§52.519 [Reserved]
§52.520 Identification of plan.
(a) Purpose and scope. This section sets forth the applicable State implementation plan for Florida under section 110 of the Clean Air Act, 42 U.S.C. 7401, and 40 CFR part 51 to meet national ambient air quality standards.
(b) Incorporation by reference. (1) Material listed in paragraphs (c) and (d) of this section with an EPA approval date prior to October 1, 2017, was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Material is incorporated as it exists on the date of the approval, and notice of any change in the material will be published in the Federal Register. Entries in paragraphs (c) and (d) of this section with EPA approval dates after October 1, 2017, for Florida will be incorporated by reference in the next update to the SIP compilation.
(2) EPA Region 4 certifies that the rules/regulations provided by EPA in the SIP compilation at the addresses in paragraph (b)(3) of this section are an exact duplicate of the officially promulgated State rules/regulations which have been approved as part of the State Implementation Plan as of the dates referenced in paragraph (b)(1) of this section.
(3) Copies of the materials incorporated by reference may be inspected at the Region 4 EPA Office at 61 Forsyth Street SW, Atlanta, GA 30303. To obtain the material, please call (404) 562-9022. You may inspect the material with an EPA approval date prior to October 1, 2017, for Florida at the National Archives and Records Administration. For information on the availability of this material at NARA go to: http://www.archives.gov/federal-register/cfr/ibr-locations.html.
(c) EPA Approved Florida Regulations.
| State citation (section) | Title/subject | State effective date | EPA approval date | Explanation |
|---|---|---|---|---|
| Chapter 62-204 Air Pollution Control - General Provisions | ||||
| 62-204.320 | Procedures for Designation and Redesignation of Areas | 3/13/1996 | 6/16/1999, 64 FR 32346 | |
| 62-204.340 | Designation of Attainment, Nonattainment, and Maintenance Areas | 3/13/1996 | 6/16/1999, 64 FR 32346 | |
| 62-204.360 | Designation of Prevention of Significant Deterioration Areas | 3/13/1996 | 6/16/1999, 64 FR 32346 | |
| 62-204.500 | Conformity | 10/23/2016 | 3/28/2024, [Insert citation of publication] | Except for paragraphs 62-204.500(1)(a), (1)(b), (1)(c), and (1)(d). |
| Chapter 62-210 Stationary Sources - General Requirements | ||||
| 62-210.200 | Definitions | 10/23/2013 | July 7, 2025, 90 FR 29745 | The ethanol production facility exclusion within the definition of “major stationary source” at 62-210.200 does not apply to 62-212.500. Except the following definitions: “animal crematory”; “biological waste”; “biological waste incinerator”; “biomedical waste”; “capture efficiency”; “cast polymer operation”; “human crematory”; “major source of air pollution,” “major source,” or “title V source”; “printed interior panels”; “unit-specific applicable requirement”; “waste-to-energy facility”; “CAIR”; “CAIR NOX Allowance”; “CAIR NOX Annual Trading Program”; “CAIR NOX Ozone Season Allowance”; “CAIR NOX Ozone Season Trading Program”; “CAIR NOX Ozone Season Unit”; “CAIR NOX Unit”; “CAIR Part” or “CAIR Permit”; “CAIR Program”; “CAIR SO2 Allowance”; “CAIR SO2 Trading Program”; “CAIR SO2 Unit”; “CAIR Source”; and “CAIR Unit”; and except for “Commence Operation” and “Designated Representative” approved on July 7, 2025, state effective 7/3/2018. |
| 62-210.220 | Small Business Assistance Program | 10/6/08 | 7/3/2017, 82 FR 30767 | |
| 62-210.300 | Permits Required | 5/9/2007 | 6/1/2009, 63 FR 26103 | |
| 62-210.310 | Air General Permits | 6/29/2011 | 10/6/2017, 82 FR 46682 | |
| 62-210.350 | Public Notice and Comment | 10/12/2008 | 07/29/2020, 85 FR 45540 | Except for 62-210.350(1)(c) which was withdrawn from EPA consideration on June 28, 2017. |
| 62-210.360 | Administrative Permit Corrections | 11/23/1994 | 6/16/1999, 64 FR 32346 | |
| 62-210.370 | Emissions Computation and Reporting | 2/2/2006 | 6/27/2008, 73 FR 36435 | |
| 62-210.550 | Stack Height Policy | 11/23/1994 | 6/16/1999, 64 FR 32346 | |
| 62-210.650 | Circumvention | 10/15/1992 | 10/20/1994, 59 FR 52916 | |
| 62–210.700 | Excess Emissions | 10/23/2016 | 8/4/2023, 88 FR 51702 | |
| 62-210.900 | Forms and Instructions | 2/9/1993 | 11/7/1994, 59 FR 46157 | |
| Chapter 62-212 Stationary Sources - Preconstruction Review | ||||
