that a State fails to submit a required plan or plan revision or finds that the plan or plan revision does not satisfy the minimum criteria under paragraph (g) of this section; or
(2) Disapproves the required State plan or plan revision or any portion thereof, as unsatisfactory because the applicable requirements of this subpart or an applicable subpart under this part have not been met.
(d) The Administrator will promulgate a final federal plan as described in paragraph (c) of this section unless the State corrects the deficiency, and the Administrator approves the plan or plan revision, before the Administrator promulgates such federal plan.
* * * *
(f) Prior to promulgation of a federal plan under paragraph (d) of this section, the Administrator will provide the opportunity for at least one public hearing in either:
* * * *
(g)(1) General. Within 60 days of the Administrator's receipt of a state submission, but no later than 6 months after the date, if any, by which a State is required to submit the plan or revision, the Administrator shall determine whether the minimum criteria for completeness have been met. Any plan or plan revision that a State submits to the EPA, and that has not been determined by the EPA by the date 6 months after receipt of the submission to have failed to meet the minimum criteria, shall on that date be deemed by operation of law to meet such minimum criteria. Where the Administrator determines that a plan submission does not meet the minimum criteria of this paragraph, the State will be treated as not having made the submission and the requirements of §60.27a regarding promulgation of a federal plan shall apply.
* * * *
(g)(2)(viii) Compilation of public comments and the State's response thereto; and
§60.28a Plan revisions by the State.
(a) Any revision to a state plan shall be adopted by such State after reasonable notice and public hearing. For plan revisions required in response to a revised emission guideline, such plan revisions shall be submitted to the Administrator within three years, or shorter if required by the Administrator, after notice of the availability of a final revised emission guideline is published under §60.22a. All plan revisions must be submitted in accordance with the procedures and requirements applicable to development and submission of the original plan.
§60.29a Plan revisions by the Administrator.
After notice and opportunity for public hearing in each affected State, the Administrator may revise any provision of an applicable federal plan if:
SUMMARY: The U.S. Environmental Protection Agency (EPA) is proposing amendments to the National Emission Standards for Hazardous Air Pollutants for Rubber Tire Manufacturing, as required by the Clean Air Act (CAA). To ensure that all emissions of hazardous air pollutants (HAP) from sources in the source category are regulated, the EPA is proposing emissions standards for the rubber processing subcategory of the rubber tire manufacturing industry, which is the only unregulated subcategory within the Rubber Tire Manufacturing source category.
DATES: Comments must be receive on or before January 2, 2024. Published in the Federal Register November 16, 2023, page 78692.
View proposed rule.
OSHA requires employers to provide each worker with respiratory protection when such equipment is necessary to protect the worker’s health. Employers are required by 29 CFR 1910.134 to provide respirators that are applicable and suitable for the purpose intended. The employer must also establish and maintain a respiratory protection program that identifies respiratory hazards, controls, and proper personal protective equipment selection and use.
Respirators protect workers against insufficient oxygen, harmful dusts, smoke, gases, and vapors. These hazards may cause cancer, lung diseases, or even death. Without the correct respirator and corresponding cartridge, workers are at risk of exposure.
Respirators protect workers in two ways — by removing contaminants from the air or by supplying clean air to the user. Particulate respirators filter out airborne particles, while air-purifying respirators (APRs) with cartridges filter out chemicals and gases. Atmosphere-supplying respirators (ASRs provide air and include airline respirators, which use compressed air from a remote source, and self-contained breathing apparatus (SCBA), which contain their own air supply.
Each type of respirator has an assigned protection factor (APF) that indicates the level of protection expected from the respirator. APRs use filters, cartridges, or canisters to remove contaminants such as dusts, gases, vapors, and aerosols from the air. The cartridges or canisters have a filter, sorbent, catalyst, or combination of these items that removes specific contaminants from air that passes through the container. Per 1910.134(d)(3)(i)(A), employers are required to assign protection factors based on Table 1 in the standard.
Both the proper type and the service life of the cartridge are paramount. Respirators and cartridges must meet or exceed the required level of worker protection. Employers must ensure APFs are appropriate to the operation or task for which respirators are used.
Employers and workers should always refer to container labels and safety data sheets (SDSs to determine the proper respiratory protection for each task. NIOSH-approved respirator cartridges are designated by color coding:
Each respirator cartridge will have an end-of-service-life indicator (ESLI) warning the respirator user that the end of adequate respiratory protection is near. For example, the sorbent is approaching saturation or is no longer effective. Workers who use cartridges or canisters beyond the ESLI are placing themselves in harm’s way.
OSHA’s Respiratory Protection standard requires employers to protect workers from insufficient oxygen, harmful dusts, smoke, gases, and vapors. Respirators and corresponding cartridges must be of proper type and condition to ensure protection appropriate to the operation or task for which they’re used.
SUMMARY: The Environmental Protection Agency (EPA) is finalizing revisions to its regulations addressing preemption of State and local regulation of locomotives and engines used in locomotives. This rule implements a policy change to no longer categorically preempt certain State regulations of non-new locomotives and engines, aligning with the plain text of the Clean Air Act (CAA), and better achieving the legislative intent of providing for exclusive Federal regulation of new locomotives and new locomotive engines while preserving the ability of California and other States to adopt and enforce certain State standards regulating non-new locomotives and engines.
DATES: This final rule is effective on December 8, 2023, published in the Federal Register November 8, 2023, page 77004.
§1074.10 Scope of preemption. | ||
(b) | Revised | View text |
(c) | Added | View text |
§1074.12 Scope of preemption-specific provisions for locomotives and locomotive engines | ||
Entire section | Removed | View text |
§1074.101 Procedures for California nonroad authorization requests. | ||
(a) | Revised | View text |
Previous Text
§1074.10 Scope of preemption.
* * * *
(b) For nonroad engines or vehicles other than those described in paragraph (a) of this section and §1074.12, States and localities are preempted from enforcing any standards or other requirements relating to control of emissions from nonroad engines or vehicles except as provided in subpart B of this part.
* * * *
§1074.101 Procedures for California nonroad authorization requests.
(a) California must request authorization from the Administrator to enforce its adopted standards and other requirements relating to control of emissions from nonroad engines or vehicles that are not preempted by §1074.10(a) or §1074.12. The request must include the record on which the state rulemaking was based.
* * * *
SUMMARY: The Environmental Protection Agency (EPA) is proposing to address the unreasonable risk of injury to human health presented by trichloroethylene (TCE) under its conditions of use as documented in EPA's November 2020 Risk Evaluation for TCE and January 2023 revised risk determination for TCE pursuant to the Toxic Substances Control Act (TSCA). TCE is widely used as a solvent in a variety of industrial, commercial and consumer applications including for hydrofluorocarbon (HFC) production, vapor and aerosol degreasing, and in lubricants, greases, adhesives, and sealants. TSCA requires that when EPA determines a chemical substance presents unreasonable risk that EPA address by rule the unreasonable risk of injury to health or the environment and apply requirements to the extent necessary so the chemical no longer presents unreasonable risk. EPA determined that TCE presents an unreasonable risk of injury to health due to the significant adverse health effects associated with exposure to TCE, including non-cancer effects (liver toxicity, kidney toxicity, neurotoxicity, immunotoxicity, reproductive toxicity, and developmental toxicity) as well as cancer (liver, kidney, and non-Hodgkin lymphoma) from chronic inhalation and dermal exposures to TCE. TCE is a neurotoxicant and is carcinogenic to humans by all routes of exposure. The most sensitive adverse effects of TCE exposure are non-cancer effects (developmental toxicity and immunosuppression) for acute exposures and developmental toxicity and autoimmunity for chronic exposures. To address the identified unreasonable risk, EPA is proposing to: prohibit all manufacture (including import), processing, and distribution in commerce of TCE and industrial and commercial use of TCE for all uses, with longer compliance timeframes and workplace controls for certain processing and industrial and commercial uses (including proposed phaseouts and time-limited exemptions); prohibit the disposal of TCE to industrial pre-treatment, industrial treatment, or publicly owned treatment works, with a time-limited exemption for cleanup projects; and establish recordkeeping and downstream notification requirements.
DATES: Comments must be received on or before December 15, 2023, published in the Federal Register October 31, 2023, page 74712.
View proposed rule.
SUMMARY: The Environmental Protection Agency (EPA) is adding per- and polyfluoroalkyl substances (PFAS) subject to reporting under the Emergency Planning and Community Right-to-Know Act (EPCRA) and the Pollution Prevention Act (PPA) pursuant to the National Defense Authorization Act for Fiscal Year 2020 (NDAA) to the list of Lower Thresholds for Chemicals of Special Concern (chemicals of special concern). These PFAS already have a lower reporting activity threshold of 100 pounds. The addition of these PFAS to the list of chemicals of special concern means such PFAS are subject to the same reporting requirements as other chemicals of special concern ( i.e., it eliminates the use of the de minimis exemption and the option to use Form A and would limit the use of range reporting for PFAS). Removing the availability of these burden-reduction reporting options will result in a more complete picture of the releases and waste management quantities for these PFAS. EPA is removing the availability of the de minimis exemption for purposes of the Supplier Notification Requirements for all chemicals on the list of chemicals of special concern. This will help ensure that purchasers of mixtures and trade name products containing such chemicals are informed of their presence in mixtures and products they purchase to better inform any TRI reporting obligations.
DATES: This final rule is effective November 30, 2023 and shall apply for the reporting year beginning January 1, 2024 (reports due July 1, 2025), published in the Federal Register October 31, 2023, page 74360.
View final rule
§372.22 Covered facilities for toxic chemical release reporting. | ||
(c) | Revised | View text |
§372.25 Thresholds for reporting. | ||
Introductory text | Revised | View text |
(f)-(h) | Revised | View text |
§372.28 Lower thresholds for chemicals of special concern. | ||
Table 1 to paragraph (a)(1); entry “Per- and polyfluoroalkyl substances” | Added | View text |
§372.29 Thresholds for per- and polyfluoroalkyl substances. | ||
Entire section | Removed | View text |
§372.30 Reporting requirements and schedule for reporting. | ||
(a)-(b) | Revised | View text |
§372.38 Exemptions. | ||
(a)(2) | Revised | View text |
(b)-(d), (f)-(h) | Revised | View text |
§372.45 Notification about toxic chemicals. | ||
(d)(1) | Revised | View text |
Previous Text
§372.22 Covered facilities for toxic chemical release reporting.
* * * *
(c) The facility manufactured (including imported), processed, or otherwise used a toxic chemical in excess of an applicable threshold quantity of that chemical set forth in §372.25, §372.27, §372.28, or §372.29.
§372.25 Thresholds for reporting.
Except as provided in §372.27, 372.28, and 372.29, the threshold amounts for purposes of reporting under §372.30 for toxic chemicals are as follows:
* * * *
(f) A toxic chemical may be listed in §372.65 with the notation that only persons who manufacture the chemical, or manufacture it by a certain method, are required to report. In that case, only owners or operators of facilities that manufacture that chemical as described in §372.65 in excess of the threshold applicable to such manufacture in §372.27, §372.28, or§372.29 or are required to report. In completing the reporting form, the owner or operator is only required to account for the quantity of the chemical so manufactured and releases associated with such manufacturing, but not releases associated with subsequent processing or use of the chemical at that facility. Owners and operators of facilities that solely process or use such a chemical are not required to report for that chemical.
