Although spot inspections of equipment and procedures are useful, it is helpful to arrange schedules where most of the equipment will be operating and employees will be working. On the other hand, the inspection team should ensure their work can be carried out at a time and in a way that it does not interfere with production processes. Avoid particularly heavy workflow periods, unless the point of the inspection is to see if those time periods generate more hazards than at other times.