['Air Programs']
['Hazardous Air Pollutants']
09/11/2024
...
Reference | Description of report | Due Date |
---|---|---|
a There may be two versions of this report due at different times; one for equipment subject to §63.502 and one for other emission points subject to this subpart.
b There will be two versions of this report due at different times; one for equipment subject to §63.502 and one for other emission points subject to this subpart. c Note that the EPPU remains subject to this subpart until the notification under §63.480(f)(3)(i) is made. | ||
§63.506(b) and subpart A | Refer to §63.506(b), Table 1 of this subpart, and to subpart A | Refer to subpart A. |
§63.506(e)(3) | Precompliance Report a | 1. Existing affected sources: December 19, 2000. |
2. New affected sources: with the application for approval of construction or reconstruction. | ||
§63.506(e)(4) | Emissions Averaging Plan | September 19, 2000. |
§63.506(e)(4)(iv) | Updates to Emissions Averaging Plan | 120 days prior to making the change necessitating the update. |
§63.506(e)(5) | Notification of Compliance Status b | Within 150 days after the compliance date. |
§63.506(e)(6) | Periodic reports | Semiannually, no later than 60 days after the end of each 6-month period. See §63.506(e)(6)(i) for the due date for this report. |
§63.506(e)(6)(xi) | Quarterly for reports Emissions Averaging | No later than 60 days after the end of each quarter. First report is due with the Notification of Compliance Status. |
§63.506(e)(6)(xii) | Quarterly reports upon request of the Administrator | No later than 60 days after the end of each quarter. |
§63.506(e)(7)(vi) | Fenceline Monitoring Reports | Quarterly, no later than 45 calendar days following the end of each quarterly reporting period. See §63.182(e) of subpart H of this part for the due date for this report. |
§63.506(e)(7)(i) | Storage Vessels Notification of Inspection | At least 30 days prior to the refilling of each storage vessel or the inspection of each storage vessel. |
§63.506(e)(7)(ii) | Requests for Approval of a Nominal Control Efficiency for Use in Emissions Averaging | Initial submittal is due with the Emissions Averaging Plan; later submittals are made at the discretion of the owner or operator as specified in §63.506(e)(7)(ii)(B). |
§63.506(e)(7)(iii) | Notification of Change in the Primary Product | For notification under §63.480(f)(3)(ii) - notification submittal date at the discretion of the owner or operator. c |
For notification under §63.480(f)(4)(ii) - within 6 months of making the determination. |
[66 FR 36928, July 16, 2001; 89 FR 43067, May 16, 2024]
['Air Programs']
['Hazardous Air Pollutants']
Load More
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2024 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.