['Air Programs']
['Air Quality']
11/20/2023
...
On and after the date on which the initial performance test required by §60.8 is completed, no owner or operator subject to the provisions of this subpart shall discharge or cause the discharge into the atmosphere from any affected facility VOC emissions in excess of the limitations listed in paragraphs (a)(1) and (2) of this section. The emission limitations listed in paragraphs (a)(1) and (2) shall apply at all times, including periods of startup, shutdown and malfunction. As provided in §60.11(f), this provision supersedes the exemptions for periods of startup, shutdown and malfunction in the general provisions in subpart A of this part.
(a) Prime Coat Operation. (1) For each EDP prime coat operation:
(i) 0.17 kilogram of VOC per liter of applied coating solids when RT is 0.16 or greater.
(ii) 0.17 × 350 (0.160−RT) kg of VOC per liter of applied coating solids when RT is greater than or equal to 0.040 and less than 0.160.
(iii) When RT is less than 0.040, there is no emission limit.
(2) For each nonelectrodeposition prime coat operation: 0.17 kilogram of VOC per liter of applied coating solids.
(b) 1.40 kilograms of VOC per liter of applied coating solids from each guide coat operation.
(c) 1.47 kilograms of VOC per liter of applied coating solids from each topcoat operation.
[45 FR 85415, Dec. 24, 1980, as amended at 59 FR 51386, Oct. 11, 1994; 88 FR 30000, May 9, 2023]
READ MORESHOW LESS
['Air Programs']
['Air Quality']
Load More
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2024 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.