Compliance Just Got Easier: Stay ahead of regulatory changes with instant notifications on updates that matter.
['Enforcement - DOT']
['Compliance reviews - Motor Carrier']
10/09/2024
(a) Form. Each document must be typewritten or legibly handwritten.
(b) Contents. Unless otherwise specified in this part, each document must contain a short, plain statement of the facts on which the person’s case rests and a brief statement of the action requested in the document. Except by prior order, all contents will be made publicly available.
(c) Length. Except for the Notice of Claim and reply, motions, briefs, and other filings may not exceed 20 pages except as permitted by Order following a motion to exceed the page limitation based upon good cause shown. Exhibits or attachments in support of the relevant filing are not included in the page limit.
(d) Paper and margins. Filed documents must be printed on 8 ½″ by 11″ paper with a one-inch margin on all four sides of text, to include pagination and footnotes.
(e) Spacing, and font size for typewritten documents. Typewritten documents will use the following line format: single-spacing for the caption and footnotes, and double-spacing for the main text. All printed matter must appear in at least 12-point font, including footnotes.
(f) Extensions of time. Only those requests showing good cause will be granted. No motion for continuance or postponement of a hearing date filed within 15 days of the date set for a hearing will be granted unless accompanied by an affidavit showing extraordinary circumstances warrant a continuance. Unless directed otherwise by the Agency decision maker before whom a matter is pending, the parties may stipulate to reasonable extensions of time by filing the stipulation in the official docket and serving copies on all parties on the certificate of service. Motions for extensions of time must be filed in accordance with §386.7 and served in accordance with §386.6. A copy must also be served upon the person presiding over the proceeding at the time of the filing.
[70 FR 28479, May 18, 2005; 77 FR 59826, Oct. 1, 2012]
['Enforcement - DOT']
['Compliance reviews - Motor Carrier']
UPGRADE TO CONTINUE READING
ezExplanations
Results Aided by AI
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2026 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.
