(a) Each piece of equipment within a process unit that can reasonably be expected to contain equipment in organic HAP service is presumed to be in organic HAP service unless an owner or operator demonstrates that the piece of equipment is not in organic HAP service. For a piece of equipment to be considered not in organic HAP service, it must be determined that the percent organic HAP content can be reasonably expected not to exceed the percent by weight control applicability criteria specified in §63.1103 for an affected source on an annual average basis. For purposes of determining the percent organic HAP content of the process fluid that is contained in or contacts equipment, Method 18 of 40 CFR part 60, appendix A shall be used. For purposes of determining the percent organic HAP content of the process fluid that is contained in or contacts equipment for the ethylene production affected sources, the following methods shall be used for equipment: For equipment in gas and vapor service, as that term is defined in Subpart UU of this part, shall use Method 18 of 40 CFR part 60, appendix A; for equipment in liquid service, as that term is defined in Subpart UU of this part, shall use a combination of Method 18 of 40 CFR part 60, appendix A, SW-846-8260B (incorporated by reference, see §63.14); and SW-846-8270D (incorporated by reference, see §63.14), as appropriate.
(b) An owner or operator may use good engineering judgment rather than the procedures in paragraph (a) of this section to determine that the percent organic HAP content does not exceed the percent by weight control applicability criteria specified in §63.1103 for an affected source. When an owner or operator and the Administrator do not agree on whether a piece of equipment is not in organic HAP service, however, the procedures in paragraph (a) of this section shall be used to resolve the disagreement.
(c) If an owner or operator determines that a piece of equipment is in organic HAP service, the determination can be revised after following the procedures in paragraph (a) of this section, or by documenting that a change in the process or raw materials no longer causes the equipment to be in organic HAP service.
(d) Samples used in determining the percent organic HAP content shall be representative of the process fluid that is contained in or contacts the equipment.
(e) Requirements for pressure relief devices. For acrylic and modacrylic fiber production affected sources and polycarbonate production affected sources, except as specified in paragraph (e)(4) of this section, the owner or operator must comply with the requirements specified in paragraphs (e)(1) and (2) of this section for pressure relief devices in organic HAP gas or vapor service. Except as specified in paragraph (e)(4) of this section, the owner or operator of an acrylic and modacrylic fiber production affected source or polycarbonate production affected source must also comply with the requirements specified in paragraph (e)(3) of this section for all pressure relief devices in organic HAP service.
(1) Operating requirements. Except during a pressure release event, operate each pressure relief device in organic HAP gas or vapor service with an instrument reading of less than 500 ppm above background as described in Method 21 of 40 CFR part 60, Appendix A.
(2) Pressure release requirements. For pressure relief devices in organic HAP gas or vapor service, the owner or operator must comply with either paragraph (e)(2)(i) or (ii) of this section following a pressure release, as applicable.
(i) If the pressure relief device does not consist of or include a rupture disk, conduct instrument monitoring, as described in Method 21 of 40 CFR part 60, Appendix A, no later than 5 calendar days after the pressure relief device returns to organic HAP service following a pressure release to verify that the pressure relief device is operating with an instrument reading of less than 500 ppm above background, except as provided in §63.171 or §63.1024(d), as applicable.
(ii) If the pressure relief device consists of or includes a rupture disk, install a replacement disk as soon as practicable after a pressure release, but no later than 5 calendar days after the pressure release, except as provided in §63.171 or §63.1024(d), as applicable.
(3) Pressure release management. Except as specified in paragraph (e)(4) of this section, emissions of organic HAP to the atmosphere from pressure relief devices in organic HAP service are prohibited, and the owner or operator must comply with the requirements specified in paragraphs (e)(3)(i) and (ii) of this section for all pressure relief devices in organic HAP service.
(i) The owner or operator must equip each pressure relief device in organic HAP service with a device(s) or parameter monitoring system that is capable of:
(A) Identifying the pressure release;
(B) Recording the time and duration of each pressure release; and
(C) Notifying operators immediately that a pressure release is occurring. The device or monitoring system may be either specific to the pressure relief device itself or may be associated with the process system or piping, sufficient to indicate a pressure release to the atmosphere. Examples of these types of devices and systems include, but are not limited to, a rupture disk indicator, magnetic sensor, motion detector on the pressure relief valve stem, flow monitor, or pressure monitor.
