['Air Programs']
['Hazardous Air Pollutants']
12/23/2024
...
As required in §63.7850, you must comply with the requirements of the NESHAP General Provisions (40 CFR part 63, subpart A) shown in the following table:
Citation | Subject | Applies to Subpart FFFFF | Explanation |
---|---|---|---|
§63.1 | Applicability | Yes | |
§63.2 | Definitions | Yes | |
§63.3 | Units and Abbreviations | Yes | |
§63.4 | Prohibited Activities | Yes | |
§63.5 | Construction/Reconstruction | Yes | |
§63.6(a), (b), (c), (d), (e)(1)(iii), (f)(2)-(3), (g), (h)(2)(ii)-(h)(9) | Compliance with Standards and Maintenance Requirements | Yes | |
§63.6(e)(1)(i) | General Duty to Minimize Emissions | No, for new or reconstructed sources which commenced construction or reconstruction after August 16, 2019. For all other affected sources, Yes on or before January 11, 2021 and No thereafter | See §63.7810(d) for general duty requirement. |
§63.6(e)(1)(ii) | Requirement to Correct Malfunctions ASAP | No, for new or reconstructed sources which commenced construction or reconstruction after August 16, 2019. For all other affected sources, Yes, on or before January 11, 2021 and No thereafter | |
§63.6(e)(3) | SSM Plan Requirements | No, for new or reconstructed sources which commenced construction or reconstruction after August 16, 2019. For all other affected sources, Yes on or before January 11, 2021 and No thereafter | See §63.7810(c) |
§63.6(f)(1) | Compliance except during SSM | No | See §63.7810(a). |
§63.6(h)(1) | Compliance except during SSM | No | See §63.7810(a). |
§63.6(h)(2)(i) | Determining Compliance with Opacity and VE Standards | No | Subpart FFFFF specifies methods and procedures for determining compliance with opacity emission and operating limits. |
§63.6(i) | Extension of Compliance with Emission Standards | Yes | |
§63.6(j) | Exemption from Compliance with Emission Standards | Yes | |
§63.7(a)(1)-(2) | Applicability and Performance Test Dates | No | Subpart FFFFF and specifies performance test applicability and dates. |
§63.7(a)(3), (b)-(d), (e)(2)-(4), (f)-(h) | Performance Testing Requirements | Yes | |
§63.7(e)(1) | Performance Testing | No, for new or reconstructed sources which commenced construction or reconstruction after August 16, 2019. For all other affected sources, Yes on or before January 11, 2021 and No thereafter | See §§63.7822(a), 63.7823(a), and 63.7825(a). |
§63.8(a)(1)-(3), (b), (c)(1)(ii), (c)(2)-(3), (c)(4)(i)-(ii), (c)(5)-(6), (c)(7)-(8), (d)(1)-(2), (e), (f)(1)-(5), (g)(1)-(4) | Monitoring Requirements | Yes | CMS requirements in §63.8(c)(4)(i)-(ii), (c)(5)-(6), (d)(1)-(2), and (e) apply only to COMS. |
§63.8(a)(4) | Additional Monitoring Requirements for Control Devices in §63.11 | No | Subpart FFFFF does not require flares. |
§63.8(c)(1)(i) | General Duty to Minimize Emissions and CMS Operation | No, for new or reconstructed sources which commenced construction or reconstruction after August 16, 2019. For all other affected sources, Yes on or before January 11, 2021 and No thereafter | |
§63.8(c)(1)(iii) | Requirement to Develop SSM Plan for CMS | No, for new or reconstructed sources which commenced construction or reconstruction after August 16, 2019. For all other affected sources, Yes on or before January 11, 2021 and No thereafter | |
§63.8(c)(4) | Continuous Monitoring System Requirements | No | Subpart FFFFF specifies requirements for operation of CMS. |
§63.8(d)(3) | Written procedures for CMS | No, for new or reconstructed sources which commenced construction or reconstruction after August 16, 2019. For all other affected sources, Yes on or before January 11, 2021 and No thereafter | See §63.7842(b)(3). |
§63.8(f)(6) | RATA Alternative | No | |
§63.8(g)(5) | Data Reduction | No | Subpart FFFFF specifies data reduction requirements. |