(g) A toxic chemical may be listed in §372.65 with the notation that it is in a specific form (e.g., fume or dust, solution, or friable) or of a specific color (e.g., yellow or white). In that case, only owners or operators of facilities that manufacture, process, or use that chemical in the form or of the color, specified in §372.65 in excess of the threshold applicable to such activity in §372.27, §372.28, or§372.29 are required to report. In completing the reporting form, the owner or operator is only required to account for the quantity of the chemical manufactured, processed, or used in the form or color specified in §372.65 and for releases associated with the chemical in that form or color. Owners or operators of facilities that solely manufacture, process, or use such a chemical in a form or color other than those specified by §372.65 are not required to report for that chemical.
(h) Metal compound categories are listed in §372.65(c) . For purposes of determining whether any of the thresholds specified in §372.27, §372.28, or§372.29 are met for metal compound category, the owner or operator of a facility must make the threshold determination based on the total amount of all members of the metal compound category manufactured, processed, or used at the facility. In completing the release portion of the reporting form for releases of the metal compounds, the owner or operator is only required to account for the weight of the parent metal released. Any contribution to the mass of the release attributable to other portions of each compound in the category is excluded.
§372.30 Reporting requirements and schedule for reporting.
(a) For each toxic chemical known by the owner or operator to be manufactured (including imported), processed, or otherwise used in excess of an applicable threshold quantity in §372.25, §372.27, §372.28, or §372.29 at its covered facility described in §372.22 for a calendar year, the owner or operator must submit to EPA and to the State in which the facility is located a completed EPA Form R (EPA Form 9350-1), EPA Form A (EPA Form 9350-2), and, for the dioxin and dioxin-like compounds category, EPA Form R Schedule 1 (EPA Form 9350-3) in accordance with the instructions referred to in subpart E of this part. If the covered facility is located in Indian country, the facility shall submit (to the extent applicable) a completed EPA Form R, Form A, and Form R Schedule 1 as described above to EPA and to the official designated by the Tribal Chairperson or equivalent elected official of the relevant Indian Tribe, instead of to the State.
(b)(1) The owner or operator of a covered facility is required to report as described in paragraph (a) of this section on a toxic chemical that the owner or operator knows is present as a component of a mixture or trade name product which the owner or operator receives from another person, if that chemical is imported, processed, or otherwise used by the owner or operator in excess of an applicable threshold quantity in §372.25, §372.27, §372.28, or §372.29 at the facility as part of that mixture or trade name product.
(2) The owner or operator knows that a toxic chemical is present as a component of a mixture or trade name product (i) if the owner or operator knows or has been told the chemical identity or Chemical Abstracts Service Registry Number of the chemical and the identity or Number corresponds to an identity or Number in §372.65 , or (ii) if the owner or operator has been told by the supplier of the mixture or trade name product that the mixture or trade name product contains a toxic chemical subject to section 313 of the Act or this part.
(3) To determine whether a toxic chemical which is a component of a mixture or trade name product has been imported, processed, or otherwise used in excess of an applicable threshold in §372.25, §372.27, §372.28, or §372.29 at the facility, the owner or operator shall consider only the portion of the mixture or trade name product that consists of the toxic chemical and that is imported, processed, or otherwise used at the facility, together with any other amounts of the same toxic chemical that the owner or operator manufactures, imports, processes, or otherwise uses at the facility as follows:
(i) If the owner or operator knows the specific chemical identity of the toxic chemical and the specific concentration at which it is present in the mixture or trade name product, the owner or operator shall determine the weight of the chemical imported, processed, or otherwise used as part of the mixture or trade name product at the facility and shall combine that with the weight of the toxic chemical manufactured (including imported), processed, or otherwise used at the facility other than as part of the mixture or trade name product. After combining these amounts, if the owner or operator determines that the toxic chemical was manufactured, processed, or otherwise used in excess of an applicable threshold in §372.25, §372.27, §372.28, or §372.29, the owner or operator shall report the specific chemical identity and all releases of the toxic chemical on EPA Form R in accordance with the instructions referred to in subpart E of this part.
(ii) If the owner or operator knows the specific chemical identity of the toxic chemical and does not know the specific concentration at which the chemical is present in the mixture or trade name product, but has been told the upper bound concentration of the chemical in the mixture or trade name product, the owner or operator shall assume that the toxic chemical is present in the mixture or trade name product at the upper bound concentration, shall determine whether the chemical has been manufactured, processed, or otherwise used at the facility in excess of an applicable threshold as provided in paragraph (b)(3)(i) of this section, and shall report as provided in paragraph (b)(3)(i) of this section.
(iii) If the owner or operator knows the specific chemical identity of the toxic chemical, does not know the specific concentration at which the chemical is present in the mixture or trade name product, has not been told the upper bound concentration of the chemical in the mixture or trade name product, and has not otherwise developed information on the composition of the chemical in the mixture or trade name product, then the owner or operator is not required to factor that chemical in that mixture or trade name product into threshold and release calculations for that chemical.
(iv) If the owner or operator has been told that a mixture or trade name product contains a toxic chemical, does not know the specific chemical identity of the chemical andknows the specific concentration at which it is present in the mixture or trade name product, the owner or operator shall determine the weight of the chemical imported, processed, or otherwise used as part of the mixture or trade name product at the facility. Since the owner or operator does not know the specific identity of the toxic chemical, the owner or operator shall make the threshold determination only for the weight of the toxic chemical in the mixture or trade name product. If the owner or operator determines that the toxic chemical was imported, processed, or otherwise used as part of the mixture or trade name product in excess of an applicable threshold in §372.25, §372.27, §372.28, or §372.29, the owner or operator shall report the generic chemical name of the toxic chemical, or a trade name if the generic chemical name is not known, and all releases of the toxic chemical on EPA Form R in accordance with the instructions referred to in subpart E of this part.
(v) If the owner or operator has been told that a mixture or trade name product contains a toxic chemical, does not know the specific chemical identity of the chemical, and does not know the specific concentration at which the chemical is present in the mixture or trade name product, but has been told the upper bound concentration of the chemical in the mixture or trade name product, the owner or operator shall assume that the toxic chemical is present in the mixture or trade name product at the upper bound concentration, shall determine whether the chemical has been imported, processed, or otherwise used at the facility in excess of an applicable threshold as provided in paragraph (b)(3)(iv) of this section, and shall report as provided in paragraph (b)(3)(iv) of this section.
(vi) If the owner or operator has been told that a mixture or trade name product contains a toxic chemical, does not know the specific chemical identity of the chemical, does not know the specific concentration at which the chemical is present in the mixture or trade name product, including information they have themselves developed, and has not been told the upper bound concentration of the chemical in the mixture or trade name product, the owner or operator is not required to report with respect to that toxic chemical.
§372.38 Exemptions.
* * * *
(a)(2) The exemption in this paragraph (a) applies whether the person received the mixture from another person, or the person produced the mixture, either by mixing the chemicals involved or by causing a chemical reaction which resulted in the creation of the toxic chemical in the mixture. However, this exemption applies only to the quantity of the toxic chemical present in the mixture. If the toxic chemical is also manufactured (including imported), processed, or otherwise used at the covered facility other than as part of the mixture or in a mixture at higher concentrations, in excess of an applicable threshold quantity set forth in §372.25, the person is required to report under §372.30. This exemption does not apply to toxic chemicals listed in §372.28, except for purposes of §372.45(d)(1).
(b) Articles. If a toxic chemical is present in an article at a covered facility, a person is not required to consider the quantity of the toxic chemical present in such article when determining whether an applicable threshold has been met under §372.25, §372.27, §372.28, or §372.29 or determining the amount of release to be reported under §372.30 . This exemption applies whether the person received the article from another person or the person produced the article. However, this exemption applies only to the quantity of the toxic chemical present in the article. If the toxic chemical is manufactured (including imported), processed, or otherwise used at the covered facility other than as part of the article, in excess of an applicable threshold quantity set forth in §372.25, §372.27, §372.28, or §372.29, the person is required to report under §372.30 . Persons potentially subject to this exemption should carefully review the definitions of "article" and "release" in §372.3 . If a release of a toxic chemical occurs as a result of the processing or use of an item at the facility, that item does not meet the definition of "article."
(c) Uses. If a toxic chemical is used at a covered facility for a purpose described in this paragraph (c) , a person is not required to consider the quantity of the toxic chemical used for such purpose when determining whether an applicable threshold has been met under §372.25, §372.27, §372.28, or §372.29 or determining the amount of releases to be reported under §372.30 . However, this exemption only applies to the quantity of the toxic chemical used for the purpose described in this paragraph (c) . If the toxic chemical is also manufactured (including imported), processed, or otherwise used at the covered facility other than as described in this paragraph (c) , in excess of an applicable threshold quantity set forth in §372.25, §372.27, §372.28, or §372.29, the person is required to report under §372.30 .
(1) Use as a structural component of the facility.
(2) Use of products for routine janitorial or facility grounds maintenance. Examples include use of janitorial cleaning supplies, fertilizers, and pesticides similar in type or concentration to consumer products.
(3) Personal use by employees or other persons at the facility of foods, drugs, cosmetics, or other personal items containing toxic chemicals, including supplies of such products within the facility such as in a facility operated cafeteria, store, or infirmary.
(4) Use of products containing toxic chemicals for the purpose of maintaining motor vehicles operated by the facility.
(5) Use of toxic chemicals present in process water and non-contact cooling water as drawn from the environment or from municipal sources, or toxic chemicals present in air used either as compressed air or as part of combustion.
(d) Activities in laboratories. If a toxic chemical is manufactured, processed, or used in a laboratory at a covered facility under the supervision of a technically qualified individual as defined in §720.3(ee) of this title, a person is not required to consider the quantity so manufactured, processed, or used when determining whether an applicable threshold has been met under §372.25, §372.27, §372.28, or §372.29 or determining the amount of release to be reported under §372.30 . This exemption does not apply in the following cases:
(1) Specialty chemical production.
(2) Manufacture, processing, or use of toxic chemicals in pilot plant scale operations.
(3) Activities conducted outside the laboratory.
(e) Certain owners of leased property. The owner of a covered facility is not subject to reporting under §372.30 if such owner's only interest in the facility is ownership of the real estate upon which the facility is operated. This exemption applies to owners of facilities such as industrial parks, all or part of which are leased to persons who operate establishments in any SIC code or NAICS code in §372.23 that is subject to the requirements of this part, where the owner has no other business interest in the operation of the covered facility.
