['Air Programs']
['Hazardous Air Pollutants']
03/08/2023
...
Table 1 to Subpart QQQQQQ of Part 63 - Applicability of General Provisions to Subpart QQQQQQ
[Change Notice] [Previous Text]
As required in §63.11432, you must comply with the requirements of the NESHAP General Provisions (40 CFR part 63, subpart A) as shown in the following table.
Citation | Subject | Applies to subpart QQQQQQ? | Explanation |
63.1(a)(1)-(4) | General applicability of the General Provisions | Yes | |
63.1(a)(5) | Reserved | No | |
63.1(a)(6) | General applicability of the General Provisions | Yes | |
63.1(a)(7)-(9) | Reserved | No | |
63.1(a)(10)-(12) | General applicability of the General Provisions | Yes | |
63.1(b)(1) | Initial applicability determination | Yes | |
63.1(b)(2) | Reserved | No | |
63.1(b)(3) | Record of applicability determination | Yes | |
63.1(c)(1)-(2) | Applicability of subpart A of this part after a relevant standard has been set | Yes | |
63.1(c)(3)-(4) | Reserved | No | |
63.1(c)(5) | Notification requirements for an area source that increases HAP emissions to major source levels | Yes | |
63.1(c)(6) | Reclassification | Yes | |
63.1(d) | Reserved | No | |
63.1(e) | Applicability of permit program before a relevant standard has been set | Yes | |
63.2 | Definitions | Yes | |
63.3 | Units and abbreviations | Yes | |
63.4 | Prohibited activities and circumvention | Yes | |
63.5(a)(1) | Applicability of preconstruction review requirements | No | |
63.5(a)(2) | Applicability of notification requirements | Yes | |
63.5(b)(1) | Requirements for newly constructed and reconstructed sources | Yes | |
63.5(b)(2) | Reserved | No | |
63.5(b)(3) | Required preconstruction approval required for major source construction and reconstruction | No | Subpart QQQQQQ does not regulate major sources. |
63.5(b)(4) | Notification requirements for construction or reconstruction of area sources | Yes | |
63.5(b)(5) | Reserved | No | |
63.5(b)(6) | Added equipment (or a process change) must be considered part of the affected source and subject to all provisions in the relevant standards | Yes | |
63.5(c) | Reserved | No | |
63.5(d) | Application for approval of construction or reconstruction | No | Subpart QQQQQQ does not require an application for construction or reconstruction. |
63.5(e) | Approval of construction or reconstruction | No | Subpart QQQQQQ does not require application approval before construction or reconstruction. |
63.5(f) | Approval of construction or reconstruction based on prior State preconstruction review | No | Subpart QQQQQQ does not require approval of construction or reconstruction based on prior State preconstruction review. |
63.6(a) | Compliance with standards and maintenance requirements | Yes | |
63.6(b)(1)-(5) | Compliance dates for new and reconstructed sources | Yes | |
63(b)(6) | Reserved | No | |
63(b)(7) | Compliance dates for new and reconstructed sources | Yes | |
63.6(c)(1)-(2) | Compliance dates for existing sources | Yes | |
63.6(c)(3)-(4) | Reserved | No | |
63.6(c)(5) | Compliance dates for existing sources | Yes | |
63.6(d) | Reserved | No | |
63.6(e)(1) | Operation and maintenance requirements | Yes | |
63.6(e)(2) | Reserved | No | |
63.6(e)(3)(i) | Startup, shutdown, and malfunction plan | No | Subpart QQQQQQ does not require a startup, shutdown, and malfunction plan. |
63.6(e)(3)(ii) | Reserved | No | |
63.6(e)(3)(iii)-(ix) | Startup, shutdown, and malfunction plan | No | Subpart QQQQQQ does not require a startup, shutdown, and malfunction plan. |
63.6(f) | Compliance with nonopacity emission standards | No | Subpart QQQQQQ does not contain emission or opacity limits. |
63.6(g) | Use of an alternative nonopacity emission standard | No | Subpart QQQQQQ does not contain emission or opacity limits. |
63.6(h)(1) | Compliance with opacity and visible emissions standards | No | Subpart QQQQQQ does not contain emission or opacity limits. |
63.6(h)(2)(i) | Compliance with opacity and visible emissions standards | No | Subpart QQQQQQ does not contain emission or opacity limits. |
63.6(h)(2)(ii) | Reserved | No | |
63.6(h)(2)(iii) | Compliance with opacity and visible emissions standards | No | Subpart QQQQQQ does not contain emission or opacity limits. |
