['Air Programs']
['Hazardous Air Pollutants']
04/15/2024
...
As specified in §63.2540, the parts of the General Provisions that apply to you are shown in the following table:
Citation | Subject | Explanation |
---|---|---|
§63.1 | Applicability | Yes. |
§63.2 | Definitions | Yes. |
§63.3 | Units and Abbreviations | Yes. |
§63.4 | Prohibited Activities | Yes. |
§63.5 | Construction/Reconstruction | Yes. |
§63.6(a) | Applicability | Yes. |
§63.6(b)(1)-(4) | Compliance Dates for New and Reconstructed sources | Yes. |
§63.6(b)(5) | Notification | Yes. |
§63.6(b)(6) | [Reserved] | |
§63.6(b)(7) | Compliance Dates for New and Reconstructed Area Sources That Become Major | Yes. |
§63.6(c)(1)-(2) | Compliance Dates for Existing Sources | Yes. |
§63.6(c)(3)-(4) | [Reserved] | |
§63.6(c)(5) | Compliance Dates for Existing Area Sources That Become Major | Yes. |
§63.6(d) | [Reserved] | |
§63.6(e)(1)(i) | Operation & Maintenance | Yes, before August 12, 2023. No, beginning on and after August 12, 2023. See §63.2450(u) for general duty requirement. |
§63.6(e)(1)(ii) | Operation & Maintenance | Yes, before August 12, 2023. No, beginning on and after August 12, 2023. |
§63.6(e)(1)(iii) | Operation & Maintenance | Yes. |
§63.6(e)(2) | [Reserved] | |
§63.6(e)(3)(i), (iii), and (v) through (viii) | Startup, Shutdown, Malfunction Plan (SSMP) | Yes, before August 12, 2023, except information regarding Group 2 emission points and equipment leaks is not required in the SSMP, as specified in §63.2525(j). No, beginning on and after August 12, 2023. |
§63.6(e)(3)(iii) and (iv) | Recordkeeping and Reporting During SSM | No, see §63.2525 for recordkeeping requirements and §63.2520(e)(4) for reporting requirements. |
§63.6(e)(3)(ix) | SSMP incorporation into title V permit | Yes, before August 12, 2023. No beginning on and after August 12, 2023. |
§63.6(f)(1) | Compliance With Non-Opacity Standards Except During SSM | No. See §63.2445(g) through (i). |
§63.6(f)(2)-(3) | Methods for Determining Compliance | Yes. |
§63.6(g)(1)-(3) | Alternative Standard | Yes. |
§63.6(h)(1) | Compliance with Opacity Standards Except During SSM | No. See §63.2445(g) through (i). |
§63.6(h)(2)-(9) | Opacity/Visible Emission (VE) Standards | Only for flares for which Method 22 of 40 CFR part 60, appendix A-7, observations are required as part of a flare compliance assessment. |
§63.6(i)(1)-(14), and (16) | Compliance Extension | Yes. |
§63.6(j) | Presidential Compliance Exemption | Yes. |
§63.7(a)(1)-(2) | Performance Test Dates | Yes, except substitute 150 days for 180 days. |
§63.7(a)(3) | Section 114 Authority | Yes, and this paragraph also applies to flare compliance assessments as specified under §63.997(b)(2). |
§63.7(a)(4) | Force Majeure | Yes. |
§63.7(b)(1) | Notification of Performance Test | Yes. |
§63.7(b)(2) | Notification of Rescheduling | Yes. |
§63.7(c) | Quality Assurance/Test Plan | Yes, except the test plan must be submitted with the notification of the performance test if the control device controls batch process vents. |
§63.7(d) | Testing Facilities | Yes. |
§63.7(e)(1) | Conditions for Conducting Performance Tests | Yes, before August 12, 2023 except that performance tests for batch process vents must be conducted under worst-case conditions as specified in §63.2460. No, beginning on and after August 12, 2023. See §63.2450(g)(6). |
§63.7(e)(2) | Conditions for Conducting Performance Tests | Yes. |
§63.7(e)(3) | Test Run Duration | Yes. |
§63.7(e)(4) | Administrator's Authority to Require Testing | Yes. |
§63.7(f) | Alternative Test Method | Yes. |
§63.7(g) | Performance Test Data Analysis | Yes, except this subpart specifies how and when the performance test and performance evaluation results are reported. |
§63.7(h) | Waiver of Tests | Yes. |
§63.8(a)(1) | Applicability of Monitoring Requirements | Yes. |