(ii) If any pressure relief device in organic HAP service releases to atmosphere as a result of a pressure release event, the owner or operator must calculate the quantity of organic HAP released during each pressure release event and report this quantity as required in paragraph (g) of this section. Calculations may be based on data from the pressure relief device monitoring alone or in combination with process parameter monitoring data and process knowledge.
(4) Pressure relief devices routed to a control device, process, fuel gas system, or drain system. If a pressure relief device in organic HAP service is designed and operated to route all HAP emissions from pressure releases through a closed vent system to a control device or to a process, fuel gas system, or drain system, the owner or operator is not required to comply with paragraphs (e)(1), (2), or (3) (if applicable) of this section for that pressure relief device. The fuel gas system or closed vent system and control device (if applicable) must meet the requirements of §63.172 or §63.1034, as applicable (except that the term “pressure relief devices” shall apply instead of the term “equipment leaks” in §63.1034). The drain system (if applicable) must meet the requirements of §63.136.
(f) Recordkeeping requirements. For acrylic and modacrylic fiber production affected sources and polycarbonate production affected sources, for pressure relief devices in organic HAP service, keep records of the information specified in paragraphs (f)(1) through (5) of this section, as applicable.
(1) A list of identification numbers for pressure relief devices that vent to a fuel gas system, process, drain system, or closed-vent system and control device, under the provisions in paragraph (e)(4) of this section.
(2) A list of identification numbers for pressure relief devices subject to the provisions in paragraph (e)(1) of this section.
(3) A list of identification numbers for pressure relief devices equipped with rupture disks, under the provisions in paragraph (e)(2)(ii) of this section.
(4) The dates and results of the monitoring following a pressure release for each pressure relief device subject to the provisions in paragraphs (e)(1) and (2) of this section. The results shall include:
(i) The background level measured during each compliance test.
(ii) The maximum instrument reading measured at each piece of equipment during each compliance test.
(5) For pressure relief devices in organic HAP service subject to paragraph (e)(3) of this section, keep records of each pressure release to the atmosphere, including the following information:
(i) The source, nature, and cause of the pressure release.
(ii) The date, time, and duration of the pressure release.
(iii) An estimate of the quantity of total HAP emitted during the pressure release and the calculations used for determining this quantity.
(iv) The actions taken to prevent this pressure release.
(v) The measures adopted to prevent future such pressure releases.
(g) Periodic reports. For owners or operators of an acrylic and modacrylic fiber production affected source or polycarbonate production affected source subject to paragraph (e) of this section, Periodic Reports must include the information specified in paragraphs (g)(1) through (3) of this section for pressure relief devices in organic HAP service.
(1) For pressure relief devices in organic HAP service subject to paragraph (e) of this section, report confirmation that all monitoring to show compliance was conducted within the reporting period.
(2) For pressure relief devices in organic HAP gas or vapor service subject to paragraph (e)(2) of this section, report any instrument reading of 500 ppm above background or greater, more than 5 days after the relief device returns to organic HAP gas or vapor service after a pressure release.
(3) For pressure relief devices in organic HAP service subject to paragraph (e)(3) of this section, report each pressure release to the atmosphere, including the following information:
(i) The source, nature, and cause of the pressure release.
(ii) The date, time, and duration of the pressure release.
(iii) An estimate of the quantity of total HAP emitted during the pressure release and the method used for determining this quantity.
(iv) The actions taken to prevent this pressure release.
(v) The measures adopted to prevent future such pressure releases.
(h) Ethylene production pressure release requirements. Beginning no later than the compliance dates specified in §63.1102(c), except as specified in paragraph (h)(4) of this section, owners or operators of ethylene production affected sources must comply with the requirements specified in paragraphs (h)(1) and (2) of this section for pressure relief devices, such as relief valves or rupture disks, in organic HAP gas or vapor service instead of the pressure relief device requirements of §63.1030 of subpart UU or §63.165 of subpart H. Beginning no later than the compliance dates specified in §63.1102(c), except as specified in paragraphs (h)(4) and (5) of this section, the owner or operator must also comply with the requirements specified in paragraphs (h)(3) and (6) through (8) of this section for all pressure relief devices.
(1) Operating requirements. Except during a pressure release, operate each pressure relief device in organic HAP gas or vapor service with an instrument reading of less than 500 ppm above background as measured by the method in §63.1023(b) of subpart UU or §63.180(b) and (c) of subpart H.
