['Air Programs']
['Hazardous Air Pollutants']
02/27/2022
...
Table 1 to Subpart LLLLLL of Part 63 - Applicability of General Provisions to Subpart LLLLLL
Citation | Subject | Applies to subpart LLLLLL? | Explanation |
---|---|---|---|
63.1(a)(1), (a)(2), (a)(3), (a)(4), (a)(6), (a)(10)-(a)(12) (b)(1), (b)(3), (c)(1), (c)(2), (c)(5), (e) | Applicability | Yes | |
63.1(a)(5), (a)(7)-(a)(9), (b)(2), (c)(3), (c)(4), (d) | Reserved | No | |
63.2 | Definitions | Yes | |
63.3 | Units and Abbreviations | Yes | |
63.4 | Prohibited Activities and Circumvention | Yes | |
63.5 | Preconstruction Review and Notification Requirements | No | |
63.6(a), (b)(1)-(b)(5), (b)(7), (c)(1), (c)(2), (c)(5), (e)(1), (e)(3)(i), (e)(3)(iii)-(e)(3)(ix), (f) (g), (i), (j) | Compliance with Standards and Maintenance Requirements | Yes | Subpart LLLLLL requires new and existing sources to comply with requirements for startups, shutdowns, and malfunctions in §63.6(e)(3). |
63.6(b)(6), (c)(3), (c)(4), (d), (e)(2), (e)(3)(ii), (h)(3), (h)(5)(iv) | Reserved | No | |
63.6(h)(1)-(h)(4), (h)(5)(i)-(h)(5)(iii), (h)(6)-(h)(9) | No | Subpart LLLLLL does not include opacity or visible emissions standards or require a continuous opacity monitoring system. | |
63.7(a), (e), (f), (g), (h) | Performance Testing Requirements | Yes/No | Subpart LLLLLL requires performance tests for new and existing sources; a test for an existing source is not required if a prior test meets the conditions in §63.11395(h). |
63.7(b), (c) | Yes/No | Requirements for notification of performance test and for quality assurance program apply to new sources but not existing sources. | |
63.8(a)(1), (a)(2), (b), (c)(1)-(c)(3), (f)(1)-(5) | Monitoring Requirements | Yes | |
63.8(a)(3) | Reserved | No | |
63.8(a)(4) | Yes | Requirements apply to new sources if flares are the selected control option. | |
63.8(c)(4)-(c)(8), (d), (e), (f)(6), (g) | Yes | Requirements apply to new sources but not to existing sources. | |
63.9(a), (b)(1), (b)(5), (c), (d), (i), (j) | Notification Requirements | Yes | |
63.9(e) | Yes/No | Notification of performance test is required for new area sources. | |
63.9(b)(2) | Yes | Initial notification of applicability is required for new and existing area sources. | |
63.9(b)(3), (h)(4) | Reserved | No | |
63.9(b)(4), (h)(5) | No | ||
63.9(f), (g) | No | Subpart LLLLLL does not require a continuous opacity monitoring system or continuous emissions monitoring system. | |
63.9(h)(1)-(h)(3), (h)(6) | Yes | Notification of compliance status is required for new and existing area sources. | |
63.10(a) | Recordkeeping Requirements | Yes | |
63.10(b)(1) | Yes/No | Record retention requirement applies to new area sources but not existing area sources. Subpart LLLLLL establishes 2-year retention period for existing area sources. | |
63.10(b)(2) | Yes | Recordkeeping requirements for startups, shutdowns, and malfunctions apply to new and existing area sources. | |
63.10(b)(3) | Yes | Recordkeeping requirements for applicability determinations apply to new area sources. | |
63.10(c)(1), (c)(5)-(c)(14) | Yes/No | Recordkeeping requirements for continuous parameter monitoring systems apply to new sources but not existing sources. | |
63.10(c)(2)-(c)(4), (c)(9) | Reserved | No | |
63.10(d)(1), (d)(4), (e)(1), (e)(2), (f) | Reporting Requirements | Yes | |
63.10(d)(2) | Yes | Report of performance test results applies to each area source required to conduct a performance test. | |
63.10(d)(3) | No | Subpart LLLLLL does not include opacity or visible emissions limits. | |
63.10(d)(5) | Yes | Requirements for startup, shutdown, and malfunction reports apply to new and existing area sources. | |
(e)(1)-(e)(2), (e)(4) | No | Subpart LLLLLL does not require a continuous emissions monitoring system or continuous opacity monitoring system. | |
63.10(e)(3) | Yes/No | Semiannual reporting requirements for excess emissions and parameter monitoring exceedances apply to new area sources but not existing area sources. | |
63.11 | Control Device Requirements | Yes | Requirements apply to new sources if flares are the selected control option. |
63.12 | State Authorities and Delegations | Yes | |
63.13 | Addresses | Yes | |
63.14 | Incorporations by Reference | Yes | |
63.15 | Availability of Information and Confidentiality | Yes | |
63.16 | Performance Track Provisions. | Yes |
Source: 72 FR 38899, July 16, 2007, unless otherwise noted.
['Air Programs']
['Hazardous Air Pollutants']
Load More
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2024 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.