Table 1 to Subpart EEEE of Part 60 - Emission Limitations
As stated in §60.2915, you must comply with the following:
For the air pollutant | You must meet this emission
limitation a | Using this averaging time | And determining
compliance using this method |
---|---|---|---|
a All emission limitations (except for opacity) are measured at 7 percent oxygen, dry basis at standard conditions. b Calculated each hour as the average of the previous 12 operating hours. | |||
1. Cadmium | 18 micrograms per dry standard cubic meter | 3-run average (1 hour minimum sample time per run) | Method 29 of appendix A of this part. |
2. Carbon monoxide | 40 parts per million by dry volume | 3-run average (1 hour minimum sample time per run during performance test), and 12-hour rolling averages measured using CEMS. b | Method 10, 10A, or 10B of appendix A of this part and CEMS. |
3. Dioxins/furans (total basis) | 33 nanograms per dry standard cubic meter | 3-run average (1 hour minimum sample meter time per run) | Method 23 of appendix A of this part. |
4. Hydrogen chloride | 15 parts per million by dry volume | 3-run average (1 hour minimum sample time per run) | Method 26A of appendix A of this part. |
5. Lead | 226 micrograms per dry standard cubic meter | 3-run average (1 hour minimum sample time per run) | Method 29 of appendix A of this part. |
6. Mercury | 74 micrograms per dry standard cubic meter | 3-run average (1 hour minimum sample time per run) | Method 29 of appendix A of this part. |
7. Opacity | 10 percent | 6-minute average (observe over three 1-hour test runs; i.e., thirty 6-minute averages) | Method 9 of appendix A of this part. |
8. Oxides of nitrogen | 103 parts per million by dry volume | 3-run average (1 hour minimum sample time per run) | Method 7, 7A, 7C, 7D, or 7E of appendix A of this part, or ANSI/ASME PTC 19.10-1981 (IBR, see §60.17(h)) in lieu of Methods 7 and 7C only. |
9. Particulate matter | 0.013 grains per dry standard cubic foot | 3-run average (1 hour minimum sample time per run) | Method 5 or 29 of appendix A of this part. |
10. Sulfur dioxide | 3.1 parts per million by dry volume | 3-run average (1 hour minimum sample time per run) | Method 6 or 6C of appendix A of this part, or ANSI/ASME PTC 19.10-1981 (IBR, see §60.17(h)) in lieu of Method 6 only. |
Table 2 to Subpart EEEE of Part 60 - Operating Limits for Incinerators and Wet Scrubbers
As stated in §60.2916, you must comply with the following:
For these operating
parameters | You must establish these operating limits | And monitoring using these minimum frequencies | ||
---|---|---|---|---|
Data measurement | Data recording | Averaging time | ||
a Calculated each hour as the average of the previous 3 operating hours. | ||||
1. Charge rate | Maximum charge rate | Continuous | Every hour | Daily for batch units. 3-hour rolling for continuous and intermittent units a. |
2. Pressure drop across the wet scrubber or amperage to wet scrubber | Minimum pressure drop or amperage | Continuous | Every 15 minutes | 3-hour rolling a. |
3. Scrubber liquor flow rate | Minimum flow rate | Continuous | Every 15 minutes | 3-hour rolling a. |
4. Scrubber liquor pH | Minimum pH | Continuous | Every 15 minutes | 3-hour rolling a. |
Table 3 to Subpart EEEE of Part 60 - Requirements for Continuous Emission Monitoring Systems (CEMS)
As stated in §60.2940, you must comply with the following:
For the following
pollutants | Use the following span values for your CEMS | Use the following performance specifications (P.S.) in appendix B of this part for your CEMS | If needed to meet minimum data requirements, use the following alternate methods in appendix A of this part to collect data |
---|---|---|---|
1. Carbon Monoxide | 125 percent of the maximum hourly potential carbon monoxide emissions of the waste combustion unit | P.S.4A | Method 10. |
2. Oxygen | 25 percent oxygen | P.S.3 | Method 3A or 3B, or ANSI/ASME PTC 19.10-1981 (IBR, see §60.17(h)) in lieu of Method 3B only. |
Table 4 to Subpart EEEE of Part 60 - Summary of Reporting Requirements
As stated in §60.2951, you must comply with the following:
Report | Due date | Contents | Reference |
---|---|---|---|
Note: This table is only a summary, see the referenced sections of the rule for the complete requirements. | |||
1. Preconstruction report | a. Prior to commencing construction | i. Statement of intent to construct;
ii. Anticipated date of commencement of onstruction; | §60.2952.
