02/27/2022
...
Table 1 to Subpart JJJJ of Part 63 - Operating Limits if Using Add-On Control Devices and Capture System
If you are required to comply with operating limits by §63.3321, you must comply with the applicable operating limits in the following table:
For the following device: | You must meet the following operating limit: | And you must demonstrate continuous compliance with operating limits by: |
---|---|---|
1. Thermal oxidizer | a. The average combustion temperature in any 3-hour period must not fall more than 50°F below the combustion temperature limit established according to §63.3360(e)(3)(i) | i. Collecting the combustion temperature data according to §63.3350(e)(10); ii. Reducing the data to 3-hour block averages; and iii. Maintain the 3-hour average combustion temperature at or above the temperature limit. |
2. Catalytic oxidizer | a. The average temperature at the inlet to the catalyst bed in any 3-hour period must not fall more than 50 degrees Fahrenheit below the combustion temperature limit established according to §63.3360(e)(3)(ii) | i. Collecting the catalyst bed inlet temperature data according to §63.3350(e)(10); ii. Reducing the data to 3-hour block averages; and iii. Maintain the 3-hour average catalyst bed inlet temperature at or above the temperature limit. |
? | b. The temperature rise across the catalyst bed must not fall below 80 percent of the limit established according to §63.3360(e)(3)(ii), provided that the minimum temperature is always 50 degrees Fahrenheit above the catalyst's ignition temperature | i. Collecting the catalyst bed inlet and outlet temperature data according to §63.3350(e)(10); ii. Reducing the data to 3-hour block averages; and iii. Maintain the 3-hour average temperature rise across the catalyst bed at or above the limit, and maintain the minimum temperature at least 50 degrees Fahrenheit above the catalyst's ignition temperature |
3. Emission capture system | Submit monitoring plan to the Administrator that identifies operating parameters to be monitored according to §63.3350(f) | Conduct monitoring according to the plan (§63.3350(f)(3)). |
Table 2 to Subpart JJJJ of Part 63 - Applicability of 40 CFR Part 63 General Provisions to Subpart JJJJ
You must comply with the applicable General Provisions requirements according to the following table:
General provisions reference | Applicable to subpart JJJJ | Explanation |
---|---|---|
§63.1(a)(1)-(4) | Yes | |
§63.1(a)(5) | No | Reserved. |
§63.1(a)(6)-(8) | Yes | |
§63.1(a)(9) | No | Reserved. |
§63.1(a)(10)-(14) | Yes | |
§63.1(b)(1) | No | Subpart JJJJ specifies applicability. |
§63.1(b)(2)-(3) | Yes | |
§63.1(c)(1) | Yes | |
§63.1(c)(2) | No | Area sources are not subject to emission standards of subpart JJJJ. |
§63.1(c)(3) | No | Reserved. |
§63.1(c)(4) | Yes | |
§63.1(c)(5) | Yes | |
§63.1(c)(6) | Yes | |
§63.1(d) | No | Reserved. |
§63.1(e) | Yes | |
§63.2 | Yes | Additional definitions in subpart JJJJ. |
§63.3(a)-(c) | Yes | |
§63.4(a)(1)-(3) | Yes | |
§63.4(a)(4) | No | Reserved. |
§63.4(a)(5) | Yes | |
§63.4(b)-(c) | Yes | |
§63.5(a)(1)-(2) | Yes | |
§63.5(b)(1) | Yes | |
§63.5(b)(2) | No | Reserved. |
§63.5(b)(3)-(6) | Yes | |
§63.5(c) | No | Reserved. |
§63.5(d) | Yes | |
§63.5(e) | Yes | |
§63.5(f) | Yes | |
§63.6(a) | Yes | Applies only when capture and control system is used to comply with the standard. |
§63.6(b)(1)-(5) | No | §63.3330 specifies compliance dates. |
§63.6(b)(6) | No | Reserved. |
§63.6(b)(7) | Yes | |
§63.6(c)(1)-(2) | Yes | |
§63.6(c)(3)-(4) | No | Reserved. |
§63.6(c)(5) | Yes | |
§63.6(d) | No | Reserved. |
§63.6(e)(1)(i) | Depends, see explanation | No, for new or reconstructed sources which commenced construction or reconstruction after September 19, 2019, see §63.3340(a) for general duty requirement. Yes, for all other affected sources before July 9, 2021, and No thereafter, see §63.3340(a) for general duty requirement. |
§63.6(e)(1)(ii) | Depends, see explanation | No, for new or reconstructed sources which commenced construction or reconstruction after September 19, 2019. Yes, for all other affected sources before July 9, 2021, and No thereafter. |
§63.6(e)(1)(iii) | Yes | |
§63.6(e)(2) | No | Reserved. |
§63.6(e)(3) | Depends, see explanation | No, for new or reconstructed sources which commenced construction or reconstruction after September 19, 2019. Yes, for all other affected sources before July 9, 2021, and No thereafter. |
§63.6(f)(1) | Depends, see explanation | No, for new or reconstructed sources which commenced construction or reconstruction after September 19, 2019. Yes, for all other affected sources before July 9, 2021, and No thereafter. |
§63.6(f)(2)-(3) | Yes | |
§63.6(g) | Yes | |
§63.6(h) | No | Subpart JJJJ does not require continuous opacity monitoring systems (COMS). |
§63.6(i)(1)-(14) | Yes | |
