['Air Programs']
['Air Quality']
05/05/2022
...
(a) Duty to apply. The CAIR designated representative of any CAIR SO2 source required to have a title V operating permit shall submit to the permitting authority a complete CAIR permit application under §96.222 for the source covering each CAIR SO2 unit at the source at least 18 months (or such lesser time provided by the permitting authority) before the later of January 1, 2010 or the date on which the CAIR SO2 unit commences commercial operation, except as provided in §96.283(a).
(b) Duty to Reapply. For a CAIR SO2 source required to have a title V operating permit, the CAIR designated representative shall submit a complete CAIR permit application under §96.222 for the source covering each CAIR SO2 unit at the source to renew the CAIR permit in accordance with the permitting authority's title V operating permits regulations addressing permit renewal, except as provided in §96.283(b).
[70 FR 25362, May 12, 2005, as amended at 71 FR 25388, Apr. 28, 2006]
READ MORESHOW LESS
['Air Programs']
['Air Quality']
Load More
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2024 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.