['Hazmat: Water']
['Hazmat: Water']
06/23/2022
...
(a) All lines used in mooring the vessel must be of sufficient strength, type, and number for the size of the vessel and local conditions.
(b) While the vessel is moored or anchored in a port area, towing wires of adequate size and length must be properly secured to mooring bits at the bow and stern ready for immediate use with the towing eyes passed outboard and kept at about water level.
(c) The mooring arrangements must be such that the vessel can be released quickly in an emergency.
READ MORESHOW LESS
['Hazmat: Water']
['Hazmat: Water']
Load More
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2024 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.