§63.9 | Notification Requirements | Yes | Additional notifications for CMS in §63.9(g) apply only to COMS. |
§63.10(a), (b)(1), (b)(2)(x), (b)(2)(xiv), (b)(3), (c)(1)-(6), (c)(9)-(14), (d)(1)-(4), (e)(1)-(2), (e)(4), (f) | Recordkeeping and Reporting Requirements | Yes | Additional records for CMS in §63.10(c)(1)-(6), (9)-(14), and reports in §63.10(d)(1)-(2) apply only to COMS. |
§63.10(b)(2)(i) | Recordkeeping of Occurrence and Duration of Startups and Shutdowns | No, for new or reconstructed sources which commenced construction or reconstruction after August 16, 2019. For all other affected sources, Yes on or before January 11, 2021 and No thereafter | |
§63.10(b)(2)(ii) | Recordkeeping of Failures to Meet a Standard | No, for new or reconstructed sources which commenced construction or reconstruction after August 16, 2019. For all other affected sources, Yes on or before January 11, 2021 and No thereafter | See §63.7842(a)(2)-(4) for recordkeeping of (1) date, time, and duration of failure to meet the standard; (2) listing of affected source or equipment, and an estimate of the quantity of each regulated pollutant emitted over the standard; and (3) actions to minimize emissions and correct the failure. |
§63.10(b)(2)(iii) | Maintenance Records | Yes | |
§63.10(b)(2)(iv) | Actions Taken to Minimize Emissions During SSM | No, for new or reconstructed sources which commenced construction or reconstruction after August 16, 2019. For all other affected sources, Yes on or before January 11, 2021 and No thereafter | See §63.7842(a)(4) for records of actions taken to minimize emissions. |
§63.10(b)(2)(v) | Actions Taken to Minimize Emissions During SSM | No, for new or reconstructed sources which commenced construction or reconstruction after August 16, 2019. For all other affected sources, Yes on or before January 11, 2021 and No thereafter | See §63.7842(a)(4) for records of actions taken to minimize emissions. |
§63.10(b)(2)(vi) | Recordkeeping for CMS Malfunctions | Yes | |
§63.10(b)(2)(vii)-(ix) | Other CMS Requirements | Yes | |
§63.10(b)(2)(xiii) | CMS Records for RATA Alternative | No | |
§63.10(c)(7)-(8) | Records of Excess Emissions and Parameter Monitoring Exceedances for CMS | No | Subpart FFFFF specifies record requirements; see §63.7842. |
§63.10(c)(15) | Use of SSM Plan | No, for new or reconstructed sources which commenced construction or reconstruction after August 16, 2019. For all other affected sources, Yes on or before January 11, 2021 and No thereafter | |
§63.10(d)(5)(i) | Periodic SSM Reports | No, for new or reconstructed sources which commenced construction or reconstruction after August 16, 2019. For all other affected sources, Yes on or before January 11, 2021 and No thereafter | See §63.7841(b)(4) for malfunction reporting requirements. |
§63.10(d)(5)(ii) | Immediate SSM Reports | No, for new or reconstructed sources which commenced construction or reconstruction after August 16, 2019. For all other affected sources, Yes on or before January 11, 2021 and No thereafter | |
§63.10(e)(3) | Excess Emission Reports | No | Subpart FFFFF specifies reporting requirements; see §63.7841. |
§63.11 | Control Device Requirements | No | Subpart FFFFF does not require flares. |
§63.12 | State Authority and Delegations | Yes | |
§63.13-§63.16 | Addresses, Incorporations by Reference, Availability of Information and Confidentiality, Performance Track Provisions | Yes |
[68 FR 27663, May 20, 2003, as amended at 71 FR 39591, July 13, 2006; 85 FR 42128, July 13, 2020; 89 FR 23329, April 3, 2024]
READ MORESHOW LESS
['Air Programs']
['Hazardous Air Pollutants']
Load More
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2024 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.