['Water Programs']
['Underground Injection Control', 'Safe Drinking Water', 'Water Quality']
05/06/2022
CFR Subpart
§146.83 Minimum criteria for siting.
§146.84 Area of review and corrective action.
§146.85 Financial responsibility.
§146.86 Injection well construction requirements.
§146.87 Logging, sampling, and testing prior to injection well operation.
§146.88 Injection well operating requirements.
§146.90 Testing and monitoring requirements.
§146.91 Reporting requirements.
§146.92 Injection well plugging.
§146.93 Post-injection site care and site closure.
§146.83 Minimum criteria for siting.
§146.84 Area of review and corrective action.
§146.85 Financial responsibility.
§146.86 Injection well construction requirements.
§146.87 Logging, sampling, and testing prior to injection well operation.
§146.88 Injection well operating requirements.
§146.90 Testing and monitoring requirements.
§146.91 Reporting requirements.
§146.92 Injection well plugging.
§146.93 Post-injection site care and site closure.
READ MORESHOW LESS
['Water Programs']
['Underground Injection Control', 'Safe Drinking Water', 'Water Quality']
Load More
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2024 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.