Report | Due date | Contents | Reference |
---|---|---|---|
1 This table is only a summary, see the referenced sections of the rule for the complete requirements. | |||
Waste Management Plan | No later than the date specified in table 1 for submittal of the final control plan | Waste management plan | §60.2755. |
Initial Test Report | No later than 60 days following the initial performance test | Complete test report for the initial performance test The values for the site-specific operating limits Installation of bag leak detection systems for fabric filters | §60.2760. |
Annual report | No later than 12 months following the submission of the initial test report. Subsequent reports are to be submitted no more than 12 months following the previous report | Name and address Statement and signature by responsible official Date of report Values for the operating limits Highest recorded 3-hour average and the lowest 3-hour average, as applicable, (or 30-day average, if applicable) for each operating parameter recorded for the calendar year being reported If a performance test was conducted during the reporting period, the results of the test If a performance test was not conducted during the reporting period, a statement that the requirements of §60.2720(a) were met Documentation of periods when all qualified CISWI operators were unavailable for more than 8 hours but less than 2 weeks If you are conducting performance tests once every 3 years consistent with §60.2720(a), the date of the last 2 performance tests, a comparison of the emission level you achieved in the last 2 performance tests to the 75 percent emission limit threshold required in §60.2720(a) and a statement as to whether there have been any operational changes since the last performance test that could increase emissions Any malfunction, deviation, or continuous monitoring system out of control periods information as specified in §60.2770(k) through (o) Fuel input information for energy recovery unit subcategory verification as specified in §60.2770(p) | §§60.2765 and 60.2770. |
Emission limitation or operating limit deviation report | By August 1 of that year for data collected during the first half of the calendar year. By February 1 of the following year for data collected during the second half of the calendar year | Dates and times of deviation Averaged and recorded data for those dates Duration and causes of each deviation and the corrective actions taken Copy of operating limit monitoring data and any test reports Dates, times and causes for monitor downtime incidents | §60.2775 and 60.2780. |
Qualified Operator Deviation Notification | Within 10 days of deviation | Statement of cause of deviation Description of efforts to have an accessible qualified operator The date a qualified operator will be accessible | §60.2785(a)(1). |
Qualified Operator Deviation Status Report | Every 4 weeks following deviation | Description of efforts to have an accessible qualified operator The date a qualified operator will be accessible Request for approval to continue operation | §60.2785(a)(2). |
Qualified Operator Deviation Notification of Resumed Operation | Prior to resuming operation | Notification that you are resuming operation | §60.2785(b). |
['Air Programs']
['Air Quality']
Load More
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2024 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.