['Air Programs']
['Hazardous Air Pollutants']
02/27/2022
...
Reference | Applies to Subpart JJJ | Explanation |
---|---|---|
§63.1(a)(1) | Yes | §63.1312 specifies definitions in addition to or that supersede definitions in §63.2. |
§63.1(a)(2) | Yes | |
§63.1(a)(3) | Yes | §63.1311(g) through (l) and §63.160(b) identify those standards which may apply in addition to the requirements of subparts JJJ and H of this part, and specify how compliance shall be achieved. |
§63.1(a)(4) | Yes | Subpart JJJ (this table) specifies the applicability of each paragraph in subpart A to subpart JJJ. |
§63.1(a)(5) | No | [Reserved.]. |
§63.1(a)(6) | Yes | |
§63.1(a)(7)-(9) | No | [Reserved.]. |
§63.1(a)(10) | Yes | |
§63.1(a)(11) | Yes | |
§63.1(a)(12)-(14) | Yes | |
§63.1(b)(1) | No | §63.1310(a) contains specific applicability criteria. |
§63.1(b)(2) | Yes | |
§63.1(b)(3) | No | §63.1310(b) provides documentation requirements for TPPUs not considered affected sources. |
§63.1(c)(1) | Yes | Subpart JJJ (this table) specifies the applicability of each paragraph in subpart A to subpart JJJ. |
§63.1(c)(2) | No | Area sources are not subject to subpart JJJ. |
§63.1(c)(3) | No | [Reserved.]. |
§63.1(c)(4) | No | [Reserved.]. |
§63.1(c)(5) | Yes | Except that affected sources are not required to submit notifications that are not required by subpart JJJ. |
§63.1(c)(6) | Yes | |
§63.1(d) | No | [Reserved.]. |
§63.1(e) | Yes | |
§63.2 | Yes | §63.1312 specifies those subpart A definitions that apply to subpart JJJ. |
§63.3 | Yes | |
§63.4(a)(1)-(3) | Yes | |
§63.4(a)(4) | No | [Reserved.]. |
§63.4(a)(5) | Yes | |
§63.4(b) | Yes | |
§63.4(c) | Yes | |
§63.5(a)(1) | Yes | Except the terms “source” and “stationary source” should be interpreted as having the same meaning as “affected source.” |
§63.5(a)(2) | Yes | |
§63.5(b)(1) | Yes | Except §63.1310(i) defines when construction or reconstruction is subject to new source standards. |
§63.5(b)(2) | No | [Reserved.]. |
§63.5(b)(3) | Yes | |
§63.5(b)(4) | Yes | Except that the Initial Notification and §63.9(b) requirements do not apply. |
§63.5(b)(5) | Yes | |
§63.5(b)(6) | Yes | Except that §63.1310(i) defines when construction or reconstruction is subject to new source standards. |
§63.5(c) | No | [Reserved.] |
§63.5(d)(1)(i) | Yes | Except that the references to the Initial Notification and §63.9(b)(5) do not apply. |
§63.5(d)(1)(ii) | Yes | Except that §63.5(d)(1)(ii)(H) does not apply. |
§63.5(d)(1)(iii) | No | §§63.1335(e)(5) and 63.1331(a)(4) specify Notification of Compliance Status requirements. |
§63.5(d)(2) | No | |
§63.5(d)(3) | Yes | Except §63.5(d)(3)(ii) does not apply, and equipment leaks subject to §63.1331 are exempt. |
§63.5(d)(4) | Yes | |
§63.5(e) | Yes | |
§63.5(f)(1) | Yes | |
§63.5(f)(2) | Yes | Except that where §63.9(b)(2) is referred to, the owner or operator need not comply. |
§63.6(a) | Yes | |
§63.6(b)(1) | No | The dates specified in §63.1311(b) apply, instead. |
§63.6(b)(2) | No | |
§63.6(b)(3) | No | |
§63.6(b)(4) | No | |
§63.6(b)(5) | No | |
§63.6(b)(6) | No | [Reserved] |
§63.6(b)(7) | No | |
§63.6(c)(1) | Yes | Except that §63.1311 specifies the compliance date. |
§63.6(c)(2) | No | |
§63.6(c)(3) | No | [Reserved] |
§63.6(c)(4) | No | [Reserved] |
§63.6(c)(5) | Yes | |
§63.6(d) | No | [Reserved] |
§63.6(e) | Yes | Except as otherwise specified for individual paragraphs. |
§63.6(e)(1)(i) | No | See §63.1310(j)(4) for general duty requirement. |
§63.6(e)(1)(ii) | No | |
§63.6(e)(1)(iii) | Yes | |
§63.6(e)(2) | Yes | |
§63.6(e)(3) | No | |
§63.6(f)(1) | No | |
§63.6(f)(2) | Yes | Except §63.7(c), as referred to in §63.6(f)(2)(iii)(D), does not apply, and except that §63.6(f)(2)(ii) does not apply to equipment leaks subject to §63.1331. |
§63.6(f)(3) | Yes | |
§63.6(g) | Yes | |
§63.6(h) | No | Subpart JJJ does not require opacity and visible emission standards. |
§63.6(i)(1) | Yes | |
§63.6(i)(2) | Yes | |
§63.6(i)(3) | Yes | |
§63.6(i)(4)(i)(A) | Yes | |
§63.6(i)(4)(i)(B) | No | Dates are specified in §63.1311(e) and §63.1335(e)(3)(i). |
§63.6(i)(4)(ii) | No | |
§63.6(i)(5)-(14) | Yes | |
§63.6(i)(15) | No | [Reserved.]. |
§63.6(i)(16) | Yes | |
§63.6(j) | Yes | |
§63.7(a)(1) | Yes | |
§63.7(a)(2) | No | §63.1335(e)(5) specifies the submittal dates of performance test results for all emission points except equipment leaks; for equipment leaks, compliance demonstration results are reported in the Periodic Reports. |
