['Air Programs']
['Hazardous Air Pollutants']
02/27/2022
...
Table 1 to Subpart YYYY of Part 63 - Emission Limitations
As stated in §63.6100, you must comply with the following emission limitations
For each new or reconstructed stationary combustion turbine described in §63.6100 which is . . . | You must meet the following emission limitations . . . |
---|---|
| limit the concentration of formaldehyde to 91 ppbvd or less at 15-percent O2, except during turbine startup. The period of time for turbine startup is subject to the limits specified in the definition of startup in §63.6175. |
[85 FR 13542, March 9, 2020]
Table 2 to Subpart YYYY of Part 63 - Operating Limitations
As stated in §§63.6100 and 63.6140, you must comply with the following operating limitations.
For . . . | You must . . . |
---|---|
1. each stationary combustion turbine that is required to comply with the emission limitation for formaldehyde and is using an oxidation catalyst | maintain the 4-hour rolling average of the catalyst inlet temperature within the range suggested by the catalyst manufacturer. You are not required to use the catalyst inlet temperature data that is recorded during engine startup in the calculations of the 4-hour rolling average catalyst inlet temperature. |
2. each stationary combustion turbine that is required to comply with the emission limitation for formaldehyde and is not using an oxidation catalyst | maintain any operating limitations approved by the Administrator. |
[85 FR 13542, March 9, 2020]
Table 3 to Subpart YYYY of Part 63 - Requirements for Performance Tests and Initial Compliance Demonstrations
As stated in §63.6120, you must comply with the following requirements for performance tests and initial compliance demonstrations.
You must . . . | Using . . . | According to the following requirements . . . |
---|---|---|
1?Incorporated by reference, see §63.14. | ||
2?The %R value for each compound must be reported in the test report, and all field measurements must be corrected with the calculated %R value for that compound using the following equation: | ||
Reported Results = ((Measured Concentration in Stack)/(%R)) × 100. | ||
a. demonstrate formaldehyde emissions meet the emission limitations specified in Table 1 by a performance test initially and on an annual basis AND | Test Method 320 of 40 CFR part 63, appendix A; ASTM D6348-12e1?1 provided that the test plan preparation and implementation provisions of Annexes A1 through A8 are followed and the %R as determined in Annex A5 is equal or greater than 70% and less than or equal to 130%;?2 or other methods approved by the Administrator | formaldehyde concentration must be corrected to 15-percent O2, dry basis. Results of this test consist of the average of the three 1-hour runs. Test must be conducted within 10 percent of 100-percent load. |
b. select the sampling port location and the number of traverse points AND | Method 1 or 1A of 40 CFR part 60, appendix A | if using an air pollution control device, the sampling site must be located at the outlet of the air pollution control device. |
c. determine the O2 concentration at the sampling port location AND | Method 3A or 3B of 40 CFR part 60, appendix A; ANSI/ASME PTC 19.10-1981?1 (Part 10) manual portion only; ASTM D6522-11?1 if the turbine is fueled by natural gas | measurements to determine O2 concentration must be made at the same time as the performance test. |
d. determine the moisture content at the sampling port location for the purposes of correcting the formaldehyde concentration to a dry basis | Method 4 of 40 CFR part 60, appendix A or Test Method 320 of 40 CFR part 63, appendix A, or ASTM D6348-12e1?1 | measurements to determine moisture content must be made at the same time as the performance test. |
[85 FR 13542, March 9, 2020]
Table 4 to Subpart YYYY of Part 63 - Initial Compliance With Emission Limitations