(f) Reporting by certain operators of establishments on leased property such as industrial parks. If two or more persons, who do not have any common corporate or business interest (including common ownership or control), operate separate establishments within a single facility, each such person shall treat the establishments it operates as a facility for purposes of this part. The determinations in §372.22 and §372.25, §372.27, §372.28, or §372.29 shall be made for those establishments. If any such operator determines that its establishment is a covered facility under §372.22 and that a toxic chemical has been manufactured (including imported), processed, or otherwise used at the establishment in excess of an applicable threshold in §372.25, §372.27, §372.28, or §372.29 for a calendar year, the operator shall submit a report in accordance with §372.30 for the establishment. For purposes of this paragraph (f), a common corporate or business interest includes ownership, partnership, joint ventures, ownership of a controlling interest in one person by the other, or ownership of a controlling interest in both persons by a third person.
(g) Coal extraction activities . If a toxic chemical is manufactured, processed, or otherwise used in extraction by facilities in SIC code 12, or in NAICS codes 212111, 212112 or 212113, a person is not required to consider the quantity of the toxic chemical so manufactured, processed, or otherwise used when determining whether an applicable threshold has been met under §372.25, §372.27, §372.28, or §372.29, or determining the amounts to be reported under §372.30.
(h) Metal mining overburden . If a toxic chemical that is a constituent of overburden is processed or otherwise used by facilities in SIC code 10, or in NAICS codes 212221, 212222, 212230 or 212299, a person is not required to consider the quantity of the toxic chemical so processed, or otherwise used when determining whether an applicable threshold has been met under §372.25, §372.27, §372.28, or §372.29, or determining the amounts to be reported under §372.30.
§372.45 Notification about toxic chemicals.
* * * *
(d)(1) If a mixture or trade name product contains no toxic chemical in excess of the applicable de minimis concentration as specified in §372.38(a) .
The Environmental Protection Agency (EPA) finalized a rule impacting all reporting facilities that manufacture, process, or otherwise use per- and polyfluoroalkyl substances (PFAS) subject to Toxics Release Inventory (TRI) reporting (listed at 40 CFR 372.65). The agency is:
Impact on reporting entities
The final rule categorizes all PFAS on the TRI as chemicals of special concern. This action:
Reporting facilities will now be required to report all quantities of PFAS they manage or release into the environment.
Additionally, EPA eliminated the de minimis exemption for the supplier notification requirements (at 372.45) to downstream facilities for facilities that manufacture or process any chemical on the list of chemicals of special concern. Previously, suppliers weren’t required to notify product users of certain chemicals present in mixtures if their concentrations were less than 1 percent (less than 0.1 percent for carcinogens). Suppliers will now be required to notify users of any amount of a chemical of special concern contained in the mixture.
Future PFAS added to TRI
The final rule also stipulates that when PFAS are added to the TRI in the future, they will also be added to the list of chemicals of special concern on the same date. This helps EPA avoid delays in reporting requirements since the 100-pound reporting threshold for PFAS will remain in the regulations.
The final rule’s changes take effect for the reporting year beginning on January 1, 2024. The annual TRI reports for 2024 are due to EPA on July 1, 2025.
Key to remember: EPA’s recent final rule requires covered facilities to include all quantities of PFAS on their TRI reports and mandates that suppliers notify product users of the presence of any chemicals of special concern contained in the mixture or product.
SUMMARY: The Environmental Protection Agency (EPA, “the Agency”) is proposing to amend the procedural framework rule for conducting risk evaluations under the Toxic Substances Control Act (TSCA). The purpose of risk evaluations under TSCA is to determine whether a chemical substance presents an unreasonable risk of injury to health or the environment, without consideration of costs or non-risk factors, including unreasonable risk to potentially exposed or susceptible subpopulations identified as relevant to the risk evaluation by EPA, under the conditions of use. EPA has reconsidered the procedural framework rule for conducting such risk evaluations and determined that certain aspects of that framework should be revised to better align with applicable court decisions and the statutory text, to reflect the Agency's experience implementing the risk evaluation program following enactment of the 2016 TSCA amendments, and to allow for consideration of future scientific advances in the risk evaluation process without need to further amend the Agency's procedural rule.
DATES: Comments must be received on or before December 14, 2023, published in the Federal Register October 30, 2023, page 74292.
View proposed rule.
Hi everyone! Welcome to the monthly news roundup video, where we’ll review the most impactful environmental, health, and safety news. Please view the content links in the transcript to take a deeper dive into the topics I’ll be covering today. With that said, let’s get started!
First, let’s take a look at what’s happening in safety and health. OSHA revised its combustible dust national emphasis program. It adds several industries with a higher likelihood of having combustible dust hazards.
California’s Safety and Health Appeals Board says drinking water must be “as close as practicable” to outdoor employees.
The Pipeline and Hazardous Materials Safety Administration says that some forklift operators may be considered hazmat employees. If operators handle hazmat cargo, such as moving it from the truck to an aircraft, they need hazmat training.
OSHA posted a letter of interpretation that answers hazard communication questions related to lithium batteries. The agency says workers may be exposed to hazards during storage, handling, and maintenance activities.
Stand Up 4 Grain Safety Week was held the week of March 27. Employers were encouraged to hold toolbox talks or safety demonstrations related to grain handling and storage.
Turning to environmental news, EPA issued significant new use rules for chemical substances that were the subject of premanufacture notices. This change brings added reporting and recordkeeping.
Thanks for tuning in to the monthly news roundup. We’ll see you next month!
Hi everyone! Welcome to the monthly roundup video, where we’ll review the most impactful environmental, safety, and health news.
First, let’s take a look at what’s happening in safety and health. Machine guarding and hazard communication topped OSHA’s list of most frequently cited serious violations in fiscal year 2022. Over 1,300 citations were issued for machine guarding and over 1,800 were issued for HazCom.
Effective March 26, OSHA will cite certain types of violations as “instance-by-instance” citations, when inspectors identify high-gravity, serious violations specific to the following: falls, trenching, machine guarding, respiratory protection, permit required confined space, and lockout/tagout, as well as other-than-serious violations specific to recordkeeping.
California’s COVID-19 prevention non-emergency regulations, which require employers to protect workers from the hazards related to COVID-19, took effect February 3, and will remain in effect for two years.
A new OSHA fact sheet outlines measures to protect shipyard employees from the physical hazards of confined spaces. In the maritime sector, physical hazards in confined spaces can increase a worker’s risk of injury.
OSHA says it will withdraw its proposal to revoke Arizona’s State Plan. The state has taken measures to remain compliant with federal OSHA. However, OSHA continues to work closely with Arizona to address other state-plan concerns that weren’t part of its original withdrawal proposal.
And turning to environmental news, EPA issued a rule that finalizes first-time standards for inorganic hazardous air pollutants in miscellaneous coating manufacturing that will limit emissions and require effective controls. Final amendments include provisions for inorganic hazardous air pollutant standards for process vessels. The rule took effect February 22.
Thanks for tuning in to the monthly news roundup. We'll see you next month!
SUMMARY: The U.S. Environmental Protection Agency is issuing regulations to implement certain provisions of the American Innovation and Manufacturing Act, as enacted on December 27, 2020. This rulemaking restricts the use of hydrofluorocarbons in specific sectors or subsectors in which they are used; establishes a process for submitting technology transitions petitions; establishes recordkeeping and reporting requirements; and addresses certain other elements related to the effective implementation of the American Innovation and Manufacturing Act. These restrictions on the use of hydrofluorocarbons address petitions granted on October 7, 2021, and September 19, 2022.
DATES: This rule is effective December 26, 2023, published in the Federal Register October 24, 2023, page 73098.
View final rule.
Part 84—Phasedown of Hydrofluorocarbons | ||
Subpart B—Restrictions on the Use of Hydrofluorocarbons | Added | View text |
SUMMARY: In this action, the Environmental Protection Agency (EPA) proposes to revise the Guideline on Air Quality Models (“Guideline”). The Guideline has been incorporated into EPA's regulations, satisfying a requirement under the Clean Air Act (CAA) section 165(e)(3)(D) for the EPA to specify, with reasonable particularity, models to be used in the Prevention of Significant Deterioration (PSD) program. It provides EPA-preferred models and other recommended techniques, as well as guidance for their use in predicting ambient concentrations of air pollutants. In this action, the EPA is proposing revisions to the Guideline, including enhancements to the formulation and application of the EPA's near-field dispersion modeling system, AERMOD, and updates to the recommendations for the development of appropriate background concentration for cumulative impact analyses. Within this action, the EPA is also announcing the Thirteenth Conference on Air Quality Modeling and invites the public to participate in the conference. The conference will focus on the proposed revisions to the Guideline, and part of the conference will also serve as the public hearing for these revisions.
DATES: This proposed rule is published in the Federal Register October 23, 2023, page 72826.
View proposed rule.
SUMMARY: The U.S. Environmental Protection Agency is proposing to issue regulations to implement certain provisions of the American Innovation and Manufacturing Act of 2020. This rulemaking proposes to establish a program for the management of hydrofluorocarbons that includes requirements for leak repair and use of automatic leak detection systems for certain equipment using refrigerants containing hydrofluorocarbons and certain substitutes; requirements for the use of reclaimed hydrofluorocarbons in certain sectors or subsectors; the use of recycled hydrofluorocarbons in fire suppression equipment; recovery of hydrofluorocarbons from cylinders; container tracking; and certain recordkeeping, reporting, and labeling requirements. The Environmental Protection Agency is also proposing alternative Resource Conservation and Recovery Act standards for spent ignitable refrigerants being recycled for reuse. Finally, EPA requests advance comment on approaches for establishing requirements for technician training and/or certification.
DATES: Comments on this notice of proposed rulemaking must be received on or before December 18, 2023, published in the Federal Register October 19, 2023, page 72216.
View proposed rule.
SUMMARY: This action proposes to establish recordkeeping and reporting requirements for uses of ozone-depleting substances as process agents and to update definitions to reflect current practice. Codified recordkeeping and reporting requirements would provide clear and consistent notice each year of information EPA collects, aggregates, and reports as a party to the Montreal Protocol on Substances that Deplete the Ozone Layer; effectively monitor these narrow uses in a more routine and consistent manner under the Clean Air Act; and enhance understanding of emissions of substances harmful to the ozone layer.
DATES: Comments on this notice of proposed rulemaking must be received on or before December 4, 2023, published in the Federal Register October 19, 2023, page 72027.
View proposed rule.
SUMMARY: On October 26, 2020, the U.S. Environmental Protection Agency (EPA) proposed under the Vessel Incidental Discharge Act (VIDA) national standards of performance for marine pollution control devices for discharges incidental to the normal operation of primarily non-military and non-recreational vessels 79 feet in length and above into the waters of the United States or the waters of the contiguous zone (hereafter, “the proposed rule”). This supplemental notice presents ballast water management system type-approval data EPA received from the U.S. Coast Guard (USCG) since the proposed rule and supplements the proposed rule with supplemental regulatory options that EPA is considering for discharges from ballast tanks, hulls and niche areas, and graywater systems. These supplemental options are informed by comments received during the first public comment period and subsequent meetings with interested states, tribes, and other stakeholders held between August and November 2021. EPA solicits public comment solely about the information presented in this document; the Agency is not soliciting public comment on any other aspects of the proposed rule that are not addressed in this document. All comments on this document and the comments on the proposed rule will be considered during the development of the final rule.
