Table 1 of Subpart TTTT of Part 60
Affected EGU | CO 2 Emission standard |
---|---|
Newly constructed steam generating unit or integrated gasification combined cycle (IGCC) | 640 kg CO 2 /MWh of gross energy output (1,400 lb CO 2 /MWh-gross). |
Reconstructed steam generating unit or IGCC that has base load rating of 2,100 GJ/h (2,000 MMBtu/h) or less | 910 kg CO 2 /MWh of gross energy output (2,000 lb CO 2 /MWh-gross). |
Reconstructed steam generating unit or IGCC that has a base load rating greater than 2,100 GJ/h (2,000 MMBtu/h) | 820 kg CO 2 /MWh of gross energy output (1,800 lb CO 2 /MWh-gross). |
Modified steam generating unit or IGCC | A unit-specific emission limit determined by the unit's best historical annual CO 2 emission rate (from 2002 to the date of the modification); the emission limit will be no lower than: |
(1) 820 kg CO 2 /MWh of gross energy output (1,800 lb CO 2 /MWh-gross) for units with a base load rating greater than 2,100 GJ/h (2,000 MMBtu/h); or | |
(2) 910 kg CO 2 /MWh of gross energy output (2,000 lb CO 2 /MWh-gross) for units with a base load rating of 2,100 GJ/h (2,000 MMBtu/h) or less. |
[89 FR 40034, May 9, 2024]
Table 2 of Subpart TTTT of Part 60
Affected EGU | CO 2 Emission standard |
---|---|
Newly constructed or reconstructed stationary combustion turbine that supplies more than its design efficiency or 50 percent, whichever is less, times its potential electric output as net-electric sales on both a 12-operating month and a 3-year rolling average basis and combusts more than 90% natural gas on a heat input basis on a 12-operating-month rolling average basis | 450 kg CO 2 /MWh (1,000 lb CO 2 /MWh) of gross energy output; or 470 kg CO 2 /MWh (1,030 lb CO 2 /MWh) of net energy output. |
Newly constructed or reconstructed stationary combustion turbine that supplies its design efficiency or 50 percent, whichever is less, times its potential electric output or less as net-electric sales on either a 12-operating month or a 3-year rolling average basis and combusts more than 90% natural gas on a heat input basis on a 12-operating-month rolling average basis] | 50 kg CO 2 /GJ (120 lb CO 2 /MMBtu) of heat input. |
Newly constructed and reconstructed stationary combustion turbine that combusts 90% or less natural gas on a heat input basis on a 12-operating-month rolling average basis | Between 50 to 69 kg CO 2 /GJ (120 to 160 lb CO 2 /MMBtu) of heat input as determined by the procedures in §60.5525. |
[89 FR 40034, May 9, 2024]
Table 3 to Subpart TTTT of Part 60
General provisions citation | Subject of citation | Applies to subpart TTTT | Explanation |
---|---|---|---|
§60.1 | Applicability | Yes | |
§60.2 | Definitions | Yes | Additional terms defined in §60.5580. |
§60.3 | Units and Abbreviations | Yes | |
§60.4 | Address | Yes | Does not apply to information reported electronically through ECMPS. Duplicate submittals are not required. |
§60.5 | Determination of construction or modification | Yes | |
§60.6 | Review of plans | Yes | |
§60.7 | Notification and Recordkeeping | Yes | Only the requirements to submit the notifications in §60.7(a)(1) and (3) and to keep records of malfunctions in §60.7(b), if applicable. |
§60.8(a) | Performance tests | No | |
§60.8(b) | Performance test method alternatives | Yes | Administrator can approve alternate methods |
§60.8(c)-(f) | Conducting performance tests | No | |
§60.9 | Availability of Information | Yes | |
§60.10 | State authority | Yes | |
§60.11 | Compliance with standards and maintenance requirements | No. | |
§60.12 | Circumvention | Yes | |
§60.13 (a)-(h), (j) | Monitoring requirements | No | All monitoring is done according to part 75. |
§60.13 (i) | Monitoring requirements | Yes | Administrator can approve alternative monitoring procedures or requirements |
§60.14 | Modification | Yes (steam generating units and IGCC facilities) No (stationary combustion turbines) | |
§60.15 | Reconstruction | Yes | |
§60.16 | Priority list | No | |
§60.17 | Incorporations by reference | Yes | |
§60.18 | General control device requirements | No | |
§60.19 | General notification and reporting requirements | Yes | Does not apply to notifications under §75.61 or to information reported through ECMPS. |
[89 FR 40035, May 9, 2024]
READ MORESHOW LESS
['Air Programs']
['Air Quality']
Load More
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2025 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.