Eleven pollutants, in four groupings, are regulated:
(a) Organics. Dioxins/furans.
(b) Metals. (1) Cadmium.
(2) Lead.
(3) Mercury.
(4) Opacity.
(5) Particulate matter.
(c) Acid gases. (1) Hydrogen chloride.
(2) Nitrogen oxides.
(3) Sulfur dioxide.
(d) Other. (1) Carbon monoxide.
(2) Fugitive ash.
(a) After the date the initial stack test and continuous emission monitoring system evaluation are required or completed (whichever is earlier), you must meet the applicable emission limits specified in the four tables of this subpart:
(1) For Class I units, see tables 2 and 3 of this subpart.
(2) For Class II units, see table 4 of this subpart.
(3) For carbon monoxide emission limits for both classes of units, see table 5 of this subpart.
(b) If your Class I municipal waste combustion unit began construction, reconstruction, or modification after June 26, 1987, then you must comply with the dioxins/furans and mercury emission limits specified in table 2 of this subpart as applicable by the later of the following two dates:
(1) One year after the effective date of State plan approval.
(2) One year after the issuance of a revised construction or operating permit, if a permit modification is required. Final compliance with the dioxins/furans limits must be achieved no later than December 6, 2005, even if the date 1 year after the issuance of a revised construction or operation permit is later than December 6, 2005.
(a) The emission limits of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or malfunction.
(b) Each startup, shutdown, or malfunction must not last for longer than 3 hours.
(c) A maximum of 3 hours of test data can be dismissed from compliance calculations during periods of startup, shutdown, or malfunction.
(d) During startup, shutdown, or malfunction periods longer than 3 hours, emissions data cannot be discarded from compliance calculations and all provisions under §60.11(d) apply.