As stated in §63.11423(a)(2), you must comply with the emission limits in the following table:
For . . . | You must . . . |
---|---|
1. Each new or existing grid casting facility | Emit no more than 0.08 milligram of lead per dry standard cubic meter of exhaust (0.000035 gr/dscf). |
2. Each new or existing paste mixing facility | Emit no more than 0.1 milligram of lead per dry standard cubic meter of exhaust (0.0000437 gr/dscf); or emit no more than 0.9 gram of lead per hour (0.002 lbs/hr) total from all paste mixing operations. |
3. Each new or existing three-process operation facility | Emit no more than 1.0 milligram of lead per dry standard cubic meter of exhaust (0.000437 gr/dscf). |
4. Each new or existing lead oxide manufacturing facility | Emit no more than 5.0 milligram of lead per kilogram of lead feed (0.010 lb/ton). |
5. Each new or existing lead reclamation facility | Emit no more than 0.45 milligram of lead per dry standard cubic meter of exhaust (0.000197 gr/dscf). |
6. Each new or existing other lead-emitting operation | Emit no more than 1.0 milligram of lead per dry standard cubic meter of exhaust (0.000437 gr/dscf). |
[72 FR 38913, July 16, 2007, as amended at 73 FR 15929, Mar. 26, 2008; 88 FR 11596, Feb. 23, 2023]