| 62-212.300 | General Preconstruction Review Requirements | 6/29/2009 | 4/12/2011, 76 FR 20239 | |
| 62-212.400 | Prevention of Significant Deterioration | 3/28/2012 | 9/16/2020, 85 FR 57710 | Except the provisions for the PM2.5 significant impact levels at (5)(b). |
| 62-212.500 | Preconstruction Review for Nonattainment Areas | 2/2/2006 | 6/27/2008, 73 FR 36435 | The ethanol production facility exclusion within the definition of “major stationary source” at 62-210.200 does not apply to 62-212.500. |
| 62-212.720 | Actuals Plantwide Applicability Limits (PALs) | 12/17/2013 | 7/3/2017, 82 FR 30767 | |
| Chapter 62-252 Gasoline Vapor Control | ||||
| 62-252.300 | Gasoline Dispensing Facilities Stage I Vapor Recovery | 5/1/2015 | 8/12/2015, 80 FR 48259 | |
| Chapter 62-256 Open Burning and Frost Protection Fires | ||||
| 62-256.100 | Declaration and Intent | 12/09/1975 | 11/1/1977, 42 FR 57124 | |
| 62-256.200 | Definitions | 11/30/1994 | 6/16/1999, 64 FR 32346 | |
| 62-256.300 | Prohibitions | 11/30/1994 | 6/16/1999, 64 FR 32346 | |
| 62-256.400 | Agricultural and Silvicultural Fires | 7/1/1971 | 5/31/1972, 37 FR 10842 | |
| 62-256.450 | Burning for Cold or Frost Protection | 6/27/1991 | 9/9/1994, 59 FR 46552 | |
| 62-256.500 | Land Clearing | 11/30/1994 | 6/16/1999, 64 FR 32346 | |
| 62-256.600 | Industrial, Commercial, Municipal, and Research Open Burning | 7/1/1971 | 5/31/1972, 37 FR 10842 | |
| 62-256.700 | Open Burning Allowed | 11/30/1994 | 6/16/1999, 64 FR 32346 | |
| 62-256.800 | Effective Date | 7/1/1971 | 5/31/1972, 37 FR 10842 | |
| Chapter 62-296 Stationary Sources - Emission Standards | ||||
| 62-296.100 | Purpose and Scope | 10/6/2008 | 10/6/2017, 82 FR 46682 | |
| 62–296.320 | General Pollutant Emission Limiting Standards | 7/10/2014 | 1/22/2024, 88 FR 3888 | Except 62–296.320(1), (2), and (3), approved on 6/16/1999, state effective 3/13/1996. |
| 62-296.340 | Best Available Retrofit Technology | 1/31/2007 | 8/29/2013, 78 FR 53250 | |
| 62-296.401 | Incinerators | 3/13/1996 | 6/16/1999, 64 FR 32346 | |
| 62–296.402 | Sulfuric Acid Plants | 6/23/2022 | 8/4/2023, 88 FR 51702 | Except for paragraphs (1), (2)(a)2., (2)(b)2., and (3)(b). |
| 62-296.403 | Phosphate Processing | 3/13/1996 | 6/16/1999, 64 FR 32346 | |
| 62-296.404 | Kraft (Sulfate) Pulp Mills and Tall Oil Plants | 3/13/1996 | 6/16/1999, 64 FR 32346 | |
| 62–296.405 | Existing Fossil Fuel Steam Generators with Greater than or Equal to 250 Million Btu Per Hour Heat Input | 6/23/2022 | 8/4/2023, 88 FR 51702 | Except for paragraphs (4)(a)2. through 5., (4)(a)8. and 9., (4)(b)1. and 2., (4)(b)4., and (5)(c). |
| 62–296.406 | Fossil Fuel Steam Generators with Less Than 250 million Btu per Hour Heat Input | 11/5/2020 | 1/22/2024, 88 FR 3888 | |
| 62–296.408 | Nitric Acid Plants | 11/23/1994 | 8/4/2023, 88 FR 51702 | Except for paragraph (2). |
| 62-296.409 | Sulfur Recovery Plants | 11/23/1994 | 6/16/1999, 64 FR 32346 | |
| 62-296.410 | Carbonaceous Fuel Burning Equipment | 11/23/1994 | 6/16/1999, 64 FR 32346 | |
| 62-296.412 | Dry Cleaning Facilities | 3/11/2010 | 10/6/2017, 82 FR 46682 | |
| 62–296.414 | Concrete Batching Plants | 11/5/2020 | 11/6/2023, 88 FR 76138 | |
| 62–296.415 | Soil Thermal Treatment Facilities | 11/5/2020 | 11/6/2023, 88 FR 76138 | |
| 62–296.418 | Bulk Gasoline Plants | 8/14/2019 | 11/6/2023, 88 FR 76138 | |
| 62–296.500 | Reasonably Available Control Technology (RACT)—Volatile Organic Compounds (VOC) and Nitrogen Oxides (NO X ) Emitting Facilities | 8/14/2019 | 11/6/2023, 88 FR 76138 | |
| 62–296.501 | Can Coating | 7/10/2014 | 11/6/2023, 88 FR 76138 | |
| 62–296.502 | Coil Coating | 7/10/2014 | 11/6/2023, 88 FR 76138 | |
| 62–296.503 | Paper Coating | 7/10/2014 | 11/6/2023, 88 FR 76138 | |
| 62–296.504 | Fabric and Vinyl Coating | 7/10/2014 | 11/6/2023, 88 FR 76138 | |
| 62–296.505 | Metal Furniture Coating | 7/10/2014 | 11/6/2023, 88 FR 76138 | |
| 62–296.506 | Surface Coating of Large Appliances | 7/10/2014 | 11/6/2023, 88 FR 76138 | |
| 62–296.507 | Magnet Wire Coating | 7/10/2014 | 11/6/2023, 88 FR 76138 | |
| 62–296.508 | Petroleum Liquid Storage | 7/10/2014 | 11/6/2023, 88 FR 76138 | |
| 62–296.510 | Bulk Gasoline Terminals | 7/10/2014 | 11/6/2023, 88 FR 76138 | |
| 62–296.511 | Solvent Metal Cleaning | 11/5/2020 | 11/6/2023, 88 FR 76138 | |
| 62–296.512 | Cutback Asphalt | 8/14/2019 | 11/6/2023, 88 FR 76138 | |
