Compliance Just Got Easier: Stay ahead of regulatory changes with instant notifications on updates that matter.
['Safety and Health Programs and Training']
['Safety and Health Programs and Training']
06/01/2025
:
|
InstituteSafety and Health Programs and TrainingTraining & DevelopmentSafety and Health Programs and TrainingIn Depth (Level 3)Human ResourcesEnglishAnalysisFocus AreaUSA
Preventive maintenance
['Safety and Health Programs and Training']

- PM is a good idea for most equipment.
Preventive maintenance (PM) is an element of a safety and health management program that makes sense on many levels. First, from an operational standpoint, equipment should run efficiently all the time. It should also run safely. Many an accident has occurred because maintenance wasn’t performed. Also, many an accident has occurred because a breakdown happened that needed to be fixed quickly and maintenance felt pressure to rush.
It may be a stretch to have PM for every single item in the workplace, but for most equipment it is a good idea and should generally be performed per the manufacturer’s schedule. In particular, look at any engineered hazard controls, emergency equipment, and material handling equipment that can be a high hazard and prone to breakdown from use.
:
safety-and-health-programs-and-training
safety-and-health-programs-and-training
FOUNDATIONAL LEARNING
Preventive maintenance
InstituteSafety and Health Programs and TrainingTraining & DevelopmentSafety and Health Programs and TrainingIn Depth (Level 3)Human ResourcesEnglishAnalysisFocus AreaUSA
['Safety and Health Programs and Training']

- PM is a good idea for most equipment.
Preventive maintenance (PM) is an element of a safety and health management program that makes sense on many levels. First, from an operational standpoint, equipment should run efficiently all the time. It should also run safely. Many an accident has occurred because maintenance wasn’t performed. Also, many an accident has occurred because a breakdown happened that needed to be fixed quickly and maintenance felt pressure to rush.
It may be a stretch to have PM for every single item in the workplace, but for most equipment it is a good idea and should generally be performed per the manufacturer’s schedule. In particular, look at any engineered hazard controls, emergency equipment, and material handling equipment that can be a high hazard and prone to breakdown from use.
2656868103
2656866443
UPGRADE TO CONTINUE READING
RELATED TOPICS
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2026 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.