As stated in §§63.6110 and 63.6130, you must comply with the following requirements to demonstrate initial compliance with emission limitations
For the . . . | You have demonstrated initial compliance if . . . |
---|---|
emission limitation for formaldehyde. | the average formaldehyde concentration meets the emission limitations specified in Table 1. |
Table 5 to Subpart YYYY of Part 63 - Continuous Compliance With Operating Limitations
As stated in §§63.6135 and 63.6140, you must comply with the following requirements to demonstrate continuing compliance with operating limitations:
For each stationary combustion turbine complying with the emission limitation for formaldehyde . . . | You must demonstrate continuous compliance by . . . |
---|---|
1. with an oxidation catalyst | continuously monitoring the inlet temperature to the catalyst and maintaining the 4-hour rolling average of the inlet temperature within the range suggested by the catalyst manufacturer. |
2. without the use of an oxidation catalyst | continuously monitoring the operating limitations that have been approved in your petition to the Administrator. |
Table 6 to Subpart YYYY of Part 63 - Requirements for Reports
As stated in §63.6150, you must comply with the following requirements for reports
If you own or operate a . . . | you must . . . | According to the following requirements . . . |
---|---|---|
1. stationary combustion turbine which must comply with the formaldehyde emission limitation | report your compliance status | semiannually, according to the requirements of §63.6150. |
2. stationary combustion turbine which fires landfill gas, digester gas or gasified MSW equivalent to 10 percent or more of the gross heat input on an annual basis | report (1) the fuel flow rate of each fuel and the heating values that were used in your calculations, and you must demonstrate that the percentage of heat input provided by landfill gas, digester gas, or gasified MSW is equivalent to 10 percent or more of the gross heat input on an annual basis, (2) the operating limits provided in your federally enforceable permit, and any deviations from these limits, and (3) any problems or errors suspected with the meters | annually, according to the requirements in §63.6150. |
3. a lean premix gas-fired stationary combustion turbine or a diffusion flame gas-fired stationary combustion turbine as defined by this subpart, and you use any quantity of distillate oil to fire any new or existing stationary combustion turbine which is located at the same major source | report (1) the number of hours distillate oil was fired by each new or existing stationary combustion turbine during the reporting period, (2) the operating limits provided in your federally enforceable permit, and any deviations from these limits, and (3) any problems or errors suspected with the meters | annually, according to the requirements in §63.6150. |
Table 7 to Subpart YYYY of Part 63 - Applicability of General Provisions to Subpart YYYY
You must comply with the applicable General Provisions requirements:
Citation | Subject | Applies to subpart YYYY | Explanation |
---|---|---|---|
§63.1 | General applicability of the General Provisions | Yes | Additional terms defined in §63.6175. |
§63.2 | Definitions | Yes | Additional terms defined in §63.6175. |
§63.3 | Units and abbreviations | Yes | |
§63.4 | Prohibited activities | Yes | |
§63.5 | Construction and reconstruction | Yes | |
§63.6(a) | Applicability | Yes | |
§63.6(b)(1)-(4) | Compliance dates for new and reconstructed sources | Yes | |
§63.6(b)(5) | Notification | Yes | |
§63.6(b)(6) | [Reserved] | ||
§63.6(b)(7) | Compliance dates for new and reconstructed area sources that become major | Yes | |
§63.6(c)(1)-(2) | Compliance dates for existing sources | Yes | |
§63.6(c)(3)-(4) | [Reserved] | ||