| 62–296.513 | Surface Coating of Miscellaneous Metal Parts and Products | 7/10/2014 | 11/6/2023, 88 FR 76138 | |
| 62-296.513 | Surface Coating of Miscellaneous Metal Parts and Products | 6/16/2022 | 9/27/2024, 89 FR 79150 | |
| 62–296.514 | Surface Coating of Flat Wood Paneling | 7/10/2014 | 11/6/2023, 88 FR 76138 | |
| 62–296.515 | Graphic Arts Systems | 7/10/2014 | 11/6/2023, 88 FR 76138 | |
| 62–296.516 | Petroleum Liquid Storage Tanks with External Floating Roofs | 7/10/2014 | 11/6/2023, 88 FR 76138 | |
| 62–296.570 | Reasonably Available Control Technology (RACT)—Requirements for Major VOC- and NO X -Emitting Facilities | 6/23/2022 | 8/4/2023, 88 FR 51702 | |
| 62-296.600 | Reasonably Available Control Technology (RACT) - Lead | 3/13/1996 | 6/16/1999, 64 FR 32346 | |
| 62-296.601 | Lead Processing Operations in General | 8/8/1994 | 9/18/1996, 61 FR 49064 | |
| 62–296.602 | Primary Lead-Acid Battery Manufacturing Operations | 7/10/2014 | 1/22/2024, 88 FR 3888 | |
| 62–296.603 | Secondary Lead Smelting Operations | 7/10/2014 | 1/22/2024, 88 FR 3888 | |
| 62–296.604 | Electric Arc Furnace Equipped Secondary Steel Manufacturing Operations | 7/10/2014 | 1/22/2024, 88 FR 3888 | |
| 62-296.605 | Lead Oxide Handling Operations | 8/8/1994 | 9/18/1996, 61 FR 49064 | |
| 62–296.700 | Reasonably Available Control Technology (RACT) Particulate Matter | 8/14/2019 | 1/22/2024, 88 FR 3888 | |
| 62–296.702 | Fossil Fuel Steam Generators | 7/10/2014 | 1/22/2024, 88 FR 3888 | |
| 62–296.704 | Asphalt Concrete Plants | 7/10/2014 | 1/22/2024, 88 FR 3888 | |
| 62–296.705 | Phosphate Processing Operations | 7/10/2014 | 1/22/2024, 88 FR 3888 | |
| 62–296.707 | Electric Arc Furnaces | 7/10/2014 | 1/22/2024, 88 FR 3888 | |
| 62–296.708 | Sweat or Pot Furnaces | 7/10/2014 | 1/22/2024, 88 FR 3888] | |
| 62–296.711 | Materials Handling, Sizing, Screening, Crushing and Grinding Operations | 7/10/2014 | 1/22/2024, 88 FR 3888 | |
| 62–296.712 | Miscellaneous Manufacturing Process Operations | 7/10/2014 | 1/22/2024, 88 FR 3888 | |
| Chapter 62-297 Stationary Sources - Emissions Monitoring | ||||
| 62-297.310 | General Emissions Test Requirements | 3/9/2015 | 10/6/2017, 82 FR 46682 | |
| 62-297.440 | Supplementary Test Procedures | 7/10/2014 | 4/2/2018, 83 FR 13875 | |
| 62-297.450 | EPA VOC Capture Efficiency Test Procedures | 7/10/2014 | 4/2/2018, 83 FR 13875 | |
| 62-297.620 | Exceptions and Approval of Alternate Procedures and Requirements | 11/23/1994 | 6/16/1999, 64 FR 32346 | |
| State Statutes | ||||
| 112.3143(4) | Voting Conflict | 4/19/2012 | 7/30/2012, 77 FR 44485 | To satisfy the requirements of sections 128 and 110(a)(2)(E)(ii). |
| 112.3144 | Full and Public Disclosure of Financial Interests | 4/19/2012 | 7/30/2012, 77 FR 44485 | To satisfy the requirements of sections 128 and 110(a)(2)(E)(ii). |
| 403.131 | Injunctive relief, remedies | 4/19/2012 | 7/30/2012, 77 FR 44485 | To satisfy the requirements of section 110(a)(2)(G). |
| 120.569 | Decisions which affect substantial interests | 4/19/2012 | 7/30/2012, 77 FR 44485 | To satisfy the requirements of section 110(a)(2)(G). |
(d) EPA-approved State Source-specific requirements.
| Name of source | Permit No. | State effective date | EPA approval date | Explanation |
|---|---|---|---|---|
| Harry S Truman, animal import center | NA | 11/26/1996 | 1/19/2000, 65 FR 2882 | |
| Martin Gas Sales, Inc | 0570477-007-AC | 1/17/2003 | 5/1/2003, 68 FR 23209 | |
| Broward County Aviation Department | 8/15/2003 | 6/17/2003, 69 FR 33862 | Order Granting Variance from Rule 62-252.400. | |
| Lockheed Martin Aeronautics Company | 4/16/2005 | 11/28/2006, 71 FR 68745 | Requirement that Lockheed Martin Aeronautics Company comply with EPA's Aerospace CTG at its Pinellas County facility. | |
| Combs Oil Company | 7/31/2009 | 9/25/2015, 80 FR 57727 | Order Granting Variance from Rule 62-296.418(2)(b)2. | |
| Mosaic Fertilizer, LLC | Air Permit No. 0570008-080-AC | 1/15/2015 | 7/3/2017, 82 FR 30749 | Specific Conditions pertaining to: EU004; EU005; and EU006. |
| Rayonier Performance Fibers, LLC | Air Permit No. 0890004-036-AC | 4/12/2012 | 7/3/2017, 82 FR 30749 | Specific Conditions pertaining to: EU005; EU006; and EU022. |
| Tampa Electric Company-Big Bend Station | Air Permit No. 0570039-074-AC | 2/26/2015 | 7/3/2017, 82 FR 30749 | Only Section 3, Subsection B, Condition 5. |
