As required in §63.1457, you must comply with the requirements of the NESHAP General Provisions (subpart A of this part) shown in the following table:
Citation | Subject | Applies to this subpart | Explanation |
---|---|---|---|
§63.1 | Applicability | Yes | |
§63.2 | Definitions | Yes | |
§63.3 | Units and Abbreviations | Yes | |
§63.4 | Prohibited Activities | Yes | |
§63.5 | Construction and Reconstruction | Yes | |
§63.6(a) through (d), (e)(iii), and (f)(2) and (3), (g) | Compliance with Standards and Maintenance Requirements | Yes | |
§63.6(e)(1)(i) | Operation and Maintenance Requirements | Yes before November 12, 2024. No on or after November 12, 2024 | General duty requirements to minimize emissions at all times are contained in §63.1447(a). |
§63.6(e)(1)(ii) | Requirement to correct malfunctions as soon as practicable | Yes before November 12, 2024. No on or after November 12, 2024 | Malfunctions are no longer exempt. |
§63.6(e)(2) | Reserved | No | |
§63.6(e)(3) | Requirement to develop a startup, shutdown, and malfunction plan | Yes before November 12, 2024. No on or after November 12, 2024 | Startup, shutdown, and malfunction (SSM) plans are no longer necessary. |
§63.6(f)(1) | Compliance with nonopacity emission standards during periods of startup, shutdown, and malfunction | Yes before November 12, 2024. No on or after November 12, 2024 | Source category rules apply at all times. |
§63.6(h) | Determining compliance with Opacity and VE standards | No | This subpart specifies the requirements and test protocol used to determine compliance with the opacity limits. |
§63.6(i) and (j) | Extension of Compliance and Presidential Compliance Exemption | Yes | |
§63.7(a)(1) and (2) | Applicability and Performance Test Dates | No | This subpart specifies performance test applicability and dates. |
§63.7(a)(3), (b) through (d), (f) through (h) | Performance Testing Requirements | Yes | |
§63.7(e)(1) | Performance Testing | Yes before November 12, 2024. No on or after November 12, 2024 | See §§63.1450 and 63.1444. |
§63.8 except for (a)(4), (c)(1)(i) and (iii), (c)(4), (d)(3), and (f)(6) | Monitoring Requirements | Yes | |
§63.8(a)(4) | Additional Monitoring Requirements for Control devices in §63.11 | No | This subpart does not require flares. |
§63.8(c)(1)(i) and (iii) | Operation and Maintenance of and SSM plan for Continuous Monitoring Systems | Yes before November 12, 2024. No on or after November 12, 2024 | Cross references to the general duty and SSM plan requirements in those paragraphs are no longer necessary. |
§63.8(c)(4) | Continuous Monitoring System Requirements | No | This subpart specifies requirements for operation of CMS. |
§63.8(d)(3) | Quality Control Program | Yes before November 12, 2024. No on or after November 12, 2024 | See §63.1456(a)(4)(iii). |
§63.8(f)(6) | RATA Alternative | No | This subpart does not require continuous emission monitoring systems. |
§63.9 | Notification Requirements | Yes | |
§63.9(g)(5) | DATA reduction | No | This subpart specifies data reduction requirements. |
§63.10 except for (b)(2)(i), (ii), (iv), (v), and (xiii), (c)(7), (8), and (15), and (d)(5) | Recordkeeping and reporting Requirements | Yes | |
§63.10(b)(2)(i) | General Recordkeeping Requirements during Startup and Shutdown | Yes before November 12, 2024. No on or after November 12, 2024 | No longer necessary because recordkeeping and reporting applicable to normal operations will apply to startup and shutdown. |
§63.10(b)(2)(ii) | General Recordkeeping Requirements during Startup, Shutdown, and Malfunction and Failures to Meet Standards | Yes before November 12, 2024. No on or after November 12, 2024 | See §63.1456(a)(4)(iv) for recordkeeping requirements for a deviation from a standard. |
§63.10(b)(2)(iv) | Actions Taken to Minimize Emissions during Startup, Shutdown, and Malfunction | Yes before November 12, 2024. No on or after November 12, 2024 | See §63.1456 for the recordkeeping requirements of actions taken to minimize emissions and record corrective actions. |
§63.10(b)(2)(v) | Actions Taken to Minimize Emissions during Startup, Shutdown, and Malfunction | Yes before November 12, 2024. No on or after November 12, 2024 | Requirements to document that actions taken during SSM events are consistent with SSM plan are no longer required. |
§63.10(b)(2)(xiii) | CMS Records for RATA Alternative | No | This subpart does not require continuous emission monitoring systems. |
§63.10(c)(7)-(8) | Records of Excess Emissions and Parameter Monitoring Exceedances for CMS | No | This subpart specifies record keeping requirements. |
§63.10(c)(15) | Use of SSM Plan | Yes before November 12, 2024. No on or after November 12, 2024 | This provision would be eliminated because it referenced the source's SSM plan, which is no longer required. |
§63.10(d)(5) | SSM Reporting and Recordkeeping Requirements | Yes before November 12, 2024. No on or after November 12, 2024 | See §§63.1455(c)(4) and 63.1456. |
§63.11 | Control Device Requirements | No | This subpart does not require flares. |
§63.12 | State Authority and Delegations | Yes | |
§§63.13 through 63.16 | Addresses, Incorporation by Reference, Availability of Information, Performance Track Provisions | Yes |
[89 FR 41692, May 13, 2024]
READ MORESHOW LESS
['Air Programs']
['Hazardous Air Pollutants']
Load More
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2024 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.