(2) Pressure release requirements. For pressure relief devices in organic HAP gas or vapor service, the owner or operator must comply with the applicable requirements in paragraphs (h)(2)(i) through (iii) of this section following a pressure release.
(i) If the pressure relief device does not consist of or include a rupture disk, conduct instrument monitoring, as specified in §63.1023(b) of subpart UU or §63.180(b) and (c) of subpart H, no later than 5 calendar days after the pressure relief device returns to organic HAP gas or vapor service following a pressure release to verify that the pressure relief device is operating with an instrument reading of less than 500 ppm.
(ii) If the pressure relief device includes a rupture disk, either comply with the requirements in paragraph (h)(2)(i) of this section (and do not replace the rupture disk) or install a replacement disk as soon as practicable after a pressure release, but no later than 5 calendar days after the pressure release.
(iii) If the pressure relief device consists only of a rupture disk, install a replacement disk as soon as practicable after a pressure release, but no later than 5 calendar days after the pressure release. The owner or operator must not initiate startup of the equipment served by the rupture disk until the rupture disc is replaced.
(3) Pressure release management. Except as specified in paragraphs (h)(4) and (5) of this section, the owner or operator must comply with the requirements specified in paragraphs (h)(3)(i) through (v) of this section for all pressure relief devices in organic HAP service.
(i) The owner or operator must equip each affected pressure relief device with a device(s) or use a monitoring system that is capable of:
(A) Identifying the pressure release;
(B) Recording the time and duration of each pressure release; and
(C) Notifying operators immediately that a pressure release is occurring. The device or monitoring system must be either specific to the pressure relief device itself or must be associated with the process system or piping, sufficient to indicate a pressure release to the atmosphere. Examples of these types of devices and systems include, but are not limited to, a rupture disk indicator, magnetic sensor, motion detector on the pressure relief valve stem, flow monitor, or pressure monitor.
(ii) The owner or operator must apply at least three redundant prevention measures to each affected pressure relief device and document these measures. Examples of prevention measures include:
(A) Flow, temperature, liquid level and pressure indicators with deadman switches, monitors, or automatic actuators. Independent, non-duplicative systems within this category count as separate redundant prevention measures.
(B) Documented routine inspection and maintenance programs and/or operator training (maintenance programs and operator training may count as only one redundant prevention measure).
(C) Inherently safer designs or safety instrumentation systems.
(D) Deluge systems.
(E) Staged relief system where the initial pressure relief device (with lower set release pressure) discharges to a flare or other closed vent system and control device.
(iii) If any affected pressure relief device releases to atmosphere as a result of a pressure release event, the owner or operator must perform root cause analysis and corrective action analysis according to the requirement in paragraph (h)(6) of this section and implement corrective actions according to the requirements in paragraph (h)(7) of this section. The owner or operator must also calculate the quantity of organic HAP released during each pressure release event and report this quantity as required in §63.1110(e)(8)(iii). Calculations may be based on data from the pressure relief device monitoring alone or in combination with process parameter monitoring data and process knowledge.
(iv) The owner or operator must determine the total number of release events that occurred during the calendar year for each affected pressure relief device separately. Prior to June 3, 2024, the owner or operator must also determine the total number of release events for each pressure relief device for which the root cause analysis concluded that the root cause was a force majeure event, as defined in §63.1103(e)(2). [Change Notice] [Previous Text]
(v) Except for pressure relief devices described in paragraphs (h)(4) and (5) of this section, the following release events from an affected pressure relief device are a violation of the pressure release management work practice standards.
(A) Any release event for which the root cause of the event was determined to be operator error or poor maintenance.
(B) Prior to June 3, 2024, a second release event not including force majeure events from a single pressure relief device in a 3-calendar year period for the same root cause for the same equipment. On and after June 3, 2024, a second release event from a single pressure relief device in a 3-calendar year period for the same root cause for the same equipment. [Change Notice] [Previous Text]
(C) Prior to June 3, 2024, a third release event not including force majeure events from a single pressure relief device in a 3-calendar year period for any reason. On and after June 3, 2024, a third release event from a single pressure relief device in a 3-calendar year period for any reason. [Change Notice] [Previous Text]
(4) Pressure relief devices routed to a control device, process, fuel gas system, or drain system. (i) If all releases and potential leaks from a pressure relief device are routed through a closed vent system to a control device, back into the process, a fuel gas system, or drain system, then the owner or operator is not required to comply with paragraph (h)(1), (2), or (3) of this section.