§63.6(c)(5) | Compliance dates for existing area sources that become major | Yes | |
§63.6(d) | [Reserved] | ||
§63.6(e)(1)(i) | General duty to minimize emissions | Yes before September 8, 2020. No after September 8, 2020. See §63.6105 for general duty requirement. | |
§63.6(e)(1)(ii) | Requirement to correct malfunctions ASAP | Yes before September 8, 2020. No after September 8, 2020. | |
§63.6(e)(1)(iii) | Operation and Maintenance Requirements | Yes | |
§63.6(e)(2) | [Reserved] | ||
§63.6(e)(3) | SSMP | Yes before September 8, 2020. No after September 8, 2020. | |
§63.6(f)(1) | Applicability of standards except during startup, shutdown, or malfunction (SSM) | Yes before September 8, 2020. No after September 8, 2020. | |
§63.6(f)(2) | Methods for determining compliance | Yes | |
§63.6(f)(3) | Finding of compliance | Yes | |
§63.6(g)(1)-(3) | Use of alternative standard | Yes | |
§63.6(h) | Opacity and visible emission standards | No | Subpart YYYY does not contain opacity or visible emission standards. |
§63.6(i) | Compliance extension procedures and criteria | Yes | |
§63.6(j) | Presidential compliance exemption | Yes | |
§63.7(a)(1)-(2) | Performance test dates | Yes | Subpart YYYY contains performance test dates at §63.6110. |
§63.7(a)(3) | Section 114 authority | Yes | |
§63.7(b)(1) | Notification of performance test | Yes | |
§63.7(b)(2) | Notification of rescheduling | Yes | |
§63.7(c) | Quality assurance/test plan | Yes | |
§63.7(d) | Testing facilities | Yes | |
§63.7(e)(1) | Conditions for conducting performance tests | Yes before September 8, 2020. No after September 8, 2020. | |
§63.7(e)(2) | Conduct of performance tests and reduction of data | Yes | Subpart YYYY specifies test methods at §63.6120. |
§63.7(e)(3) | Test run duration | Yes | |
§63.7(e)(4) | Administrator may require other testing under section 114 of the CAA | Yes | |
§63.7(f) | Alternative test method provisions | Yes | |
§63.7(g) | Performance test data analysis, recordkeeping, and reporting | Yes | |
§63.7(h) | Waiver of tests | Yes | |
§63.8(a)(1) | Applicability of monitoring requirements | Yes | Subpart YYYY contains specific requirements for monitoring at §63.6125. |
§63.8(a)(2) | Performance specifications | Yes | |
§63.8(a)(3) | [Reserved] | ||
§63.8(a)(4) | Monitoring for control devices | No | |
§63.8(b)(1) | Monitoring | Yes | |
§63.8(b)(2)-(3) | Multiple effluents and multiple monitoring systems | Yes | |
§63.8(c)(1) | Monitoring system operation and maintenance | Yes | |
§63.8(c)(1)(i) | General duty to minimize emissions and CMS operation | Yes before September 8, 2020. No after September 8, 2020. | |
§63.8(c)(1)(ii) | Parts for repair of CMS readily available | Yes | |
§63.8(c)(1)(iii) | Requirement to develop SSM Plan for CMS | Yes before September 8, 2020. No after September 8, 2020. | |
§63.8(c)(2)-(3) | Monitoring system installation | Yes | |
§63.8(c)(4) | Continuous monitoring system (CMS) requirements | Yes | Except that subpart YYYY does not require continuous opacity monitoring systems (COMS). |
§63.8(c)(5) | COMS minimum procedures | No | |
§63.8(c)(6)-(8) | CMS requirements | Yes | Except that subpart YYYY does not require COMS. |
§63.8(d)(1)-(2) | CMS quality control | Yes | |
§63.8(d)(3) | Written procedures for CMS | Yes before September 8, 2020. No after September 8, 2020. | |
§63.8(e) | CMS performance evaluation | Yes | Except for §63.8(e)(5)(ii), which applies to COMS. |
§63.8(f)(1)-(5) | Alternative monitoring method | Yes | |
§63.8(f)(6) | Alternative to relative accuracy test | Yes | |
§63.8(g) | Data reduction | Yes | Except that provisions for COMS are not applicable. Averaging periods for demonstrating compliance are specified at §§63.6135 and 63.6140. |
§63.9(a) | Applicability and State delegation of notification requirements | Yes | |
§63.9(b)(1)-(5) | Initial notifications | Yes | Except that §63.9(b)(3) is reserved. |