| WestRock, LLC | Air Permit No. 0890003-046-AC | 1/9/2015 | 7/3/2017, 82 FR 30749 | Specific Conditions pertaining to: EU006; EU015; EU007 and EU011. |
| Tampa Electric Company-Big Bend Station | Air Permit No. 0570039-120-AC | 12/14/2018 | 11/12/2019, 84 FR 60927 | Only Section 2, Condition 4; the “SO2 Emissions Cap” provision from Section 3, Condition 4; the “SO2 CEMS” provision from Section 3, Condition 4; and the “Methods of Operation” for Units 1 and 2 provision from Section 3, Condition 6. |
| Mosaic Fertilizer, LLC—Bartow Facility | Air Permit No. 1050046-050-AC | 7/3/2017 | 2/20/2020, 85 FR 9666 | Section III, Subsection A, Specific Condition 3 (as administratively corrected by Permit No. 1050046-063-AC with an effective date of January 11, 2019); Condition 4; and Condition 5. |
| Mosaic Fertilizer, LLC—New Wales Facility | Air Permit No. 1050059-106-AC | 10/30/2017 | 2/20/2020, 85 FR 9666 | Section III, Subsection A, Specific Condition 3 (as administratively corrected by Permit No. 1050059-114-AC with an effective date of January 11, 2019); Condition 4; and Condition 5. |
| EnviroFocus Technologies, LLC | Air Construction Permit No. 0570057-27-AC | 12/14/2012 | 6/4/2021, 86 FR 29951 | Except for conditions not specifically related to lead emissions; Section 3, Subsection B, Specific Conditions 3 and 10; Section 3, Subsection C, Specific Condition 5; and Section 3, Subsection G, Specific Condition 5. |
| EnviroFocus Technologies, LLC | Air Construction Permit No. 0570057-37-AC | 11/6/2019 | 6/14/2021, 86 FR 29951 | Only incorporating the following conditions: Section 3, Subsection B, Specific Conditions 2 and 3a; Section 3, Subsection C, Specific Condition 1; and Section 3, Subsection D, Specific Condition 1. |
| Nutrien White Springs | 0470002–132–AC | 1/1/2023 | 8/4/2023, 88 FR 51702 | Conditions 3 through 6 at EU 066 (SAP E) and EU 067 (SAP F). |
| Mosaic Fertilizer, LLC—South Pierce Facility | 1050055–037–AC | 4/1/2023 | 8/4/2023, 88 FR 51702 | Conditions 4 through 7 at EU 004 (SAP 10) and EU 005 (SAP 11). |
| Tampa Electric Company (TECO)—Polk Power Station | 1050233–050–AC | 1/1/2023 | 8/4/2023, 88 FR 51702 | Conditions 1 through 4 at EU 004. |
| Ascend Pensacola | 0330040–076–AC | 1/1/2023 | 8/4/2023, 88 FR 51702 | Conditions 1 through 6 at EU 042. |
| Trademark Nitrogen | 0570025–016–AC | 1/1/2023 | 8/4/2023, 88 FR 51702 | Conditions 1 and 5 through 9 at EU 001. |
| Duke Crystal River Citrus Co. Combined Cycle | 0170004-047-AC | 12/16/2014 | 6/5/2025, 90 FR 24008 | Section 3, Subsection A, Conditions 7 and 28 at EU 040—Unit 1A, EU 041—Unit 1B, EU 042—Unit 2A, and EU 043—Unit 2B. |
| Duke Crystal River | 0170004-059-AC | 10/30/2020 | 6/5/2025, 90 FR 24008 | Section 3, Condition 1 at EU 003—Unit 5 and EU 004—Unit 4 (revising Section 3, Subsection B, Condition 3.A.9 of Permit No. 0170004-054-AC). |
| Nutrien White Springs | 0470002-122-AC | 12/21/2018 | 6/5/2025, 90 FR 24008 | Section 3, Condition 3 at EU066—SAP E and EU067—SAP F. |
| Seminole Generating Station | 1070025-037-AC | 4/14/2021 | 6/5/2025, 90 FR 24008 | Section 3, Condition 2, Subsection 3 at EU001—Unit 1 and EU002—Unit 2 (revising Section 3, Condition 3 of Permit No. 1070025-019-AC). |
| TECO-Big Bend | 0570039-129-AC | 8/11/2020 | 6/5/2025, 90 FR 24008 | Section 3, Subsection C, Conditions 12 and 13 at EU004—Unit 4. |
| WestRock-Fernandina Beach Mill | 0890003-072-AC | 6/24/2021 | 6/5/2025, 90 FR 24008 | Section 3, Subsection A, Conditions 2, 3, and 4 at EU 015—No. 7 Power Boiler. |
| WestRock-Fernandina Beach Mill | 0890003-074-AC | 12/16/2021 | 6/5/2025, 90 FR 24008 | Section 3, Subsection A, Condition 2 (adding Condition 5 to Section 3, Subsection A of Permit No. 0890003-072-AC) at EU 015—No. 7 Power Boiler. |
| JEA Northside | 0310045-003-AC | 7/14/1999 | 6/5/2025, 90 FR 24008 | Section III, Conditions 9, 14(a), and 31(a) at EU 026—Boiler 2 and EU 027—Boiler 1. |
| JEA Northside | 0310045-059-AC | 2/16/2023 | 6/5/2025, 90 FR 24008 | Section 3, Subsection A, Condition 2 at EU 026—Boiler 2 and EU 027—Boiler 1. |
| JEA Northside | 0310045-057-AC | 6/17/2021 | 6/5/2025, 90 FR 24008 | Section 3, Conditions 2, 5, and 6 at EU 003—Boiler No. 3. |
| JEA Northside | 0310045-062-AC | 8/24/2023 | 6/5/2025, 90 FR 24008 | Condition 7 at EU 003—Boiler No. 3 (adding Condition 7 to Section III, Subsection A of Permit No. 0310045-057-AC). |
(e) EPA-approved Florida non-regulatory provisions.
