['Air Programs']
['Hazardous Air Pollutants']
06/04/2024
...
You must submit a(n) . . . | The report must contain . . . | You must submit the report . . . |
---|---|---|
1 The requirement for the SSM report in row 2 of this table does not apply for new or reconstructed affected sources that commenced construction or reconstruction after September 6, 2019. | ||
(1) Compliance report | The information in §63.2281(c) through (g) | Semiannually according to the requirements in §63.2281(b). |
(2) Immediate startup, shutdown, and malfunction report if you had a startup, shutdown, or malfunction during the reporting period that is not consistent with your SSMP before August 13, 2021.1 | (i) Actions taken for the event (ii) The information in §63.10(d)(5)(ii) | By fax or telephone within 2 working days after starting actions inconsistent with the plan. By letter within 7 working days after the end of the event unless you have made alternative arrangements with the permitting authority. |
(3) Performance test report | The information required in §63.7(g) | According to the requirements of §63.2281(i). |
(4) CMS performance evaluation, as required for CEMS under §63.2269(d)(2) | The information required in §63.7(g) | According to the requirements of §63.2281(j). |
[85 FR 49464, Aug. 13, 2020]
['Air Programs']
['Hazardous Air Pollutants']
Load More
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2025 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.