§63.9(c) | Request for compliance extension | Yes | |
§63.9(d) | Notification of special compliance requirements for new sources | Yes | |
§63.9(e) | Notification of performance test | Yes | |
§63.9(f) | Notification of visible emissions/opacity test | No | Subpart YYYY does not contain opacity or VE standards. |
§63.9(g)(1) | Notification of performance evaluation | Yes | |
§63.9(g)(2) | Notification of use of COMS data | No | Subpart YYYY does not contain opacity or VE standards. |
§63.9(g)(3) | Notification that criterion for alternative to relative accuracy test audit (RATA) is exceeded | Yes | |
§63.9(h) | Notification of compliance status | Yes | Except that notifications for sources not conducting performance tests are due 30 days after completion of performance evaluations. §63.9(h)(4) is reserved. |
§63.9(i) | Adjustment of submittal deadlines | Yes | |
§63.9(j) | Change in previous information | Yes | |
§63.9(k) | Electronic reporting procedures | Yes | Only as specified in §63.9(j). |
§63.10(a) | Administrative provisions for recordkeeping and reporting | Yes | |
§63.10(b)(1) | Record retention | Yes | |
§63.10(b)(2)(i) | Recordkeeping of occurrence and duration of startups and shutdowns | Yes before September 8, 2020. No after September 8, 2020. | |
§63.10(b)(2)(ii) | Recordkeeping of failures to meet a standard | Yes before September 8, 2020. No after September 8, 2020. See §63.6155 for recordkeeping of (1) date, time and duration; (2) listing of affected source or equipment, and an estimate of the quantity of each regulated pollutant emitted over the standard; and (3) actions to minimize emissions and correct the failure. | |
§63.10(b)(2)(iii) | Maintenance records | Yes | |
§63.10(b)(2)(iv)-(v) | Records related to actions during SSM | Yes before September 8, 2020. No after September 8, 2020. | |
§63.10(b)(2)(vi)-(xi) | CMS records | Yes | |
§63.10(b)(2)(xii) | Record when under waiver | Yes | |
§63.10(b)(2)(xiii) | Records when using alternative to RATA | Yes | |
§63.10(b)(2)(xiv) | Records of supporting documentation | Yes | |
§63.10(b)(3) | Records of applicability determination | Yes | |
§63.10(c)(1)-(14) | Additional records for sources using CMS | Yes | Except that §63.10(c)(2)-(4) and (9) are reserved. |
§63.10(c)(15) | Use of SSM Plan | Yes before September 8, 2020. No after September 8, 2020. | |
§63.10(d)(1) | General reporting requirements | Yes | |
§63.10(d)(2) | Report of performance test results | Yes | |
§63.10(d)(3) | Reporting opacity or VE observations | No | Subpart YYYY does not contain opacity or VE standards. |
§63.10(d)(4) | Progress reports | Yes | |
§63.10(d)(5) | Startup, shutdown, and malfunction reports | No. After September 8, 2020, see 63.6150(a) for malfunction reporting requirements. | |
§63.10(e)(1) and (2)(i) | Additional CMS reports | Yes | |
§63.10(e)(2)(ii) | COMS-related report | No | Subpart YYYY does not require COMS. |
§63.10(e)(3) | Excess emissions and parameter exceedances reports | Yes | After September 8, 2020 submitted with the compliance report through CEDRI according to §63.6150(a). |
§63.10(e)(4) | Reporting COMS data | No | Subpart YYYY does not require COMS. |
§63.10(f) | Waiver for recordkeeping and reporting | Yes | |
§63.11 | Flares | No | |
§63.12 | State authority and delegations | Yes | |
§63.13 | Addresses | Yes | After September 8, 2020 not applicable to reports required to be submitted through CEDRI by 63.6150(c), (e), (f), or (g). |
§63.14 | Incorporation by reference | Yes | |
§63.15 | Availability of information | Yes |
[85 FR 13543, March 9, 2020; 85 FR 73911, Nov. 19, 2020]
Source: 69 FR 10537, Mar. 5, 2004, unless otherwise noted.
READ MORESHOW LESS
['Air Programs']
['Hazardous Air Pollutants']
Load More
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2024 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.