['Air Programs']
['Hazardous Air Pollutants']
02/27/2022
...
Reference | Applies to subpart PPP | Explanation |
---|---|---|
63.1(a)(1) | Yes | §63.1423 specifies definitions in addition to or that supersede definitions in §63.2. |
63.1(a)(2) | Yes. | |
63.1(a)(3) | Yes | §63.1422(f) through (k) of this subpart and §63.160(b) identify those standards which overlap with the requirements of subparts PPP and H and specify how compliance shall be achieved. |
63.1(a)(4) | Yes | Subpart PPP (this table) specifies the applicability of each paragraph in subpart A to subpart PPP. |
63.1(a)(5) | No | Reserved. |
63.1(a)(6) | Yes. | |
63.1(a)(7)-(9) | No | Reserved. |
63.1(a)(10) | Yes. | |
63.1(a)(11) | Yes. | |
63.1(a)(12)-(14) | Yes. | |
63.1(b)(1) | No | §63.1420(a) contains specific applicability criteria. |
63.1(b)(2) | Yes. | |
63.1(b)(3) | Yes. | |
63.1(c)(1) | Yes | Subpart PPP (this table) specifies the applicability of each paragraph in subpart A to subpart PPP. |
63.1(c)(2) | No | Area sources are not subject to subpart PPP. |
63.1(c)(3) | No | Reserved. |
63.1(c)(4) | No | Reserved. |
63.1(c)(5) | Yes | Except that affected sources are not required to submit notifications overridden by this table. |
63.1(c)(6) | Yes | |
63.1(d) | No | Reserved. |
63.1(e) | Yes. | |
63.2 | Yes | §63.1423 specifies those subpart A definitions that apply to subpart PPP. |
63.3 | Yes. | |
63.4(a)(1)-(3) | Yes. | |
63.4(a)(4) | No | Reserved. |
63.4(a)(5) | Yes. | |
63.4(b) | Yes. | |
63.4(c) | Yes. | |
63.5(a)(1) | Yes | Except the terms “source” and “stationary source” should be interpreted as having the same meaning as “affected source.” |
63.5(a)(2) | Yes. | |
63.5(b)(1) | Yes | Except §63.1420(g) defines when construction or reconstruction is subject to new source standards. |
63.5(b)(2) | No | Reserved. |
63.5(b)(3) | Yes. | |
63.5(b)(4) | Yes | Except that the initial notification requirements in §63.1439(e)(3) shall apply instead of the requirements in §63.9(b). |
63.5(b)(5) | Yes. | |
63.5(b)(6) | Yes | Except that §63.1420(g) defines when construction or reconstruction is subject to the new source standards. |
63.5(c) | No | Reserved. |
63.5(d)(1)(i) | Yes. | |
63.5(d)(1)(ii) | Yes | Except that §63.5(d)(1)(ii)(H) does not apply. |
63.5(d)(1)(iii) | No | §63.1439(e)(5) and §63.1434(e) specify notification of compliance status requirements. |
63.5(d)(2) | No. | |
63.5(d)(3) | Yes | Except §63.5(d)(3)(ii) does not apply, and equipment leaks subject to §63.1434 are exempt. |
63.5(d)(4) | Yes. | |
63.5(e) | Yes. | |
63.5(f)(1) | Yes. | |
63.5(f)(2) | Yes | Except that where §63.9(b)(2) is referred to, the owner or operator need not comply. |
63.6(a) | Yes. | |
63.6(b)(1) | Yes. | |
63.6(b)(2) | Yes. | |
63.6(b)(3) | Yes. | |
63.6(b)(4) | Yes. | |
63.6(b)(5) | Yes. | |
63.6(b)(6) | No | Reserved. |
63.6(b)(7) | No. | |
63.6(c)(1) | Yes | §63.1422 specifies the compliance date. |
63.6(c)(2) | No. | |
63.6(c)(3) | No | Reserved. |
63.6(c)(4) | No | Reserved. |
63.6(c)(5) | Yes. | |
63.6(d) | No | Reserved. |
63.6(e) | Yes | Except as otherwise specified for individual paragraphs. |
§63.6(e)(1)(i) | No | See §63.1420(h)(4) for general duty requirement. |
§63.6(e)(1)(ii) | No. | |
63.6(e)(1)(iii) | Yes. | |
63.6(e)(2) | Yes. | |
§63.6(e)(3) | No. | |
§63.6(f)(1) | No. | |
63.6(f)(2) | Yes | Except 63.7(c), as referred to in §63.6(f)(2)(iii)(D) does not apply, and except that §63.6(f)(2)(ii) does not apply to equipment leaks subject to §63.1434. |
63.6(f)(3) | Yes. | |
63.6(g) | Yes. | |
63.6(h) | No | Subpart PPP does not require opacity and visible emission standards. |
63.6(i)(1) | Yes. | |
63.6(i)(2) | Yes. | |
63.6(i)(3) | Yes. | |
63.6(i)(4)(i)(A) | Yes. | |
63.6(i)(4)(i)(B) | No | Dates are specified in §63.1422(e) and §63.1439(e)(4)(i) for all emission points except equipment leaks, which are covered under §63.182(a)(6)(i). |
63.6(i)(4)(ii) | No. | |
63.6(i)(5)-(14) | Yes. | |
63.6(i)(15) | No | Reserved. |
63.6(i)(16) | Yes. | |
63.6(j) | Yes. | |
63.7(a)(1) | Yes. | |