DATES: Comments must be received on or before December 18, 2023, published in the Federal Register October 18, 2023, page 71788.
View proposed rule.
Quick action using cardiopulmonary resuscitation (CPR) and automated external defibrillators(AEDs) can save the lives of the nearly 350,000 cardiac event victims each year outside of a hospital setting. But what does OSHA require for the workplace? What you didn’t know about OSHA regulations regarding AEDs may surprise you.
For every minute a patient is in cardiac arrest, their chances of survival decrease dramatically. When a patient doesn’t have a pulse and isn’t breathing, CPR should be performed until an AED is available. It’s important to note that CPR alone does not restart the heart. CPR is an oxygen circulation procedure. AEDs, on the other hand, are meant for lifesaving intervention.
CPR and early defibrillation are vital components of the emergency medical services (EMS) chain of survival that increases the odds of cardiac patient survival. However, according to the American Heart Association (AHA), even the best CPR can’t provide enough circulation of oxygen to the brain and heart for more than a few minutes. In fact, a patient whose brain is deprived of oxygen for 10 minutes or more seldom recovers.
Just like a reliable vehicle, the circulatory system is the human body’s blood transportation system, and the heart is the engine. Amazingly, the heart generates its own electrical impulses, pumping in a regular, rhythmic manner. As with any engine, the heart requires a certain amount of pressure to function and doesn’t work well when clogged with grease or debris. The most common causes of sudden cardiac arrest include a heart attack, electrocution, and asphyxiation — all of which could occur in the workplace. Common signs and symptoms include:
CPR provides the pressure for the body’s “engine” to oxygen circulating, while an AED provides the electrical impulses to keep the engine pumping.
OSHA 1910.151 requires first aid treatment be provided in the absence of an infirmary, clinic, or hospital in near proximity to the workplace used to treat injured employees. This may include assisting a victim of cardiac arrest using CPR or defibrillation.
OSHA requirements for CPR and defibrillation differ considerably. Standards requiring CPR include:
OSHA recommends basic adult CPR refresher training and retesting every year, and first aid training at least once every three years. CPR training include facilitated discussion along with ’hands-on’ skills training that uses mannequins and partner practice.
Though OSHA recognizes AEDs as important lifesaving technology that plays a role in treating cardiac arrest, the agency doesn’t currently require their use in the workplace. Instead, OSHA wants employers to assess their own requirements for AEDs as part of their first aid response.
AEDs are considered Class III medical devices which means the Food and Drug Administration (FDA) has some oversight on their use. Almost all AEDs require the purchaser to obtain a prescription from a physician under FDA regulations. The prescription process is meant as a quality control mechanism to ensure AEDs are properly maintained, that all designated responders are properly trained, and assist employers with establishing an emergency response plan for their workplace AED program.
The AHA requires AED operators to also receive CPR training as an “integral part of providing lifesaving aid to people suffering sudden cardiac arrest.” Though easy to use, each AED is slightly different, so training helps users understand the unique traits and supplies for the individual units at their workplace. Additionally, AED users must be trained to understand the signs of a sudden cardiac arrest, when to activate the EMS system, and how to perform CPR.
AEDs are light, portable, easy to use, and inexpensive. They’re best placed near high-hazard areas such as confined spaces, near electrical energy, or in remote work areas. Response time to reach AEDs should be kept within 3–5-minutes.
Need more information on defibrillators in the workplace? See our ezExplanation on AEDs. |
Many states require or encourage CPR and AED training from nationally recognized organizations. Any AED training should include CPR training. OSHA doesn’t offer first aid or CPR training, nor certify trainers. Training by a nationally recognized organization, such as AHA, the American Red Cross, or National Safety Council is recommended.
While OSHA doesn’t currently require the use of AEDs in the workplace, they do expect employers to assess their own AED requirements as part of their first aid response. AED training is required by most states and should include CPR with a hands-on practical component.
OSHA requires employers to provide all workers with immediately available and sanitary restroom or toilet facilities. But does this include truckers and delivery drivers that stop at your facilities? The sanitation standards (1910.141, 1926.51, and 1928.110) are meant to protect all workers from adverse health effects from unsanitary toilets facilities, or the unavailability of facilities when needed.
Bipartisan legislation has recently been introduced in the House that would require businesses to provide restroom access to truckers who are loading or delivering cargo at their warehouses, manufacturers, distribution centers, retailers, and ports.
Supported by leading organizations in the trucking industry, the Trucker Bathroom Access Act (H.R. 9592) was introduced on Dec. 15, 2022. The bill requires retailers, warehouses, and other establishments with existing restrooms to provide access to drivers who are loading or delivering cargo. Additionally, operators of ports and marine terminals must provide access for drayage and parking while accessing such restrooms.
This amendment to Title 49 would exempt some employers from the bill including filling and service stations, and restaurants 800-square feet or smaller with restrooms intended for employee use only. The bill doesn’t require employers to construct new restrooms but to give truck drivers the same access as employees or customers.
Commercial truckers and delivery drivers are the lifeline of our supply chain of supplies, products, and consumables. Working tirelessly all hours, during holidays and weekends, and throughout the pandemic, they continue to deliver critical food and emergency supplies to companies everywhere. Employers have the privilege of demonstrating gratitude to truckers and delivery drivers with a positive work environment.
The benefits of allowing truckers and delivery drivers the convenience and safety of readily available, sanitary restroom facilities are plenty. They’re able to rest and reset when necessary, which keeps them and others safer on the roads. Equally important, restroom availability prevents drivers from having to search for available facilities elsewhere, allowing them to keep a timely delivery schedule, limit supply chain delays, and ultimately lower costs for employers and customers.
The proposed Trucker Bathroom Access Act will require retailers, warehouses, and other establishments with existing restrooms to provide access to truckers and delivery drivers who are loading or delivering cargo. Access to restrooms keeps them refreshed and ready to deliver essential supplies to companies across the country.
Safety has the workforce brimming with color. In fact, 29 CFR 1910.144 and 1910.145 tell us precisely what OSHA expects for safety color coding to identify hazards in the workplace. Signs, warning labels, symbols, and other color coding in your facilities should have your employees seeing red. But what if they can't?
Though rare, color blindness is the inability to distinguish between colors as most people do. This makes it difficult for workers to see colors intended to protect them from harm. Color blindness can vary, making it difficult to distinguish between red and green or blue and yellow hues - the very shades of safety.
Some individuals can't see any colors, which is called monochromacy. Workers with this type of color blindness may have trouble seeing clearly and may be more sensitive to light. Employers must collaborate with these employees to ensure alternative measures are taken to protect their eyes and clearly communicate warnings and hazards.
The color identifiers below differentiate the various levels of risk and hazards for workplace safety. Employers must ensure workers with color blindness are able to understand hazards in the workplace and the meaning of signs and warning labels.
RED - identifies fire and fire protective apparatus, danger, and emergency stops. It marks areas near open flames or flammable materials, fire extinguishers, and where workers are directed to stop an action.
ORANGE - warns workers of hazardous parts of equipment that could physically harm people or the facility. Typically used as labels on machinery, orange may also be used on signs, hard hats, safety vests, and other objects.
YELLOW - designates caution and is used for marking physical hazards, such as falling, pinch points, contact hazards, and other similar hazards.
GREEN - identifies directional safety information. This includes pointing workers to emergency egresses, safety showers or eyewash stations, first aid stations, and other safety equipment.
BLUE - not always safety-related, provides information regarding a particular location, process, or item. Employers may use blue signs to convey workplace policies, instructions, or locations, such as "Employees Only."
PURPLE - often combined with yellow, alerts workers to radiation hazards.
BLACK/WHITE - provides instructional and directional information. This includes speed limits, one-way traffic, and aisle markings.
Having a standardized color-coding system for safety is effective for alerting employees of workplace hazards - if they can see the colors properly. For those who can't, employers must ensure these workers understand the hazards and warning signs throughout the workplace.
Interested in learning more? See our ezExplanation on Color Coding. |
Not only are employers required to ensure workers understand warning signs and colors, but they must also protect workers from becoming color blind. That's right - color blindness can be acquired. Exposure to lead or carbon disulfide can cause color blindness, even at low levels. Terminal illness and alcohol consumption can also contribute to color blindness, so employers should promote health as part of their safety and health programs.
Color blindness is considered a disability according to the Americans with Disabilities Act (ADA). Employers are required to reasonably accommodate employees with disabilities.
Employers must ensure employees with color blindness are able to understand hazards in the workplace and the meaning of signs and warning labels. The ADA requires employers to make reasonable accommodations for workers with disabilities, including color blindness.
SUMMARY: The U.S. Environmental Protection Agency (the EPA) is soliciting information and requesting comments to assist in the potential development of non-regulatory and regulatory options that would ensure the proper management of used industrial containers that held hazardous chemicals or hazardous waste, up to and including the drum reconditioning process. Options could include revising the Resource Conservation and Recovery Act (RCRA) regulations or other, non-regulatory options. This Advance Notice of Proposed Rulemaking (ANPRM) does not propose any regulatory requirements or change any existing regulatory requirements.
DATES: Comments must be received on or before November 22, 2023, published in the Federal Register August 11, 2023, page 54537.
View proposed rule.
Hi everyone! Welcome to the monthly roundup video, where we’ll review the most impactful environmental, safety, and health news. First, let’s take a look at what’s happening in safety and health.
If you haven’t already done so, now is the time to post your OSHA 300A Summary. Employers are required to post the Summary in a conspicuous place from February 1st through April 30th.
As required by law, OSHA increased its penalties for inflation in mid-January. Penalties went up 7.7 percent, effective January 17th.
Also in January, OSHA released its long-awaited Fall 2022 regulatory agenda. Along with numerous proposed rules in the works, three major final rules are slated for 2023 – COVID-19 in healthcare, Injury and Illness tracking, and an update to the hazard communication standard.
OSHA recently released two new letters of interpretation, which address exit signs and lockout/tagout. Specifically, OSHA states that the International Standards Organization emergency exit symbol can be located beside the mandatory EXIT text on an existing sign.
The second letter addresses the applicability of lockout/tagout and the maintenance and operations of cathodic protection rectifiers when working on pipelines.
New York’s Warehouse Worker Protection Act was signed into law in December and takes effect in late February. It protects warehouse distribution workers from undisclosed or unlawful work speed quotas and includes protections for workers who fail to meet these quotas.
In 2021, a worker died every 101 minutes from a work-related injury, according to the Bureau of Labor Statistics. A total of 5,190 fatal work injuries was recorded in the U.S. in 2021, an 8.9 percent increase over 2020.
Turning to environmental news, EPA automatically added nine per- and polyfluoroalkyl substances, or PFAS, to the Toxics Release Inventory, or TRI, list. Four PFAS were added since they are no longer claimed as confidential business information.
EPA released its Fall 2022 regulatory agenda in early January. Included are major regulations impacting the National Ambient Air Quality Standards, waters of the United States, and modifications to the Risk Management Program under the Clean Air Act.
