['Retirement Benefits']
['Pension Protection Act (PPA)']
05/18/2022
...
Pension Protection Act of 2006
Title XIV Tariff Provisions
Subtitle A Temporary Duty Suspensions and Reductions
Chapter 1 New Duty Suspension and Reductions
(a) WATERTUBE BOILERS.-Subchapter II of chapter 99 is amended by inserting in numerical sequence the following new heading:
"9902.84.01 | Watertube boilers with a steam production exceeding 45 t per hour, for use in nuclear facilities entered after 12/31/2008 and on or before 12/31/2010 if the contract for the purchase of such watertube boilers was entered into on or before 7/31/2006 (provided for in subheading 8402.11.00) | Free | No change | No change | On or before 12/31/2010" |
(b) REACTOR VESSEL HEADS.-Subchapter II of chapter 99 is amended by inserting in numerical sequence the following new heading:
"9902.84.04 | Reactor vessel heads and pressurizers for nuclear reactors entered after 12/ 31/2008 and on or before 12/31/2010 if the contract for the purchase of such heads and pressurizers was entered into on or before 7/31/2006 (provided for in subheading 8401.40.00) | Free | No change | No change | On or before 12/31/2010". |
READ MORESHOW LESS
['Retirement Benefits']
['Pension Protection Act (PPA)']
Load More
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2025 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.