['Water Programs']
['Water Quality']
02/24/2022
...
Except as provided in 40 CFR 125.30 through 125.32, any point source subject to this subpart must achieve, at a minimum, the following effluent limitations representing the degree of effluent reduction attainable by application of the best available technology economically achievable (BAT).
(a)-(b) [Reserved]
(c) Erosion and sediment controls. The limitations are described at �450.21(a).
(d) Soil stabilization. The limitations are described at �450.21(b).
(e) Dewatering. The limitations are described at �450.21(c).
(f) Pollution prevention measures. The limitations are described at �450.21(d).
(g) Prohibited discharges. The limitations are described at �450.21(e).
(h) Surface outlets. The limitations are described at �450.21(f).
[74 FR 63057, Dec. 1, 2009, as amended at 75 FR 10439, Mar. 8, 2010; 75 FR 68217, Nov. 5, 2010; 80 FR 25236, May 4, 2015]
READ MORESHOW LESS
['Water Programs']
['Water Quality']
Load More
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2025 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.