There are also a number of rules related to the National Emission Standards for Hazardous Air Pollutants in various rule stages.
And finally, beginning with model year 2027, heavy-duty trucks will be required to meet clean air standards that are 80 percent more stringent than current requirements.
EPA says this final rule is aimed at reducing smog- and soot-forming emissions, increasing the life of governed vehicles by up to 250 percent, and increasing emissions warranty periods up to 450 percent.
Thanks for tuning in to the monthly news roundup!
According to OSHA, “If you focus on achieving goals, monitoring performance, and evaluating outcomes, your workplace can progress along the path to higher levels of safety and health achievement.” Workplace safety apps can help.
Mobile safety apps are great resources for both employers and workers. They can help track hazards and perform inspections, identify exposures, and report incidents fast and efficiently. Many apps are available for any kind of mobile device, are free to download, and are applicable to a variety of industries.
The OSHA/NIOSH Heat Safety Tool automatically calculates the real-time Heat Index based on the worker’s current location and displays temperature and humidity percentage. The app provides protective measures for the risk level and can track hourly temperatures to prevent heat stress. The Heat Safety Tool also provides symptoms of heat-related illnesses and first aid steps, including hydration and reminders to take rest breaks.
Need more information on the Heat safety? See our ezExplanation on Heat Stress. |
The NIOSH PPE tracker helps employers seamlessly track and log personal protective equipment (PPE) information. It allows for the recording and analysis of facility types where PPE is used as well as daily inventories. Reports generated from the app help with the management and procurement of PPE.
The NIOSH Pocket Guide to Chemical Hazards app allows worksite chemicals to be searched to better identify properties, storage and use requirements, and required PPE. Information provided by the app clarifies industrial hygiene information and recommendations for respirator use, symptoms of exposure, and first aid.
The NIOSH Sound Level Meter (SLM) app was developed by acoustics engineers and hearing loss experts to help workers better understand their noise environment and hearing health. The SLM measures sound levels in the workplace and uses a built-in microphone to identify noise levels that are considered hazardous. Information can be shared as HTML or PDF reports that help determine proper protective equipment and implement controls to combat hearing loss.
The NIOSH Ladder Safety app guides workers through important safety information when selecting and using a straight/extension or step ladder. From ladder setup, inspection, and safe use, workers are provided with the information they need to safely use ladders on the job.
The NIOSH Lifting Equation Calculator (NLE Calc) provides quick and easy calculation of Lifting Index (LI) and Composite Lifting Index (CLI). These indexes are based on information the user provides about the job such as hand location, load weight, and frequency and duration of the lift. The app gives recommendations for safe lifting before the lift is even started.
The NIOSH Mast Climbing Work Platform (MCWP) safety tool is an inspection app that assists construction workers to safely use elevating equipment when working at heights. The app helps workers identify hazards and helps employers and safety professionals with training and compliance.
The American Red Cross First Aid app provides instant access to lifesaving information from experts. Employees can use the app as a reminder of how to handle common first aid situations and stay prepared for various emergencies using videos and interactive quizzes. The ARC Workplace Safety app also allows calls to 911 directly from the app to summon emergency assistance.
The ErgoMine ergonomics audit tool is designed specifically for mining hazards such as slip, trip, and fall hazards; musculoskeletal disorder (MSD) risks, and management of identified safety deficiencies. Audits are available for bagging, haul truck, and maintenance and repair operations at surface mining and processing facilities. Based on audit entries and checklists responses, the tool provides recommendations for remediating hazards and making ergonomic improvements.
Ensuring workplace safety is a never-ending endeavor. Employers can benefit from workplace safety apps designed to monitor and evaluate hazards in the workplace. Check out the free apps mentioned above to see how it can benefit your workplace.
The 150 air-mile exemptions, which are in the regulations at 395.1(e)(1) and (2), allow a driver to use a time record in place of a log, provided that certain conditions are met. While this is possibly the most widely used hours-of-service exemption, it may be the most commonly misused exemption, as well.
To be able to use this logging exemption in 395.1(e)(1), the driver must:
The company must retain the time record and have it available for inspection for six months.
Need more info? View our ezExplanation on the 150 air-mile exception. |
If the driver cannot meet the terms of the exemption (he or she goes too far or works too many hours), the driver must complete a regular driver’s log for the day as soon as the exemption no longer applies.
If the driver has had to complete a log 8 or fewer days out of the last 30 days, the driver can use a paper log for the day. If the driver had to complete a log more than 8 days out of the last 30 days, the driver needs to use an electronic log for the day (unless one of the ELD exemptions applies, such as operating a vehicle older than model year 2000).
When a property-carrying driver is operating under the 150 air-mile exemption, the driver is also exempt from having to take the required 30-minute break (see 395.3(a)(3)(ii)).
If the driver began the day as a 150 air-mile driver and has driven more than 8 consecutive hours without a break, and something unexpected happens and the driver can no longer use the 150 air-mile exemption, the driver must stop and immediately take the 30-minute break as well as start logging. If the driver went outside of the 150 air-mile area before the driver had 8 hours of driving without a break from driving, the driver would be expected to take the break at the appropriate time.
Here are some of the common myths and misunderstandings about the 150 air-mile exemption:
The 150 air-mile exemption at 395.1(e)(2) only applies to drivers that: Operate property-carrying vehicles that do not require a CDL to operate, and Stay within the 150 air-miles of their work reporting location.
If the driver stays within the 150 air-mile radius of the work reporting location, and returns to the work reporting location within 14 hours on 5 of the last 7 days, and 16 hours on 2 of the last seven days, the driver is allowed to use a time record in place of a log.
If the driver does not meet the terms of the exception, the driver will need to complete a log for the day. If the driver had to log more than 8 days out of the last 30 days, the driver will need to use an electronic log for the day. All of the other issues discussed above would apply to these drivers as well.
If you have drivers that use these exemptions, you will need to check time records to make sure they are complying with the appropriate time limits. You will also need to check movement records to verify that the drivers using these exemptions are staying within the mandated area (within 150 air-miles of the work reporting location for the day).
If a driver is over the hours limit, or has gone too far, you need to verify that the submitted a log for the day, either paper or electronic, depending on how many days the driver had to log out of the previous 30 days.
During an audit, if it is discovered that your drivers are using these exemptions incorrectly, you will be cited for not having drivers’ logs when required. Each day this occurred will be another violation, so the fine could be rather large if you are not managing the use of these exemptions!
When drivers fail a DOT test or engage in other prohibited drug or alcohol behavior, their commercial driving careers are stalled until specific steps in rehabilitation and treatment are completed.
Read our FAQ: What happens if a DOT return-to-duty or follow-up test is canceled? |
A commercial driver is required to go through the DOT return-to-duty process if:
Actual knowledge occurs when information is provided to the motor carrier indicating a DOT testing violation. This might be learned through:
When a motor carrier learns of a testing violation on a new hire, it must obtain proof that the driver has completed the return-to-duty process. Otherwise, the motor carrier would have to begin the return-to-duty process or pick up where it left off.
To resume a safety-sensitive function, the driver must complete the following return-to-duty steps in Subpart O of Part 40.
When drivers engage in prohibited drug or alcohol behavior, they must be immediately removed from performing all safety-sensitive functions. If on a dispatch, a driver must be told of the test result and instructed to park the vehicle. This notification often involves making arrangements to get the driver home and continue the run with different driver.
The employer must present the driver with a list of substance abuse professionals (SAPs) who have the appropriate credentials and DOT training to perform driver evaluations. The list must be given without a fee and made available to the driver (or driver applicant) whether or not the carrier retains the driver.
If the motor carrier does not have another face-to-face meeting with the driver, this list may be mailed or emailed to the driver.
For drug test results, the medical review officer (MRO) will report the violation to the Clearinghouse. This includes shy bladder scenarios without a valid medical explanation.
Failed alcohol tests (.04 or greater BAC), actual knowledge, and certain refusal to test scenarios are reported by the motor carrier to the Clearinghouse.
After the SAP list is given to a driver, the motor carrier cannot force a driver to begin the process. Nevertheless, to resume safety-sensitive functions, the driver must seek a face-to-face evaluation from a qualified SAP as a first step.
Payment of the evaluation is not required of the employer. Instead, it is based on labor-management agreements and healthcare benefits.
The SAP’s referral to an education and/or treatment program is based on a clinical evaluation of the driver during the face-to-face meeting. The SAP should have a working knowledge of what programs and counselors are available.
The SAP may take into consideration the driver’s ability to pay and insurance coverage. Once a SAP-approved provider has been agreed upon with the driver, the SAP will facilitate the referral and provide the program with the diagnostic determinations that led to the treatment plan. Programs range from outpatient treatment to partial or full in-patient resources.
Once the treatment plan has ended, the SAP will determine if it was a success. This decision is based on information provided by the education and/or treatment program and another face-to-face evaluation with the driver.
This second evaluation will result in one of three determinations:
If the SAP is satisfied with the driver’s ability to return to driving, the SAP will issue a report to the designated employer representative (DER). This report will list any continuing treatment and education, if required, and the number of DOT follow-up drug and/or alcohol tests required in a given time frame. The driver will be required to have a minimum of six unannounced follow-up tests in the first 12 months following the return to a safety-sensitive function. The SAP may require follow-up testing for up to five years.
For all Part 382 violations occurring since January 6, 2020, the SAP is required to report the successful completion of the evaluation and treatment to the Clearinghouse, provided the driver has designated the SAP in the driver’s personal Clearinghouse account.
The DER must wait for the go-ahead in the SAP report before sending the driver for the return-to-duty drug and/or alcohol test. All return-to-duty drug tests are performed under direct observation. The motor carrier must report a negative return-to-duty test to the Clearinghouse. In order for the “prohibited” status to be lifted from the driver’s record, both the SAP and motor carrier submission must be entered onto the driver’s record.
Once the Clearinghouse is no longer showing an unresolved testing violation, the driver can return to a safety-sensitive function.
Editor’s Note: Violations occurring prior to January 6, 2020, are not tracked in the Clearinghouse. Instead, the motor carrier would use the SAP report as a green light to perform the return-to-duty test, and once the negative test result is received, the driver can resume a safety-sensitive function.
After the driver returns to safety-sensitive functions, the motor carrier must carry out the unannounced follow-up tests under direct observation as prescribed in the SAP report. The DER must ensure that the tests do not have any discernible pattern.
The follow-up tests are in addition to any other DOT-required tests (e.g., random, post-accident). For instance, you cannot use a follow-up test as a substitute for a random test or vice versa.
If the driver leaves the motor carrier prior to the completion of the very last follow-up test, the next employer(s) must pick up where the process left off.
When the follow-up program is complete, the motor carrier under whose program the last test was performed must report this to the Clearinghouse. If the violation predates the Clearinghouse, the employer does not report the completed follow-up program to anyone.
If the motor carrier fails to begin or continue with a driver’s DOT return-to-duty process and follow-up testing, it is an acute violation that could cost the company up to $15,876. Allowing this driver to operate a CMV puts the carrier at risk of negligent entrustment claims if there is a crash.
