Compliance Just Got Easier: Stay ahead of regulatory changes with instant notifications on updates that matter.
['Waste']
['Waste Identification', 'Solid Waste', 'Hazardous Waste']
11/25/2024
The requirements of this subpart apply to those areas of an entity managing hazardous secondary materials excluded under §261.4(a)(23) and/or (24) where hazardous secondary materials are generated or accumulated on site.
(a) A generator of hazardous secondary material, or an intermediate or reclamation facility, that accumulates 6000 kg or less of hazardous secondary material at any time must comply with §§1.410 and 261.411.
(b) A generator of hazardous secondary material, or an intermediate or reclamation facility that accumulates more than 6000 kg of hazardous secondary material at any time must comply with §§1.410 and 261.420.
[80 FR 1780, Jan. 13, 2015; 88 FR 54102, Aug. 9, 2023]
['Waste']
['Waste Identification', 'Solid Waste', 'Hazardous Waste']
UPGRADE TO CONTINUE READING
ezExplanations
Results Aided by AI
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2026 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.
