['Specialized Industries']
['Mining']
10/22/2024
...
(a) Application. Requests for an approval or extension of approval shall be sent to: U.S. Department of Labor, Mine Safety and Health Administration, Approval and Certification Center, 765 Technology Drive, Triadelphia, WV 26059.
(b) Fees. Fees calculated in accordance with Part 5 of this title shall be submitted in accordance with §5.40.
(c) Original approval. Each application for approval of a product shall include—
(1) A brief description of the product;
(2) The documentation specified in the appropriate subpart of this part;
(3) The name, address, and telephone number of the applicant's representative responsible for answering any questions regarding the application;
(4) If appropriate, a statement indicating whether, in the applicant's opinion, testing is required. If testing is not proposed, the applicant shall explain the reasons for not testing; and
(5) If appropriate, the place and date for product testing.
(d) Subsequent approval of a similar product. Each application for a product similar to one for which the applicant already holds an approval shall include—
(1) The approval number for the product which most closely resembles the new one;
(2) The information specified in paragraph (c) of this section for the new product, except that any document which is the same as one listed by MSHA in prior approvals need not be submitted, but shall be noted in the application;
(3) An explanation of any change from the existing approval; and
(4) A statement as to whether, in the applicant's opinion, the change requires product testing. If testing is not proposed, the applicant shall explain the reasons for not testing.
(e) Extension of an approval. Any change in the approved product from the documentation on file at MSHA that affects the technical requirements of this part shall be submitted to MSHA for approval prior to implementing the change. Each application for an extension of approval shall include—
(1) The MSHA-assigned approval number for the product for which the extension is sought;
(2) A brief description of the proposed change to the previously approved product;
(3) Drawings and specifications which show the change in detail;
(4) A statement as to whether, in the applicant's opinion, the change requires product testing. If testing is not proposed, the applicant shall explain the reasons for not testing;
(5) The place and date for product testing, if testing will be conducted; and
(6) The name, address, and telephone number of the applicant's representative responsible for answering any questions regarding the application.
(f) Certification statement.(1) Each application for original approval, subsequent approval, or extension of approval of a product shall include a certification by the applicant that the product meets the design portion of the technical requirements, as specified in the appropriate subpart, and that the applicant will perform the quality assurance functions specified in §7.7. For a subsequent approval or extension of approval, the applicant shall also certify that the proposed change cited in the application is the only change that affects the technical requirements.
(2) After completion of the required product testing, the applicant shall certify that the product has been tested and meets the performance portion of the technical requirements, as specified in the appropriate subpart.
(3) All certification statements shall be signed by an authorized company official.
[73 FR 52210 Sept. 9, 2008]
READ MORESHOW LESS
['Specialized Industries']
['Mining']
Load More
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2024 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.