The FMCSA is planning to test the effects of letting commercial truck drivers “pause” their 14-hour on-duty limit by up to 3 hours per day.
The agency is hoping to enlist up to 400 drivers to participate in its three-year “Split Duty Period Pilot Program.” Participants would be allowed to use one off-duty break of between 30 minutes and 3 hours to pause the 14-hour driving window, as long as they take 10 consecutive hours off duty at the end of the day. The pause should enable drivers to reduce fatigue, avoid congestion, reduce the pressure to speed, and be more productive, the FMCSA says.
Normally, short breaks taken during a driver’s day must be subtracted from the driver’s 14-consecutive-hour window during which driving is allowed.
For more information, see our ezExplanation on the 14-hour on-duty rule. |
Under new rules in effect on September 29, 2020, some truck drivers can pause their 14-hour limit with a break of 2 hours or more, but only if they also spend at least 7 hours in a sleeper berth (see below). Under the pilot program, drivers could pause the clock with off-duty time alone, without the need for a sleeper berth. This idea was proposed back in 2019 but didn’t find its way into the recent rule changes because the FMCSA didn’t have enough data to justify it.
As required by law, the FMCSA is gathering public input on the proposal until November 2nd. It will then decide whether to implement the program. After the program concludes, the agency will need to report to Congress on its findings before it could proceed with any changes to the hours-of-service regulations.
Participation in the pilot program would be limited to between 200 and 400 commercial driver’s license (CDL) holders from companies of all sizes, with each driver participating for up to one year. Motor carriers that want to enroll in the program will need to apply via an FMCSA website which could be available late this year. Comments on the proposal may be submitted online at www.regulations.gov under docket number FMCSA-2020-0098.
Truck drivers who fall under the federal hours-of-service rules can already pause their 14-hour clock with a short rest break, as of September 29, 2020 (see log image). This is known as the “split sleeper-berth” option, and it works like this:
Key to remember: The FMCSA plans to test the safety of allowing truck drivers to pause their 14-hour clock with a rest break of up to 3 hours, even if they don’t have a sleeper berth. The pilot program could open later this year.
As of January 1, 2023, heavy-duty trucks and buses with engines from model years 2007 to 2009 operating in California must be either:
This is the final step in the phase-in of the Truck and Bus regulation. Covered vehicles originally built with engines older than model year 2006 must have already been replaced or retrofitted.
Need more on CMV maintenance? See our ezExplanation Inspection and Maintenance. |
One issue that has come up is new vehicles are not available for delivery before January 1, 2023. This means fleets that operate in California that cannot get a replacement vehicle will be faced with the choice of either retiring their 2007 to 2009 engine vehicles without a replacement or operating in violation as of January 1, 2023.
However, the California Air Resources Board (CARB), the agency that oversees the Truck and Bus program, is aware of the situation and has provided an exemption. If the company has a written contract to purchase a new vehicle to replace a vehicle with a 2007 to 2009 engine in place before September 1, 2023, the existing vehicle can be operated until the replacement is placed in service.
To use this exemption, the company must register in CARB’s Truck Regulation Upload, Compliance, and Reporting System (TRUCRS) and report the use of the exemption. This is especially important to California-based companies as vehicle registration is tied to compliance with the Truck and Bus regulations requirements.
As of January 1, 2023, California will be placing roadside emissions monitoring devices (REMD) at locations around the state. These devices check emissions on any vehicle that passes it. If the device determines a vehicle may be a high emitter, the owner will receive a Notice to Submit to Testing. This will require the vehicle to be brought in to a “referee” location where the emissions and emissions components can be inspected.
These Truck and Bus requirements go into effect on January 1, 2023, and only apply to vehicles operating in California.
Most motor carriers review their roadside inspection reports for the obvious reasons: fixing mechanical defects and identifying unsafe or noncompliant driver behavior.
Some violations are easy to decipher, such as a burned-out light bulb or exceeding the speed limit by a specific range. Others take a little more to figure out, such as doing the math to determine when and how a driver exceeded hours-of-service (HOS) limits. Then there are all those 392.2 violations with suffixes. Some count against a carrier’s Compliance, Safety, Accountability (CSA) scores, while others do not, depending on whether they contribute to causing a crash.
One that often baffles motor carriers is 392.2C.
Section 392.2C is enforcement’s code for “failure to obey traffic control device.” The C stands for control.
The citation appears in the severity table for the Unsafe Driving BASIC (Behavior Analysis and Safety Improvement Category). The violation has been assigned a value of 5 out 10, with 10 being the most severe. The violation is used when calculating both the carrier’s and driver’s Unsafe Driving BASIC scores.
In most instances, the traffic control device is not a signal light or stop or yield sign. Rather, it is the sign that instructs the driver to pull into a weigh station.
View our Weigh Stations ezExplanation for additional information. |
The vehicles that must stop at scales and inspection locations vary from state to state and even from location to location within a state. The “weigh scale ahead” or similar sign should be the driver’s guide.
If the sign reads:
Often those who operate commercial vehicles not requiring a commercial driver’s license, such as a large pickup truck or small box truck, mistakenly believe weigh scale inspections are just for larger rigs.
If a driver goes past a weigh station without pulling in as directed by a traffic control device, enforcement will pursue and pull over the driver. The officer will then escort the driver back to the weigh station for a roadside inspection.
Even if the driver was honestly confused whether the sign applied to the vehicle, it is too late. And more than likely enforcement’s interest has been piqued. It is highly unlikely the driver will be waived through at this point, and 392.2C will be entered on the roadside inspection report.
CSA’s enforcement model suggests finding the root cause of roadside inspection violations to prevent future occurrences and ultimately improve BASIC scores.
A violation of 392.2C may have one of several root causes, such as:
Whatever the reason, it must be addressed with the driver. Corrective actions range from refresher training to termination. If the driver was trying to avoid enforcement for other reasons (drugs, alcohol, over HOS limits), these other violations need to be addressed accordingly.
Key to remember: Failing to obey a traffic control device will be used in calculation of the CSA Unsafe Driving BASIC scores. Motor carriers should address the root cause of the violation so it does not recur.
Often, we’re presented with different driver and hazmat load scenarios along with one basic question: in this situation, does my driver need a hazmat endorsement on his or her commercial driver’s license (CDL)?
Typically, this comes up in two common situations:
First, a lesson on hazmat endorsements. For the hazmat endorsement requirements, we need to look at the Federal Motor Carrier Safety Administration (FMCSA) regulations, as CDLs are an FMCSA requirement.
Section 383.5 defines hazardous materials as “any material that has been designated as hazardous under 49 U.S.C. 5103 and is required to be placarded under subpart F of 49 CFR part 172 or any quantity of a material listed as a select agent or toxin in 42 CFR part 73.”
The key phrase in this definition is “required to be placarded.” If a hazardous material is required to be placarded, then the hazmat endorsement is also required.
Now, to address our two common situations.
Class 9
Class 9 materials do not require placards for domestic transportation and as a result, a hazmat endorsement is not required if the driver is transporting only Class 9 materials. Placards aren’t required; therefore, the hazmat endorsement is not required.
Many of you might be wondering, “What if I placard Class 9 materials anyway?” The answer to this question goes back to the key phrase in the definition — “required to be placarded.” While Class 9 materials do not require placarding, they may be placarded according to the hazardous materials regulations (HMR). If you choose to placard a Class 9 material, that’s fine, but the endorsement is not required because the placards were not required.
Diesel fuel
Whether diesel is regulated largely depends on the type of packaging. Generally, combustible liquids such as diesel are not subject to the HMR when in non-bulk packaging. Therefore, when diesel is transported in non-bulk packaging, placards are not required.
However, when diesel is transported in bulk packaging (greater than 119 gallons liquid capacity), it is regulated and does require placards.
Therefore, a hazmat endorsement is required if the driver is transporting diesel in bulk packaging requiring placards.
Remember, whether a package is bulk or non-bulk depends on the capacity of the packaging.
When placards are required by the hazmat regulations, a hazmat endorsement is required. If placards are placed on a hazmat shipment, but are not required to transport the hazmat legally, then the driver does not require a hazmat endorsement.
Wage overpayment errors happen for many reasons — from clerical mistakes to payroll system snafus.
Regardless of the reason, employees are not necessarily entitled to keep the extra money, and employers need to know their obligations for recouping it.
Under the federal Fair Labor Standards Act (FLSA), employers don’t need an employee’s permission to recoup wage overpayments. The extra money is seen as a loan or a wage advancement to the employee.
Because of this, employers are generally free to recoup the overpayment from the next paycheck — even if such a deduction cuts into the minimum wage or overtime pay due the employee under the FLSA.
State laws, however, may have greater restrictions. For example, New York employers may only make deductions from an employee’s wages for “an overpayment of wages where such overpayment is due to a mathematical or other clerical error by the employer.”
There are also limitations on the timing and duration, frequency, and method and amount of recovery.
The bottom line is, employers should try to avoid getting themselves into an overpayment situation in the first place. Supervisors should closely review their direct reports’ timesheets to catch errors before paychecks are issued
Also, employees should be encouraged to review their pay stubs for accuracy to help catch mistakes sooner rather than later.
If a mistake happens, employers should do their due diligence to communicate with the affected employees and make a reasonable plan to recoup the funds (provided it’s allowed under state law) so as not to cause any unnecessary financial harm to employees.
Wage overpayment errors can and will occur. Employers need to know their obligations under both federal and state laws before recouping money.
When an employee is on leave under the Family and Medical Leave Act (FMLA), the employer must maintain benefits under the company’s group health plan.
Thus, employees generally must continue paying their share of the health insurance premiums.
But how do employees pay their share of the premiums when FMLA leave is unpaid? Employers may offer three payment options:
Employers may allow a combination of these options, such as pre-pay for part of the leave and catch-up for the remainder. Below is a breakdown of the three available payment options.
When unpaid FMLA leave is foreseeable, employers may allow employees to pre-pay their premiums. For example, if an employee is adopting a child and requests several weeks for bonding time but does not have enough vacation to cover the entire absence, an employer could allow the employee to pre-pay his or her premiums for the portion of the leave that would be unpaid.
Employers may not require an employee to pre-pay, so this cannot be the only option offered.
If an employee chooses this option, however, employers may collect premiums on a pre-tax basis – with one exception. If the absence will extend into the next tax year (such as leave from December through January), only the premiums for the current tax year may be pre-paid with pre-tax income. The IRS does not allow employees to defer untaxed income from one year to the next.
In this example, the premiums for January could either be pre-paid with after-tax income, or the employee could elect one of the other options (pay-as-you-go or catch-up).
Under the pay-as-you-go option, employees pay their share of the premiums based upon the agreed terms made between the employer and employee. These payments are usually made on an after-tax basis.
For example, the employee might mail in a personal check every two weeks. If the employee fails to send in the checks, or otherwise fails to make payments using the agreed-upon system, the FMLA does allow employers to drop coverage after giving specified notices of non-payment.
Dropping coverage would likely cause some administrative headaches, and some insurers may refuse to do this because the employee would have to be reinstated to the health plan upon return from FMLA leave.
