['Tank Systems', 'Waste']
['Solid Waste', 'Hazardous Waste', 'TSD Facilities', 'Tank Systems']
05/05/2022
...
(a) You must ensure that you follow proper handling procedures to prevent damage to a new tank system during installation. Before placing a new tank system or component in use, an independent, qualified installation inspector or an independent, qualified, registered professional engineer, either of whom is trained and experienced in the proper installation of tank systems or components, must inspect the system for the presence of any of the following items:
(1) Weld breaks.
(2) Punctures.
(3) Scrapes of protective coatings.
(4) Cracks.
(5) Corrosion.
(6) Other structural damage or inadequate construction/ installation.
(b) You must remedy all discrepancies before the tank system is placed in use.
[70 FR 54370 Sept. 8, 2005]
READ MORESHOW LESS
['Tank Systems', 'Waste']
['Solid Waste', 'Hazardous Waste', 'TSD Facilities', 'Tank Systems']
Load More
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2024 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.