63.7(a)(2) | No | §63.1439(e) (5) and (6) specify the submittal dates of performance test results for all emission points except equipment leaks; for equipment leaks, compliance demonstration results are reported in the Periodic Reports. |
63.7(a)(3) | Yes. | |
63.7(b) | No | §63.1437(a)(4) specifies notification requirements. |
63.7(c) | No | Except if the owner or operator chooses to submit an alternative nonopacity emission standard for approval under §63.6(g). |
63.7(d) | Yes. | |
63.7(e)(1) | No | See §63.1437(a). |
63.7(e)(2) | Yes. | |
63.7(e)(3) | No | Subpart PPP specifies requirements. |
63.7(e)(4) | Yes. | |
63.7(f) | Yes | Since a site-specific test plan is not required, the notification deadline in §63.7(f)(2)(i) shall be 60 days prior to the performance test, and in §63.7(f)(3) approval or disapproval of the alternative test method shall not be tied to the site-specific test plan. |
63.7(g) | Yes | Except the notification of compliance status report requirements in §63.1439(e)(5) shall apply instead of those in §63.9(h). In addition, equipment leaks subject to §63.1434 are not required to conduct performance tests. |
63.7(h) | Yes | Except §63.7(h)(4)(ii) is not applicable, since the site-specific test plans in §63.7(c)(2) are not required. |
63.8(a)(1) | Yes. | |
63.8(a)(2) | No. | |
63.8(a)(3) | No | Reserved. |
63.8(a)(4) | Yes. | |
63.8(b)(1) | Yes. | |
63.8(b)(2) | No | Subpart PPP specifies locations to conduct monitoring. |
63.8(b)(3) | Yes. | |
63.8(c)(1) | Yes. | |
63.8(c)(1)(i) | No. | |
63.8(c)(1)(ii) | No. | |
63.8(c)(1)(iii) | No. | |
63.8(c)(2) | Yes. | |
63.8(c)(3) | Yes. | |
63.8(c)(4) | No | §63.1438 specifies monitoring requirements; not applicable to equipment leaks, because §63.1434 does not require continuous monitoring systems. |
63.8(c)(5)-(8) | No. | |
63.8(d) | No. | |
63.8(e) | No. | |
63.8(f)(1)-(3) | Yes. | |
63.8(f)(4)(i) | Yes | Except the timeframe for submitting request is specified in §63.1439(f) or (g); not applicable to equipment leaks, because §63.1434 (through subpart H of this part) specifies acceptable alternative methods. |
63.8(f)(4)(ii) | Yes. | |
63.8(f)(4)(iii) | Yes. | |
63.8(f)(5)(i) | Yes. | |
63.8(f)(5)(ii) | No. | |
63.8(f)(5)(iii) | Yes. | |
63.8(f)(6) | No | Subpart PPP does not require CEMs. |
63.8(g) | No | Data reduction procedures specified in §63.1439(d) and (h); not applicable to equipment leaks. |
63.9(a) | Yes. | |
63.9(b) | No | The initial notification requirements are specified in §63.1439(e)(3). |
63.9(c) | Yes. | |
63.9(d) | Yes. | |
63.9(e) | No | §63.1437(a)(4) specifies notification deadline. |
63.9(f) | No | Subpart PPP does not require opacity and visible emission standards. |
63.9(g) | No. | |
63.9(h) | No | §63.1439(e)(5) specifies notification of compliance status requirements. |
63.9(i) | Yes. | |
63.9(j) | Yes | For change in major source status only. |
63.9(k) | Yes | Only as specified in §63.9(j). |
63.10(a) | Yes. | |
63.10(b)(1) | No | §63.1439(a) specifies record retention requirements. |
63.10(b)(2) | No | Subpart PPP specifies recordkeeping requirements. |
63.10(b)(3) | Yes. | |
63.10(c) | No | §63.1439 specifies recordkeeping requirements. |
63.10(d)(1) | Yes. | |
63.10(d)(2) | No | §63.1439(e)(5) and (6) specify performance test reporting requirements; not applicable to equipment leaks. |
63.10(d)(3) | No | Subpart PPP does not require opacity and visible emission standards. |
63.10(d)(4) | Yes. | |
63.10(d)(5) | No | See §63.1439(b)(1)(ii) for malfunction reporting requirements. |
63.10(e) | No | §63.1439 specifies reporting requirements. |
63.10(f) | Yes. | |
63.11 | Yes. | |
63.12 | Yes | Except that the authority of §63.177 (for equipment leaks) will not be delegated to States. |
63.13-63.15 | Yes. |
[65 FR 26502, May 8, 2000, as amended at 71 FR 20461, Apr. 20, 2006; 79 FR 17381, Mar. 27, 2014; 85 FR 73900, Nov. 19, 2020]
['Air Programs']
['Hazardous Air Pollutants']
UPGRADE TO CONTINUE READING
Load More
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2025 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.