Therefore, employers may prefer to continue coverage by paying the employee’s share of the premiums, then use the catch-up option once the employee returns to work. Some insurance carriers recommend this as an alternative to dropping coverage.
Under the catch-up option, the employer and employee agree that the employee will not pay premiums until he or she returns from leave.
This option might be used when the need for FMLA leave was not foreseeable, such as having to care for a parent who was unexpectedly hospitalized.
To use this option, the employer and employee must agree in advance that:
When the employee returns, the employer collects the current premiums plus any catch-up payments, perhaps taking double premiums, until caught up. Contributions under the catch-up option may be taken on a pre-tax basis.
The IRS regulations indicate that, if the employee chooses the pay-as-you-go option, but fails to make the required payments, you may change to the catch-up option even without the employee’s prior agreement.
Employees on unpaid FMLA leave must still pay their share of health insurance premiums by either pre-paying, paying as they go, or making catch-up contributions upon returning to work.
A new year often begins a new round of employee performance reviews. Since the Family and Medical Leave Act (FMLA) allows eligible employees to take up to 12 (or 26) weeks of leave, many events can occur during an employee’s leave, including the employee’s pre-scheduled performance review. Such reviews might take place on an annual or other scheduled basis. How you treat the timing of those reviews should include some thought.
If, for example, Jo Employee takes 12 weeks of FMLA leave, during which her annual performance review is scheduled, here are some questions to ponder:
Delaying a review
An annual performance review generally takes into consideration a full years’ worth of work. Some employers think it’s best to delay the performance review by the same amount of time an employee took FMLA leave to capture an entire years’ work. This practice, however, might risk running afoul of one of the cornerstones of the FMLA: Returning the employee to his or her position, including the equivalent pay, benefits, and working conditions.
The issues can be particularly concerning if the performance review affects wage increases or other compensation.
What the regulations say
The FMLA regulations indicate that an equivalent position includes equivalent pay, which includes any unconditional pay increases that may have occurred during the FMLA leave period. Equivalent pay also includes bonuses or payments, whether discretionary or non-discretionary. FMLA leave cannot undermine the employee’s right to such pay.
Furthermore, “… employers cannot use the taking of FMLA leave as a negative factor in employment actions, such as hiring, promotions, or disciplinary actions; nor can FMLA leave be counted under no fault attendance policies.” [29 CFR 825.220(c)]
Avoiding a negative factor
Therefore, you would need to look at whether delaying an employee’s performance review could be seen as having a negative factor for the employee.
If, for example, Jo Employee took 12 weeks of leave from April through June, during which she would otherwise have obtained a pay increase in May, but you delayed this increase until September (so you could use a full 12 months of work), you may have violated the equivalent pay provision. If delaying a review creates a new review schedule going forward, the negative impacts could continue.
If, however, a pay increase is conditioned upon seniority, length of service, or work performed, you would grant it in accordance with your policy or practice as applied to other employees on an equivalent leave status for a reason that does not qualify as FMLA leave.
In other words, don’t treat an employee on FMLA leave differently than you would an employee on other forms of leave.
Key to remember: It might be less risky to keep the performance review on schedule and prorate wage increases to account for FMLA leave.
Many employers have a policy of requiring employees to supply a doctor’s note to account for their use of sick leave. Of course, this type of policy is intended to discourage the abuse of paid time off, and it is legal, but if enforcing such a policy, consider the following:
Essentially, the stricter the policy, the more problematic it could be. If a company requires a doctor’s note for a single sick day, it may find the policy difficult to enforce. On the other hand, it may be more reasonable to indicate that such a note may be required for extended absences (perhaps of three days or more). The key is to strike a balance between not encouraging employees to work sick but also making sure they’re not abusing the system.
Remember, if an employee is off work under the Family and Medical Leave Act (FMLA), employers should not ask for doctor’s notes for intermittent absences, as it’s akin to a recertification. There are limited circumstances in which an employer can ask an employee to recertify their need for FMLA Leave.
Recent news headlines say many employers are requiring employees to return to the physical office; some after employees have been working remotely for about three years.
Since the long arm of long COVID and other medical conditions (physical or mental) continue to haunt the workplace, employers could find employees asking to keep working remotely because of their condition.
To help with these requests, here are six steps to take when an employee asks to work remotely as a reasonable accommodation under the Americans with Disabilities Act (ADA):
If this process looks familiar, it is because it’s pretty much the same process used for any accommodation request under the ADA. The goal is to find an effective solution for both employer and employee.
Key to remember: Having a process to follow can not only help comply with the ADA, but it can also help employees get their jobs done even while working remotely. Ensure employees are treated fairly, which can go a long way toward retention goals, as well as help avoid discrimination claims.
Last month, the U.S. Department of Labor (DOL) filed suit against a restaurant and its owner for back wages and liquidated damages for 26 employees.
An investigation by the DOL’s Wage and Hour Division (WHD) found multiple violations of the federal Fair Labor Standards Act (FLSA), including making illegal deductions from servers’ pay for uniforms, aprons, name tags, and lost items such as crackers and utensils, resulting in employees not earning minimum wage.
The WHD alleged that the company owes $75,402 in back wages to the 26 workers.
Limits on employee wage deductions
While restaurant profit margins might be thin and overhead expenses high, that doesn’t mean the business may dock employees’ pay for these kinds of costs. Many companies in the service industry have business-related expenses like the ones listed above, as well as:
The FLSA does not, however, allow employers to make deductions from employee pay for any items which:
Case in point
If, for example, Bob’s Business requires Jo Employee to wear a uniform because it’s required by:
The cost is considered Bob’s Business’ expense and not Jo’s.
If Bob wants Jo to wear specific clothing not worn outside of work, Bob will likely need to cover the cost. If Bob wants Jo to wear a general uniform like regular khakis and a polo shirt that can also be worn outside of work, Bob may require Jo to pay for it without considering the cost as coming out of Jo’s wages.
Otherwise, Bob may not require Jo or any employee to pay for uniforms that would bring their pay below the federal minimum wage.
How much do employees pay?
If an employer requires employees to bear the cost of work-related expenses, it may not reduce the employee's wage below the federal minimum wage of $7.25 per hour. Nor may that cost cut into overtime compensation required by the FLSA.
If, for example, Jo was paid $7.75 per hour and worked 30 hours in the workweek, the maximum amount the employer could legally deduct from Jo’s wages would be $15 ($.50 X 30 hours).
Employers may spread out deductions for uniform or other costs over a period of paydays, as long as they’re compliant with the FLSA.
Key to remember: Improper wage deductions are on the WHD’s radar, especially in certain segments. The restaurant industry employs people who, in addition to being among the nation’s lowest paid workers, can also be vulnerable to wage theft because they might not know their rights and protections or be reluctant to exercise them. Therefore, the WHD takes these cases seriously.
The COVID-19 outbreak created a shortage of latex and nitrile gloves in many workplaces.
Latex and nitrile gloves are used extensively in health care, and their disposable (single use) nature meant that large quantities were consumed during the peak of the pandemic. The shortage was also worsened because of hoarding by some consumers. In addition, certain businesses and government agencies began using these gloves to protect employees, even if their workers didn’t normally require gloves on the job.
If you have trouble obtaining your staff’s usual gloves, be prepared to identify feasible alternatives. You don’t want to endanger them by having them wear any old gloves they find lying around.
To identify alternatives for workers who rely on latex or nitrile gloves as PPE, you must know which chemicals workers handle or come in contact with. That’s because all glove materials are not suitable for all hazards.
Evaluate which materials offer appropriate protection from the specific chemicals that workers handle to select appropriate alternative gloves.
Here’s a summary of glove types and the protection given to help evaluate alternatives.
Butyl gloves protect against a variety of chemicals such as peroxide, highly corrosive acids, strong bases, alcohols, aldehydes, ketones, esters and nitrocompounds. Butyl gloves also resist oxidation, ozone corrosion and abrasion, and remain flexible at low temperatures. However, they do not perform well with aliphatic and aromatic hydrocarbons and halogenated solvents.
Natural (latex) rubber gloves have good elasticity and temperature resistance, and resist abrasions well. They protect against most water solutions of acids, alkalis, salts, and ketones. Latex gloves may cause allergic reactions and may not be appropriate for all employees. Hypoallergenic gloves, glove liners, and powderless gloves are possible alternatives for employees who are allergic.
Neoprene gloves protect against hydraulic fluids, gasoline, alcohols, organic acids, and alkalis. Their chemical and wear resistance are generally better than gloves of natural rubber.
Nitrile gloves are intended for jobs requiring dexterity, and they stand up even after prolonged exposure to substances that cause other gloves to deteriorate. They offer protection when working with greases, oils, acids, caustics, and alcohols but are not recommended for use with strong oxidizing agents, aromatic solvents, ketones, and acetates.
OSHA’s 1910.151(c) standard, Medical Services and First Aid, requires that employers provide emergency eyewashes when employees may be exposed to injurious corrosive materials during the course of their work. Employers have a wide range of eyewash types available to choose from on the market, including portable units (i.e., eyewash bottles). While many employers use bottles, OSHA says that they can’t be the only eyewash made available to employees, and their use should be limited.
The OSHA standard does not provide a great deal of detail on eyewashes for employers. However, where the regulation is silent, OSHA refers employers to the American National Standards Institute (ANSI) standard Z358.1-2009, “Emergency Eyewash and Shower Equipment,” regarding installation, operation, and maintenance of emergency eyewashes. This includes capacity and flushing requirements. The ANSI standard states that an eyewash must deliver 0.4 gallons of flushing fluid per minute for at least 15 minutes.
As such, ANSI says that an eyewash bottle does not meet these criteria; therefore, it can only be used to support eyewashes that do (i.e., plumbed and self-contained units), but cannot replace them.
The reason for this limitation is that eyewash bottles simply cannot provide the required 15 minutes of flushing. Eyewash bottles typically hold less than a gallon of water, which would supply the user with flushing fluid for approximately 1 minute. Even larger self-contained units (those with bladders) that have a capacity of 5 to 10 gallons would only provide maximum use of about 5 minutes.
In other words, eyewash bottles don’t provide an adequate amount of flushing fluid and cannot be considered a primary means of protection.
For this reason, OSHA warns that the use of eyewash bottles should be limited. In a 1986 memorandum to Regional Administrators, the agency states, “In general, squeeze bottles should not be used except where the hazard severity or distance from plumbed eyewash equipment requires personal equipment at work stations for immediate flushing prior to prolonged flushing at a plumbed or self-contained unit.”
In other words, employers can provide eyewash bottles in instances where plumbed or self-contained units can’t reasonably be provided (e.g., an outside yard) in the immediate work area, but only until they can reach a unit which can provide the amount of flushing fluid necessary to flush the eyes for at least 15 minutes.