§60.2952. |
iii. Documentation for siting requirements; | §60.2952. | ||
iv. Waste management plan; and | §60.2952. | ||
v. Anticipated date of initial startup. | §60.2952. | ||
2. Startup notification | a. Prior to initial startup | i. Types of waste to be burned;
ii. Maximum design waste burning capacity; | §60.2953.
§60.2953. |
iii. Anticipated maximum charge rate; | §60.2953. | ||
iv. If applicable, the petition for site-specific operating limits; and | §60.2953. | ||
v. Anticipated date of initial startup. | §60.2953. | ||
3. Initial test report | a. No later than 60 days following the initial performance test | i. Complete test report for the initial performance test; and
ii. The values for the site-specific operating limits | §60.2954.
§60.2954. |
4. Annual report | a. No later than 12 months following the submission of the initial test report. Subsequent reports are to be submitted no more than 12 months following the previous report | i. Company Name and address;
ii. Statement and signature by the owner or operator; iii. Date of report; iv. Values for the operating limits; v. If no deviations or malfunctions were reported, a statement that no deviations occurred during the reporting period; | §§60.2955 and 60.2956.
§§60.2955 and 60.2956. §§60.2955 and 60.2956. §§60.2955 and 60.2956. §§60.2955 and 60.2956. |
vi. Highest and lowest recorded 12-hour averages, as applicable, for carbon monoxide emissions and highest and lowest recorded 3-hour averages, as applicable, for each operating parameter recorded for the calendar year being reported; | §§60.2955 and 60.2956. | ||
vii. Information for deviations or malfunctions recorded under §60.2949(b)(6) and (c) through (e); | §§60.2955 and 60.2956. | ||
viii. If a performance test was conducted during the reporting period, the results of the test; | §§60.2955 and 60.2956. | ||
ix. If a performance test was not conducted during the reporting period, a statement that the requirements of §60.2934 (a) or (b) were met; and | §§60.2955 and 60.2956. | ||
x. Documentation of periods when all qualified OSWI unit operators were unavailable for more than 12 hours but less than 2 weeks. | §§60.2955 and 60.2956. | ||
5. Emission limitation or operating limit deviation report | a. By August 1 of that year for data collected during the first half of the calendar year. By February 1 of the following year for data collected during the second half of the calendar year | i. Dates and times of deviation;
ii. Averaged and recorded data for those dates; iii. Duration and causes of each deviation and the corrective actions taken; iv. Copy of operating limit monitoring data and any test reports; v. Dates, times, and causes for monitor downtimes incidents; vi. Whether each deviation occurred during a period of startup, shutdown, or malfunction; and | §§60.2957 and 60.2958.
§§60.2957 and 60.2958. §§60.2957 and 60.2958. §§60.2957 and 60.2958. §§60.2957 and 60.2958. §§60.2957 and 60.2958. |
vii. Dates, times, and durations of any bypass of the control device. | §§60.2957 and 60.2958. | ||
6. Qualified operator deviation notification | a. Within 10 days of deviation | i. Statement of cause of deviation;
ii. Description of efforts to have an accessible qualified operator; and | §60.2959(a)(1).
§60.2959(a)(1) |
iii. The date a qualified operator will be accessible | §60.2959(a)(1). | ||
7. Qualified operation deviation status report | a. Every 4 weeks following deviation | i. Description of efforts to have an accessible qualified operator;
ii. The date a qualified operator will be accessible; and | §60.2959(a)(2).
§60.2959(a)(2). |
iii. Request to continue operation | §60.2959(a)(2). | ||
8. Qualified operator deviation notification of resumed operation | a. Prior to resuming operation | i. Notification that you are resuming operation | §60.2959(b). |
[70 FR 74892, Dec. 16, 2005, as amended at 71 FR 67806, Nov. 24, 2006]
READ MORESHOW LESS
['Air Programs']
['Air Quality']
Load More
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2024 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.