['General Packaging Requirements - Hazmat']
['General Packaging Requirements - Hazmat']
10/14/2024
...
A package of Class 7 (radioactive) material must be designed, constructed, and loaded so that —
(a) The heat generated within the package by the radioactive contents will not, during conditions normally incident to transport, affect the integrity of the package; and
(b) The temperature of the accessible external surfaces of the loaded package will not, assuming still air in the shade at an ambient temperature of 38°C (100°F), exceed either —
(1) 50°C (122°F) in other than an exclusive use shipment; or
(2) 85°C (185°F) in an exclusive use shipment.
READ MORESHOW LESS
['General Packaging Requirements - Hazmat']
['General Packaging Requirements - Hazmat']
Load More
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2024 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.