| Provision | State effective date | EPA approval date | Federal Register, notice | Explanation |
|---|---|---|---|---|
| Revision to Maintenance Plan for Southeast Florida Area | 12/20/2002 | 2/13/2004 | 69 FR 7132 | 10 year update. |
| Revision to Maintenance Plan for the Tampa, Florida Area | 12/20/2002 | 3/29/2004 | 69 FR 16172 | 10 year update. |
| Revision to Maintenance Plan Update for Jacksonville Area, Florida | 12/20/2002 | 7/22/2003 | 68 FR 43315 | |
| 110(a)(1) Maintenance Plan for the Southeast Florida Area | 7/2/2009 | 7/26/2010 | 75 FR 29671 | 110(a)(1) maintenance plan for 1997 8-hour ozone NAAQS. |
| 110(a)(1) Maintenance Plan for the Tampa, Florida Area | 7/2/2009 | 7/26/2010 | 75 FR 29671 | 110(a)(1) maintenance plan for 1997 8-hour ozone NAAQS. |
| 110(a)(1) Maintenance Plan for the Jacksonville, Florida Area | 7/2/2009 | 7/26/2010 | 75 FR 29671 | 110(a)(1) maintenance plan for 1997 8-hour ozone NAAQS. |
| 110(a)(1) and (2) Infrastructure Requirements for the 1997 8-Hour Ozone National Ambient Air Quality Standards | 12/13/2007 | 7/30/2012 | 77 FR 44485 | |
| Section 128 Requirements | 5/24/2012 | 7/30/2012 | 77 FR 44485 | |
| Sections 110(a)(2)(E)(ii) and (G) Infrastructure Requirements for the 1997 8-Hour Ozone National Ambient Air Quality Standards | 5/24/2012 | 7/30/2012 | 77 FR 44485 | |
| 110(a)(2)(D)(i)(I) Infrastructure Requirements for the 2006 24-hour PM2.5 NAAQS | 9/23/2009 | 10/11/2012 | 77 FR 61724 | EPA partially disapproved this SIP submission to the extent that it relied on the Clean Air Interstate Rule to meet the 110(a)(2)(D)(i)(I) requirements for the 2006 24-hour PM2.5 NAAQS. |
| 110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality Standards | 4/18/2008 | 11/8/2012 | 77 FR 66927 | With the exception of section 110(a)(2)(D)(i). |
| 110(a)(1) and (2) Infrastructure Requirements for 2006 Fine Particulate Matter National Ambient Air Quality Standards | 9/23/2009 | 11/8/2012 | 77 FR 66927 | With the exception of section 110(a)(2)(D)(i). |
| Portion of Regional Haze Plan Amendment submitted on September 17, 2012 | 9/17/2012 | 11/29/2012 | 77 FR 71111 | Only the BART determinations approved in 77 FR 71111 are incorporated. |
| 110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality Standards | 4/18/2008 | 4/3/2013 | 78 FR 19998 | EPA disapproved the State's prong 3 of section 110(a)(2)(D)(i) as it relates to GHG PSD permitting requirements. |
| 110(a)(1) and (2) Infrastructure Requirements for 2006 Fine Particulate Matter National Ambient Air Quality Standards | 9/23/2009 | 4/3/2013 | 78 FR 19998 | EPA disapproved the State's prong 3 of section 110(a)(2)(D)(i) as it relates to GHG PSD permitting requirements. |
| Initial Regional Haze Plan | 3/19/2010 | 8/29/2013 | 78 FR 53250 | |
| Regional Haze Plan Amendment 1 | 8/31/2010 | 8/29/2013 | 78 FR 53250 | |
| Regional Haze Plan Amendment 2 | 9/17/2012 | 8/29/2013 | 78 FR 53250 | Remaining Portion of Regional Haze Plan Amendment not approved on November 29, 2012. |
| Progress Energy Permit (Air Permit No. 0170004-038-AC) | 10/15/2012 | 8/29/2013 | 78 FR 53250 | |
| Update to October 15, 2013, Progress Energy Permit (Air Permit No. 0170004-038-AC) | 5/2/2013 | 8/29/2013 | 78 FR 53250 | |
| 110(a)(1) and (2) Infrastructure Requirements for the 2008 8-Hour Ozone National Ambient Air Quality Standards | 10/31/2011 | 11/1/2013 | 78 FR 65559 | With the exception of section 110(a)(2)(D)(i)(I) concerning interstate transport; section 110(a)(2)(D)(i)(II) concerning visibility requirements; and the portions of sections 110(a)(2)(C), prong 3 of 110(a)(2)(D)(i), and 110(a)(2)(J) related to the regulation of GHG emissions, which are being disapproved. |
| RVP Update for Florida 1997 8-hour Ozone Maintenance Plans | 8/15/2013 | 1/6/2014 | 79 FR 573 | |
| 110(a)(1) and (2) Infrastructure Requirements for the 1997 Fine Particulate Matter National Ambient Air Quality Standards | 4/18/2008 | 8/25/2014 | 79 FR 50554 | Addressing prong 4 of section 110(a)(2)(D)(i) only. |
| 110(a)(1) and (2) Infrastructure Requirements for the 2006 Fine Particulate Matter National Ambient Air Quality Standards | 9/23/2009 | 8/25/2014 | 79 FR 50554 | Addressing prong 4 of section 110(a)(2)(D)(i) only. |
| 110(a)(1) and (2) Infrastructure Requirements for the 2008 Ozone National Ambient Air Quality Standards | 10/31/2011 | 8/25/2014 | 79 FR 50554 | Addressing prong 4 of section 110(a)(2)(D)(i) only. |
| 110(a)(1) and (2) Infrastructure Requirements for the 2008 Lead NAAQS | 10/14/2011 | 3/18/2015 | 80 FR 14019 | Addressing the PSD permitting requirements of sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only. |
| 110(a)(1) and (2) Infrastructure Requirements for the 2010 NO2 NAAQS | 1/22/2013 | 3/18/2015 | 80 FR 14019 | Addressing the PSD permitting requirements of sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only. |
| 2008 Lead Attainment Demonstration for Hillsborough Area | 6/29/2012 | 4/16/2015 | 80 FR 20441 | |
| 2008 Lead Attainment Demonstration for Hillsborough Area Amendment | 6/27/2013 | 4/16/2015 | 80 FR 20441 | |