§63.8(a)(2) | Performance Specifications | Yes. |
§63.8(a)(3) | [Reserved] | |
§63.8(a)(4) | Monitoring with Flares | Yes, except for flares subject to §63.2450(e)(5). |
§63.8(b)(1) | Monitoring | Yes. |
§63.8(b)(2)-(3) | Multiple Effluents and Multiple Monitoring Systems | Yes. |
§63.8(c)(1) | Monitoring System Operation and Maintenance | Yes. |
§63.8(c)(1)(i) | Routine and Predictable SSM | Yes, before August 12, 2023. No, beginning on and after August 12, 2023. |
§63.8(c)(1)(ii) | CMS malfunction not in SSM plan | Yes. |
§63.8(c)(1)(iii) | Compliance with Operation and Maintenance Requirements | Yes, before August 12, 2023. No, beginning on and after August 12, 2023. |
§63.8(c)(2)-(3) | Monitoring System Installation | Yes. |
§63.8(c)(4) | CMS Requirements | Only for CEMS. Requirements for CPMS are specified in referenced subparts G and SS of this part. Requirements for COMS do not apply because this subpart does not require continuous opacity monitoring systems (COMS). |
§63.8(c)(4)(i) | COMS Measurement and Recording Frequency | No; this subpart does not require COMS. |
§63.8(c)(4)(ii) | CEMS Measurement and Recording Frequency | Yes. |
§63.8(c)(5) | COMS Minimum Procedures | No. This subpart does not contain opacity or VE limits. |
§63.8(c)(6) | CMS Requirements | Only for CEMS; requirements for CPMS are specified in referenced subparts G and SS of this part. Requirements for COMS do not apply because this subpart does not require COMS. |
§63.8(c)(7)-(8) | CMS Requirements | Only for CEMS. Requirements for CPMS are specified in referenced subparts G and SS of this part. Requirements for COMS do not apply because this subpart does not require COMS. |
§63.8(d)(1) | CMS Quality Control | Only for CEMS. |
§63.8(d)(2) | CMS Quality Control | Only for CEMS. |
§63.8(d)(3) | CMS Quality Control | Yes, only for CEMS before August 12, 2023. No, beginning on and after August 12, 2023. See §63.2450(j)(6). |
§63.8(e) | CMS Performance Evaluation | Only for CEMS, except this subpart specifies how and when the performance evaluation results are reported. Section 63.8(e)(5)(ii) does not apply because this subpart does not require COMS. |
§63.8(f)(1)-(5) | Alternative Monitoring Method | Yes, except you may also request approval using the precompliance report. |
§63.8(f)(6) | Alternative to Relative Accuracy Test | Only applicable when using CEMS to demonstrate compliance, including the alternative standard in §63.2505. |
§63.8(g)(1)-(4) | Data Reduction | Only when using CEMS, including for the alternative standard in §63.2505, except that the requirements for COMS do not apply because this subpart has no opacity or VE limits, and §63.8(g)(2) does not apply because data reduction requirements for CEMS are specified in §63.2450(j). |
§63.8(g)(5) | Data Reduction | No. Requirements for CEMS are specified in §63.2450(j). Requirements for CPMS are specified in referenced subparts G and SS of this part. |
§63.9(a) | Notification Requirements | Yes. |
§63.9(b)(1)-(5) | Initial Notifications | Yes. |
§63.9(c) | Request for Compliance Extension | Yes. |
§63.9(d) | Notification of Special Compliance Requirements for New Source | Yes. |
§63.9(e) | Notification of Performance Test | Yes. |
§63.9(f) | Notification of VE/Opacity Test | No. |
§63.9(g) | Additional Notifications When Using CMS | Only for CEMS. Section 63.9(g)(2) does not apply because this subpart does not require COMS. |
63.9(h)(1)-(6) | Notification of Compliance Status | Yes, except §63.9(h)(2)(i)(A) through (G) and (h)(2)(ii) do not apply because §63.2520(d) specifies the required contents and due date of the notification of compliance status report. |
§63.9(i) | Adjustment of Submittal Deadlines | Yes. |
