['Air Programs']
['Hazardous Air Pollutants']
02/27/2022
...
Table 1 to Subpart ZZZZZZ of Part 63 - Applicability of General Provisions to Aluminum, Copper, and Other Nonferrous Foundries Area Sources
As required in §63.11555, “What General Provisions apply to this subpart?,” you must comply with each requirement in the following table that applies to you.
Citation | Subject | Applies to subpart ZZZZZZ? | Explanation |
---|---|---|---|
§63.1(a)(1), (a)(2), (a)(3), (a)(4), (a)(6), (a)(10)-(a)(12), (b)(1), (b)(3), (c)(1), (c)(2), (c)(5), (e) | Applicability | Yes | §63.11544(f) exempts affected sources from the obligation to obtain a title V operating permit. |
§63.1(a)(5), (a)(7)-(a)(9), (b)(2), (c)(3), (c)(4), (d) | Reserved | No | |
§63.2 | Definitions | Yes | |
§63.3 | Units and Abbreviations | Yes | |
§63.4 | Prohibited Activities and Circumvention | Yes | |
§63.5 | Preconstruction Review and Notification Requirements | Yes | |
§63.6(a), (b)(1)-(b)(5), (b)(7), (c)(1), (c)(2), (c)(5), (e)(1), (e)(3)(i), (e)(3)(iii)-(e)(3)(ix), (f)(2), (f)(3), (g), (i), (j) | Compliance with Standards and Maintenance Requirements | Yes | |
§63.6(f)(1) | Compliance with Nonopacity Emission Standards | No | Subpart ZZZZZZ requires continuous compliance with all requirements in this subpart. |
§63.6(h)(1), (h)(2), (h)(5)-(h)(9) | Compliance with Opacity and Visible Emission Limits | No | Subpart ZZZZZZ does not contain opacity or visible emission limits. |
§63.6(b)(6), (c)(3), (c)(4), (d), (e)(2), (e)(3)(ii), (h)(3), (h)(5)(iv) | Reserved | No | |
§63.7 | Applicability and Performance Test Dates | Yes | |
§63.8(a)(1), (b)(1), (f)(1)-(5), (g) | Monitoring Requirements | Yes | |
§63.8(a)(2), (a)(4), (b)(2)-(3), (c), (d), (e), (f)(6), (g) | Continuous Monitoring Systems | No | Subpart ZZZZZZ does not require a flare or CPMS, COMS or CEMS. |
§63.8(a)(3) | [Reserved] | No | |
§63.9(a), (b)(1), (b)(2)(i)-(iii), (b)(5), (c), (d), (e), (h)(1)-(h)(3), (h)(5), (h)(6), (j) | Notification Requirements | Yes | Subpart ZZZZZZ requires submission of Notification of Compliance Status within 120 days of compliance date unless a performance test is required. |
§63.9(b)(2)(iv)-(v), (b)(4), (f), (g), (i) | No | ||
§63.9(b)(3), (h)(4) | Reserved | No | |
§63.10(a), (b)(1), (b)(2)(i)-(v), (vii), (vii)(C), (viii), (ix), (b)(3), (d)(1)-(2), (d)(4), (d)(5), (f) | Recordkeeping and Reporting Requirements | Yes | |
§63.10(b)(2)(vi), (b)(2)(vii)(A)-(B), (c), (d)(3), (e) | No | Subpart ZZZZZZ does not require a CPMS, COMS, CEMS, or opacity or visible emissions limit. | |
§63.10(c)(2)-(c)(4), (c)(9) | Reserved | No | |
§63.11 | Control Device Requirements | No | |
§63.12 | State Authority and Delegations | Yes | |
§§63.13-63.16 | Addresses, Incorporations by Reference, Availability of Information, Performance Track Provisions | Yes |
Source: 74 FR 30393, June 25, 2009, unless otherwise noted.
READ MORESHOW LESS
['Air Programs']
['Hazardous Air Pollutants']
Load More
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2024 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.