['Waste']
['Hazardous Waste']
12/05/2025
...
SEARCH
The Washington Department of Ecology is authorized to implement the RCRA program for Washington. Washington’s regulations related to hazardous waste management are incorporated by reference into the RCRA program, as outlined in 40 CFR 272.1651. The Washington hazardous waste program contains certain provisions that are beyond the scope of the Federal program. The following provisions are:
- Provision for satellite accumulation requirements whereby the State can require additional management requirements on a case-by-case basis, which renders the State rule more stringent than the Federal rule.
- The State's Academic Laboratories Generator Standards contain more stringent requirements than the corresponding Federal rules (73 FR 72912, December 1, 2008).
- WAC 173-303-235(4)(a), (4)(b)(ii), (5)(a), and (5)(b)(ii), are more stringent because the State requires small quantity generators to obtain EPA/state identification numbers, whereas the Federal rules at 40 CFR 262.203(a) and (b)(ii) and 40 CFR 262.204(a) and (b)(2) exempt the comparable Conditionally Exempt Small Quantity Generators (CESQGs).
- WAC 173-303-235(4)(b) and (5)(b) are more stringent than 40 CFR 262.203(b) and 262.204(b) introductory paragraphs due to the State requirement for small quantity generators to complete the entire Washington State Dangerous Waste Site Identification form, whereas the Federal rules exempt CESQGs from filling in a site identification number.
- WAC 173-303-235(7)(a)(i), 235(9)(d)(i)(A) and 235(9)(d)(ii)(A) require accumulation start dates and full container dates to be attached to the containers rather than, at a minimum, be associated with them as required by 40 CFR 262.206(a)(1) and 262.208(d)(1)(i).
- Characteristic of Reactivity—On January 31, 1986 (51 FR 3782), the State received authorization for its dangerous waste identification rules including WAC 173-303-090(7) Characteristic of reactivity. On January 18, 2010 (75 FR 12989), the Federal rule at 40 CFR 261.23(a)(8) was revised to update the forbidden explosives regulation under 40 CFR 261.23 Characteristic of reactivity. The State revised the corresponding WAC 173-303-090(7)(a)(viii) but included Division 1.5 explosives (refer to the US Department of Transportation Hazardous Materials Class 1 explosives chart) not included in the Federal rule. As a result, the State's rule is more stringent than the Federal rule.
- Under 40 CFR 262.42(c)(2), the 35/45/60-day timeframes for exception reporting begin the date the waste was accepted by the initial transporter forwarding the hazardous waste from the designated facility to the alternate facility. The State rule at WAC 173-303-220(2)(e)(ii) is more stringent because it does not have a 60-day window for Medium Quantity Generators (equivalent to Federal Small Quantity Generators) to submit exception reports to the Washington State Department of Ecology.
Related information
Citations
- Washington Dangerous (Hazardous) Waste Regulations
- 40 CFR 260 – Hazardous Waste Management System: General
- 40 CFR 261 – Identification and Listing of Hazardous Waste
- 40 CFR 262 – Standards Applicable to Generators of Hazardous Waste
- 40 CFR 265 – Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities
- 40 CFR 268 – Land Disposal Restrictions
['Waste']
['Hazardous Waste']
UPGRADE TO CONTINUE READING
Load More
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2025 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.