| 110(a)(1) and (2) Infrastructure Requirements for the 2008 Lead National Ambient Air Quality Standards | 10/14/2011 | 9/24/2015 | 80 FR 57538 | With the exception of provisions pertaining to PSD permitting requirements in sections 110(a)(2)(C), prong 3 of D(i) and (J). |
| Regional Haze Plan Amendment 3 | 4/30/2014 | 10/23/2015 | 80 FR 64344 | Establishes NOX BART emissions limit for Unit 1 at the Lakeland Electric - C.D. McIntosh Power Plant and includes FDEP Permit No. 1050004-034-AC. |
| March 2015 Regional Haze Progress Report | 3/10/2015 | 8/2/2016 | 81 FR 50628 | |
| 110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour Primary SO2 National Ambient Air Quality Standards | 6/3/2013 | 9/30/2016 | 81 FR 67179 | With the exception of section for provisions relating to 110(a)(2)(D)(i)(I) (prongs 1 and 2) concerning interstate transport requirements. |
| 110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour NO2 NAAQS | 1/22/2013 | 11/23/2016 | 81 FR 84479 | With the exception of sections: 110(a)(2)(B) Concerning ambient air quality monitoring and data system; 110(a)(2)(C) and (J) concerning PSD permitting requirements; and 110(a)(2)(D)(i)(I) and (II) (prongs 1 through 3) concerning interstate transport requirements. |
| 110(a)(1) and (2) Infrastructure Requirements for the 2012 Annual PM2.5 NAAQS | 10/15/2015 | 4/7/2017 | 82 FR 16920 | With the exception of section 110(a)(2)(D)(i)(I) and (II) (prongs 1 and 2). |
| 2010 1-hour SO2 Attainment Demonstration for the Hillsborough Area | 4/3/2015 | 7/3/2017 | 82 FR 30749 | |
| 2010 1-hour SO2 Attainment Demonstration for the Nassau Area | 4/3/2015 | 7/3/2017 | 82 FR 30749 | |
| 110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour NO2 NAAQS (Element B only) | 1/22/2013 | 8/10/2017 | 82 FR 37310 | Addressing section 110(a)(2)(B) concerning ambient air quality monitoring and data system only. |
| 110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour NO2 NAAQS | 2/3/2017 | 10/16/2017 | 82 FR 47983 | Addressing Prongs 1 and 2 of section 110(a)(2)(D)(i) only. |
| 2008 Lead NAAQS Maintenance Plan for the Hillsborough Area | 3/26/2018 | 9/11/2018 | 83 FR 45836 | |
| 110(a)(1) and (2) Infrastructure Requirements for the 2012 Annual PM2.5 NAAQS | 10/15/2015 | 9/25/2018 | 83 FR 48387 | Addressing Prongs 1 and 2 of section 110(a)(2)(D)(i)(I) only. |
| 110(a)(1) and (2) Infrastructure Requirements for the 2008 8-Hour Ozone NAAQS | 10/3/2017 | 4/11/2019 | 84 FR 14615 | Addressing prongs 1 and 2 of section 110(a)(2)(D)(i)(I) only. |
| 2010 1-hour SO2 Maintenance Plan for the Nassau Area | 6/7/2018 | 4/24/2019 | 84 FR 17085 | |
| 2010 1-hour SO2 Maintenance Plan for the Hillsborough Area | 6/7/2018 | 11/12/2019 | 84 FR 60927 | |
| 2010 1-hour SO2 Maintenance Plan for the Hillsborough-Polk Area | 10/9/2019 | 2/20/2020 | 85 FR 9666 | |
| 110(a)(1) and (2) Infrastructure Requirements for the 2015 8-Hour Ozone NAAQS | 9/18/2018 | 4/6/2020 | 85 FR 19089 | With the exception of Prongs 1 and 2 of section 110(a)(2)(D)(i)(I). |
| 110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour SO2 NAAQS | 9/18/2018 | 5/1/2020 | 85 FR 25301 | Addressing Prongs 1 and 2 of section 110(a)(2)(D)(i) only. |
| 2008 Lead NAAQS Maintenance Plan for the Hillsborough Area | 1/23/2020 | 6/4/2021 | 86 FR 29951 | Updates to the attainment emissions inventory and the maintenance demonstration, including the projected future emissions inventories, in the March 26, 2018 maintenance plan. |
| 110(a)(1) and (2) Infrastructure Requirements for the 1997 8-Hour Ozone National Ambient Air Quality Standards | 8/26/2020 | 7/7/2021 | 86 FR 35610 | Approving SIP submission for sections 110(a)(2)(C) & 110(a)(2)(J) as it relates to GHG PSD permitting requirements. |
| 110(a)(1) and (2) Infrastructure Requirements for the 1997 Annual Fine Particulate Matter National Ambient Air Quality Standards | 8/26/2020 | 7/7/2021 | 86 FR 35610 | Approving SIP submission for prong 3 of section 110(a)(2)(D)(i) as it relates to GHG PSD permitting requirements. |
| 110(a)(1) and (2) Infrastructure Requirements for the 2006 24-hour Fine Particulate Matter National Ambient Air Quality Standards | 8/26/2020 | 7/7/2021 | 86 FR 35610 | Approving SIP submission for prong 3 of section 110(a)(2)(D)(i) as it relates to GHG PSD permitting requirements. |
| 110(a)(1) and (2) Infrastructure Requirements for the 2008 8-Hour Ozone National Ambient Air Quality Standards | 8/26/2020 | 7/7/2021 | 86 FR 35610 | Approving SIP submission for section 110(a)(2)(C), prong 3 of 110(a)(2)(D)(i), and 110(a)(2)(J) as it relates to the regulation of GHG emissions. |
| 110(a)(1) and (2) Infrastructure Requirements for the 2015 8-Hour Ozone NAAQS | 9/18/2018 | 12/2/2021 | 86 FR 68420 | Addressing Prongs 1 and 2 of section 110(a)(2)(D)(i)(I) only. |
| Regional Haze Plan—Second Planning Period | 10/8/2021 | 6/5/2025 | 6/5/2025, 90 FR 24008 | |
| Regional Haze Plan—Second Planning Period—Supplement 1 | 6/14/2024 | 6/5/2025 | 6/5/2025, 90 FR 24008 | |
| Regional Haze Plan—Second Planning Period Supplement 2 | 10/28/2024 | 6/5/2025 | 6/5/2025, 90 FR 24008 |
Editorial Note: For Federal Register citations affecting §52.520, see the List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at www.govinfo.gov.
