Compliance Just Got Easier: Stay ahead of regulatory changes with instant notifications on updates that matter.
['Specialized Industries']
['Mining']
04/15/2026
§75.1103-10 Fire suppression systems; additional requirements.
For each conveyor belt flight exceeding 2,000 feet in length, where the average air velocity along the belt haulage entry exceeds 100 feet per minute, an additional cache of the materials specified in §75.1103–9(a)(1), (2), and (3) shall be provided. The additional cache may be stored at the locations specified in §75.1103, or at some other strategic location readily accessible to the conveyor belt flight.
[73 FR 80616 Dec. 31, 2008]
['Specialized Industries']
['Mining']
UPGRADE TO CONTINUE READING
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2026 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.