63.6(h)(3) | Reserved | No | |
63.6(h)(4) | Notification of opacity or visible emission observations | No | Subpart QQQQQQ does not contain emission or opacity limits. |
63.6 (h)(5)(i)-(iii) | Conduct of opacity or visible emission observations | No | Subpart QQQQQQ does not contain emission or opacity limits. |
63.6(h)(5)(iv) | Reserved | No | |
63.6(h)(5)(v) | Conduct of opacity or visible emission observations | No | Subpart QQQQQQ does not contain emission or opacity limits. |
63.6(h)(6)-(9) | Availability of records and use of continuous opacity monitoring system | No | Subpart QQQQQQ does not contain emission or opacity limits. |
63.6(i) | Extension of compliance with emissions standards | Yes | |
63.6(j) | Exemption from compliance with emissions standards | Yes | |
63.7 | Performance Testing Requirements | No | Subpart QQQQQQ does not require performance tests. |
63.8(a)(1)-(2) | Applicability of monitoring requirements | No | Subpart QQQQQQ does not require monitoring of emissions. |
63.8(a)(3) | Reserved | No | |
63.8(a)(4) | Applicability of monitoring requirements | No | Subpart QQQQQQ does not require monitoring of emissions. |
63.8(b)-(g) | Conduct of monitoring | No | Subpart QQQQQQ does not require monitoring of emissions. |
63.9(a) | Applicability and general information for notification requirements | Yes | |
63.9(b)(1)-(2) | Initial notifications | Yes | |
63.9(b)(3) | Reserved | No | |
63.9(b)(4)-(5) | Initial notifications | Yes | |
63.9(c)-(d) | Extension of compliance and special compliance requirements | Yes | |
63.9(e), (f), (g) | Notification of performance test, opacity and visible emission observation, and requirements for sources with continuous monitoring systems | No | Subpart QQQQQQ does not require monitoring of emissions. |
63.9(h)(1)-(3) | Notification of compliance status | Yes | |
63.9(h)(4) | Reserved | No | |
63.9(h)(5)-(6) | Notification of compliance status | Yes | |
63.9(i)-(j) | Adjustment to time periods or postmark deadlines for submittal and review of required communications, and change in information already provided | Yes | |
63.9(k) | Electronic submission of notifications and reports | No | Subpart QQQQQQ does not require electronic reporting. |
63.10(a)-(b) | Recordkeeping and reporting requirement applicability and general information | No | Subpart QQQQQQ establishes requirements for a report of deviations within 30 days. |
63.10(c)(1) | Additional recordkeeping requirements for sources with continuous monitoring systems | No | Subpart QQQQQQ does not require the use of continuous monitoring systems. |
63.10(c)(2)-(4) | Reserved | No | |
63.10(c)(5)-(8) | Additional recordkeeping requirements for sources with continuous monitoring systems | No | Subpart QQQQQQ does not require the use of continuous monitoring systems. |
63.10(c)(9) | Reserved | No | |
63.10(c)(10)-(15) | Additional recordkeeping requirements for sources with continuous monitoring systems | No | Subpart QQQQQQ does not require the use of continuous monitoring systems. |
63.10(d)-(f) | General reporting requirements, additional requirements for sources with continuous monitoring systems, and waiver of recordkeeping or reporting requirements | No | Subpart QQQQQQ establishes requirements for a report of deviations within 30 days. |
63.11 | Control device requirements for flares and work practice requirements for monitoring leaks | No | Subpart QQQQQQ does not require flares and does not require monitoring for leaks. |
63.12 | State authorities and delegations | Yes | |
63.13 | Addresses of state air pollution control agencies and EPA Regional Offices | Yes | |
63.14 | Incorporations by Reference | Yes | |
63.15 | Availability of information and confidentiality | Yes | |
63.16 | Requirements for Performance Track member facilities | Yes |
[72 FR 38915, July 16, 2007, as amended at 73 FR 15929, Mar. 26, 2008; 88 FR 14288, March 8, 2023]
Source: 72 FR 38915, July 16, 2007, unless otherwise noted.
READ MORESHOW LESS
['Air Programs']
['Hazardous Air Pollutants']
Load More
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2024 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.