['Air Programs']
['Mobile Emission Sources']
12/12/2024
...
Batch size | Code letter |
---|---|
4 to 8 | A. |
9 to 15 | B. |
16 to 25 | C. |
26 and larger | D. |
Sample size code letter | Test sample | Test sample size | Cumulative test sample size | Batch inspection criteria | |
---|---|---|---|---|---|
Acceptance No. | Rejection No. | ||||
A | 1st | 4 | 4 | 0 | 1 |
B | 1st | 3 | 3 | 0 | 1 |
C | 1st | 3 | 3 | 0 | 2 |
2d | 3 | 6 | 1 | 2 | |
D | 1st | 2 | 2 | ( 1) | 2 |
2d | 2 | 4 | ( 1) | 2 | |
3d | 2 | 6 | 0 | 2 | |
4th | 2 | 8 | 0 | 3 | |
5th | 2 | 10 | 1 | 3 | |
6th | 2 | 12 | 1 | 3 | |
7th | 2 | 14 | 2 | 3 | |
1 Batch acceptance not permitted at this sample size. |
Sample size code letter | Number of batches | Cumulative number of batches | Sequence inspection criteria | |
---|---|---|---|---|
Acceptance No. | Rejection No. | |||
A | 2 | 2 | 1 | ( 2) |
2 | 4 | 2 | 4 | |
2 | 6 | 3 | 5 | |
2 | 8 | 4 | 5 | |
B | 2 | 2 | 0 | ( 2) |
2 | 4 | 1 | 4 | |
2 | 6 | 2 | 5 | |
2 | 8 | 3 | 5 | |
2 | 10 | 4 | 6 | |
2 | 12 | 5 | 6 | |
C | 2 | 2 | ( 1) | 2 |
2 | 4 | 0 | 2 | |
2 | 6 | 0 | 3 | |
2 | 8 | 1 | 3 | |
2 | 10 | 2 | 4 | |
2 | 12 | 3 | 4 | |
D | 2 | 2 | 0 | 2 |
2 | 4 | 1 | 3 | |
2 | 6 | 2 | 4 | |
2 | 8 | 3 | 4 | |
1 Batch sequence acceptance not permitted for this number of batches. 2 Batch sequence rejection not permitted for this number of batches. |
Test Report Number: | Manufacturer: | ||
VEHICLE: | |||
Trade Name: | VIN: | ||
Model Year: | Other Reference No: | ||
Configuration Identification: | Category Identification: | ||
Test Site Identification and Location: | |||
INSTRUMENTATION: | |||
Microphone Manufacturer: | Model No: | Serial No: | |
Sound Level Manufacturer: | Model No: | Serial No: | |
Calibrator Manufacturer: | Model No: | Serial No: | |
Other and Manufacturer: | Model No: | Serial No: | |
TEST DATA: | |||
Approach Gear: | Date of Test: | ||
Approach RPM: | Temp: | Wind: | |
Acceleration Test: | |||
Deceleration Test: |
Run No. | ||||||
---|---|---|---|---|---|---|
1 | 2 | 3 | 4 | 5 | ||
dBA | Left | |||||
Right | ||||||
Highest RPM attained in End Zone | ||||||
Calculated Sound Pressure | dBA | |||||
Deceleration Test with Exhaust Brake Applied | ||||||
dBA | Left | |||||
Right | ||||||
Calculated Sound Pressure | dBA | |||||
TEST Personnel: | ||||||
(Name) | ||||||
Recorded By: | Date:......... | |||||
(Signature) | ||||||
Supervisor: | Title:......... | |||||
(Signature) |
[41 FR 15544, Apr. 13, 1976, as amended at 42 FR 61460, Dec. 5, 1977]
READ MORESHOW LESS
['Air Programs']
['Mobile Emission Sources']
Load More
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2024 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.