(ii) Before the compliance dates specified in §63.1102(c), both the closed vent system and control device (if applicable) referenced in paragraph (h)(4)(i) of this section must meet the applicable requirements specified in §63.982(b) and (c)(2). Beginning no later than the compliance dates specified in §63.1102(c), both the closed vent system and control device (if applicable) referenced in paragraph (h)(4)(i) of this section must meet the applicable requirements specified in §§63.982(c)(2), 63.983, and 63.1103(e)(4). For purposes of compliance with this paragraph, the phrase “Except for equipment needed for safety purposes such as pressure relief devices” in §63.983(a)(3) does not apply.
(iii) The drain system (if applicable) referenced in paragraph (h)(4)(i) of this section must meet the applicable requirements specified in §61.346 or §63.136.
(5) Pressure relief devices exempted from pressure release management requirements. The following types of pressure relief devices are not subject to the pressure release management requirements in paragraph (h)(3) of this section.
(i) Pressure relief devices in heavy liquid service, as defined in §63.1020 of subpart UU.
(ii) Thermal expansion relief valves.
(iii) Pressure relief devices on mobile equipment.
(iv) Pilot-operated pressure relief devices where the primary release valve is routed through a closed vent system to a control device or back into the process, a fuel gas system, or drain system.
(v) Balanced bellows pressure relief devices where the primary release valve is routed through a closed vent system to a control device or back into the process, a fuel gas system, or drain system.
(6) Root cause analysis and corrective action analysis. A root cause analysis and corrective action analysis must be completed as soon as possible, but no later than 45 days after a release event. Special circumstances affecting the number of root cause analyses and/or corrective action analyses are provided in paragraphs (h)(6)(i) through (iii) of this section. [Change Notice] [Previous Text]
(i) You may conduct a single root cause analysis and corrective action analysis for a single emergency event that causes two or more pressure relief devices that are installed on the same equipment to release.
(ii) Prior to June 3, 2024, you may conduct a single root cause analysis and corrective action analysis for a single emergency event that causes two or more pressure relief devices to release, regardless of the equipment served, if the root cause is reasonably expected to be a force majeure event, as defined in §63.1103(e)(2). [Change Notice] [Previous Text]
(iii) Except as provided in paragraphs (h)(6)(i) and (ii) of this section, if more than one pressure relief device has a release during the same time period, an initial root cause analysis must be conducted separately for each pressure relief device that had a release. If the initial root cause analysis indicates that the release events have the same root cause(s), the initial separate root cause analyses may be recorded as a single root cause analysis and a single corrective action analysis may be conducted.
(7) Corrective action implementation. Each owner or operator required to conduct a root cause analysis and corrective action analysis as specified in paragraphs (h)(3)(iii) and (6) of this section, must implement the corrective action(s) identified in the corrective action analysis in accordance with the applicable requirements in paragraphs (h)(7)(i) through (iii) of this section.
(i) All corrective action(s) must be implemented within 45 days of the event for which the root cause and corrective action analyses were required or as soon thereafter as practicable. If an owner or operator concludes that no corrective action should be implemented, the owner or operator must record and explain the basis for that conclusion no later than 45 days following the event.
(ii) For corrective actions that cannot be fully implemented within 45 days following the event for which the root cause and corrective action analyses were required, the owner or operator must develop an implementation schedule to complete the corrective action(s) as soon as practicable.
(iii) No later than 45 days following the event for which a root cause and corrective action analyses were required, the owner or operator must record the corrective action(s) completed to date, and, for action(s) not already completed, a schedule for implementation, including proposed commencement and completion dates.
(8) Flowing pilot-operated pressure relief devices. For ethylene production affected sources that commenced construction or reconstruction on or before October 9, 2019, owners or operators are prohibited from installing a flowing pilot-operated pressure relief device or replacing any pressure relief device with a flowing pilot-operated pressure relief device after July 6, 2023. For ethylene production affected sources that commenced construction or reconstruction after October 9, 2019, owners or operators are prohibited from installing and operating flowing pilot-operated pressure relief devices. For purpose of compliance with this paragraph, a flowing pilot-operated pressure relief device means the type of pilot-operated pressure relief device where the pilot discharge vent continuously releases emissions to the atmosphere when the pressure relief device is actuated.
[64 FR 34921, June 29, 1999, as amended at 79 FR 60926, Oct. 8, 2014; 85 FR 40432, July, 6, 2020; 89 FR 23865, April 4, 2024]