['General Packaging Requirements - Hazmat']
['Hazmat Package Testing']
03/22/2024
...
(a) Number of samples. One barrel is required for each different packaging.
(b) Method of testing. Remove all hoops above the bilge of an empty barrel at least two days old.
(c) Criteria for passing the test. A packaging passes the cooperage test only if the diameter of the cross-section of the upper part of the barrel does not increase by more than 10 percent.
READ MORESHOW LESS
['General Packaging Requirements - Hazmat']
['Hazmat Package Testing']
Load More
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2024 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.