Compliance Just Got Easier: Stay ahead of regulatory changes with instant notifications on updates that matter.
['Electrical Safety', 'Specialized Industries']
['Electrical Safety', 'Electric Power Utilities']
10/11/2024
...
How does the standard treat maximum transient overvoltages?
No later than April 1, 2015, for voltages over 72.5 kilovolts, the employer must determine the maximum anticipated per-unit transient overvoltage, phase-to-ground, through an engineering analysis. Alternatively, the employer may assume a maximum anticipated per-unit transient overvoltage, phase-to-ground, in accordance with the following table:
| Voltage Range(kV) | Type of Current (ac or dc) | Assumed Maximum Per-Unit Transient Overvoltage |
|---|---|---|
| 72.6 to 420 | ac | 3.5 |
| 420.1 to 550.0 | ac | 3.0 |
| 550.1 to 800.0 | ac | 2.5 |
| 250 to 750 | dc | 1.8 |
['Electrical Safety', 'Specialized Industries']
['Electrical Safety', 'Electric Power Utilities']
UPGRADE TO CONTINUE READING
Load More
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2026 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.
