['Air Programs', 'Waste']
['Solid Waste', 'Air Emissions', 'Waste Generators', 'TSD Facilities', 'Hazardous Waste']
11/08/2023
...
(a) An owner or operator subject to the requirements of §264.1057 may elect to have all valves within a hazardous waste management unit comply with an alternative standard that allows no greater than 2 percent of the valves to leak.
(b) The following requirements shall be met if an owner or operator decides to comply with the alternative standard of allowing 2 percent of valves to leak:
(1) A performance test as specified in paragraph (c) of this section shall be conducted initially upon designation, annually, and at other times requested by the Regional Administrator.
(2) If a valve leak is detected, it shall be repaired in accordance with §264.1057(d) and (e) .
(c) Performance tests shall be conducted in the following manner:
(1) All valves subject to the requirements in §264.1057 within the hazardous waste management unit shall be monitored within 1 week by the methods specified in §264.1063(b) .
(2) If an instrument reading of 10,000 ppm or greater is measured, a leak is detected.
(3) The leak percentage shall be determined by dividing the number of valves subject to the requirements in §264.1057 for which leaks are detected by the total number of valves subject to the requirements in §264.1057 within the hazardous waste management unit.
[71 FR 16907, Apr. 4, 2006]
READ MORESHOW LESS
['Air Programs', 'Waste']
['Solid Waste', 'Air Emissions', 'Waste Generators', 'TSD Facilities', 'Hazardous Waste']
Load More
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2024 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.