§63.9(j) | Change in previous information | Yes, for change in major source status, otherwise §63.2520(e) specifies reporting requirements for process changes. |
§63.9(k) | Electronic reporting procedures | Yes. [Change Notice] [Previous Text] |
§63.10(a) | Recordkeeping/Reporting | Yes. |
§63.10(b)(1) | Recordkeeping/Reporting | Yes. |
§63.10(b)(2)(i) | Records related to startup and shutdown | No, see §§63.2450(e) and 63.2525 for recordkeeping requirements. |
§63.10(b)(2)(ii) | Recordkeeping relevant to SSM periods and CMS | Yes, before August 12, 2023. No, beginning on and after August 12, 2023. See §63.2525(h) and (l). |
§63.10(b)(2)(iii) | Records related to maintenance of air pollution control equipment | Yes. |
§63.10(b)(2)(iv) and (v) | Recordkeeping relevant to SSM period | Yes, before August 12, 2023. No, beginning on and after August 12, 2023. |
§63.10(b)(2)(vi) | CMS Records | Before August 12, 2023, yes but only for CEMS; requirements for CPMS are specified in referenced subparts G and SS of this part. Beginning on and after August 12, 2023, yes for CEMS and CPMS for flares subject to §63.2450(e)(5). |
§63.10(b)(2)(x) and (xi) | CMS Records | Only for CEMS; requirements for CPMS are specified in referenced subparts G and SS of this part. |
§63.10(b)(2)(vii)-(ix) | Records | Yes. |
§63.10(b)(2)(xii) | Records | Yes. |
§63.10(b)(2)(xiii) | Records | Only for CEMS. |
§63.10(b)(2)(xiv) | Records | Yes. |
§63.10(b)(3) | Records | Yes. |
§63.10(c)(1)-(6),(9)-(14) | Records | Only for CEMS. Recordkeeping requirements for CPMS are specified in referenced subparts G and SS of this part. |
§63.10(c)(7)-(8) | Records | No. Recordkeeping requirements are specified in §63.2525. |
§63.10(c)(15) | Records | Yes, before August 12, 2023, but only for CEMS. No, beginning on and after August 12, 2023. |
§63.10(d)(1) | General Reporting Requirements | Yes. |
§63.10(d)(2) | Report of Performance Test Results | Yes, before October 13, 2020. No, beginning on and after October 13, 2020. |
§63.10(d)(3) | Reporting Opacity or VE Observations | No. |
§63.10(d)(4) | Progress Reports | Yes. |
§63.10(d)(5)(i) | Periodic Startup, Shutdown, and Malfunction Reports | No, §63.2520(e)(4) and (5) specify the SSM reporting requirements. |
§63.10(d)(5)(ii) | Immediate SSM Reports | No. |
§63.10(e)(1) | Additional CEMS Reports | Yes. |
§63.10(e)(2)(i) | Additional CMS Reports | Only for CEMS, except this subpart specifies how and when the performance evaluation results are reported. |
§63.10(e)(2)(ii) | Additional COMS Reports | No. This subpart does not require COMS. |
§63.10(e)(3) | Reports | No. Reporting requirements are specified in §63.2520. |
§63.10(e)(3)(i)-(iii) | Reports | No. Reporting requirements are specified in §63.2520. |
§63.10(e)(3)(iv)-(v) | Excess Emissions Reports | No. Reporting requirements are specified in §63.2520. |
§63.10(e)(3)(iv)-(v) | Excess Emissions Reports | No. Reporting requirements are specified in §63.2520. |
§63.10(e)(3)(vi)-(viii) | Excess Emissions Report and Summary Report | No. Reporting requirements are specified in §63.2520. |
§63.10(e)(4) | Reporting COMS data | No. |
§63.10(f) | Waiver for Recordkeeping/Reporting | Yes. |
§63.11 | Control device requirements for flares and work practice requirements for equipment leaks | Yes, except for flares subject to §63.2450(e)(5). |
§63.12 | Delegation | Yes. |
§63.13 | Addresses | Yes. |
§63.14 | Incorporation by Reference | Yes. |
§63.15 | Availability of Information | Yes. |
[68 FR 63888, Nov. 10, 2003, as amended at 70 FR 38561, July 1, 2005; 71 FR 20463, Apr. 20, 2006; 71 FR 40341, July 14, 2006; 73 FR 72816, Dec. 22, 2008; 85 FR 49164, Aug. 12, 2020; 85 FR 73903, Nov. 19, 2020]
READ MORESHOW LESS
['Air Programs']
['Hazardous Air Pollutants']
Load More
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2024 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.