OSHA expects the employer to determine the level of the potential risk to employees and provide eyewash (and/or shower) protection accordingly. The severity of the hazard(s) involved is a critical consideration when making this determination. In the past, OSHA has said that 1910.151(c)is meant to cover strong acids and alkalis, and the requirement to provide suitable facilities for quick drenching or flushing depends on the exposure and the strength of the hazardous chemical. Chemicals and materials such as household detergents or cleaners, sawdust, metal filings, etc. would not require emergency eyewash (or shower) under the standard.
If an employer determines that an eyewash is needed, then it must meet the provisions set forth in the American National Standards Institute (ANSI) standard Z358.1. The agency uses the ANSI standard as an enforcement tool. This is clarified in a November 1, 2002, Letter of Interpretation, which says, “If OSHA inspects a workplace and finds unsuitable facilities for quick drenching or flushing of the eyes and body, a citation under 29 CFR 1910.151(c)would be issued. When determining whether the eyewash or shower facilities are suitable given the circumstances of a particular worksite, OSHA may refer to the most recent consensus standard regarding eyewash or shower equipment…”
Need information on eyewash inspections? See our Institute document on Inspections and Maintenance. |
Without the ANSI standard, employers would find it difficult to demonstrate to OSHA exactly how their eyewash and shower units were suitable exclusive to the regulatory language under 1910.151(c) since it’s limited and vague.
Eyewash bottles don’t meet the requirement under 1910.151(c) to provide “suitable” facilities for quick drenching or flushing of the eyes. They cannot be the only eyewash provided in the workplace.
Each year, the National Fire Protection Agency (NFPA) reminds employers not to prop open fire doors for convenience. Propping open doors has become a common violation of fire codes after the pandemic because workers didn’t want to become exposed to germs on common touchpoints.
I know firsthand this is an issue at construction jobsites and remember telling workers not to prop open fire doors in our clients’ facilities. Workers were doing this out of convenience because they carried things into and out of the existing facility. Propping open a fire door, or wedging it open, are serious fire and safety hazards. Keep fire doors closed to prevent smoke and fire from spreading into the fire evacuation route, like a stairwell. OSHA and NFPA don’t prohibit propping open a fire exit door but caution employers against doing this for safety and security reasons.
Fire doors must remain closed, although some may be designed to automatically close when fire and smoke are sensed by jobsite fire detection equipment. To reduce the need to disinfect frequently touched points, workers can push open fire doors using their sleeves by pushing against the push bar instead of using their hands. You can also increase housekeeping efforts and the frequency that doorknobs, handles, and push bars are cleaned throughout the shift.
One way employers try to handle skyrocketing inflation is to manage first aid supplies. But do OSHA regulations allow employers to lock first aid supplies as a way to control costs?
Our experts are often asked whether OSHA permits locking first aid supplies. In a January 23, 2007, OSHA letter of interpretation (LOI), OSHA confirmed that first aid cabinets can be locked. The LOI stated, however, that first aid supplies must be readily accessible in the event of an emergency. Additionally, 29 CFR 1910.151(b) states: “In the absence of an infirmary, clinic, or hospital in near proximity to the workplace which is used for the treatment of all injured employees, a person or persons shall be adequately trained to render first aid. Adequate first aid supplies shall be readily available.”
OSHA defines “readily available” as accessible within three to five minutes and warns that locking first aid supplies, whether kits or cabinets, may limit employee accessibility per the standard. The agency advises that if an employer was relying on first aid services not provided by a clinic, infirmary, or hospital and adequate first aid supplies were not available when needed, then the employer would be in violation of 1910.151(b).
If you’re concerned with supplies being used in a manner not intended by the company, there are ways to manage supplies. For example, employers could use vending machines that allow employees to scan their badges and get basic supplies or personal protective equipment free of charge. This can help employers manage their supply chain and evaluate by whom and for what supplies are being used.
If opting to lock your first aid supplies, remember to make supplies readily accessible (within three to five minutes). This may require that additional keys for locks be made available to multiple personnel at all times when workers are present.
Although their recommendations are non-mandatory, OSHA suggests using the American National Standards Institute (ANSI) for reference to determine what supplies you need to have. The contents for Class A kits listed in the ANSI standard should be adequate for small worksites. Class B kits are designed with a broader range and quantity of supplies to deal with injuries in more complex or high-risk environments (for example, larger operations or multiple operations conducted at the same location).
It’s important to note that although OSHA is still citing ANSI’s 1998 standard, an updated version of the standard, ANSI/International Safety Equipment Association (ISEA) Z308.1-2021, was approved on April 15, 2022, and went into effect on October 15, 2022. Major changes to the standard included:
Determining what first aid supplies should be accessible depends on the workplace hazards and potential injuries. A great place to begin is by assessing your Form 300 injury logs to see the types of injuries already reported. Most employers perform risk assessments, beginning with a review of the Form 300 logs, to drive their decisions. OSHA also provides guidance to employers in 1910.151 Appendix A.
Employers must understand the accessibility risks associated with locking first aid cabinets even though OSHA and ANSI do not prohibit this practice. First aid supplies must be readily accessible (within three to five minutes) in the event of an emergency.
Many employers will need to electronically submit the 300A, 300 Log, and 301 Forms by March 2, 2024. OSHA sent the electronic reporting rule changes to the Office of Management and Budget (OMB) on April 7, 2023. The OMB review can take two to four months, so a final rule could appear any time from July to September. That would allow the rule to take effect before January 1, 2024, when employers can begin reporting.
Covered establishments must electronically submit injury data by March 2nd each year. Currently, covered locations include establishments with 250 or more employees that must keep a 300 Log, as well as establishments with 20-249 employees in specific industries that OSHA identified and listed in the regulation.
Based on the proposed rule, the coming changes would revise the reporting obligations as follows:
Note that an “establishment” is a single physical location, so the employee counts are based on each location. For example, furniture stores must report if a location has 20 or more employees. Suppose an employer operates 117 furniture stores around the country, but only two establishments have 20 or more employees. The other 115 establishments have fewer than 20 employees. The employer would only have to report for the two establishments that exceed 20 employees, and would not have to report on the other 115 establishments.
The revisions would also update from the 2012 North American Industry Classification System (NAICS) codes to the 2017 codes. The most current version is 2022, but since the Bureau of Labor Statistics uses the 2017 version, OSHA wants the e-reporting rule to match.
Need more information on NAICS codes? See our news item “Which NAICS code should you use for OSHA?” |
Assuming the final rule mirrors the proposed rule, employers can prepare as follows:
For example, all manufacturing establishments with 20 or more employees must report the 300A, and many establishments with 100 or more employees will need to report the 300A, 300 Log, and 301s. However, if an establishment has 100 or more employees but is not listed in proposed Appendix B, the location will only file the 300A. A sampling of NAICS codes not listed in Appendix B include 322 (paper manufacturing), 323 (printing), 324 (petroleum and coal), and 325 (chemical manufacturing).
The proposed list of NAICS codes for establishments with 100 or more employees appears on the last two pages of the proposed rule at https://www.govinfo.gov/content/pkg/FR-2022-03-30/pdf/2022-06546.pdf.
Key to remember: OSHA’s final rule to revise electronic reporting obligations should come out this year and could impact 2024 reporting, though legal challenges or technical issues might delay the effective date.
Approximately 22 million workers are impacted by hazardous noise in the workplace each year. About 1 in 8 of the working population has hearing difficulty. Among those, occupational exposures are the cause for 1 in 4. Noise exposure in the workplace can lead to hearing loss and tinnitus (ringing in the ears), and affected workers are more likely to get injured on the job.
We tend to think of hearing loss as something that affects only our ears, but there are other health impacts. It’s associated with cognitive decline and heart problems. Hearing loss and tinnitus can also impact mental health, which may lead to anxiety, depression, and feelings of isolation and sadness.
I sat down for a chat about hearing loss with my colleague Cindy Pauley. In addition to her role as an editor on our Environmental, Health, and Safety (EHS) team, Cindy is also a Certified Occupational Safety Specialist (COSS) and a Certified Occupational Hearing Conservationist (COHC).
For more information about hearing conservation, see our ezExplanation. |
Editor: Cindy, I know you’re passionate about hearing. Tell me a little more about that.
Cindy: Other than a deep adoration of how the human body heals itself, my passion comes from spending time with people, which I know sounds a bit vague. But bear with me. My dad worked as a heavy equipment operator. He ran everything from dozers and front-end loaders to quarry trucks. Now, fast forward to my days as a 911 dispatcher. My coworkers (and friends) were police officers, firefighters, and paramedics. What did they all have in common? The word “what.”
That's right - almost every time I said something to them, they would respond with “what?” You can imagine how frustrating this was not just for me, but for them. I could sense their frustration at having to ask for a repeat of information or feeling excluded from conversations because they didn’t want to ask people to repeat themselves. Eventually, I could see them become more introverted and depressed. I didn’t want that for them, so I became passionate about hearing protection.
My message is two-fold: 1) that hearing loss is permanent and 2) unhealthy noise is everywhere. Attached to nerve cells in the cochlea of the ear are thousands of tiny hairs that help turn sound vibrations into electrical signals. The electrical signals are transmitted to the brain which turns these signals into sound. Once these delicate hairs are damaged, they don’t grow back. What people don’t recognize is how simple things we do each day are damaging to these hairs.
Let’s take my dad and 911 friends as examples. My dad operated heavy equipment without hearing protection most of the time (this was before hearing protection became a workplace focus). Similarly, my 911 friends were exposed to emergency sirens that averaged 120–130 decibels. Exposure at these levels without hearing protection, even for a brief period, caused permanent hearing damage.
To make matters worse, they didn’t wear hearing protection off the job either. They continued to expose themselves to other forms of unhealthy noise such as lawnmowing, attending concerts, and operating recreational vehicles. The most surprising, however, is one most people never think of — driving with windows down. My dad and each of my friends all had greater hearing loss in their left ears, next to the window that was down. Studies have found that regardless of speed or vehicle model, when the windows are down, the driver is exposed to a nearly constant 89 decibels of noise. For my 911 friends, add the 120-130 decibels from the siren coming through the same window and it’s no wonder they struggle to hear.
I hope workers take the message off-the-job and use hearing protection. Essentially, if they have to raise their voice to speak to someone while performing an activity, their hearing needs protection!
Editor: Statistics from fiscal year 2022 show that OSHA cited 1910.95 – Occupational noise exposure - 268 times. The regulation requires employers to implement a hearing conservation program when employees’ noise exposure equals or exceeds 85 decibels over an 8-hour time-weighted average (TWA). Cindy, what do you think may be behind employers’ lack of a hearing conservation program?
Cindy: My belief, which comes from experience as a Safety Manager in various industries, is that employers struggle with compliance because they don’t understand the requirements of the standard. It throws a lot of numbers and calculations at people, which can be confusing. Unfortunately, this confusion can lead to avoidance. Additionally, I think employers believe that the process of performing audiometric tests; finding licensed or certified audiologists, otolaryngologists, or other physicians; and identifying and managing potential standard threshold shifts (STS) will be complicated and expensive. However, there are so many resources available to assist employers, and I encourage them to use those resources.
Key to remember: Hearing loss is permanent – and preventable. Workplace noise monitoring can help employers determine whether a hearing conservation program must be implemented.