['Water Programs']
['Underground Injection Control', 'Water Quality', 'Safe Drinking Water']
05/09/2022
...
(a) In addition to the information listed in §146.14(a) of this chapter, the Director shall consider the following prior to issuing any Class I permit:
(1) Expected pressure changes, native fluid displacement, and direction of movement of the injected fluid; and
(2) Methods to be used for sampling, and for measurement and calculation of flow.
(b) In addition to the information listed in §146.14(b) of this chapter, the Director shall consider any information required under §146.14(a) of this chapter (as supplemented by this subpart) that has been gathered during construction.
READ MORESHOW LESS
['Water Programs']
['Underground Injection Control', 'Water Quality', 'Safe Drinking Water']
Load More
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2024 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.