['Water Programs']
['Water Quality']
06/19/2025
...
Pretreatment standards for integrated facilities shall be computed as required by §403.6(e) of EPA's General Pretreatment Regulations. In cases where electroplating process wastewaters are combined with regulated wastewaters which have 30 days average standards, the corresponding 30 day average standard for the electroplating wastewaters must be used. The 30 day average shall be determined for pollutants in the relevant subcategory from the corresponding daily and 4 day average values listed in the table below.
If the maximum for any 1 day is | And the 4 day average is | Then the 30 day average is |
---|---|---|
0.6 | 0.4 | 0.3 |
1.2 | .7 | .5 |
1.9 | 1 | .55 |
4.1 | 2.6 | 1.8 |
4.2 | 2.6 | 1.8 |
4.5 | 2.7 | 1.8 |
5.0 | 2.7 | 1.5 |
7.0 | 4 | 2.5 |
10.5 | 6.8 | 5 |
20.0 | 13.4 | 10 |
23 | 16 | 12 |
47 | 29 | 20 |
53 | 36 | 27 |
74 | 39 | 21 |
107 | 65 | 45 |
169 | 89 | 49 |
160 | 100 | 70 |
164 | 102 | 70 |
176 | 105 | 70 |
273 | 156 | 98 |
365 | 229 | 160 |
374 | 232 | 160 |
401 | 241 | 160 |
410 | 267 | 195 |
623 | 257 | 223 |
935 | 609 | 445 |
['Water Programs']
['Water Quality']
UPGRADE TO CONTINUE READING
Load More
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2025 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.