[64 FR 32348, June 16, 1999; 84 FR 60931, Nov. 12, 2019; 85 FR 9672, Feb. 20, 2020; 85 FR 19089, Apr. 6, 2020; 85 FR 25301, May 1, 2020; 85 FR 45540, July 29, 2020; 85 FR 57710, Sep. 16, 2020; 86 FR 29951, June 4, 2021; 86 FR 35610, July 7, 2020; 86 FR 68420, Dec. 2, 2021; 87 FR 3662, Jan. 25, 2022; 88 FR 12838, Mar. 1, 2023; 88 FR 51702, Aug. 4, 2023; 88 FR 67964, Oct. 3, 2023; 88 FR 76138, Nov. 6, 2023; 88 FR 3888, Jan. 22, 2024; 88 FR 21439, Mar. 28, 2024; 89 FR 57735, July 16, 2024; 89 FR 79150, Sep. 27, 2024; 90 FR 24039, June 5, 2025; 90 FR 29748, July 7, 2025]
§52.521 Classification of regions.
The Florida plan was evaluated on the basis of the following classifications:
| Air quality control region | Pollutant | ||||
|---|---|---|---|---|---|
| Particulate matter | Sulfur oxides | Nitrogen dioxide | Carbon monoxide | Photochemical oxidants (hydrocarbons) | |
| Mobile (Alabama)-Pensacola-Panama City (Florida)-Southern Mississippi Interstate | I | I | III | III | I |
| Jacksonville (Florida)-Brunswick (Georgia) Interstate | I | II | III | III | I |
| West Central Florida Intrastate | I | I | III | III | III |
| Central Florida Intrastate | II | III | III | III | III |
| Southwest Florida Intrastate | III | III | III | III | III |
| Southeast Florida Intrastate | II | III | III | III | III |
[37 FR 10858, May 31, 1972, as amended 39 FR 16346, May 8, 1974]
§52.522 Approval status.
(a) With the exceptions set forth in this subpart, the Administrator approves Florida's plan for the attainment and maintenance of the national standards under section 110 of the Clean Air Act. Furthermore, the Administrator finds that the plan satisfies all requirements of part D, title 1, of the Clean Air Act as amended in 1977.
(b) [Removed and reserved]
[45 FR 17143, Mar. 18, 1980, as amended at 78 FR 65561, Nov. 1, 2013; 79 FR 30050, May 27, 2014; 86 FR 35610, July 7, 2021]
§52.523 [Removed and reserved]]
[77 FR 44488, July 30, 2012; 86 FR 35610, July 7, 2021]
§52.524 Compliance schedule.
(a) The information in this section is available in the 40 CFR, part 52 edition revised as of July 1, 1999, the 40 CFR, part 52, Volume 1 of 2 (§§52.01 to 52.1018) editions revised as of July 1, 2000 through July 1, 2011, and the 40 CFR, part 52, Volume 1 of 3 (§§52.01 to 52.1018) editions revised as of July 1, 2012.
(b) [Reserved]
[79 FR 30050, May 27, 2014]
§52.525 General requirements.
(a) The requirements of §51.116(c) of this chapter are not met since the legal authority to provide for public availability of emission data is inadequate.
(b) Regulation for public availability of emission data. (1) Any person who cannot obtain emission data from the Agency responsible for making emission data available to the public, as specified in the applicable plan, concerning emissions from any source subject to emission limitations which are part of the approved plan may request that the appropriate Regional Administrator obtain and make public such data. Within 30 days after receipt of any such written request, the Regional Administrator shall require the owner or operator of any such source to submit information within 30 days on the nature and amounts of emissions from such source and any other information as may be deemed necessary by the Regional Administrator to determine whether such source is in compliance with applicable emission limitations or other control measures that are part of the applicable plan.
(2) Commencing after the initial notification by the Regional Administrator pursuant to paragraph (b)(1) of this section, the owner or operator of the source shall maintain records of the nature and amounts of emissions from such source and any other information as may be deemed necessary by the Regional Administrator to determine whether such source is in compliance with applicable emission limitations or other control measures that are part of the plan. The information recorded shall be summarized and reported to the Regional Administrator, on forms furnished by the Regional Administrator, and shall be submitted within 45 days after the end of the reporting period. Reporting periods are January 1 to June 30 and July 1 to December 31.
(3) Information recorded by the owner or operator and copies of this summarizing report submitted to the Regional Administrator shall be retained by the owner or operator for 2 years after the date on which the pertinent report is submitted.
(4) Emission data obtained from owners or operators of stationary sources will be correlated with applicable emission limitations and other control measures that are part of the applicable plan and will be available at the appropriate regional office and at other locations in the state designated by the Regional Administrator.
[39 FR 34536, Sep. 26, 1974, as amended at 40 FR 55328, Nov. 28, 1975; 51 FR 40676, Nov. 7, 1986]
§52.526 Legal authority.
(a) The requirements of §51.230(f) of this chapter are not met, since section 403.111 of the Florida Statutes could, in some circumstances, prohibit the disclosure of emission data to the public. Therefore, section 403.111 is disapproved.
[39 FR 34536, Sep. 26, 1974, as amended at 51 FR 40676, Nov. 7, 1986]
§52.527 [Reserved]
§52.528 Control strategy: Sulfur oxides and particulate matter.
