Compliance Just Got Easier: Stay ahead of regulatory changes with instant notifications on updates that matter.
['Waste', 'Tank Systems', 'CERCLA, SARA, EPCRA']
['Tank Systems', 'Release Notifications', 'Solid Waste', 'Toxic/Hazardous Substance Releases', 'Underground Storage Tanks']
05/20/2022
At sites where investigations under �280.62(a)(6) indicate the presence of free product, owners and operators must remove free product to the maximum extent practicable as determined by the implementing agency while continuing, as necessary, any actions initiated under ��280.61 through 280.63, or preparing for actions required under ��280.65 through 280.66. In meeting the requirements of this section, owners and operators must:
(a) Conduct free product removal in a manner that minimizes the spread of contamination into previously uncontaminated zones by using recovery and disposal techniques appropriate to the hydrogeologic conditions at the site, and that properly treats, discharges or disposes of recovery byproducts in compliance with applicable local, state, and federal regulations;
(b) Use abatement of free product migration as a minimum objective for the design of the free product removal system;
(c) Handle any flammable products in a safe and competent manner to prevent fires or explosions; and
(d) Unless directed to do otherwise by the implementing agency, prepare and submit to the implementing agency, within 45 days after confirming a release, a free product removal report that provides at least the following information:
(1) The name of the person(s) responsible for implementing the free product removal measures;
(2) The estimated quantity, type, and thickness of free product observed or measured in wells, boreholes, and excavations;
(3) The type of free product recovery system used;
(4) Whether any discharge will take place on-site or off-site during the recovery operation and where this discharge will be located;
(5) The type of treatment applied to, and the effluent quality expected from, any discharge;
(6) The steps that have been or are being taken to obtain necessary permits for any discharge; and
(7) The disposition of the recovered free product.
[80 FR 41638, July 15, 2015]
['Waste', 'Tank Systems', 'CERCLA, SARA, EPCRA']
['Tank Systems', 'Release Notifications', 'Solid Waste', 'Toxic/Hazardous Substance Releases', 'Underground Storage Tanks']
UPGRADE TO CONTINUE READING
ezExplanations
Results Aided by AI
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2026 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.