§63.6(i)(15) | No | Reserved. |
§63.6(i)(16) | Yes | |
§63.6(j) | Yes | |
§63.7(a)-(d) | Yes | |
§63.7(e)(1) | No | See §63.3360(e)(2). |
§63.7(e)(2)-(3) | Yes | |
§63.7(f)-(h) | Yes | |
§63.8(a)(1)-(2) | Yes | |
§63.8(a)(3) | No | Reserved. |
§63.8(a)(4) | No | Subpart JJJJ does not have monitoring requirements for flares. |
§63.8(b) | Yes | |
§63.8(c)(1) and §63.8(c)(1)(i) | Depends, see explanation | No, for new or reconstructed sources which commenced construction or reconstruction after September 19, 2019, see §63.3340(a) for general duty requirement. Yes, for all other affected sources before July 9, 2021, and No thereafter, see §63.3340(a) for general duty requirement. |
§63.8(c)(1)(ii) | Yes | §63.8(c)(1)(ii) only applies if you use capture and control systems. |
§63.8(c)(1)(iii) | Depends, see explanation | No, for new or reconstructed sources which commenced construction or reconstruction after September 19, 2019. Yes, for all other affected sources before July 9, 2021, and No thereafter. |
§63.8(c)(2)-(3) | Yes | See §63.3350(e)(10)(iv) for temperature sensor validation procedures |
§63.8(c)(4) | No | §63.3350 specifies the requirements for the operation of CMS for capture systems and add-on control devices at sources using these to comply. |
§63.8(c)(5) | No | Subpart JJJJ does not require COMS. |
§63.8(c)(6)-(8) | Yes | Provisions for COMS are not applicable. |
§63.8(d)(1)-(2) | Yes | Refer to §63.3350(e)(5) for CPMS quality control procedures to be included in the quality control program. |
§63.8(d)(3) | No | §63.3350(e)(5) specifies the program of corrective action. |
§63.8(e)-(f) | Yes | §63.8(e)(2) does not apply to CPMS. §63.8(f)(6) only applies if you use CEMS. |
§63.8(g) | Yes | Only applies if you use CEMS. |
§63.9(a) | Yes | |
§63.9(b)(1) | Yes | |
§63.9(b)(2) | Yes | Except §63.3400(b)(1) requires submittal of initial notification for existing affected sources no later than 1 year before compliance date. |
§63.9(b)(3)-(5) | Yes | |
§63.9(c)-(e) | Yes | |
§63.9(f) | No | Subpart JJJJ does not require opacity and visible emissions observations. |
§63.9(g) | Yes | Provisions for COMS are not applicable. |
§63.9(h)(1)-(3) | Yes | |
§63.9(h)(4) | No | Reserved. |
§63.9(h)(5)-(6) | Yes | |
§63.9(i) | Yes | |
§63.9(j) | Yes | |
§63.9(k) | Yes | Only as specified in §63.9(j). |
§63.10(a) | Yes | |
§63.10(b)(1) | Yes | |
§63.10(b)(2)(i) | Depends, see explanation | No, for new or reconstructed sources which commenced construction or reconstruction after September 19, 2019. Yes, for all other affected sources before July 9, 2021, and No thereafter. |
§63.10(b)(2)(ii) | No | See §63.3410 for recordkeeping of relevant information. |
§63.10(b)(2)(iii) | Yes | §63.10(b)(2)(iii) only applies if you use a capture and control system. |
§63.10(b)(2)(iv)-(v) | Depends, see explanation | No, for new or reconstructed sources which commenced construction or reconstruction after September 19, 2019. Yes, for all other affected sources before July 9, 2021, and No thereafter. |
§63.10(b)(2)(vi)-(xiv) | Yes | |
§63.10(b)(3) | Yes | |
§63.10(c)(1) | Yes | |
§63.10(c)(2)-(4) | No | Reserved. |
§63.10(c)(5)-(8) | Yes | |
§63.10(c)(9) | No | Reserved. |
§63.10(c)(10)-(14) | Yes | |
§63.10(c)(15) | Depends, see explanation | No, for new or reconstructed sources which commenced construction or reconstruction after September 19, 2019. Yes, for all other affected sources before July 9, 2021, and No thereafter. |
§63.10(d)(1)-(2) | Yes | |
§63.10(d)(3) | No | Subpart JJJJ does not require opacity and visible emissions observations. |
§63.10(d)(4) | Yes | |
§63.10(d)(5)(i) | Depends, see explanation | No, for new or reconstructed sources which commenced construction or reconstruction after September 19, 2019. Yes, for all other affected sources before July 9, 2021, and No thereafter. See §63.3400(c) for malfunction reporting requirements. |
§63.10(d)(5)(ii) | Depends, see explanation | No, for new or reconstructed sources which commenced construction or reconstruction after September 19, 2019. Yes, for all other affected sources before July 9, 2021, and No thereafter. See §63.3400(c) for malfunction reporting requirements. |
§63.10(e)(1)-(2) | Yes | Provisions for COMS are not applicable. |
§63.10(e)(3)-(4) | No | Subpart JJJJ does not require opacity and visible emissions observations. |
§63.10(f) | Yes | |
§63.11 | No | Subpart JJJJ does not specify use of flares for compliance. |
§63.12 | Yes | |
§63.13 | Yes | |
§63.14 | Yes | Subpart JJJJ includes provisions for alternative ASME and ASTM test methods that are incorporated by reference. |
§63.15 | Yes | |
§63.16 | Yes |
[85 FR 73905, Nov. 19, 2020]
Source: 69 FR 22623, Apr. 26, 2004, unless otherwise noted.
READ MORESHOW LESS
['Air Programs']
['Hazardous Air Pollutants']
Load More
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.