Compliance Just Got Easier: Stay ahead of regulatory changes with instant notifications on updates that matter.
['Waste']
['TSD Facilities', 'Hazardous Waste', 'Solid Waste']
11/08/2023
In addition to the waste analyses required by �265.13 , the owner or operator must sufficiently analyze any waste which he has not previously treated in his thermal process to enable him to establish steady state (normal) or other appropriate (for a non-continuous process) operating conditions (including waste and auxiliary fuel feed) and to determine the type of pollutants which might be emitted. At a minimum, the analysis must determine:
(a) Heating value of the waste;
(b) Halogen content and sulfur content in the waste; and
(c) Concentrations in the waste of lead and mercury, unless the owner or operator has written, documented data that show that the element is not present.
[Comment: As required by �265.73 , the owner or operator must place the results from each waste analysis, or the documented information, in the operating record of the facility.]
['Waste']
['TSD Facilities', 'Hazardous Waste', 'Solid Waste']
UPGRADE TO CONTINUE READING
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2026 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.