(a) In a letter dated October 10, 1986, the Florida Department of Environmental Regulation certified that no emission limits in the State's plan are based on dispersion techniques not permitted by EPA's stack height rules.
(b) The variance granted to the Turkey Point and Port Everglades plants of Florida Power and Light Company from the particulate emission limits of the plan is disapproved because the relaxed limits would cause violation of the Class I increment for sulfur dioxide in the Everglades National Park. These plants must meet the 0.1#/MMBTU particulate limit of the plan.
[48 FR 33868, July 26, 1983, as amended at 54 FR 25455, June 15, 1989]
§52.529 [Reserved]
§52.530 Significant deterioration of air quality.
(a) EPA approves the Florida Prevention of Significant Deterioration program, as incorporated into this chapter, for power plants subject to the Florida Power Plant Siting Act.
(b) Pursuant to part C, subpart 1 of the Clean Air Act, EPA is approving a December 19, 2013 SIP revision submitted by the State of Florida, through the Florida Department of Environmental Protection (FDEP), Division of Air Resource Management that establishes prevention of significant deterioration (PSD) applicability thresholds forgreenhouse gas (GHG) emissions at the same emissions thresholds and in the same timeframes as those specified by EPA in the GHG Tailoring Rule. This approval gives FDEP the authority to regulate GHG-emitting sources and issue GHG PSD permits. FDEP's December 19, 2013 SIP revision also includes a GHG PSD Permit Transition Plan which governs the transition from EPA administering GHG PSD permitting requirements for Florida sources under a Federal Implementation Plan (FIP) to the State administering GHG PSD permitting requirements under its approved SIP. Under this GHG PSD Permit Transition Plan, FDEP will administer and enforce GHG PSD permits issued by EPA to Florida sources under the GHG PSD FIP. FDEP's authority over these existing EPA-issued GHG PSD permits includes the authority for FDEP to conduct general administration of these existing permits, authority to process and issue any and all subsequent permit actions relating to such permits, and authority to enforce such permits.
(c) All applications and other information required pursuant to §52.21 of this part from sources located in the State of Florida shall be submitted to the State agency, Florida Department of Environmental Protection, Division of Air Resources Management, 2600 Blair Stone Road, MS 5500, Tallahassee, Florida 32399-2400, rather than to EPA's Region 4 office.
(d) The requirements of sections 160 through 165 of the Clean Air Act are not met since the Florida plan, as submitted, does not apply to certain sources. Therefore, the provisions of §52.21 except paragraph (a)(1) are hereby incorporated by reference and made a part of the Florida plan for:
(1) Sources proposing to locate on Indian reservations in Florida; and
(2) Permits issued by EPA prior to approval of the Florida PSD rule.
[45 FR 52741, Aug. 7, 1980, as amended at 46 FR 17020, Mar. 17, 1981; 48 FR 52716, Nov. 22, 1983; 68 FR 11322, Mar. 10, 2003; 68 FR 74488, Dec. 24, 2003; 72 FR 29276, May 25, 2007; 73 FR 36442, June 27, 2008; 74 FR 55143, Oct. 27, 2009; 79 FR 28612, May 19, 2014]
§52.532 [Reserved]
§52.533 Source surveillance.
The plan lacks test methods for several source categories. As required by §52.12(c)(1) of this part, EPA test methods (found at 40 CFR part 60) will be used by EPA to determine compliance with the following emission limiting standards:
(a) Particulate emissions from citrus plants controlled by a scrubber and subject to the process weight table (submitted as 17-2.05(2) and reformatted as 17-2.610(1)1.a).
(b) TRS emissions from recovery furnaces at kraft pulp mills (submitted as 17-2.05(6)D and reformatted as 17-2.600(4)1).
(c) Sulfur dioxide emissions from fossil fuel steam sources (submitted as 17-2.05(6)E and reformatted as 17-2.600 (5) and (6)).
(d) Emissions from portland cement plants (submitted as 17-2.05(6)F and reformatted as 17-2.600(7)).
(e) Particulate and visible emissions from carbonaceous fuel burning equipment (submitted as 17-2.05(6)I and reformatted as 17-2.600(10)).
[47 FR 32116, July 26, 1982]
§52.534 Visibility protection.
(a) The requirements of section 169A of the Clean Air Act are not met because the plan does not include approvable procedures meeting the requirements of 40 CFR 51.305 and 51.307 for protection of visibility in mandatory Class I Federal areas.
(b) Regulations for visibility new source review. The provisions of §52.28 are hereby incorporated and made part of the applicable plan for the State of Florida.
[51 FR 5505, Feb. 13, 1986]
§52.536 Original identification of plan section.
(a) This section identified the original “Air Implementation Plan for the State of Florida” and all revisions submitted by Florida that were federally approved prior to July 1, 1998. The information in this section is available in the 40 CFR, part 52 edition revised as of July 1, 1999, the 40 CFR, part 52, Volume 1 of 2 (§§52.01 to 52.1018) editions revised as of July 1, 2000 through July 1, 2011, and the 40 CFR, part 52, Volume 1 of 3 (§§52.01 to 52.1018) editions revised as of July 1, 2012.
(b)-(c) [Reserved]
[79 FR 30050, May 27, 2014]
§52.540 Interstate pollutant transport provisions; What are the FIP requirements for decreases in emissions of nitrogen oxides?
(a) The owner and operator of each source and each unit located in the State of Florida and Indian country within the borders of the State and for which requirements are set forth under the CSAPR NOX Ozone Season Group 1 Trading Program in subpart BBBBB of part 97 of this chapter must comply with such requirements with regard to emissions occurring in 2015 and 2016.
(b) [Reserved]
[76 FR 48362, Aug. 8, 2011, as amended at 81 FR 74594, Oct. 26, 2016]
['Air Programs']
['Air Quality']
UPGRADE TO CONTINUE READING
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2026 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.