§63.7(a)(3) | Yes | |
§63.7(b) | No | §63.1333(a)(4) specifies notification requirements. |
§63.7(c) | No | |
§63.7(d) | Yes | |
§63.7(e)(1) | No | See §63.1333(a). |
§63.7(e)(2) | Yes | |
§63.7(e)(3) | No | Subpart JJJ specifies requirements. |
§63.7(e)(4) | Yes | |
§63.7(f) | Yes | Except that §63.144(b)(5)(iii)(A) and (B) shall apply for process wastewater. Also, because a site specific test plan is not required, the notification deadline in §63.7(f)(2)(i) shall be 60 days prior to the performance test, and in §63.7(f)(3), approval or disapproval of the alternative test method shall not be tied to the site specific test plan. |
§63.7(g) | Yes | Except that the requirements in §63.1335(e)(5) shall apply instead of references to the Notification of Compliance Status report in §63.9(h). In addition, equipment leaks subject to §63.1331 are not required to conduct performance tests. |
§63.7(h) | Yes | Except §63.7(h)(4)(ii) is not applicable, because the site-specific test plans in §63.7(c)(2) are not required. |
§63.8(a)(1) | Yes | |
§63.8(a)(2) | No | |
§63.8(a)(3) | No | [Reserved] |
§63.8(a)(4) | Yes | |
§63.8(b)(1) | Yes | |
§63.8(b)(2) | No | Subpart JJJ specifies locations to conduct monitoring. |
§63.8(b)(3) | Yes | |
§63.8(c)(1) | Yes | |
§63.8(c)(1)(i) | No | |
§63.8(c)(1)(ii) | No | |
§63.8(c)(1)(iii) | No | |
§63.8(c)(2) | Yes | |
§63.8(c)(3) | Yes | |
§63.8(c)(4) | No | §63.1334 specifies monitoring frequency; not applicable to equipment leaks because §63.1331 does not require continuous monitoring systems. |
§63.8(c)(5)-(8) | No. | |
§63.8(d) | No. | |
§63.8(e) | No. | |
§63.8(f)(1)-(3) | Yes. | |
§63.8(f)(4)(i) | No | Timeframe for submitting request is specified in §63.1335(f) or (g); not applicable to equipment leaks because §63.1331 (through reference to subpart H) specifies acceptable alternative methods. |
§63.8(f)(4)(ii) | No | Contents of requests are specified in §63.1335(f) or (g). |
§63.8(f)(4)(iii) | No. | |
§63.8(f)(5)(i) | Yes. | |
§63.8(f)(5)(ii) | No. | |
§63.8(f)(5)(iii) | Yes. | |
§63.8(f)(6) | No | Subpart JJJ does not require continuous emission monitors. |
§63.8(g) | No | Data reduction procedures specified in §63.1335(d) and (h); not applicable to equipment leaks. |
§63.9(a) | Yes. | |
§63.9(b) | No | Subpart JJJ does not require an initial notification. |
§63.9(c) | Yes. | |
§63.9(d) | Yes. | |
§63.9(e) | No | §63.1333(a)(4) specifies notification deadline. |
§63.9(f) | No | Subpart JJJ does not require opacity and visible emission standards. |
§63.9(g) | No. | |
§63.9(h) | No | §63.1335(e)(5) specifies Notification of Compliance Status requirements. |
§63.9(i) | Yes. | |
§63.9(j) | Yes. | For change in major source status only. |
§63.9(k) | Yes | Only as specified in §63.9(j). |
§63.10(a) | Yes. | |
§63.10(b)(1) | No | §63.1335(a) specifies record retention requirements. |
§63.10(b)(2) | No | Subpart JJJ specifies recordkeeping requirements. |
§63.10(b)(3) | No | §63.1310(b) requires documentation of sources that are not affected sources. |
§63.10(c) | No | §63.1335 specifies recordkeeping requirements. |
§63.10(d)(1) | Yes. | |
§63.10(d)(2) | No | §63.1335(e) specifies performance test reporting requirements; not applicable to equipment leaks. |
§63.10(d)(3) | No | Subpart JJJ does not require opacity and visible emission standards. |
§63.10(d)(4) | Yes. | |
§63.10(d)(5) | No | See §63.1335(b)(1)(ii) for malfunction reporting requirements. |
§63.10(e) | No | §63.1335 specifies reporting requirements. |
§63.10(f) | Yes. | |
§63.11 | Yes | §63.11(b) specifies requirements for flares used to comply with provisions of this subpart. §63.1333(e) contains the requirements to conduct compliance demonstrations for flares subject to this subpart. §63.11(c), (d), and (e) specifies requirements for an alternative work practice for equipment leaks. |
§63.12 | Yes | Except that the authority of §63.1332(i) and the authority of §63.177 (for equipment leaks) shall not be delegated to States. |
§§63.13-63.15 | Yes. |
[66 FR 36939, July 16, 2001, as amended at 71 FR 20460, Apr. 20, 2006; 73 FR 78214, Dec. 22, 2008; 79 FR 17371, Mar. 27, 2014; 85 FR 73898, Nov. 19, 2020]
['Air Programs']
['Hazardous Air Pollutants']
Load More
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2024 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.