Compliance Just Got Easier: Stay ahead of regulatory changes with instant notifications on updates that matter.
['Waste']
['TSD Facilities', 'Hazardous Waste', 'Waste Generators', 'Drip Pads', 'Solid Waste']
11/08/2023
(a) During construction or installation, liners and cover systems ( e.g. , membranes, sheets, or coatings) must be inspected for uniformity, damage and imperfections ( e.g. , holes, cracks, thin spots, or foreign materials). Immediately after construction or installation, liners must be inspected and certified as meeting the requirements in �264.573 of this subpart by a qualified Professional Engineer. This certification must be maintained at the facility as part of the facility operating record. After installation, liners and covers must be inspected to ensure tight seams and joints and the absence of tears, punctures, or blisters.
(b) While a drip pad is in operation, it must be inspected weekly and after storms to detect evidence of any of the following:
(1) Deterioration, malfunctions or improper operation of run-on and run-off control systems;
(2) The presence of leakage in and proper functioning of leak detection system.
(3) Deterioration or cracking of the drip pad surface.
Note: See �264.573(m) for remedial action required if deterioration or leakage is detected.
[71 FR 16907, Apr. 4, 2006]
['Waste']
['TSD Facilities', 'Hazardous Waste', 'Waste Generators', 'Drip Pads', 'Solid Waste']
UPGRADE TO CONTINUE READING
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2026 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.
