['Waste']
['Hazardous Waste', 'Waste Generators', 'Solid Waste']
11/08/2023
...
If an eligible academic entity makes the hazardous waste determination, pursuant to §262.11 , for unwanted material at an on-site interim status or permitted treatment, storage or disposal facility, it must comply with the following:
(a) A trained professional must accompany all unwanted material that is transferred from the laboratory(ies) to an on-site interim status or permitted treatment, storage or disposal facility.
(b) All unwanted material removed from the laboratory(ies) must be taken directly from the laboratory(ies) to the on-site interim status or permitted treatment, storage or disposal facility.
(c) The unwanted material becomes subject to the terms of the eligible academic entity's hazardous waste permit or interim status as soon as it arrives in the on-site treatment, storage or disposal facility.
(d) A trained professional must determine, pursuant to §262.11(a) through (d) , if the unwanted material is a hazardous waste within 4 calendar days of the unwanted materials' arrival at an on-site interim status or permitted treatment, storage, or disposal facility.
(e) If the unwanted material is a hazardous waste, the eligible academic entity must:
(1) Write the words “hazardous waste” on the container label that is affixed or attached to the container (or on the label that is affixed or attached to the container, if that is preferred) within 4 calendar days of arriving at the on-site interim status or permitted treatment, storage or disposal facility and before the hazardous waste may be removed from the on-site interim status or permitted treatment, storage or disposal facility, and
(2) Write the appropriate hazardous waste code(s) on the container label that is associated with the container (or on the label that is affixed or attached to the container, if that is preferred) before the hazardous waste may be treated or disposed on-site or transported off-site, and
(3) Count the hazardous waste toward the eligible academic entity's generator status, pursuant to §262.13 in the calendar month that the hazardous waste determination was made, and
(4) Manage the hazardous waste according to all applicable hazardous waste regulations.
[73 FR 72958, Dec. 1, 2008; 75 FR 79308, Dec. 20, 2010; 81 FR 85820, Nov. 28, 2016; 88 FR 54111, Aug. 9, 2023]
READ MORESHOW LESS
['Waste']
['Hazardous Waste', 'Waste Generators', 'Solid Waste']
Load More
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2024 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.