['CERCLA, SARA, EPCRA', 'Waste']
['Hazardous Waste', 'Contingency Planning', 'Waste Generators', 'Solid Waste']
11/08/2023
...
(a) A large quantity generator must have a contingency plan for the facility. The contingency plan must be designed to minimize hazards to human health or the environment from fires, explosions, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents to air, soil, or surface water.
(b) The provisions of the plan must be carried out immediately whenever there is a fire, explosion, or release of hazardous waste or hazardous waste constituents which could threaten human health or the environment.
[81 FR 85824, Nov. 28, 2016]
READ MORESHOW LESS
['CERCLA, SARA, EPCRA', 'Waste']
['Hazardous Waste', 'Contingency Planning', 'Waste Generators', 'Solid Waste']
Load More
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2024 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.